guia conector rj45

5
INSTALLATION INSTRUCTIONS PN375B  © Pandui t Corp. 2009 For Technical Support: www.panduit.com/resources/install_maint ain.asp TX6 PLUS  Shielded Modular Plug T568B & T568A Part Number: SPS688-C First thre ad on the Boot and Collar. Remov e 1.5" of the out er jacke t from the cabl e end usin g wire stripping tool (CJAST). Cut foi l flush to cab le jacke t end. If cab le is braid ed, form in to a drain wire. Bend the drain wire back so it is against the cable jacket. Fan twi sted pai rs into res pectiv e quadran ts. The br own pair should be opposite the orange pair. When a cab le spli ne (X-s haped fi ller) is p resent , cut spl ine flush to fanned pairs using wire snipping tool (CWST). 1 Thread on Boot and Collar first! (Cable ends 1 & 2) 90° CWST Specifications Cable jacket diameter . 225-.250 in. 24 A WG Stranded conductor maximum insulated diameter .040 in. PANDUIT  recommends T568B wiring scheme for use with cable constructed with the brown pair opposing the orange pair. For use with FTP, ScTP , SFTP and STP/ PIMF type cables. Cable must have drain wire or braid. Conductor holes and Contact slots Page 1 of 4 Strain Relief Boot Strain Relief Collar Divider Load Bar Plug Housing with Shield Load Bar 1 8 Divider Conductor slots and “V” channel The “V” channe l shoul d be align ed with t he gree n pair . Insert Div ider pos ts into the ca ble . If the cab le has an inte rnal spline, insert Divider posts into the brown and orange quadrants of the spline. 2 BLU GRN “V” channel BRN ORG GRN BLU BRN ORG (Cable end 2) (Cable end 1) “V” channel Arra nge condu ctors to T56 8B Wiring Sc heme whil e minimi zing untwist and smooth conductors. Seat co nduct ors into pr oper Div ider slots while hol ding Div ider near the end of the cable jacket. 3 “V” channel (Cable end 1) (Cable end 2) T568B Wiring Scheme T568B BRN 8 WHT 7 BRN/ 6 GRN WHT 5 BLU/ 4 BLU WHT 3 GRN/ 2 ORG WHT 1 ORG/ Pin # (Cable end 2) (Cable end 1) “V” channel Conductor holes Contact slots Divider post Pins

Transcript of guia conector rj45

Page 1: guia conector rj45

7/23/2019 guia conector rj45

http://slidepdf.com/reader/full/guia-conector-rj45 1/4

INSTALLATION INSTRUCTIONS PN375B © Panduit Corp. 2009

For Technical Support: www.panduit.com/resources/install_maintain.asp 

TX6 PLUS  Shielded Modular Plug

T568B & T568APart Number: SPS688-C

• First thread on the Boot and Collar.

• Remove 1.5" of the outer jacket from the cable end using wirestripping tool (CJAST).

• Cut foil flush to cable jacket end. If cable is braided, form into

a drain wire. Bend the drain wire back so it is against thecable jacket.

• Fan twisted pairs into respective quadrants. The brown pairshould be opposite the orange pair.

• When a cable spline (X-shaped filler) is present, cut splineflush to fanned pairs using wire snipping tool (CWST).

1 Thread on Bootand Collar first!(Cable ends 1 & 2)

90°

CWST

Specifications• Cable jacket diameter .225-.250 in.

• 24 AWG Stranded conductor maximum

insulated diameter .040 in.

• PANDUIT  recommends T568B wiring scheme fo

use with cable constructed with the brown pair

opposing the orange pair.

• For use with FTP, ScTP, SFTP and STP/PIMF

type cables. Cable must have drain wire or braid

Conductor holes and Contact slots

Page 1 of 4

Strain Relief Boot

Strain Relief Collar

Divider

Load Bar

Plug Housing with Shield

Load Bar

18

DividerConductor slots and “V” channel

• The “V” channel should be aligned with the green pair.

• Insert Divider posts into the cable. If the cable has an internalspline, insert Divider posts into the brown and orangequadrants of the spline.

