160
S I M B O L O G I A DC DESPALME EN CORTE DT DESPALME EN TERRAPLEN C CORTE T TERRAPLEN 0+000.000 983.450 979.830 31.93 7.48 0+020.000 983.440 979.778 65.05 17.12 1.00 10.00 969.80 969.80 245.98 245.98 0+040.000 983.360 979.726 64.61 14.63 1.00 10.00 1296.59 2266.39 317.54 563.52 0+060.000 983.270 979.674 64.28 13.90 1.00 10.00 1288.91 3555.31 285.32 848.84 0+080.000 983.240 979.622 64.61 14.54 1.00 10.00 1288.84 4844.15 284.40 1133.24 0+100.000 983.180 979.570 64.58 16.94 1.00 10.00 1291.86 6136.01 314.79 1448.03 0+120.000 983.140 979.518 64.76 16.58 1.00 10.00 1293.41 7429.42 335.18 1783.21 0+140.000 983.040 979.466 64.11 15.18 1.00 10.00 1288.74 8718.16 317.60 2100.81 0+160.000 983.020 979.414 64.34 16.83 1.00 10.00 1284.50 10002.66 320.09 2420.90 0+180.000 982.960 979.363 64.21 16.56 1.00 10.00 1285.46 11288.12 333.91 2754.81 0+200.000 982.870 979.311 63.70 14.01 1.00 10.00 1279.12 12567.25 305.70 3060.51 0+220.000 982.800 979.259 63.60 16.49 1.00 10.00 1273.06 13840.30 304.98 3365.49 0+240.000 982.780 979.207 64.16 15.64 1.00 10.00 1277.59 15117.89 321.30 3686.80 0+260.000 982.730 979.155 64.37 13.90 1.00 10.00 1285.27 16403.16 295.42 3982.22 0+280.000 982.690 979.103 64.54 14.35 1.00 10.00 1289.07 17692.23 282.46 4264.68 0+300.000 982.670 979.051 64.81 14.67 1.00 10.00 1293.43 18985.66 290.14 4554.81 0+320.000 982.620 978.999 65.00 15.38 1.00 10.00 1298.11 20283.76 300.45 4855.27 0+340.000 982.590 978.947 65.52 14.68 1.00 10.00 1305.18 21588.95 300.54 5155.81 0+360.000 982.540 978.895 65.45 14.76 1.00 10.00 1309.62 22898.57 294.34 5450.15 0+380.000 982.469 978.843 65.28 14.24 1.00 10.00 1307.29 24205.86 289.94 5740.09 0+400.000 982.380 978.791 65.10 12.96 1.00 10.00 1303.86 25509.72 271.95 6012.04 0+420.000 982.320 978.739 65.00 13.05 1.00 10.00 1301.07 26810.79 260.07 6272.10 0+440.000 982.300 978.687 65.47 12.99 1.00 10.00 1304.73 28115.52 260.44 6532.55 0+460.000 982.270 978.635 65.88 12.87 1.00 10.00 1313.49 29429.01 258.65 6791.19 0+480.000 982.210 978.583 65.87 12.79 1.00 10.00 1317.53 30746.55 256.59 7047.78 0+500.000 982.169 978.531 66.00 12.82 1.00 10.00 1318.69 32065.24 256.10 7303.88 0+520.000 982.070 978.480 65.32 12.90 1.00 10.00 1313.15 33378.39 257.20 7561.08 0+540.000 982.040 978.428 65.63 12.88 1.00 10.00 1309.49 34687.89 257.77 7818.85 0+560.000 982.010 978.376 66.05 12.74 1.00 10.00 1316.82 36004.71 256.19 8075.04 0+580.000 981.990 978.324 66.54 12.64 1.00 10.00 1325.95 37330.66 253.82 8328.86 0+600.000 981.980 978.272 66.90 12.80 1.00 10.00 1334.42 38665.08 254.38 8583.24 0+620.000 981.939 978.220 66.90 12.93 1.00 10.00 1338.04 40003.12 257.25 8840.49 0+640.000 981.839 978.168 66.08 13.13 1.00 10.00 1329.86 41332.98 260.62 9101.11 0+660.000 981.760 978.116 65.67 13.18 1.00 10.00 1317.56 42650.53 263.16 9364.27 0+680.000 981.750 978.064 66.13 13.26 1.00 10.00 1318.01 43968.54 264.39 9628.67 0+700.000 981.750 978.012 66.98 13.07 1.00 10.00 1331.13 45299.67 263.26 9891.93 0+720.000 981.709 977.960 67.28 12.95 1.00 10.00 1342.61 46642.28 260.17 10152.09 0+740.000 981.630 977.908 67.10 12.79 1.00 10.00 1343.79 47986.06 257.33 10409.42 0+760.000 981.590 977.856 67.18 12.86 1.00 10.00 1342.82 49328.88 256.49 10665.92 0+780.000 981.520 977.804 66.94 13.50 1.00 10.00 1341.16 50670.05 263.60 10929.52 0+800.000 981.480 977.752 66.91 14.89 1.00 10.00 1338.47 52008.51 283.90 11213.42 0+820.000 981.440 977.700 67.12 15.88 1.00 10.00 1340.28 53348.79 307.70 11521.12 0+840.000 981.430 977.648 67.75 14.86 1.00 10.00 1348.70 54697.49 307.43 11828.55 0+860.000 981.419 977.597 68.19 12.82 1.00 10.00 1359.45 56056.94 276.87 12105.42 V O L U M E N E S SUM C SUM T CUADRO RESUMEN TN SUBRASANTE Factor de abundamiento en corte SEMI- DISTANCIA C T COORDENADA INICIAL DE CURVA MASA C T ELEVACIONES SECCIONES DE TN LEVANTADAS EN CAMPO

Transcript of Rio cojedes total mediciones

S I M B O L O G I A

DC DESPALME EN CORTE

DT DESPALME EN TERRAPLEN

C CORTE

T TERRAPLEN

0+000.000 983.450 979.830 31.93 7.48

0+020.000 983.440 979.778 65.05 17.12 1.00 10.00 969.80 969.80 245.98 245.98

0+040.000 983.360 979.726 64.61 14.63 1.00 10.00 1296.59 2266.39 317.54 563.52

0+060.000 983.270 979.674 64.28 13.90 1.00 10.00 1288.91 3555.31 285.32 848.84

0+080.000 983.240 979.622 64.61 14.54 1.00 10.00 1288.84 4844.15 284.40 1133.24

0+100.000 983.180 979.570 64.58 16.94 1.00 10.00 1291.86 6136.01 314.79 1448.03

0+120.000 983.140 979.518 64.76 16.58 1.00 10.00 1293.41 7429.42 335.18 1783.21

0+140.000 983.040 979.466 64.11 15.18 1.00 10.00 1288.74 8718.16 317.60 2100.81

0+160.000 983.020 979.414 64.34 16.83 1.00 10.00 1284.50 10002.66 320.09 2420.90

0+180.000 982.960 979.363 64.21 16.56 1.00 10.00 1285.46 11288.12 333.91 2754.81

0+200.000 982.870 979.311 63.70 14.01 1.00 10.00 1279.12 12567.25 305.70 3060.51

0+220.000 982.800 979.259 63.60 16.49 1.00 10.00 1273.06 13840.30 304.98 3365.49

0+240.000 982.780 979.207 64.16 15.64 1.00 10.00 1277.59 15117.89 321.30 3686.80

0+260.000 982.730 979.155 64.37 13.90 1.00 10.00 1285.27 16403.16 295.42 3982.22

0+280.000 982.690 979.103 64.54 14.35 1.00 10.00 1289.07 17692.23 282.46 4264.68

0+300.000 982.670 979.051 64.81 14.67 1.00 10.00 1293.43 18985.66 290.14 4554.81

0+320.000 982.620 978.999 65.00 15.38 1.00 10.00 1298.11 20283.76 300.45 4855.27

0+340.000 982.590 978.947 65.52 14.68 1.00 10.00 1305.18 21588.95 300.54 5155.81

0+360.000 982.540 978.895 65.45 14.76 1.00 10.00 1309.62 22898.57 294.34 5450.15

0+380.000 982.469 978.843 65.28 14.24 1.00 10.00 1307.29 24205.86 289.94 5740.09

0+400.000 982.380 978.791 65.10 12.96 1.00 10.00 1303.86 25509.72 271.95 6012.04

0+420.000 982.320 978.739 65.00 13.05 1.00 10.00 1301.07 26810.79 260.07 6272.10

0+440.000 982.300 978.687 65.47 12.99 1.00 10.00 1304.73 28115.52 260.44 6532.55

0+460.000 982.270 978.635 65.88 12.87 1.00 10.00 1313.49 29429.01 258.65 6791.19

0+480.000 982.210 978.583 65.87 12.79 1.00 10.00 1317.53 30746.55 256.59 7047.78

0+500.000 982.169 978.531 66.00 12.82 1.00 10.00 1318.69 32065.24 256.10 7303.88

0+520.000 982.070 978.480 65.32 12.90 1.00 10.00 1313.15 33378.39 257.20 7561.08

0+540.000 982.040 978.428 65.63 12.88 1.00 10.00 1309.49 34687.89 257.77 7818.85

0+560.000 982.010 978.376 66.05 12.74 1.00 10.00 1316.82 36004.71 256.19 8075.04

0+580.000 981.990 978.324 66.54 12.64 1.00 10.00 1325.95 37330.66 253.82 8328.86

0+600.000 981.980 978.272 66.90 12.80 1.00 10.00 1334.42 38665.08 254.38 8583.24

0+620.000 981.939 978.220 66.90 12.93 1.00 10.00 1338.04 40003.12 257.25 8840.49

0+640.000 981.839 978.168 66.08 13.13 1.00 10.00 1329.86 41332.98 260.62 9101.11

0+660.000 981.760 978.116 65.67 13.18 1.00 10.00 1317.56 42650.53 263.16 9364.27

0+680.000 981.750 978.064 66.13 13.26 1.00 10.00 1318.01 43968.54 264.39 9628.67

0+700.000 981.750 978.012 66.98 13.07 1.00 10.00 1331.13 45299.67 263.26 9891.93

0+720.000 981.709 977.960 67.28 12.95 1.00 10.00 1342.61 46642.28 260.17 10152.09

0+740.000 981.630 977.908 67.10 12.79 1.00 10.00 1343.79 47986.06 257.33 10409.42

0+760.000 981.590 977.856 67.18 12.86 1.00 10.00 1342.82 49328.88 256.49 10665.92

0+780.000 981.520 977.804 66.94 13.50 1.00 10.00 1341.16 50670.05 263.60 10929.52

0+800.000 981.480 977.752 66.91 14.89 1.00 10.00 1338.47 52008.51 283.90 11213.42

0+820.000 981.440 977.700 67.12 15.88 1.00 10.00 1340.28 53348.79 307.70 11521.12

0+840.000 981.430 977.648 67.75 14.86 1.00 10.00 1348.70 54697.49 307.43 11828.55

0+860.000 981.419 977.597 68.19 12.82 1.00 10.00 1359.45 56056.94 276.87 12105.42

V O L U M E N E S

SUM C SUM T

CUADRO RESUMEN

TN SUBRASANTE

Factor de

abundamiento

en corte

SEMI-

DISTANCIAC T

COORDENADA INICIAL DE CURVA

MASA

C T

ELEVACIONESSECCIONES DE

TN

LEVANTADAS

EN CAMPO

V O L U M E N E S

SUM C SUM T

TN SUBRASANTE

Factor de

abundamiento

en corte

SEMI-

DISTANCIAC T

COORDENADA INICIAL DE CURVA

MASA

C T

ELEVACIONESSECCIONES DE

TN

LEVANTADAS

EN CAMPO

0+880.000 981.349 977.545 67.89 13.30 1.00 10.00 1360.85 57417.79 261.24 12366.67

0+900.000 981.279 977.493 67.79 13.76 1.00 10.00 1356.81 58774.60 270.66 12637.33

0+920.000 981.219 977.441 67.67 13.14 1.00 10.00 1354.61 60129.21 269.07 12906.40

0+940.000 981.169 977.389 67.63 12.95 1.00 10.00 1353.02 61482.24 260.91 13167.31

0+960.000 981.119 977.337 67.59 15.55 1.00 10.00 1352.18 62834.42 285.00 13452.31

0+980.000 981.050 977.285 67.52 14.86 1.00 10.00 1351.05 64185.47 304.11 13756.42

1+000.000 981.039 977.233 68.12 13.15 1.00 10.00 1356.35 65541.82 280.09 14036.51

1+020.000 980.949 977.181 67.67 13.49 1.00 10.00 1357.88 66899.70 266.45 14302.96

1+040.000 980.869 977.129 67.32 13.60 1.00 10.00 1349.90 68249.60 270.95 14573.91

1+060.000 980.780 977.077 66.80 13.30 1.00 10.00 1341.22 69590.82 269.01 14842.92

1+080.000 980.769 977.025 67.57 13.40 1.00 10.00 1343.69 70934.50 267.02 15109.95

1+100.000 980.719 976.973 67.64 13.53 1.00 10.00 1352.04 72286.54 269.37 15379.31

1+120.000 980.669 976.921 67.57 13.18 1.00 10.00 1352.12 73638.66 267.13 15646.45

1+140.000 980.569 976.869 66.82 12.84 1.00 10.00 1343.99 74982.65 260.20 15906.65

1+160.000 980.499 976.817 66.74 13.84 1.00 10.00 1335.60 76318.24 266.84 16173.49

