DESARENADOR
DATOS GENERALES DEL DESARENADOR CEMENTO F° 3/8 (Var)A = 3.40 e = 0.20 1.40 3.96 0.49 31.03 17B = 1.00 em = 0.12C = 1.00 ep = 0.20H = 1.20h = 1.00
EXCAVACIONVaso: 9.80 Incluir la pendiente del terreno
Piso: 0.92 Cimentacion: 0.77
CIMENTACIONA L H V K1 PIEDRA HORMIGON K2 CEMENTO0.20 12.00 0.320 0.77 0.48 0.29 6.00 1.73
MUROS(Incluye Tabique central)A L H V K1 PIEDRA HORMIGON ARENA FINA K2 CEMENTO0.20 12.00 1.100 2.83 0.00 0.00 2.83 7.00 19.81 CONCRETO0.035 11.20 1.100 0.43 0.00 0.00 0.43 8.00 3.45 TARRAJEO
0.00 2.83 0.43 23.26
TAPAA L H V K1 PIEDRA HORMIGON K2 CEMENTO1.40 1.40 0.150 0.29 0.00 0.00 0.29 6.00 1.76 CONCRETO1.40 1.40 0.030 0.06 0.00 0.00 0.06 7.00 0.41 TARRAJEO
0.00 0.29 0.06 2.18
PISOA L H V K1 PIEDRA HORMIGON K2 CEMENTO1.00 4.60 0.200 0.92 1.00 0.92 0.00 6.00 0.00 EMPEDRADO1.00 4.60 0.120 0.55 0.00 0.00 0.55 7.00 3.86 MEZCLA
0.92 0.55 0.00 3.86
ACERO 3/8A L K1 N LT K2 KG1.10 12.00 0.30 4.67 56.00 0.58 32.48 H
MUROS12.00 1.10 0.30 41.00 45.10 0.58 26.16 V4.80 1.20 0.30 17.00 20.40 0.58 11.83 H
PISO1.20 4.80 0.30 5.00 24.00 0.58 13.92 V1.00 1.00 1.30 1.77 1.77 0.58 1.03 H
TABIQUE1.00 1.05 2.30 1.43 1.51 0.58 0.87 V86.29
PIEDRA(M3) HORMIGON(M3) ARENA FINA(M3)
m3
m3 m3
e
e
B
e
ep
em
H
A
H
h
H>h
e eC