2

BLU

GRN

“V” channel

BRN

ORG

GRN

BLU

BRN

ORG

(Cable end 2)

(Cable end 1)

“V” channel

• Arrange conductors to T568B Wiring Scheme while minimizinguntwist and smooth conductors.

• Seat conductors into proper Divider slots while holding Dividernear the end of the cable jacket.

3

“V” channel

(Cable end 1) (Cable end 2)

T568B Wiring Scheme

T568B BRN

8

WHT

7

BRN/ 

6

GRNWHT

5

BLU/ 

4

BLUWHT

3

GRN/ 

2

ORGWHT

1

ORG/ 

Pin #(Cable end 2)

(Cable end 1)

“V” channel

Conductor holes

Contact slotsDivider post

Pins

Page 2: guia conector rj45

7/23/2019 guia conector rj45

http://slidepdf.com/reader/full/guia-conector-rj45 2/4

INSTALLATION INSTRUCTIONS PN375B

For Technical Support: www.panduit.com/resources/install_maintain.asp 

• Guide conductors into Load Bar holes while holdingconductors in the Divider.

• Slide Load Bar towards Divider until flush.

• Ensure the Divider/Load Bar is centered and perpendicularto the cable axis.

• Trim conductors flush with Load Bar face.

6

(Cable end 1)

7

• Orient Load Bar with contact slots facing downward.

VerifyLoad Barorientation

5

(Cable end 1)

(Cable end 2)

1

8Pins

1

8Pins

• While holding conductors in respective Divider slots,straighten and align untwisted conductors using a circularmotion.

• Do not release grip of conductors until Load Bar is appliedin order to maintain conductor alignment.

• Trim conductors on an angle approximately 1.00" fromDivider leading edge.

4

1.00"

T568B BRN

8

WHT

7

BRN/ 

6

GRNWHT

5

BLU/ 

4

BLUWHT

3

GRN/ 

2

ORGWHT

1

ORG/ 

Pin #

(Cable end 1)

10 MPT5-8A9 • Grip and squeeze across Collar arms as sub-assembly isinserted into Plug Housing. (Fig. 9)

• Push sub-assembly into Housing until Collar locking tabs clearthe Plug Housing pocket. Although not required, TX6 PLUS  Plug Assembly Tool (CSPT) is available to facilitate this step.

• Use tool MPT5-8A to complete termination. (Fig. 10)

• Press any excess drain wire between the Collar Latches andthe cable jacket. Pull up Boots and engage with Collar. Latchesof the Collar should be engaged on the window slot of the boot.

• Assembly is complete. Visually check plug.

Drain Wire

(Cable end 2)

(Cable end 1)

Strain CollarGuides

Collar Latches

Boot positionwhen usingCSPTPins

Collar Barbs

1

8

Pins

1

8

Collar LockingTabs

• Orient cable so drain wire is facing up. While holding the LoadBar and Divider stationary, slide the Collar towards thetermination point until there is no gap between the Collar andDivider. Ensure the drain wire is routed through the StrainCollar Guides. Do not exert pressure onto the Divider, theCollar can push the Load Bar off the conductors.

• Confirm orientation of Collar. Cable jacket should extendbeyond Collar barbs.

• Align Pin #1 of cable sub-assembly (Cable, Load Bar, Divider,Collar with Boot) with Pin #1 of Plug Housing.

8

Page 2 of 4

Page 3: guia conector rj45

7/23/2019 guia conector rj45

http://slidepdf.com/reader/full/guia-conector-rj45 3/4

INSTALLATION INSTRUCTIONS PN375B

For Technical Support: www.panduit.com/resources/install_maintain.asp 

T568A Wiring Scheme

T568A BRN

8

WHT

7

BRN/ 

6

ORG WHT

5

BLU/ 

4

BLU WHT

3

ORG/ 

2

GRN WHT

1

GRN/ 

Pin #

• The “V” channel should be aligned with the orange pair.

• Insert Divider posts into the cable. If the cable has an internalspline, insert Divider posts into the brown and greenquadrants of the spline.

2

BLU

ORG

“V” channel

BRN

GRN

ORG

BLU

BRN

GRN

(Cable end 2)

(Cable end 1)

“V” channel

• Arrange conductors to T568A Wiring Scheme whileminimizing untwist and smooth conductors.