1+180.000 980.439 976.765 66.72 13.29 1.00 10.00 1334.54 77652.78 271.34 16444.82

1+200.000 980.359 976.714 66.31 13.30 1.00 10.00 1330.30 78983.08 265.94 16710.76

1+220.000 980.288 976.662 66.00 13.47 1.00 10.00 1323.11 80306.19 267.76 16978.52

1+240.000 980.189 976.610 65.47 12.80 1.00 10.00 1314.70 81620.89 262.70 17241.22

1+260.000 980.119 976.558 65.18 12.75 1.00 10.00 1306.52 82927.41 255.46 17496.68

1+280.000 980.079 976.506 65.64 15.00 1.00 10.00 1308.19 84235.60 277.53 17774.21

1+300.000 980.040 976.454 65.64 14.59 1.00 10.00 1312.74 85548.34 295.90 18070.10

1+320.000 980.030 976.402 66.49 12.77 1.00 10.00 1321.27 86869.62 273.51 18343.61

1+340.000 980.029 976.350 67.30 12.21 1.00 10.00 1337.89 88207.50 249.80 18593.41

1+360.000 979.989 976.298 67.37 12.25 1.00 10.00 1346.69 89554.19 244.68 18838.09

1+380.000 979.958 976.246 67.62 12.29 1.00 10.00 1349.88 90904.07 245.46 19083.55

1+400.000 979.888 976.194 67.35 12.32 1.00 10.00 1349.64 92253.72 246.11 19329.66

1+420.000 979.829 976.142 67.17 12.43 1.00 10.00 1345.16 93598.87 247.51 19577.17

1+440.000 979.799 976.090 67.26 12.52 1.00 10.00 1344.33 94943.20 249.58 19826.75

1+460.000 979.768 976.038 67.70 12.40 1.00 10.00 1349.66 96292.86 249.24 20076.00

1+480.000 979.678 975.986 67.22 12.39 1.00 10.00 1349.25 97642.10 247.94 20323.93

1+500.000 979.589 975.934 66.96 15.02 1.00 10.00 1341.82 98983.92 274.16 20598.09

1+520.000 979.536 975.882 67.15 15.24 1.00 10.00 1341.10 100325.02 302.65 20900.73

1+540.000 979.448 975.831 66.51 14.08 1.00 10.00 1336.58 101661.60 293.19 21193.93

1+560.000 979.398 975.779 66.82 14.66 1.00 10.00 1333.26 102994.86 287.40 21481.32

1+580.000 979.349 975.729 67.11 11.76 1.00 10.00 1339.30 104334.16 264.24 21745.56

1+600.000 979.330 975.681 67.22 13.27 1.00 10.00 1343.32 105677.49 250.33 21995.89

1+620.000 979.315 975.633 67.71 12.38 1.00 10.00 1349.29 107026.77 256.57 22252.46

1+640.000 979.226 975.585 67.08 15.65 1.00 10.00 1347.87 108374.64 280.32 22532.78

1+660.000 979.147 975.537 66.89 13.87 1.00 10.00 1339.64 109714.29 295.19 22827.97

1+680.000 979.106 975.489 66.96 13.16 1.00 10.00 1338.45 111052.74 270.27 23098.24

1+700.000 979.056 975.441 67.21 11.57 1.00 10.00 1341.68 112394.42 247.26 23345.50

1+720.000 978.993 975.393 67.03 11.57 1.00 10.00 1342.43 113736.85 231.41 23576.91

1+740.000 978.909 975.345 66.52 11.58 1.00 10.00 1335.56 115072.41 231.47 23808.38

1+760.000 978.893 975.297 67.27 11.34 1.00 10.00 1337.92 116410.32 229.14 24037.52

1+780.000 978.796 975.249 66.53 11.38 1.00 10.00 1337.98 117748.30 227.14 24264.65

1+800.000 978.749 975.201 66.29 11.55 1.00 10.00 1328.21 119076.52 229.31 24493.97

1+820.000 978.725 975.153 66.62 13.72 1.00 10.00 1329.11 120405.63 252.71 24746.68

1+840.000 978.657 975.105 66.08 12.00 1.00 10.00 1327.02 121732.65 257.18 25003.86

1+860.000 978.619 975.057 65.20 8.88 1.00 10.00 1312.85 123045.50 208.84 25212.70

1+880.000 978.559 975.009 66.09 11.84 1.00 10.00 1312.92 124358.42 207.19 25419.89

1+900.000 978.540 974.961 66.52 11.71 1.00 10.00 1326.13 125684.55 235.46 25655.36

V O L U M E N E S

SUM C SUM T

TN SUBRASANTE

Factor de

abundamiento

en corte

SEMI-

DISTANCIAC T

COORDENADA INICIAL DE CURVA

MASA

C T

ELEVACIONESSECCIONES DE

TN

LEVANTADAS

EN CAMPO

1+920.000 978.526 974.913 67.16 11.59 1.00 10.00 1336.78 127021.33 232.99 25888.35

1+940.000 978.440 974.865 66.63 11.55 1.00 10.00 1337.90 128359.24 231.43 26119.78

1+960.000 978.427 974.817 67.20 11.63 1.00 10.00 1338.30 129697.53 231.79 26351.56

1+980.000 978.380 974.769 67.17 14.03 1.00 10.00 1343.69 131041.22 256.52 26608.08

2+000.000 978.379 974.721 67.70 12.43 1.00 10.00 1348.76 132389.98 264.55 26872.63

2+020.000 978.356 974.673 68.21 12.10 1.00 10.00 1359.16 133749.13 245.26 27117.89

2+040.000 978.279 974.625 67.85 11.99 1.00 10.00 1360.60 135109.74 240.86 27358.75

2+060.000 978.267 974.577 68.38 14.01 1.00 10.00 1362.24 136471.98 259.96 27618.71

2+080.000 978.219 974.529 68.36 14.11 1.00 10.00 1367.41 137839.38 281.14 27899.85

2+100.000 978.196 974.482 68.78 11.99 1.00 10.00 1371.40 139210.78 260.95 28160.80

2+120.000 978.140 974.434 68.75 12.75 1.00 10.00 1375.29 140586.07 247.42 28408.22

2+140.000 978.137 974.386 69.46 12.07 1.00 10.00 1382.10 141968.17 248.26 28656.48

2+160.000 978.085 974.338 69.37 12.56 1.00 10.00 1388.23 143356.40 246.36 28902.84

2+180.000 978.015 974.290 68.89 12.18 1.00 10.00 1382.58 144738.99 247.39 29150.23

2+200.000 977.949 974.242 68.44 13.48 1.00 10.00 1373.35 146112.34 256.52 29406.75

2+220.000 977.929 974.194 68.64 13.56 1.00 10.00 1370.87 147483.20 270.41 29677.16

2+240.000 977.917 974.146 69.22 12.83 1.00 10.00 1378.65 148861.86 263.97 29941.13

2+260.000 977.877 974.098 69.33 12.25 1.00 10.00 1385.55 150247.41 250.84 30191.97

2+280.000 977.838 974.050 69.55 11.42 1.00 10.00 1388.80 151636.21 236.75 30428.73

2+300.000 977.814 974.002 69.78 13.07 1.00 10.00 1393.30 153029.51 244.90 30673.63

2+320.000 977.742 973.954 69.35 13.34 1.00 10.00 1391.33 154420.84 264.02 30937.65

2+340.000 977.660 973.906 68.72 13.59 1.00 10.00 1380.65 155801.49 269.30 31206.95

2+360.000 977.656 973.858 69.45 13.12 1.00 10.00 1381.67 157183.17 267.11 31474.06

2+380.000 977.610 973.810 69.45 13.81 1.00 10.00 1389.01 158572.17 269.25 31743.31

2+400.000 977.605 973.762 69.85 12.90 1.00 10.00 1392.96 159965.13 267.06 32010.38

2+420.000 977.553 973.714 69.76 11.77 1.00 10.00 1396.09 161361.22 246.72 32257.10

2+440.000 977.481 973.666 69.34 11.98 1.00 10.00 1391.01 162752.22 237.55 32494.64

2+460.000 977.395 973.618 68.76 14.88 1.00 10.00 1381.00 164133.22 268.64 32763.28

2+480.000 977.347 973.570 68.74 14.37 1.00 10.00 1375.00 165508.22 292.56 33055.84

2+500.000 977.314 973.522 68.84 12.21 1.00 10.00 1375.81 166884.03 265.79 33321.63

2+520.000 977.255 973.474 68.51 12.34 1.00 10.00 1373.49 168257.52 245.45 33567.09

2+540.000 977.204 973.426 68.42 15.02 1.00 10.00 1369.25 169626.78 273.55 33840.63

2+560.000 977.149 973.378 67.90 13.92 1.00 10.00 1363.15 170989.92 289.33 34129.96

2+580.000 977.136 973.330 68.38 12.95 1.00 10.00 1362.74 172352.67 268.66 34398.62

2+600.000 977.105 973.282 68.51 15.02 1.00 10.00 1368.87 173721.54 279.65 34678.27

2+620.000 977.062 973.234 68.49 14.65 1.00 10.00 1369.97 175091.51 296.71 34974.98

2+640.000 977.009 973.186 68.52 12.85 1.00 10.00 1370.08 176461.59 275.05 35250.03

2+660.000 976.989 973.139 68.93 12.80 1.00 10.00 1374.52 177836.11 256.55 35506.58

2+680.000 976.908 973.091 68.42 12.91 1.00 10.00 1373.46 179209.58 257.16 35763.74

2+700.000 976.829 973.043 67.79 13.06 1.00 10.00 1362.08 180571.66 259.71 36023.45

2+720.000 976.817 972.995 68.42 12.94 1.00 10.00 1362.15 181933.81 259.95 36283.40

2+740.000 976.797 972.947 68.87 12.81 1.00 10.00 1372.98 183306.79 257.46 36540.86

2+760.000 976.768 972.899 69.10 12.89 1.00 10.00 1379.77 184686.55 257.01 36797.87

2+780.000 976.682 972.851 68.65 12.88 1.00 10.00 1377.56 186064.12 257.75 37055.62

2+800.000 976.629 972.803 68.44 12.94 1.00 10.00 1370.90 187435.02 258.20 37313.81

2+820.000 976.608 972.755 68.67 13.07 1.00 10.00 1371.07 188806.08 260.10 37573.91

2+840.000 976.518 972.707 68.18 13.10 1.00 10.00 1368.48 190174.56 261.77 37835.68

2+860.000 976.430 972.659 67.98 12.82 1.00 10.00 1361.60 191536.16 259.23 38094.91

2+880.000 976.359 972.611 67.83 12.66 1.00 10.00 1358.16 192894.32 254.77 38349.67

2+900.000 976.280 972.563 67.13 12.96 1.00 10.00 1349.60 194243.92 256.19 38605.86

2+920.000 976.209 972.515 66.78 12.98 1.00 10.00 1339.09 195583.01 259.39 38865.25

2+940.000 976.139 972.467 66.22 13.21 1.00 10.00 1330.00 196913.01 261.92 39127.17

V O L U M E N E S

SUM C SUM T

TN SUBRASANTE

Factor de

abundamiento

en corte

SEMI-

DISTANCIAC T

COORDENADA INICIAL DE CURVA

MASA

C T

ELEVACIONESSECCIONES DE

TN

LEVANTADAS

EN CAMPO

2+960.000 976.125 972.419 66.84 13.05 1.00 10.00 1330.61 198243.63 262.60 39389.77

2+980.000 976.085 972.371 67.04 12.98 1.00 10.00 1338.81 199582.44 260.27 39650.04

3+000.000 976.043 972.323 67.37 12.77 1.00 10.00 1344.08 200926.52 257.53 39907.57

3+020.000 975.990 972.275 67.20 12.77 1.00 10.00 1345.68 202272.20 255.36 40162.93

3+040.000 975.918 972.227 67.07 12.65 1.00 10.00 1342.71 203614.91 254.18 40417.11

3+060.000 975.840 972.179 66.58 12.74 1.00 10.00 1336.54 204951.45 253.92 40671.04

3+080.000 975.832 972.131 67.18 13.60 1.00 10.00 1337.59 206289.03 263.39 40934.42

3+100.000 975.780 972.083 66.85 13.09 1.00 10.00 1340.25 207629.28 266.85 41201.27

3+120.000 975.769 972.035 67.55 15.48 1.00 10.00 1343.93 208973.21 285.63 41486.91

3+140.000 975.687 971.987 67.20 16.05 1.00 10.00 1347.52 210320.73 315.23 41802.14

3+160.000 975.607 971.939 66.56 14.28 1.00 10.00 1337.62 211658.35 303.32 42105.46

3+180.000 975.532 971.891 66.36 12.58 1.00 10.00 1329.14 212987.49 268.69 42374.15

3+200.000 975.478 971.843 66.27 12.30 1.00 10.00 1326.25 214313.74 248.85 42623.00

3+220.000 975.406 971.796 65.73 14.91 1.00 10.00 1319.99 215633.73 272.08 42895.08

3+240.000 975.337 971.748 65.51 14.09 1.00 10.00 1312.37 216946.10 289.97 43185.04

3+260.000 975.313 971.700 66.00 15.06 1.00 10.00 1315.02 218261.12 291.49 43476.54

3+280.000 975.278 971.652 66.11 14.51 1.00 10.00 1321.11 219582.23 295.67 43772.21

3+300.000 975.268 971.604 67.05 15.19 1.00 10.00 1331.61 220913.84 297.00 44069.21

3+320.000 975.247 971.556 67.28 14.89 1.00 10.00 1343.23 222257.08 300.85 44370.06

3+340.000 975.173 971.508 66.94 13.07 1.00 10.00 1342.22 223599.29 279.67 44649.73

3+360.000 975.092 971.460 66.46 12.53 1.00 10.00 1334.03 224933.32 256.01 44905.74

3+380.000 975.045 971.412 66.51 12.52 1.00 10.00 1329.65 226262.98 250.51 45156.25

3+400.000 974.976 971.364 66.33 12.42 1.00 10.00 1328.33 227591.31 249.49 45405.75

3+420.000 974.947 971.316 66.70 12.32 1.00 10.00 1330.24 228921.55 247.44 45653.19

3+440.000 974.871 971.268 66.31 12.37 1.00 10.00 1330.11 230251.65 246.92 45900.11

3+460.000 974.773 971.220 65.32 12.62 1.00 10.00 1316.35 231568.00 249.98 46150.09

3+480.000 974.683 971.172 64.62 12.81 1.00 10.00 1299.38 232867.38 254.30 46404.39

3+500.000 974.602 971.124 64.25 12.87 1.00 10.00 1288.66 234156.04 256.71 46661.10

3+520.000 974.562 971.076 64.54 13.66 1.00 10.00 1287.90 235443.93 265.31 46926.41

3+540.000 974.513 971.028 64.54 13.01 1.00 10.00 1290.76 236734.69 266.71 47193.12

3+560.000 974.426 970.980 63.80 12.68 1.00 10.00 1283.33 238018.03 256.90 47450.01

3+580.000 974.364 970.932 63.38 12.50 1.00 10.00 1271.73 239289.76 251.84 47701.85

3+600.000 974.338 970.884 63.80 12.82 1.00 10.00 1271.80 240561.56 253.17 47955.02

3+620.000 974.330 970.836 64.30 16.15 1.00 10.00 1281.01 241842.57 289.65 48244.68

3+640.000 974.312 970.788 64.93 15.63 1.00 10.00 1292.27 243134.83 317.82 48562.50

3+660.000 974.228 970.740 64.63 13.99 1.00 10.00 1295.58 244430.42 296.25 48858.74

3+680.000 974.170 970.692 64.12 13.44 1.00 10.00 1287.52 245717.94 274.29 49133.04

3+700.000 974.109 970.644 63.98 12.84 1.00 10.00 1281.07 246999.01 262.79 49395.83

3+720.000 974.013 970.596 63.03 15.04 1.00 10.00 1270.16 248269.17 278.82 49674.65

3+740.000 973.946 970.548 62.71 14.92 1.00 10.00 1257.38 249526.56 299.59 49974.24

3+760.000 973.926 970.501 62.94 12.96 1.00 10.00 1256.48 250783.04 278.82 50253.06

3+780.000 973.893 970.453 63.30 13.78 1.00 10.00 1262.45 252045.48 267.45 50520.50

3+800.000 973.830 970.405 62.93 13.34 1.00 10.00 1262.36 253307.84 271.17 50791.67

3+820.000 973.824 970.357 63.41 13.28 1.00 10.00 1263.44 254571.28 266.12 51057.79

3+840.000 973.781 970.309 63.55 13.25 1.00 10.00 1269.60 255840.87 265.30 51323.09

3+860.000 973.708 970.261 63.07 13.15 1.00 10.00 1266.24 257107.11 264.06 51587.15

3+880.000 973.692 970.213 63.67 13.17 1.00 10.00 1267.43 258374.54 263.25 51850.40

3+900.000 973.656 970.165 63.85 13.12 1.00 10.00 1275.17 259649.71 262.94 52113.34

3+920.000 973.629 970.117 64.15 15.30 1.00 10.00 1280.03 260929.74 284.22 52397.56

3+940.000 973.586 970.069 64.00 18.24 1.00 10.00 1281.56 262211.29 335.38 52732.94

3+960.000 973.556 970.021 64.43 15.89 1.00 10.00 1284.27 263495.57 341.31 53074.25

3+980.000 973.489 969.973 64.45 16.10 1.00 10.00 1288.77 264784.33 319.88 53394.13

V O L U M E N E S

SUM C SUM T

TN SUBRASANTE

Factor de

abundamiento

en corte

SEMI-

DISTANCIAC T

COORDENADA INICIAL DE CURVA

MASA

C T

ELEVACIONESSECCIONES DE

TN

LEVANTADAS

EN CAMPO

4+000.000 973.415 969.925 63.64 16.62 1.00 10.00 1280.86 266065.19 327.12 53721.25

4+020.000 973.395 969.877 64.18 14.15 1.00 10.00 1278.18 267343.37 307.66 54028.91

4+040.000 973.373 969.829 64.53 14.86 1.00 10.00 1287.10 268630.47 290.07 54318.98

4+060.000 973.347 969.781 64.79 13.68 1.00 10.00 1293.15 269923.63 285.34 54604.32

4+080.000 973.322 969.733 64.96 14.82 1.00 10.00 1297.50 271221.13 285.00 54889.33

4+100.000 973.262 969.685 64.90 13.87 1.00 10.00 1298.64 272519.76 286.90 55176.22

4+120.000 973.225 969.637 65.15 13.15 1.00 10.00 1300.55 273820.31 270.12 55446.34

4+140.000 973.186 969.589 65.14 13.59 1.00 10.00 1302.93 275123.24 267.37 55713.71

4+160.000 973.178 969.541 66.09 15.42 1.00 10.00 1312.34 276435.57 290.08 56003.79

4+180.000 973.082 969.493 64.94 16.60 1.00 10.00 1310.36 277745.93 320.21 56324.01

4+200.000 973.036 969.445 65.22 14.40 1.00 10.00 1301.57 279047.50 310.06 56634.07

4+220.000 972.959 969.397 64.66 13.28 1.00 10.00 1298.78 280346.28 276.86 56910.93

4+240.000 972.904 969.349 64.33 13.60 1.00 10.00 1289.92 281636.20 268.86 57179.79

4+260.000 972.809 969.301 63.70 13.71 1.00 10.00 1280.26 282916.46 273.08 57452.86

4+280.000 972.731 969.253 63.30 13.76 1.00 10.00 1269.95 284186.41 274.62 57727.49

4+300.000 972.669 969.205 62.97 13.75 1.00 10.00 1262.69 285449.10 275.02 58002.51

4+320.000 972.616 969.158 62.94 16.71 1.00 10.00 1259.14 286708.24 304.55 58307.06

4+340.000 972.547 969.110 62.25 16.11 1.00 10.00 1251.99 287960.22 328.19 58635.25

4+360.000 972.537 969.062 62.99 14.22 1.00 10.00 1252.43 289212.66 303.32 58938.57

4+380.000 972.522 969.014 63.64 13.71 1.00 10.00 1266.27 290478.93 279.30 59217.87

4+400.000 972.481 968.966 64.16 14.76 1.00 10.00 1277.98 291756.91 284.67 59502.55

4+420.000 972.405 968.918 63.71 13.81 1.00 10.00 1278.67 293035.58 285.66 59788.20

4+440.000 972.332 968.870 62.52 20.08 1.00 10.00 1262.21 294297.79 338.86 60127.07

4+460.000 972.298 968.822 63.09 17.55 1.00 10.00 1256.07 295553.86 376.26 60503.32

4+480.000 972.264 968.774 63.25 13.92 1.00 10.00 1263.37 296817.23 314.71 60818.03

4+500.000 972.229 968.726 63.54 13.67 1.00 10.00 1267.88 298085.11 275.98 61094.02

4+520.000 972.150 968.678 63.43 13.46 1.00 10.00 1269.73 299354.84 271.38 61365.39

4+540.000 972.053 968.630 62.68 13.54 1.00 10.00 1261.09 300615.93 270.06 61635.46

4+560.000 971.981 968.582 62.10 14.43 1.00 10.00 1247.83 301863.76 279.77 61915.22

4+580.000 971.954 968.534 62.17 14.94 1.00 10.00 1242.71 303106.47 293.69 62208.91

4+600.000 971.916 968.486 62.20 14.05 1.00 10.00 1243.66 304350.13 289.86 62498.77

4+620.000 971.854 968.438 61.96 14.08 1.00 10.00 1241.57 305591.70 281.34 62780.12

4+640.000 971.834 968.390 62.23 14.15 1.00 10.00 1241.86 306833.56 282.33 63062.45

4+660.000 971.814 968.342 62.57 14.17 1.00 10.00 1247.99 308081.56 283.17 63345.62

4+680.000 971.791 968.294 62.83 14.97 1.00 10.00 1254.04 309335.60 291.36 63636.98

4+700.000 971.767 968.246 63.10 15.91 1.00 10.00 1259.37 310594.97 308.81 63945.79

4+720.000 971.751 968.198 63.69 14.78 1.00 10.00 1267.95 311862.92 306.96 64252.74

4+740.000 971.712 968.150 63.97 16.12 1.00 10.00 1276.58 313139.50 309.01 64561.75

4+760.000 971.651 968.102 63.84 17.16 1.00 10.00 1278.11 314417.61 332.80 64894.55

4+780.000 971.585 968.054 63.56 15.46 1.00 10.00 1274.00 315691.61 326.25 65220.80

4+800.000 971.527 968.006 63.33 14.57 1.00 10.00 1268.85 316960.46 300.27 65521.08

4+820.000 971.504 967.958 63.66 13.96 1.00 10.00 1269.86 318230.32 285.22 65806.30

4+840.000 971.448 967.910 63.56 17.17 1.00 10.00 1272.14 319502.47 311.28 66117.58

4+860.000 971.370 967.863 63.22 18.89 1.00 10.00 1267.74 320770.21 360.64 66478.22

4+880.000 971.279 967.815 62.28 16.26 1.00 10.00 1254.99 322025.21 351.48 66829.70

4+900.000 971.217 967.767 61.65 18.50 1.00 10.00 1239.33 323264.53 347.60 67177.30

4+920.000 971.196 967.719 62.40 15.92 1.00 10.00 1240.47 324505.01 344.20 67521.50

4+940.000 971.159 967.671 62.67 14.61 1.00 10.00 1250.66 325755.67 305.26 67826.77

4+960.000 971.136 967.623 63.09 14.20 1.00 10.00 1257.62 327013.29 288.10 68114.87

4+980.000 971.105 967.575 63.47 14.74 1.00 10.00 1265.58 328278.87 289.36 68404.23

5+000.000 971.028 967.527 63.14 16.17 1.00 10.00 1266.10 329544.97 309.03 68713.25

5+020.000 970.970 967.479 62.89 16.60 1.00 10.00 1260.32 330805.30 327.68 69040.94

V O L U M E N E S

SUM C SUM T

TN SUBRASANTE

Factor de

abundamiento

en corte

SEMI-

DISTANCIAC T

COORDENADA INICIAL DE CURVA

MASA

C T

ELEVACIONESSECCIONES DE

TN

LEVANTADAS

EN CAMPO

5+040.000 970.966 967.431 63.34 17.24 1.00 10.00 1262.26 332067.56 338.46 69379.40

5+060.000 970.956 967.383 63.84 13.81 1.00 10.00 1271.79 333339.36 310.56 69689.96

5+080.000 970.924 967.335 64.09 19.00 1.00 10.00 1279.34 334618.69 328.15 70018.11

5+100.000 970.850 967.287 63.60 16.20 1.00 10.00 1276.95 335895.64 351.99 70370.10

5+120.000 970.781 967.239 63.13 16.34 1.00 10.00 1267.36 337163.00 325.33 70695.43

5+140.000 970.742 967.191 62.99 13.95 1.00 10.00 1261.27 338424.26 302.85 70998.28

5+160.000 970.707 967.143 62.90 17.21 1.00 10.00 1258.95 339683.21 311.56 71309.84

5+180.000 970.662 967.095 62.97 15.16 1.00 10.00 1258.75 340941.96 323.71 71633.55

5+200.000 970.635 967.047 63.16 15.11 1.00 10.00 1261.34 342203.30 302.72 71936.26

5+220.000 970.576 966.999 62.98 17.97 1.00 10.00 1261.46 343464.76 330.81 72267.07

5+240.000 970.501 966.951 62.73 17.45 1.00 10.00 1257.11 344721.88 354.17 72621.23

5+260.000 970.458 966.903 62.50 15.73 1.00 10.00 1252.31 345974.19 331.76 72953.00

5+280.000 970.405 966.855 62.49 15.68 1.00 10.00 1249.97 347224.16 314.08 73267.07

5+300.000 970.311 966.807 61.82 16.91 1.00 10.00 1243.16 348467.32 325.91 73592.98

5+320.000 970.223 966.759 61.33 15.47 1.00 10.00 1231.51 349698.83 323.81 73916.79

5+340.000 970.176 966.711 61.41 16.46 1.00 10.00 1227.39 350926.23 319.31 74236.10

5+360.000 970.158 966.663 61.85 16.76 1.00 10.00 1232.60 352158.83 332.27 74568.37

5+380.000 970.132 966.615 62.25 18.23 1.00 10.00 1240.97 353399.80 349.88 74918.25

5+400.000 970.116 966.567 62.63 16.03 1.00 10.00 1248.83 354648.63 342.52 75260.77

5+420.000 970.075 966.520 62.56 16.21 1.00 10.00 1251.90 355900.53 322.38 75583.15

5+440.000 969.984 966.472 62.25 19.02 1.00 10.00 1248.10 357148.64 352.32 75935.47

5+460.000 969.906 966.424 61.53 18.71 1.00 10.00 1237.82 358386.45 377.31 76312.77