• Seat conductors into proper Divider slots while holdingDivider near the end of the cable jacket.

3

“V” channel

(Cable end 1) (Cable end 2)

Conductor holes and Contact slots

Load Bar DividerConductor slots and “V” channel

“V” channelDivider post

18

Conductor holes

Contact slots

Pins

Specifications

• Cable jacket diameter .225-.250 in.• 24 AWG Stranded conductor maximum

insulated diameter .040 in.

• PANDUIT  recommends T568A wiring scheme fo

use with cable constructed with the brown pair

opposing the green pair.

• For use with FTP, ScTP, SFTP and STP/PIMF

type cables. Cable must have drain wire or braid

Page 3 of 4

Strain Relief Boot

Strain Relief Collar

Divider

Load Bar

Plug Housing with Shield

(Cable end 2)

(Cable end 1)

• First thread on the Boot and Collar.

• Remove 1.5" of the outer jacket from the cable end using wirestripping tool (CJAST).

• Cut foil flush to cable jacket end. If cable is braided, form intoa drain wire. Bend the drain wire back so it is against thecable jacket.

• Fan twisted pairs into respective quadrants. The brown pairshould be opposite the green pair.

• When a cable spline (X-shaped filler) is present, cut splineflush to fanned pairs using wire snipping tool (CWST).

1 Thread on Bootand Collar first!(Cable ends 1 & 2)

90°

CWST

Page 4: guia conector rj45

7/23/2019 guia conector rj45

http://slidepdf.com/reader/full/guia-conector-rj45 4/4

E-mail:[email protected]

Fax: (708) 444-6993

For Instructions in Local Languagesand Technical Support:

www.panduit.com/resources/install_maintain.aspwww.panduit.com

INSTALLATION INSTRUCTIONS PN375B

4

1.00"T568A BRN

8

WHT

7

BRN/ 

6

ORGWHT

5

BLU/ 

4

BLUWHT

3

ORG/ 

2

GRNWHT

1

GRN/ 

Pin #

(Cable end 1)

• While holding conductors in respective Divider slots,straighten and align untwisted conductors using a circularmotion.

• Do not release grip of conductors until Load Bar is appliedin order to maintain conductor alignment.

• Trim conductors on an angle approximately 1.00” fromDivider leading edge.

5(Cable end 1)

(Cable end 2)

1

8Pins

VerifyLoad Barorientation

1

8Pins

• Orient Load Bar with contact slots facing downward.

6

(Cable end 1)

7 • Guide conductors into Load Bar holes while holdingconductors in the Divider.

• Slide Load Bar towards Divider until flush.

• Ensure the Divider/Load Bar is centered and perpendicularto the cable axis.

• Trim conductors flush with Load Bar face.

10MPT5-8A9 • Grip and squeeze across Collar arms as sub-assembly is

inserted into Plug Housing. (Fig. 9)

• Push sub-assembly into Housing until Collar locking tabs clearthe Plug Housing pocket. Although not required, TX6 PLUS  Plug Assembly Tool (CSPT) is available to facilitate this step.

• Use tool MPT5-8A to complete termination. (Fig. 10)

• Press any excess drain wire between the Collar Latches andthe cable jacket. Pull up Boots and engage with Collar. Latchesof the Collar should be engaged on the window slot of the boot.

• Assembly is complete. Visually check plug.

Drain Wire

(Cable end 2)

(Cable end 1)

Strain CollarGuides

Collar Latches

Boot positionwhen usingCSPTPins

Collar Barbs

1

8

Pins

1

8

Collar LockingTabs

• Orient cable so drain wire is facing up. While holding the Load

Bar and Divider stationary, slide the Collar towards thetermination point until there is no gap between the Collar andDivider. Ensure the drain wire is routed through the StrainCollar Guides. Do not exert pressure onto the Divider, theCollar can push the Load Bar off the conductors.

• Confirm orientation of Collar. Cable jacket should extendbeyond Collar barbs.

• Align Pin #1 of cable sub-assembly (Cable, Load Bar, Divider,Collar with Boot) with Pin #1 of Plug Housing.

8

Page 4 of 4