5+480.000 969.850 966.376 61.64 14.22 1.00 10.00 1231.66 359618.11 329.30 76642.08

5+500.000 969.783 966.328 61.57 14.74 1.00 10.00 1232.06 360850.17 289.63 76931.70

5+520.000 969.730 966.280 61.36 15.10 1.00 10.00 1229.28 362079.45 298.42 77230.13

5+540.000 969.718 966.232 61.93 15.13 1.00 10.00 1232.88 363312.33 302.24 77532.37

5+560.000 969.680 966.184 62.06 14.90 1.00 10.00 1239.90 364552.23 300.25 77832.62

5+580.000 969.650 966.136 62.21 16.78 1.00 10.00 1242.75 365794.97 316.80 78149.42

5+600.000 969.638 966.088 62.67 15.70 1.00 10.00 1248.79 367043.76 324.77 78474.19

5+620.000 969.595 966.040 62.73 15.66 1.00 10.00 1253.94 368297.70 313.59 78787.79

5+640.000 969.548 965.992 62.67 16.86 1.00 10.00 1254.03 369551.73 325.21 79113.00

5+660.000 969.526 965.944 63.09 19.84 1.00 10.00 1257.59 370809.32 367.02 79480.02

5+680.000 969.507 965.896 63.44 16.76 1.00 10.00 1265.26 372074.58 366.07 79846.09

5+700.000 969.486 965.848 64.06 14.64 1.00 10.00 1275.02 373349.60 314.03 80160.11

5+720.000 969.465 965.800 64.44 14.57 1.00 10.00 1285.02 374634.63 292.09 80452.20

5+740.000 969.417 965.752 64.57 14.48 1.00 10.00 1290.07 375924.70 290.49 80742.69

5+760.000 969.359 965.704 64.33 14.61 1.00 10.00 1288.91 377213.61 290.85 81033.53

5+780.000 969.300 965.656 64.41 14.44 1.00 10.00 1287.33 378500.94 290.43 81323.96

5+800.000 969.222 965.608 63.91 14.55 1.00 10.00 1283.17 379784.11 289.86 81613.82

5+820.000 969.153 965.560 63.46 14.71 1.00 10.00 1273.68 381057.78 292.60 81906.42

5+840.000 969.117 965.512 63.38 14.93 1.00 10.00 1268.35 382326.13 296.38 82202.80

5+860.000 969.062 965.464 63.27 14.98 1.00 10.00 1266.41 383592.54 299.01 82501.81

5+880.000 968.980 965.416 62.85 14.99 1.00 10.00 1261.16 384853.70 299.60 82801.41

5+900.000 968.919 965.368 62.53 15.12 1.00 10.00 1253.78 386107.48 301.04 83102.45

5+920.000 968.886 965.320 62.55 15.26 1.00 10.00 1250.78 387358.26 303.80 83406.25

5+940.000 968.863 965.272 62.78 18.14 1.00 10.00 1253.32 388611.58 333.99 83740.24

5+960.000 968.815 965.225 62.87 16.76 1.00 10.00 1256.55 389868.13 348.97 84089.22

5+980.000 968.755 965.177 62.92 17.05 1.00 10.00 1257.96 391126.09 338.10 84427.32

6+000.000 968.707 965.129 62.49 19.16 1.00 10.00 1254.10 392380.19 362.11 84789.43

6+020.000 968.664 965.081 62.40 20.79 1.00 10.00 1248.91 393629.10 399.46 85188.89

6+040.000 968.617 965.033 62.51 16.14 1.00 10.00 1249.10 394878.20 369.26 85558.15

6+060.000 968.565 964.985 62.46 15.64 1.00 10.00 1249.65 396127.85 317.84 85875.99

V O L U M E N E S

SUM C SUM T

TN SUBRASANTE

Factor de

abundamiento

en corte

SEMI-

DISTANCIAC T

COORDENADA INICIAL DE CURVA

MASA

C T

ELEVACIONESSECCIONES DE

TN

LEVANTADAS

EN CAMPO

6+080.000 968.516 964.937 62.37 16.77 1.00 10.00 1248.33 397376.18 324.17 86200.15

6+100.000 968.479 964.889 62.70 16.68 1.00 10.00 1250.78 398626.96 334.50 86534.65

6+120.000 968.431 964.841 62.69 16.64 1.00 10.00 1253.97 399880.93 333.19 86867.84

6+140.000 968.411 964.793 63.05 16.82 1.00 10.00 1257.43 401138.36 334.57 87202.41

6+160.000 968.369 964.745 63.33 15.22 1.00 10.00 1263.78 402402.14 320.39 87522.81

6+180.000 968.312 964.697 63.19 15.28 1.00 10.00 1265.17 403667.31 305.01 87827.82

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

0+000.00 0.00 983.45 10.67 983.38 -0.39 0.00 979.83 7.12 979.83 -25.77

7.12 979.83 10.12 982.83 -6.36

10.12 982.83 10.67 983.38 -0.19

-0.39 -32.32 31.93

10.67 983.38 14.95 983.35 -0.38 10.67 983.38 12.92 985.63 2.37

14.95 983.35 15.08 983.35 -0.01 12.92 985.63 15.08 985.63 4.71

-0.39 7.09 -7.48

TOTAL AREAS(M2): 31.93 -7.48

0+020.00 -15.01 983.44 -10.78 983.44 0.00 -15.01 985.58 -12.92 985.58 4.46

-12.92 985.58 -10.78 983.44 2.28

0.00 6.75 -6.75

-10.78 983.44 -0.01 983.44 0.00 -10.78 983.44 -10.12 982.78 -0.22

-0.01 983.44 0.00 983.44 0.00 -10.12 982.78 -7.12 979.78 -6.49

0.00 983.44 0.00 983.44 0.00 -7.12 979.78 0.00 979.78 -26.08

0.00 983.44 10.69 983.35 -0.51 0.00 979.78 7.12 979.78 -26.08

7.12 979.78 10.12 982.78 -6.49

10.12 982.78 10.69 983.35 -0.21

-0.52 -65.57 65.05

10.69 983.35 14.28 983.31 -0.40 10.69 983.35 12.92 985.58 2.28

14.28 983.31 15.28 983.31 -0.13 12.92 985.58 15.32 985.58 5.13

15.28 983.31 17.06 983.32 -0.23 15.32 985.58 17.06 983.84 2.21

-0.76 9.62 -10.37

TOTAL AREAS(M2): 65.05 -17.12

0+040.00 -14.89 983.34 -10.74 983.34 0.01 -14.89 985.53 -12.92 985.53 4.32

-12.92 985.53 -10.74 983.34 2.39

0.01 6.71 -6.70

-10.74 983.34 0.00 983.36 0.15 -10.74 983.34 -10.12 982.73 -0.19

0.00 983.36 0.00 983.36 0.00 -10.12 982.73 -7.12 979.73 -6.34

0.00 983.36 0.01 983.36 0.00 -7.12 979.73 0.00 979.73 -25.72

0.01 983.36 10.71 983.31 -0.03 0.00 979.73 7.12 979.73 -25.72

7.12 979.73 10.12 982.73 -6.34

10.12 982.73 10.71 983.31 -0.19

0.12 -64.50 64.61

10.71 983.31 15.14 983.29 -0.16 10.71 983.31 12.92 985.53 2.39

15.14 983.29 15.38 983.29 -0.01 12.92 985.53 15.32 985.53 5.25

15.32 985.53 15.38 985.47 0.12

-0.17 7.76 -7.93

TOTAL AREAS(M2): 64.61 -14.63

0+060.00 -14.97 983.32 -10.75 983.31 -0.03 -14.97 985.47 -12.92 985.47 4.41

-12.92 985.47 -10.75 983.31 2.32

-0.03 6.72 -6.75

-10.75 983.31 0.00 983.27 -0.36 -10.75 983.31 -10.12 982.67 -0.21

0.00 983.27 0.00 983.27 0.00 -10.12 982.67 -7.12 979.67 -6.44

0.00 983.27 0.01 983.27 0.00 -7.12 979.67 0.00 979.67 -25.97

0.01 983.27 10.71 983.26 -0.61 0.00 979.67 7.12 979.67 -25.97

7.12 979.67 10.12 982.67 -6.44

10.12 982.67 10.71 983.26 -0.21

-0.97 -65.25 64.28

10.71 983.26 15.03 983.26 -0.28 10.71 983.26 12.92 985.47 2.31

12.92 985.47 15.03 985.47 4.55

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

Página 1

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-0.28 6.86 -7.14

TOTAL AREAS(M2): 64.28 -13.90

0+080.00 -15.32 983.26 -15.00 983.26 0.00 -15.32 985.42 -15.32 985.42 0.00

-15.00 983.26 -10.76 983.26 -0.01 -15.32 985.42 -12.92 985.42 5.18

-12.92 985.42 -10.76 983.26 2.33

-0.01 7.51 -7.52

-10.76 983.26 0.00 983.24 -0.17 -10.76 983.26 -10.12 982.62 -0.21

0.00 983.24 0.00 983.24 0.00 -10.12 982.62 -7.12 979.62 -6.43

0.00 983.24 0.00 983.24 0.00 -7.12 979.62 0.00 979.62 -25.93

0.00 983.24 10.72 983.22 -0.36 0.00 979.62 7.12 979.62 -25.93

7.12 979.62 10.12 982.62 -6.43

10.12 982.62 10.72 983.22 -0.21

-0.53 -65.13 64.61

10.72 983.22 15.00 983.22 -0.20 10.72 983.22 12.92 985.42 2.33

12.92 985.42 15.00 985.42 4.50

-0.20 6.82 -7.02

TOTAL AREAS(M2): 64.61 -14.54

0+100.00 -17.46 983.23 -15.44 983.23 0.00 -17.46 983.23 -15.32 985.37 2.28

-15.44 983.23 -14.60 983.23 0.00 -15.32 985.37 -12.92 985.37 5.13

-14.60 983.23 -10.77 983.22 -0.03 -12.92 985.37 -10.77 983.22 2.28

-0.04 9.70 -9.73

-10.77 983.22 -0.09 983.18 -0.36 -10.77 983.22 -10.12 982.57 -0.22

-0.09 983.18 0.00 983.18 0.00 -10.12 982.57 -7.12 979.57 -6.49

0.00 983.18 0.01 983.18 0.00 -7.12 979.57 0.00 979.57 -26.08

0.01 983.18 10.72 983.17 -0.62 0.00 979.57 7.12 979.57 -26.08

7.12 979.57 10.12 982.57 -6.49

10.12 982.57 10.72 983.17 -0.22

-0.99 -65.57 64.58

10.72 983.17 15.00 983.17 -0.28 10.72 983.17 12.92 985.37 2.28

15.00 983.17 15.09 983.17 -0.01 12.92 985.37 15.09 985.37 4.64

-0.28 6.92 -7.20

TOTAL AREAS(M2): 64.58 -16.94

0+120.00 -15.04 983.19 -15.00 983.19 0.00 -15.04 985.32 -12.92 985.32 4.53

-15.00 983.19 -10.77 983.17 -0.03 -12.92 985.32 -10.77 983.17 2.27

-0.03 6.80 -6.83

-10.77 983.17 -0.01 983.14 -0.31 -10.77 983.17 -10.12 982.52 -0.22

-0.01 983.14 0.00 983.14 0.00 -10.12 982.52 -7.12 979.52 -6.50

0.00 983.14 0.12 983.14 -0.01 -7.12 979.52 0.00 979.52 -26.11

0.12 983.14 10.72 983.12 -0.59 0.00 979.52 7.12 979.52 -26.11

7.12 979.52 10.12 982.52 -6.50

10.12 982.52 10.72 983.12 -0.22

-0.91 -65.67 64.76

10.72 983.12 14.29 983.11 -0.24 10.72 983.12 12.92 985.32 2.27

14.29 983.11 15.20 983.11 -0.07 12.92 985.32 15.32 985.32 5.12

15.20 983.11 16.66 983.13 -0.09 15.32 985.32 16.66 983.98 1.96

-0.40 9.35 -9.75

TOTAL AREAS(M2): 64.76 -16.58

0+140.00 -15.68 983.12 -15.02 983.12 0.00 -15.68 984.91 -15.32 985.27 0.70

-15.02 983.12 -10.75 983.10 -0.05 -15.32 985.27 -12.92 985.27 5.15

-12.92 985.27 -10.75 983.10 2.31

Página 2

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-0.05 8.16 -8.21

-10.75 983.10 -0.01 983.04 -0.54 -10.75 983.10 -10.12 982.47 -0.21

-0.01 983.04 0.00 983.04 0.00 -10.12 982.47 -7.12 979.47 -6.46

0.00 983.04 0.50 983.04 -0.04 -7.12 979.47 0.00 979.47 -26.01

0.50 983.04 10.72 983.07 -0.65 0.00 979.47 7.12 979.47 -26.01

7.12 979.47 10.12 982.47 -6.46

10.12 982.47 10.72 983.07 -0.21

-1.23 -65.35 64.11

10.72 983.07 14.98 983.08 -0.19 10.72 983.07 12.92 985.27 2.30

14.98 983.08 15.01 983.08 0.00 12.92 985.27 15.01 985.27 4.48

-0.19 6.78 -6.97

TOTAL AREAS(M2): 64.11 -15.18

0+160.00 -15.04 983.05 -14.82 983.04 0.00 -15.04 985.21 -12.92 985.21 4.59

-14.82 983.04 -10.74 983.04 -0.03 -12.92 985.21 -10.74 983.04 2.35

-0.03 6.94 -6.97

-10.74 983.04 -0.02 983.02 -0.19 -10.74 983.04 -10.12 982.41 -0.20

-0.02 983.02 0.00 983.02 0.00 -10.12 982.41 -7.12 979.41 -6.40

0.00 983.02 0.10 983.02 0.00 -7.12 979.41 0.00 979.41 -25.86

0.10 983.02 10.71 983.00 -0.37 0.00 979.41 7.12 979.41 -25.86

7.12 979.41 10.12 982.41 -6.40

10.12 982.41 10.71 983.00 -0.20

-0.57 -64.91 64.34

10.71 983.00 15.47 982.99 -0.23 10.71 983.00 12.92 985.21 2.35

15.47 982.99 16.69 983.02 -0.05 12.92 985.21 15.32 985.21 5.20

15.32 985.21 16.69 983.84 2.03

-0.28 9.59 -9.86

TOTAL AREAS(M2): 64.34 -16.83

0+180.00 -16.64 983.02 -15.21 983.00 -0.02 -16.64 983.84 -15.32 985.16 1.95

-15.21 983.00 -10.75 982.99 -0.14 -15.32 985.16 -12.92 985.16 5.13

-12.92 985.16 -10.75 982.99 2.28

-0.15 9.37 -9.52

-10.75 982.99 -0.02 982.96 -0.54 -10.75 982.99 -10.12 982.36 -0.22

-0.02 982.96 0.00 982.96 0.00 -10.12 982.36 -7.12 979.36 -6.49

0.00 982.96 0.82 982.96 -0.05 -7.12 979.36 0.00 979.36 -26.07

0.82 982.96 10.70 982.94 -0.75 0.00 979.36 7.12 979.36 -26.07

7.12 979.36 10.12 982.36 -6.49

10.12 982.36 10.70 982.94 -0.22

-1.34 -65.55 64.21

10.70 982.94 14.93 982.93 -0.38 10.70 982.94 12.92 985.16 2.28

14.93 982.93 14.97 982.93 0.00 12.92 985.16 14.97 985.16 4.37

-0.38 6.66 -7.04

TOTAL AREAS(M2): 64.21 -16.56

0+200.00 -15.00 983.00 -10.77 982.96 -0.08 -15.00 985.11 -12.92 985.11 4.39

-12.92 985.11 -10.77 982.96 2.23

-0.08 6.62 -6.69

-10.77 982.96 -0.02 982.87 -0.89 -10.77 982.96 -10.12 982.31 -0.24

-0.02 982.87 0.00 982.87 0.00 -10.12 982.31 -7.12 979.31 -6.57

0.00 982.87 4.62 982.86 -0.63 -7.12 979.31 0.00 979.31 -26.27

4.62 982.86 10.65 982.84 -0.91 0.00 979.31 7.12 979.31 -26.27

7.12 979.31 10.12 982.31 -6.57

Página 3

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

10.12 982.31 10.65 982.84 -0.23

-2.43 -66.13 63.70

10.65 982.84 15.00 982.83 -0.71 10.65 982.84 12.92 985.11 2.21

12.92 985.11 15.00 985.11 4.39

-0.71 6.60 -7.31

TOTAL AREAS(M2): 63.70 -14.01

0+220.00 -14.65 982.98 -10.80 982.94 -0.09 -14.65 985.06 -12.92 985.06 3.58

-12.92 985.06 -10.80 982.94 2.15

-0.09 5.73 -5.83

-10.80 982.94 -0.04 982.80 -1.24 -10.80 982.94 -10.12 982.26 -0.26

-0.04 982.80 0.00 982.80 -0.01 -10.12 982.26 -7.12 979.26 -6.67

0.00 982.80 0.16 982.80 -0.03 -7.12 979.26 0.00 979.26 -26.52

0.16 982.80 10.65 982.78 -2.01 0.00 979.26 7.12 979.26 -26.52

7.12 979.26 10.12 982.26 -6.67

10.12 982.26 10.65 982.78 -0.24

-3.29 -66.90 63.60

10.65 982.78 16.09 982.78 -1.11 10.65 982.78 12.92 985.06 2.13

16.09 982.78 17.59 982.78 -0.31 12.92 985.06 15.32 985.06 4.98

15.32 985.06 17.59 982.78 2.13

-1.42 9.25 -10.66

TOTAL AREAS(M2): 63.60 -16.49

0+240.00 -14.56 982.95 -10.82 982.91 -0.08 -14.56 985.01 -12.92 985.01 3.37

-12.92 985.01 -10.82 982.91 2.11

-0.08 5.48 -5.57

-10.82 982.91 -0.06 982.78 -1.15 -10.82 982.91 -10.12 982.21 -0.28

-0.06 982.78 0.00 982.78 -0.01 -10.12 982.21 -7.12 979.21 -6.73

0.00 982.78 0.12 982.78 -0.02 -7.12 979.21 0.00 979.21 -26.65

0.12 982.78 10.66 982.75 -1.97 0.00 979.21 7.12 979.21 -26.65

7.12 979.21 10.12 982.21 -6.73

10.12 982.21 10.66 982.75 -0.26

-3.15 -67.30 64.16

10.66 982.75 15.63 982.73 -1.04 10.66 982.75 12.92 985.01 2.09

15.63 982.73 16.58 982.74 -0.20 12.92 985.01 15.32 985.01 4.94

15.32 985.01 16.58 983.74 1.80

-1.25 8.83 -10.08

TOTAL AREAS(M2): 64.16 -15.64

0+260.00 -14.55 982.93 -10.84 982.88 -0.09 -14.55 984.95 -12.92 984.95 3.30

-12.92 984.95 -10.84 982.88 2.06

-0.09 5.36 -5.45

-10.84 982.88 -0.07 982.73 -1.32 -10.84 982.88 -10.12 982.15 -0.30

-0.07 982.73 0.00 982.73 -0.01 -10.12 982.15 -7.12 979.15 -6.81

0.00 982.73 0.10 982.73 -0.02 -7.12 979.15 0.00 979.15 -26.85

0.10 982.73 10.68 982.71 -2.17 0.00 979.15 7.12 979.15 -26.85

7.12 979.15 10.12 982.15 -6.81

10.12 982.15 10.68 982.71 -0.27

-3.53 -67.90 64.37

10.68 982.71 15.57 982.70 -1.07 10.68 982.71 12.92 984.95 2.03

12.92 984.95 15.32 984.95 4.87

15.32 984.95 15.57 984.71 0.47

-1.07 7.38 -8.45

Página 4

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 64.37 -13.90

0+280.00 -15.40 982.89 -15.00 982.88 0.00 -15.40 984.83 -15.32 984.90 0.15

-15.00 982.88 -10.85 982.83 -0.14 -15.32 984.90 -12.92 984.90 4.83

-12.92 984.90 -10.85 982.83 2.02

-0.15 7.00 -7.15

-10.85 982.83 -0.07 982.69 -1.42 -10.85 982.83 -10.12 982.10 -0.31

-0.07 982.69 0.00 982.69 -0.01 -10.12 982.10 -7.12 979.10 -6.87

0.00 982.69 0.10 982.69 -0.02 -7.12 979.10 0.00 979.10 -26.98

0.10 982.69 10.68 982.66 -2.29 0.00 979.10 7.12 979.10 -26.98

7.12 979.10 10.12 982.10 -6.87

10.12 982.10 10.68 982.66 -0.28

-3.74 -68.28 64.54

10.68 982.66 15.00 982.65 -1.03 10.68 982.66 12.92 984.90 2.00

12.92 984.90 15.00 984.90 4.18

-1.03 6.17 -7.20

TOTAL AREAS(M2): 64.54 -14.35

0+300.00 -16.31 982.83 -15.63 982.81 0.00 -16.31 983.86 -15.32 984.85 1.51

-15.63 982.81 -10.84 982.77 -0.17 -15.32 984.85 -12.92 984.85 4.85

-12.92 984.85 -10.84 982.77 2.04

-0.18 8.41 -8.59

-10.84 982.77 -0.07 982.67 -1.17 -10.84 982.77 -10.12 982.05 -0.30

-0.07 982.67 0.00 982.67 -0.01 -10.12 982.05 -7.12 979.05 -6.83

0.00 982.67 0.16 982.67 -0.03 -7.12 979.05 0.00 979.05 -26.90

0.16 982.67 10.67 982.60 -2.04 0.00 979.05 7.12 979.05 -26.90

7.12 979.05 10.12 982.05 -6.83

10.12 982.05 10.67 982.60 -0.28

-3.24 -68.05 64.81

10.67 982.60 14.48 982.58 -0.91 10.67 982.60 12.92 984.85 2.02

12.92 984.85 14.48 984.85 3.15

-0.91 5.17 -6.08

TOTAL AREAS(M2): 64.81 -14.67

0+320.00 -14.79 982.77 -10.85 982.73 -0.08 -14.79 984.80 -12.92 984.80 3.78

-12.92 984.80 -10.85 982.73 2.05

-0.08 5.83 -5.91

-10.85 982.73 -0.08 982.62 -1.04 -10.85 982.73 -10.12 982.00 -0.30

-0.08 982.62 0.00 982.62 -0.01 -10.12 982.00 -7.12 979.00 -6.82

0.00 982.62 0.14 982.62 -0.02 -7.12 979.00 0.00 979.00 -26.87

0.14 982.62 10.69 982.57 -1.89 0.00 979.00 7.12 979.00 -26.87

7.12 979.00 10.12 982.00 -6.82

10.12 982.00 10.69 982.57 -0.28

-2.96 -67.96 65.00

10.69 982.57 15.26 982.55 -0.98 10.69 982.57 12.92 984.80 2.03

15.26 982.55 16.18 982.54 -0.21 12.92 984.80 15.32 984.80 4.86

15.32 984.80 16.18 983.94 1.37

-1.20 8.27 -9.46

TOTAL AREAS(M2): 65.00 -15.38

0+340.00 -14.21 982.74 -10.88 982.71 -0.06 -14.21 984.75 -12.92 984.75 2.59

-12.92 984.75 -10.88 982.71 2.00

-0.06 4.60 -4.66

-10.88 982.71 -0.13 982.59 -1.02 -10.88 982.71 -10.12 981.95 -0.32

Página 5

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-0.13 982.59 0.00 982.59 -0.02 -10.12 981.95 -7.12 978.95 -6.89

0.00 982.59 0.13 982.59 -0.02 -7.12 978.95 0.00 978.95 -27.04

0.13 982.59 10.71 982.54 -1.91 0.00 978.95 7.12 978.95 -27.04

7.12 978.95 10.12 981.95 -6.89

10.12 981.95 10.71 982.54 -0.30

-2.97 -68.49 65.52

10.71 982.54 16.12 982.52 -1.18 10.71 982.54 12.92 984.75 1.98

16.12 982.52 16.84 982.51 -0.17 12.92 984.75 15.32 984.75 4.80

15.32 984.75 16.84 983.22 1.89

-1.34 8.68 -10.02

TOTAL AREAS(M2): 65.52 -14.68

0+360.00 -16.29 982.72 -15.37 982.71 0.00 -16.29 983.72 -15.32 984.70 1.45

-15.37 982.71 -10.89 982.66 -0.14 -15.32 984.70 -12.92 984.70 4.74

-12.92 984.70 -10.89 982.66 1.95

-0.15 8.14 -8.29

-10.89 982.66 -0.12 982.54 -1.26 -10.89 982.66 -10.12 981.90 -0.34

-0.12 982.54 0.00 982.54 -0.02 -10.12 981.90 -7.12 978.90 -6.97

0.00 982.54 0.16 982.54 -0.03 -7.12 978.90 0.00 978.90 -27.23

0.16 982.54 10.69 982.47 -2.28 0.00 978.90 7.12 978.90 -27.23

7.12 978.90 10.12 981.90 -6.97

10.12 981.90 10.69 982.47 -0.31

-3.59 -69.04 65.45

10.69 982.47 14.68 982.44 -1.06 10.69 982.47 12.92 984.70 1.92

12.92 984.70 14.68 984.70 3.48

-1.06 5.41 -6.47

TOTAL AREAS(M2): 65.45 -14.76

0+380.00 -17.27 982.70 -16.07 982.69 -0.01 -17.27 982.70 -15.32 984.64 1.89

-16.07 982.69 -10.89 982.62 -0.24 -15.32 984.64 -12.92 984.64 4.67

-12.92 984.64 -10.89 982.62 1.89

-0.25 8.44 -8.69

-10.89 982.62 -0.13 982.47 -1.66 -10.89 982.62 -10.12 981.84 -0.36

-0.13 982.47 0.00 982.47 -0.03 -10.12 981.84 -7.12 978.84 -7.07

0.00 982.47 0.38 982.47 -0.09 -7.12 978.84 0.00 978.84 -27.45

0.38 982.47 10.69 982.41 -2.67 0.00 978.84 7.12 978.84 -27.45

7.12 978.84 10.12 981.84 -7.07

10.12 981.84 10.69 982.41 -0.33

-4.45 -69.73 65.28

10.69 982.41 14.28 982.39 -1.06 10.69 982.41 12.92 984.64 1.85

12.92 984.64 14.28 984.64 2.63

-1.06 4.48 -5.55

TOTAL AREAS(M2): 65.28 -14.24

0+400.00 -15.22 982.67 -10.92 982.59 -0.18 -15.22 984.59 -12.92 984.59 4.41

-12.92 984.59 -10.92 982.59 1.84

-0.18 6.25 -6.43

-10.92 982.59 -0.12 982.38 -2.00 -10.92 982.59 -10.12 981.79 -0.38

-0.12 982.38 0.00 982.38 -0.04 -10.12 981.79 -7.12 978.79 -7.14

0.00 982.38 0.53 982.38 -0.15 -7.12 978.79 0.00 978.79 -27.62

0.53 982.38 10.71 982.38 -2.95 0.00 978.79 7.12 978.79 -27.62

7.12 978.79 10.12 981.79 -7.14

10.12 981.79 10.71 982.38 -0.34

Página 6

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-5.13 -70.24 65.10

10.71 982.38 14.77 982.38 -1.17 10.71 982.38 12.92 984.59 1.80

12.92 984.59 14.77 984.59 3.55

-1.17 5.35 -6.53

TOTAL AREAS(M2): 65.10 -12.96

0+420.00 -15.00 982.62 -10.92 982.54 -0.17 -15.00 984.54 -12.92 984.54 3.98

-12.92 984.54 -10.92 982.54 1.83

-0.17 5.81 -5.98

-10.92 982.54 -0.12 982.32 -2.08 -10.92 982.54 -10.12 981.74 -0.39

-0.12 982.32 0.00 982.32 -0.04 -10.12 981.74 -7.12 978.74 -7.15

0.00 982.32 0.53 982.32 -0.16 -7.12 978.74 0.00 978.74 -27.66

0.53 982.32 10.70 982.32 -3.09 0.00 978.74 7.12 978.74 -27.66

7.12 978.74 10.12 981.74 -7.15

10.12 981.74 10.70 982.32 -0.35

-5.36 -70.36 65.00

10.70 982.32 15.00 982.32 -1.30 10.70 982.32 12.92 984.54 1.79

12.92 984.54 15.00 984.54 3.98

-1.30 5.77 -7.07

TOTAL AREAS(M2): 65.00 -13.05

0+440.00 -15.00 982.59 -10.94 982.51 -0.16 -15.00 984.49 -12.92 984.49 3.95

-12.92 984.49 -10.94 982.51 1.80

-0.16 5.75 -5.91

-10.94 982.51 -0.12 982.30 -1.97 -10.94 982.51 -10.12 981.69 -0.40

-0.12 982.30 0.00 982.30 -0.04 -10.12 981.69 -7.12 978.69 -7.20

0.00 982.30 0.53 982.30 -0.15 -7.12 978.69 0.00 978.69 -27.77

0.53 982.30 10.70 982.27 -3.08 0.00 978.69 7.12 978.69 -27.77

7.12 978.69 10.12 981.69 -7.20

10.12 981.69 10.70 982.27 -0.36

-5.24 -70.71 65.47

10.70 982.27 15.00 982.26 -1.38 10.70 982.27 12.92 984.49 1.75

12.92 984.49 15.00 984.49 3.95

-1.38 5.70 -7.09

TOTAL AREAS(M2): 65.47 -12.99

0+460.00 -15.00 982.54 -10.95 982.47 -0.15 -15.00 984.44 -12.92 984.44 3.95

-12.92 984.44 -10.95 982.47 1.80

-0.15 5.74 -5.89

-10.95 982.47 -0.12 982.27 -1.83 -10.95 982.47 -10.12 981.64 -0.40

-0.12 982.27 0.00 982.27 -0.03 -10.12 981.64 -7.12 978.64 -7.21

0.00 982.27 0.53 982.27 -0.14 -7.12 978.64 0.00 978.64 -27.79

0.53 982.27 10.73 982.24 -2.87 0.00 978.64 7.12 978.64 -27.79

7.12 978.64 10.12 981.64 -7.21

10.12 981.64 10.73 982.24 -0.36

-4.88 -70.76 65.88

10.73 982.24 15.00 982.23 -1.28 10.73 982.24 12.92 984.44 1.76

12.92 984.44 15.00 984.44 3.95

-1.28 5.70 -6.98

TOTAL AREAS(M2): 65.88 -12.87

0+480.00 -15.00 982.52 -10.97 982.44 -0.17 -15.00 984.38 -12.92 984.38 3.87

-12.92 984.38 -10.97 982.44 1.73

-0.17 5.60 -5.77

Página 7

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-10.97 982.44 -0.12 982.21 -2.14 -10.97 982.44 -10.12 981.58 -0.44

-0.12 982.21 0.00 982.21 -0.04 -10.12 981.58 -7.12 978.58 -7.32

0.00 982.21 0.53 982.21 -0.17 -7.12 978.58 0.00 978.58 -28.04

0.53 982.21 10.72 982.18 -3.33 0.00 978.58 7.12 978.58 -28.04

7.12 978.58 10.12 981.58 -7.32

10.12 981.58 10.72 982.18 -0.38

-5.67 -71.54 65.87

10.72 982.18 15.00 982.17 -1.47 10.72 982.18 12.92 984.38 1.67

12.92 984.38 15.00 984.38 3.87

-1.47 5.55 -7.02

TOTAL AREAS(M2): 65.87 -12.79

0+500.00 -15.00 982.48 -10.99 982.40 -0.17 -15.00 984.33 -12.92 984.33 3.84

-12.92 984.33 -10.99 982.40 1.70

-0.17 5.55 -5.71

-10.99 982.40 -0.12 982.17 -2.15 -10.99 982.40 -10.12 981.53 -0.45

-0.12 982.17 0.00 982.17 -0.04 -10.12 981.53 -7.12 978.53 -7.36

0.00 982.17 0.53 982.17 -0.17 -7.12 978.53 0.00 978.53 -28.14

0.53 982.17 10.70 982.12 -3.49 0.00 978.53 7.12 978.53 -28.14

7.12 978.53 10.12 981.53 -7.36

10.12 981.53 10.70 982.12 -0.39

-5.84 -71.84 66.00

10.70 982.12 15.00 982.09 -1.63 10.70 982.12 12.92 984.33 1.64

12.92 984.33 15.00 984.33 3.84

-1.63 5.48 -7.11

TOTAL AREAS(M2): 66.00 -12.82

0+520.00 -15.00 982.46 -10.99 982.35 -0.21 -15.00 984.28 -12.92 984.28 3.79

-12.92 984.28 -10.99 982.35 1.66

-0.21 5.45 -5.66

-10.99 982.35 -0.12 982.07 -2.64 -10.99 982.35 -10.12 981.48 -0.47

-0.12 982.07 0.00 982.07 -0.05 -10.12 981.48 -7.12 978.48 -7.43

0.00 982.07 0.53 982.07 -0.21 -7.12 978.48 0.00 978.48 -28.31

0.53 982.07 10.67 982.03 -4.13 0.00 978.48 7.12 978.48 -28.31

7.12 978.48 10.12 981.48 -7.43

10.12 981.48 10.67 982.03 -0.39

-7.02 -72.34 65.32

10.67 982.03 15.00 982.01 -1.88 10.67 982.03 12.92 984.28 1.57

12.92 984.28 15.00 984.28 3.79

-1.88 5.36 -7.24

TOTAL AREAS(M2): 65.32 -12.90

0+540.00 -15.00 982.43 -11.02 982.33 -0.21 -15.00 984.23 -12.92 984.23 3.73

-12.92 984.23 -11.02 982.33 1.61

-0.21 5.34 -5.55

-11.02 982.33 -0.12 982.04 -2.69 -11.02 982.33 -10.12 981.43 -0.50

-0.12 982.04 0.00 982.04 -0.05 -10.12 981.43 -7.12 978.43 -7.51

0.00 982.04 0.53 982.04 -0.21 -7.12 978.43 0.00 978.43 -28.51

0.53 982.04 10.66 981.97 -4.37 0.00 978.43 7.12 978.43 -28.51

7.12 978.43 10.12 981.43 -7.51

10.12 981.43 10.66 981.97 -0.40

-7.32 -72.95 65.63

10.66 981.97 15.00 981.93 -2.09 10.66 981.97 12.92 984.23 1.50

Página 8

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

12.92 984.23 15.00 984.23 3.74

-2.09 5.24 -7.33

TOTAL AREAS(M2): 65.63 -12.88

0+560.00 -15.00 982.38 -11.03 982.28 -0.20 -15.00 984.18 -12.92 984.18 3.73

-12.92 984.18 -11.03 982.28 1.60

-0.20 5.33 -5.53

-11.03 982.28 -0.12 982.01 -2.55 -11.03 982.28 -10.12 981.38 -0.50

-0.12 982.01 0.00 982.01 -0.05 -10.12 981.38 -7.12 978.38 -7.52

0.00 982.01 0.53 982.01 -0.20 -7.12 978.38 0.00 978.38 -28.53

0.53 982.01 10.68 981.94 -4.15 0.00 978.38 7.12 978.38 -28.53

7.12 978.38 10.12 981.38 -7.52

10.12 981.38 10.68 981.94 -0.41

-6.95 -73.01 66.05

10.68 981.94 15.00 981.91 -1.97 10.68 981.94 12.92 984.18 1.51

12.92 984.18 15.00 984.18 3.73

-1.97 5.24 -7.21

TOTAL AREAS(M2): 66.05 -12.74

0+580.00 -15.00 982.29 -11.01 982.21 -0.16 -15.00 984.12 -12.92 984.12 3.81

-12.92 984.12 -11.01 982.21 1.67

-0.16 5.48 -5.64

-11.01 982.21 -0.12 981.99 -2.09 -11.01 982.21 -10.12 981.32 -0.47

-0.12 981.99 0.00 981.99 -0.04 -10.12 981.32 -7.12 978.32 -7.41

0.00 981.99 0.53 981.99 -0.16 -7.12 978.32 0.00 978.32 -28.27

0.53 981.99 10.73 981.93 -3.41 0.00 978.32 7.12 978.32 -28.27

7.12 978.32 10.12 981.32 -7.41

10.12 981.32 10.73 981.93 -0.41

-5.70 -72.24 66.54

10.73 981.93 15.00 981.91 -1.59 10.73 981.93 12.92 984.12 1.61

12.92 984.12 15.00 984.12 3.81

-1.59 5.41 -7.01

TOTAL AREAS(M2): 66.54 -12.64

0+600.00 -15.00 982.22 -11.00 982.15 -0.13 -15.00 984.07 -12.92 984.07 3.86

-12.92 984.07 -11.00 982.15 1.72

-0.13 5.58 -5.71

-11.00 982.15 -0.12 981.98 -1.62 -11.00 982.15 -10.12 981.27 -0.44

-0.12 981.98 0.00 981.98 -0.03 -10.12 981.27 -7.12 978.27 -7.33

0.00 981.98 0.53 981.97 -0.13 -7.12 978.27 0.00 978.27 -28.08

0.53 981.97 10.72 981.87 -2.99 0.00 978.27 7.12 978.27 -28.08

7.12 978.27 10.12 981.27 -7.33

10.12 981.27 10.72 981.87 -0.39

-4.77 -71.67 66.90

10.72 981.87 15.00 981.83 -1.57 10.72 981.87 12.92 984.07 1.66

12.92 984.07 15.00 984.07 3.86

-1.57 5.52 -7.09

TOTAL AREAS(M2): 66.90 -12.80

0+620.00 -15.00 982.15 -10.99 982.09 -0.11 -15.00 984.02 -12.92 984.02 3.90

-12.92 984.02 -10.99 982.09 1.75

-0.11 5.65 -5.76

-10.99 982.09 -0.12 981.94 -1.41 -10.99 982.09 -10.12 981.22 -0.43

-0.12 981.94 0.00 981.94 -0.03 -10.12 981.22 -7.12 978.22 -7.28

Página 9

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

0.00 981.94 0.53 981.93 -0.11 -7.12 978.22 0.00 978.22 -27.96

0.53 981.93 10.71 981.81 -2.82 0.00 978.22 7.12 978.22 -27.96

7.12 978.22 10.12 981.22 -7.28

10.12 981.22 10.71 981.81 -0.37

-4.37 -71.27 66.90

10.71 981.81 15.00 981.75 -1.57 10.71 981.81 12.92 984.02 1.70

12.92 984.02 15.00 984.02 3.90

-1.57 5.59 -7.17

TOTAL AREAS(M2): 66.90 -12.93

0+640.00 -15.00 982.08 -10.97 982.02 -0.13 -15.00 983.97 -12.92 983.97 3.93

-12.92 983.97 -10.97 982.02 1.78

-0.13 5.71 -5.84

-10.97 982.02 -0.12 981.84 -1.64 -10.97 982.02 -10.12 981.17 -0.41

-0.12 981.84 0.00 981.84 -0.03 -10.12 981.17 -7.12 978.17 -7.24

0.00 981.84 0.53 981.83 -0.13 -7.12 978.17 0.00 978.17 -27.86

0.53 981.83 10.67 981.72 -3.07 0.00 978.17 7.12 978.17 -27.86

7.12 978.17 10.12 981.17 -7.24

10.12 981.17 10.67 981.72 -0.35

-4.87 -70.95 66.08

10.67 981.72 15.00 981.67 -1.65 10.67 981.72 12.92 983.97 1.72

12.92 983.97 15.00 983.97 3.93

-1.65 5.64 -7.30

TOTAL AREAS(M2): 66.08 -13.13

0+660.00 -15.00 982.03 -10.96 981.95 -0.15 -15.00 983.92 -12.92 983.92 3.93

-12.92 983.92 -10.96 981.95 1.78

-0.15 5.71 -5.86

-10.96 981.95 -0.12 981.76 -1.82 -10.96 981.95 -10.12 981.12 -0.41

-0.12 981.76 0.00 981.76 -0.03 -10.12 981.12 -7.12 978.12 -7.23

0.00 981.76 0.53 981.75 -0.14 -7.12 978.12 0.00 978.12 -27.84

0.53 981.75 10.66 981.66 -3.23 0.00 978.12 7.12 978.12 -27.84

7.12 978.12 10.12 981.12 -7.23

10.12 981.12 10.66 981.66 -0.35

-5.23 -70.90 65.67

10.66 981.66 15.00 981.62 -1.68 10.66 981.66 12.92 983.92 1.72

12.92 983.92 15.00 983.92 3.93

-1.68 5.65 -7.33

TOTAL AREAS(M2): 65.67 -13.18

0+680.00 -15.00 981.96 -10.96 981.91 -0.12 -15.00 983.86 -12.92 983.86 3.95

-12.92 983.86 -10.96 981.91 1.80

-0.12 5.75 -5.87

-10.96 981.91 -0.12 981.75 -1.46 -10.96 981.91 -10.12 981.06 -0.40

-0.12 981.75 0.00 981.75 -0.03 -10.12 981.06 -7.12 978.06 -7.20

0.00 981.75 0.53 981.74 -0.12 -7.12 978.06 0.00 978.06 -27.77

0.53 981.74 10.66 981.60 -2.95 0.00 978.06 7.12 978.06 -27.77

7.12 978.06 10.12 981.06 -7.20

10.12 981.06 10.66 981.60 -0.34

-4.55 -70.68 66.13

10.66 981.60 15.00 981.54 -1.69 10.66 981.60 12.92 983.86 1.74

12.92 983.86 15.00 983.86 3.95

-1.69 5.69 -7.38

Página 10

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 66.13 -13.26

0+700.00 -15.00 981.93 -10.99 981.88 -0.10 -15.00 983.81 -12.92 983.81 3.91

-12.92 983.81 -10.99 981.88 1.76

-0.10 5.67 -5.77

-10.99 981.88 -0.12 981.75 -1.26 -10.99 981.88 -10.12 981.01 -0.42

-0.12 981.75 0.00 981.75 -0.02 -10.12 981.01 -7.12 978.01 -7.27

0.00 981.75 0.53 981.74 -0.10 -7.12 978.01 0.00 978.01 -27.92

0.53 981.74 10.68 981.58 -2.80 0.00 978.01 7.12 978.01 -27.92

7.12 978.01 10.12 981.01 -7.27

10.12 981.01 10.68 981.58 -0.36

-4.18 -71.17 66.98

10.68 981.58 15.00 981.51 -1.70 10.68 981.58 12.92 983.81 1.70

12.92 983.81 15.00 983.81 3.91

-1.70 5.61 -7.30

TOTAL AREAS(M2): 66.98 -13.07

0+720.00 -15.00 981.91 -11.02 981.86 -0.10 -15.00 983.76 -12.92 983.76 3.85

-12.92 983.76 -11.02 981.86 1.71

-0.10 5.57 -5.67

-11.02 981.86 -0.12 981.71 -1.36 -11.02 981.86 -10.12 980.96 -0.45

-0.12 981.71 0.00 981.71 -0.02 -10.12 980.96 -7.12 977.96 -7.34

0.00 981.71 0.53 981.70 -0.11 -7.12 977.96 0.00 977.96 -28.11

0.53 981.70 10.69 981.53 -2.97 0.00 977.96 7.12 977.96 -28.11

7.12 977.96 10.12 980.96 -7.34

10.12 980.96 10.69 981.53 -0.38

-4.46 -71.73 67.28

10.69 981.53 15.00 981.46 -1.78 10.69 981.53 12.92 983.76 1.64

12.92 983.76 15.00 983.76 3.85

-1.78 5.50 -7.28

TOTAL AREAS(M2): 67.28 -12.95

0+740.00 -15.00 981.89 -11.03 981.82 -0.14 -15.00 983.71 -12.92 983.71 3.78

-12.92 983.71 -11.03 981.82 1.65

-0.14 5.42 -5.56

-11.03 981.82 -0.12 981.63 -1.80 -11.03 981.82 -10.12 980.91 -0.48

-0.12 981.63 0.00 981.63 -0.03 -10.12 980.91 -7.12 977.91 -7.45

0.00 981.63 0.53 981.62 -0.14 -7.12 977.91 0.00 977.91 -28.37

0.53 981.62 10.70 981.48 -3.44 0.00 977.91 7.12 977.91 -28.37

7.12 977.91 10.12 980.91 -7.45

10.12 980.91 10.70 981.48 -0.40

-5.42 -72.52 67.10

10.70 981.48 15.00 981.43 -1.88 10.70 981.48 12.92 983.71 1.57

12.92 983.71 15.00 983.71 3.78

-1.88 5.34 -7.23

TOTAL AREAS(M2): 67.10 -12.79

0+760.00 -15.00 981.85 -11.05 981.78 -0.14 -15.00 983.66 -12.92 983.66 3.75

-12.92 983.66 -11.05 981.78 1.62

-0.14 5.38 -5.51

-11.05 981.78 -0.12 981.59 -1.80 -11.05 981.78 -10.12 980.86 -0.49

-0.12 981.59 0.00 981.59 -0.03 -10.12 980.86 -7.12 977.86 -7.49

0.00 981.59 0.53 981.58 -0.14 -7.12 977.86 0.00 977.86 -28.45

0.53 981.58 10.67 981.41 -3.62 0.00 977.86 7.12 977.86 -28.45

Página 11

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

7.12 977.86 10.12 980.86 -7.49

10.12 980.86 10.67 981.41 -0.40

-5.59 -72.77 67.18

10.67 981.41 15.00 981.34 -2.07 10.67 981.41 12.92 983.66 1.53

12.92 983.66 15.00 983.66 3.75

-2.07 5.28 -7.35

TOTAL AREAS(M2): 67.18 -12.86

0+780.00 -15.34 981.81 -15.00 981.81 0.00 -15.34 983.59 -15.32 983.60 0.03

-15.00 981.81 -11.05 981.73 -0.14 -15.32 983.60 -12.92 983.60 4.31

-12.92 983.60 -11.05 981.73 1.61

-0.14 5.96 -6.10

-11.05 981.73 -0.12 981.52 -1.96 -11.05 981.73 -10.12 980.80 -0.50

-0.12 981.52 0.00 981.52 -0.03 -10.12 980.80 -7.12 977.80 -7.51

0.00 981.52 0.56 981.51 -0.16 -7.12 977.80 0.00 977.80 -28.50

0.56 981.51 10.66 981.35 -3.81 0.00 977.80 7.12 977.80 -28.50

7.12 977.80 10.12 980.80 -7.51

10.12 980.80 10.66 981.35 -0.40

-5.97 -72.91 66.94

10.66 981.35 15.00 981.28 -2.14 10.66 981.35 12.92 983.60 1.51

12.92 983.60 15.00 983.60 3.75

-2.14 5.26 -7.40

TOTAL AREAS(M2): 66.94 -13.50

0+800.00 -16.88 981.75 -15.16 981.76 0.01 -16.88 982.00 -15.32 983.55 1.60

-15.16 981.76 -11.05 981.68 -0.12 -15.32 983.55 -12.92 983.55 4.33

-12.92 983.55 -11.05 981.68 1.63

-0.11 7.56 -7.67

-11.05 981.68 -0.13 981.48 -1.81 -11.05 981.68 -10.12 980.75 -0.49

-0.13 981.48 0.00 981.48 -0.03 -10.12 980.75 -7.12 977.75 -7.48

0.00 981.48 2.26 981.43 -0.65 -7.12 977.75 0.00 977.75 -28.44

2.26 981.43 10.64 981.27 -3.31 0.00 977.75 7.12 977.75 -28.44

7.12 977.75 10.12 980.75 -7.48

10.12 980.75 10.64 981.27 -0.38

-5.80 -72.71 66.91

10.64 981.27 14.86 981.18 -2.20 10.64 981.27 12.92 983.55 1.52

12.92 983.55 14.86 983.55 3.50

-2.20 5.02 -7.22

TOTAL AREAS(M2): 66.91 -14.89

0+820.00 -15.00 981.67 -11.03 981.61 -0.12 -15.00 983.50 -12.92 983.50 3.80

-12.92 983.50 -11.03 981.61 1.68

-0.12 5.48 -5.60

-11.03 981.61 -0.15 981.44 -1.57 -11.03 981.61 -10.12 980.70 -0.47

-0.15 981.44 0.00 981.44 -0.03 -10.12 980.70 -7.12 977.70 -7.40

0.00 981.44 0.92 981.42 -0.22 -7.12 977.70 0.00 977.70 -28.25

0.92 981.42 10.67 981.25 -3.23 0.00 977.70 7.12 977.70 -28.25

7.12 977.70 10.12 980.70 -7.40

10.12 980.70 10.67 981.25 -0.38

-5.05 -72.16 67.12

10.67 981.25 15.20 981.17 -2.07 10.67 981.25 12.92 983.50 1.59

15.20 981.17 16.59 981.15 -0.70 12.92 983.50 15.32 983.50 4.40

15.32 983.50 16.59 982.23 1.52

Página 12

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-2.77 7.51 -10.28

TOTAL AREAS(M2): 67.12 -15.88

0+840.00 -14.50 981.59 -11.03 981.55 -0.07 -14.50 983.45 -12.92 983.45 2.93

-12.92 983.45 -11.03 981.55 1.72

-0.07 4.65 -4.71

-11.03 981.55 -0.23 981.43 -1.08 -11.03 981.55 -10.12 980.65 -0.45

-0.23 981.43 0.00 981.43 -0.04 -10.12 980.65 -7.12 977.65 -7.34

0.00 981.43 0.52 981.42 -0.09 -7.12 977.65 0.00 977.65 -28.09

0.52 981.42 10.71 981.23 -2.72 0.00 977.65 7.12 977.65 -28.09

7.12 977.65 10.12 980.65 -7.34

10.12 980.65 10.71 981.23 -0.38

-3.92 -71.68 67.75

10.71 981.23 16.15 981.14 -2.22 10.71 981.23 12.92 983.45 1.66

16.15 981.14 16.66 981.13 -0.23 12.92 983.45 15.32 983.45 4.45

15.32 983.45 16.66 982.11 1.59

-2.46 7.69 -10.15

TOTAL AREAS(M2): 67.75 -14.86

0+860.00 -15.30 981.56 -11.05 981.52 -0.09 -15.30 983.40 -12.92 983.40 4.36

-12.92 983.40 -11.05 981.52 1.68

-0.09 6.04 -6.13

-11.05 981.52 -0.22 981.42 -0.99 -11.05 981.52 -10.12 980.60 -0.47

-0.22 981.42 0.00 981.42 -0.03 -10.12 980.60 -7.12 977.60 -7.40

0.00 981.42 0.69 981.40 -0.11 -7.12 977.60 0.00 977.60 -28.25

0.69 981.40 10.68 981.16 -2.85 0.00 977.60 7.12 977.60 -28.25

7.12 977.60 10.12 980.60 -7.40

10.12 980.60 10.68 981.16 -0.39

-3.98 -72.17 68.19

10.68 981.16 14.70 981.06 -1.84 10.68 981.16 12.92 983.40 1.59

12.92 983.40 14.70 983.40 3.27

-1.84 4.86 -6.70

TOTAL AREAS(M2): 68.19 -12.82

0+880.00 -15.22 981.52 -15.05 981.52 0.00 -15.22 983.34 -12.92 983.34 4.21

-15.05 981.52 -11.05 981.47 -0.08 -12.92 983.34 -11.05 981.47 1.67

-0.08 5.88 -5.96

-11.05 981.47 -0.21 981.35 -1.11 -11.05 981.47 -10.12 980.54 -0.47

-0.21 981.35 0.00 981.35 -0.04 -10.12 980.54 -7.12 977.54 -7.42

0.00 981.35 0.76 981.33 -0.13 -7.12 977.54 0.00 977.54 -28.28

0.76 981.33 10.66 981.08 -3.07 0.00 977.54 7.12 977.54 -28.28

7.12 977.54 10.12 980.54 -7.42

10.12 980.54 10.66 981.08 -0.38

-4.35 -72.24 67.89

10.66 981.08 14.94 980.98 -2.08 10.66 981.08 12.92 983.34 1.58

12.92 983.34 14.94 983.34 3.69

-2.08 5.26 -7.34

TOTAL AREAS(M2): 67.89 -13.30

0+900.00 -15.75 981.50 -15.15 981.51 0.00 -15.75 982.86 -15.32 983.29 0.68

-15.15 981.51 -11.08 981.45 -0.08 -15.32 983.29 -12.92 983.29 4.30

-12.92 983.29 -11.08 981.45 1.60

-0.07 6.58 -6.66

-11.08 981.45 -0.21 981.28 -1.47 -11.08 981.45 -10.12 980.49 -0.51

Página 13

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-0.21 981.28 0.00 981.28 -0.05 -10.12 980.49 -7.12 977.49 -7.53

0.00 981.28 1.01 981.26 -0.24 -7.12 977.49 0.00 977.49 -28.55

1.01 981.26 10.65 981.02 -3.52 0.00 977.49 7.12 977.49 -28.55

7.12 977.49 10.12 980.49 -7.53

10.12 980.49 10.65 981.02 -0.39

-5.27 -73.06 67.79

10.65 981.02 14.82 980.92 -2.22 10.65 981.02 12.92 983.29 1.49

12.92 983.29 14.82 983.29 3.40

-2.22 4.88 -7.11

TOTAL AREAS(M2): 67.79 -13.76

0+920.00 -14.92 981.48 -11.09 981.41 -0.13 -14.92 983.24 -12.92 983.24 3.53

-12.92 983.24 -11.09 981.41 1.55

-0.13 5.08 -5.21

-11.09 981.41 -0.22 981.22 -1.76 -11.09 981.41 -10.12 980.44 -0.54

-0.22 981.22 0.00 981.22 -0.06 -10.12 980.44 -7.12 977.44 -7.62

0.00 981.22 0.86 981.20 -0.23 -7.12 977.44 0.00 977.44 -28.76

0.86 981.20 10.63 980.95 -3.96 0.00 977.44 7.12 977.44 -28.76

7.12 977.44 10.12 980.44 -7.62

10.12 980.44 10.63 980.95 -0.40

-6.01 -73.68 67.67

10.63 980.95 15.13 980.84 -2.63 10.63 980.95 12.92 983.24 1.41

12.92 983.24 15.13 983.24 3.89

-2.63 5.30 -7.94

TOTAL AREAS(M2): 67.67 -13.14

0+940.00 -15.05 981.43 -11.09 981.36 -0.14 -15.05 983.19 -12.92 983.19 3.75

-12.92 983.19 -11.09 981.36 1.54

-0.14 5.30 -5.43

-11.09 981.36 -0.22 981.17 -1.77 -11.09 981.36 -10.12 980.39 -0.54

-0.22 981.17 0.00 981.17 -0.06 -10.12 980.39 -7.12 977.39 -7.62

0.00 981.17 0.92 981.14 -0.25 -7.12 977.39 0.00 977.39 -28.77

0.92 981.14 10.62 980.89 -4.02 0.00 977.39 7.12 977.39 -28.77

7.12 977.39 10.12 980.39 -7.62

10.12 980.39 10.62 980.89 -0.39

-6.10 -73.73 67.63

10.62 980.89 14.92 980.77 -2.59 10.62 980.89 12.92 983.19 1.40

12.92 983.19 14.92 983.19 3.52

-2.59 4.92 -7.51

TOTAL AREAS(M2): 67.63 -12.95

0+960.00 -14.78 981.38 -11.09 981.31 -0.12 -14.78 983.14 -12.92 983.14 3.27

-12.92 983.14 -11.09 981.31 1.55

-0.12 4.82 -4.94

-11.09 981.31 -0.25 981.12 -1.71 -11.09 981.31 -10.12 980.34 -0.54

-0.25 981.12 0.00 981.12 -0.06 -10.12 980.34 -7.12 977.34 -7.62

0.00 981.12 0.65 981.10 -0.17 -7.12 977.34 0.00 977.34 -28.76

0.65 981.10 10.60 980.82 -4.13 0.00 977.34 7.12 977.34 -28.76

7.12 977.34 10.12 980.34 -7.62

10.12 980.34 10.60 980.82 -0.39

-6.08 -73.67 67.59

10.60 980.82 15.41 980.69 -2.99 10.60 980.82 12.92 983.14 1.40

15.41 980.69 16.41 980.72 -0.67 12.92 983.14 15.32 983.14 4.23

Página 14

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

15.32 983.14 16.41 982.05 1.33

-3.66 6.95 -10.61

TOTAL AREAS(M2): 67.59 -15.55

0+980.00 -14.76 981.34 -14.61 981.34 0.00 -14.76 983.08 -12.92 983.08 3.22

-14.61 981.34 -11.11 981.27 -0.12 -12.92 983.08 -11.11 981.27 1.52

-0.11 4.74 -4.86

-11.11 981.27 -0.30 981.06 -1.89 -11.11 981.27 -10.12 980.28 -0.55

-0.30 981.06 0.00 981.05 -0.09 -10.12 980.28 -7.12 977.28 -7.66

0.00 981.05 0.53 981.04 -0.16 -7.12 977.28 0.00 977.28 -28.86

0.53 981.04 10.61 980.78 -4.34 0.00 977.28 7.12 977.28 -28.86

7.12 977.28 10.12 980.28 -7.66

10.12 980.28 10.61 980.78 -0.40

-6.47 -73.99 67.52

10.61 980.78 15.58 980.65 -3.09 10.61 980.78 12.92 983.08 1.37

15.58 980.65 16.06 980.67 -0.33 12.92 983.08 15.32 983.08 4.19

15.32 983.08 16.06 982.34 1.02

-3.41 6.59 -10.00

TOTAL AREAS(M2): 67.52 -14.86

1+000.00 -15.61 981.33 -15.32 981.34 0.00 -15.61 982.74 -15.32 983.03 0.45

-15.32 981.34 -11.14 981.26 -0.15 -15.32 983.03 -12.92 983.03 4.08

-12.92 983.03 -11.14 981.26 1.44

-0.15 5.97 -6.13

-11.14 981.26 -0.28 981.05 -1.98 -11.14 981.26 -10.12 980.23 -0.60

-0.28 981.05 0.00 981.04 -0.08 -10.12 980.23 -7.12 977.23 -7.80

0.00 981.04 0.67 981.02 -0.20 -7.12 977.23 0.00 977.23 -29.20

0.67 981.02 10.60 980.72 -4.62 0.00 977.23 7.12 977.23 -29.20

7.12 977.23 10.12 980.23 -7.80

10.12 980.23 10.60 980.72 -0.42

-6.90 -75.01 68.12

10.60 980.72 14.69 980.59 -2.77 10.60 980.72 12.92 983.03 1.25

12.92 983.03 14.69 983.03 3.00

-2.77 4.26 -7.03

TOTAL AREAS(M2): 68.12 -13.15

1+020.00 -15.02 981.30 -11.15 981.21 -0.18 -15.02 982.98 -12.92 982.98 3.51

-12.92 982.98 -11.15 981.21 1.40

-0.18 4.92 -5.09

-11.15 981.21 -0.29 980.96 -2.39 -11.15 981.21 -10.12 980.18 -0.63

-0.29 980.96 0.00 980.95 -0.10 -10.12 980.18 -7.12 977.18 -7.87

0.00 980.95 0.66 980.93 -0.24 -7.12 977.18 0.00 977.18 -29.36

0.66 980.93 10.59 980.65 -5.11 0.00 977.18 7.12 977.18 -29.36

7.12 977.18 10.12 980.18 -7.87

10.12 980.18 10.59 980.65 -0.42

-7.84 -75.51 67.67

10.59 980.65 14.98 980.53 -3.14 10.59 980.65 12.92 982.98 1.19

14.98 980.53 15.23 980.53 -0.19 12.92 982.98 15.23 982.98 3.87

-3.34 5.07 -8.40

TOTAL AREAS(M2): 67.67 -13.49

1+040.00 -14.76 981.24 -11.14 981.15 -0.16 -14.76 982.93 -12.92 982.93 3.11

-12.92 982.93 -11.14 981.15 1.42

-0.16 4.53 -4.69

Página 15

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-11.14 981.15 -0.32 980.88 -2.45 -11.14 981.15 -10.12 980.13 -0.61

-0.32 980.88 0.00 980.87 -0.12 -10.12 980.13 -7.12 977.13 -7.83

0.00 980.87 0.58 980.85 -0.22 -7.12 977.13 0.00 977.13 -29.26

0.58 980.85 10.59 980.60 -5.11 0.00 977.13 7.12 977.13 -29.26

7.12 977.13 10.12 980.13 -7.83

10.12 980.13 10.59 980.60 -0.41

-7.89 -75.21 67.32

10.59 980.60 15.34 980.48 -3.30 10.59 980.60 12.92 982.93 1.23

15.34 980.48 15.46 980.49 -0.09 12.92 982.93 15.32 982.93 4.06

15.32 982.93 15.46 982.79 0.23

-3.39 5.51 -8.91

TOTAL AREAS(M2): 67.32 -13.60

1+060.00 -15.47 981.22 -15.16 981.21 0.00 -15.47 982.72 -15.32 982.88 0.24

-15.16 981.21 -11.14 981.10 -0.24 -15.32 982.88 -12.92 982.88 3.98

-12.92 982.88 -11.14 981.10 1.37

-0.24 5.60 -5.84

-11.14 981.10 -0.30 980.79 -2.96 -11.14 981.10 -10.12 980.08 -0.64

-0.30 980.79 0.00 980.78 -0.13 -10.12 980.08 -7.12 977.08 -7.92

0.00 980.78 0.67 980.76 -0.30 -7.12 977.08 0.00 977.08 -29.47

0.67 980.76 10.57 980.53 -5.65 0.00 977.08 7.12 977.08 -29.47

7.12 977.08 10.12 980.08 -7.92

10.12 980.08 10.57 980.53 -0.41

-9.04 -75.84 66.80

10.57 980.53 14.83 980.43 -3.14 10.57 980.53 12.92 982.88 1.14

12.92 982.88 14.83 982.88 3.17

-3.14 4.31 -7.46

TOTAL AREAS(M2): 66.80 -13.30

1+080.00 -15.95 981.21 -15.24 981.20 0.00 -15.95 982.19 -15.32 982.83 0.82

-15.24 981.20 -11.18 981.09 -0.26 -15.32 982.83 -12.92 982.83 3.88

-12.92 982.83 -11.18 981.09 1.30

-0.27 6.01 -6.27

-11.18 981.09 -0.29 980.78 -3.00 -11.18 981.09 -10.12 980.03 -0.69

-0.29 980.78 0.00 980.77 -0.12 -10.12 980.03 -7.12 977.03 -8.05

0.00 980.77 0.87 980.75 -0.39 -7.12 977.03 0.00 977.03 -29.78

0.87 980.75 10.59 980.49 -5.70 0.00 977.03 7.12 977.03 -29.78

7.12 977.03 10.12 980.03 -8.05

10.12 980.03 10.59 980.49 -0.44

-9.22 -76.78 67.57

10.59 980.49 14.72 980.39 -3.17 10.59 980.49 12.92 982.83 1.05

12.92 982.83 14.72 982.83 2.91

-3.17 3.96 -7.13

TOTAL AREAS(M2): 67.57 -13.40

1+100.00 -14.93 981.17 -11.20 981.06 -0.21 -14.93 982.77 -12.92 982.77 3.22

-12.92 982.77 -11.20 981.06 1.28

-0.21 4.50 -4.71

-11.20 981.06 -0.30 980.73 -3.03 -11.20 981.06 -10.12 979.97 -0.71

-0.30 980.73 0.00 980.72 -0.13 -10.12 979.97 -7.12 976.97 -8.09

0.00 980.72 0.79 980.70 -0.36 -7.12 976.97 0.00 976.97 -29.89

0.79 980.70 10.58 980.43 -5.95 0.00 976.97 7.12 976.97 -29.89

7.12 976.97 10.12 979.97 -8.09

Página 16

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

10.12 979.97 10.58 980.43 -0.44

-9.48 -77.12 67.64

10.58 980.43 15.12 980.31 -3.65 10.58 980.43 12.92 982.77 1.01

15.12 980.31 15.38 980.34 -0.23 12.92 982.77 15.32 982.77 3.84

15.32 982.77 15.38 982.71 0.10

-3.87 4.95 -8.83

TOTAL AREAS(M2): 67.64 -13.53

1+120.00 -14.92 981.08 -11.18 980.98 -0.19 -14.92 982.72 -12.92 982.72 3.28

-12.92 982.72 -11.18 980.98 1.33

-0.19 4.61 -4.81

-11.18 980.98 -0.31 980.68 -2.78 -11.18 980.98 -10.12 979.92 -0.67

-0.31 980.68 0.00 980.67 -0.13 -10.12 979.92 -7.12 976.92 -7.99

0.00 980.67 0.74 980.65 -0.31 -7.12 976.92 0.00 976.92 -29.64

0.74 980.65 10.59 980.39 -5.58 0.00 976.92 7.12 976.92 -29.64

7.12 976.92 10.12 979.92 -7.99

10.12 979.92 10.59 980.39 -0.43

-8.79 -76.37 67.57

10.59 980.39 15.11 980.27 -3.44 10.59 980.39 12.92 982.72 1.10

15.11 980.27 15.22 980.28 -0.08 12.92 982.72 15.22 982.72 3.76

-3.52 4.85 -8.37

TOTAL AREAS(M2): 67.57 -13.18

1+140.00 -15.04 981.04 -11.17 980.92 -0.23 -15.04 982.67 -12.92 982.67 3.46

-12.92 982.67 -11.17 980.92 1.32

-0.23 4.79 -5.02

-11.17 980.92 -0.31 980.58 -3.15 -11.17 980.92 -10.12 979.87 -0.68

-0.31 980.58 0.00 980.57 -0.14 -10.12 979.87 -7.12 976.87 -8.01

0.00 980.57 0.75 980.55 -0.36 -7.12 976.87 0.00 976.87 -29.68

0.75 980.55 10.56 980.30 -5.99 0.00 976.87 7.12 976.87 -29.68

7.12 976.87 10.12 979.87 -8.01

10.12 979.87 10.56 980.30 -0.41

-9.64 -76.46 66.82

10.56 980.30 14.94 980.19 -3.46 10.56 980.30 12.92 982.67 1.06

12.92 982.67 14.94 982.67 3.30

-3.46 4.36 -7.82

TOTAL AREAS(M2): 66.82 -12.84

1+160.00 -14.88 981.01 -11.18 980.88 -0.23 -14.88 982.62 -12.92 982.62 3.15

-12.92 982.62 -11.18 980.88 1.29

-0.23 4.44 -4.67

-11.18 980.88 -0.33 980.51 -3.37 -11.18 980.88 -10.12 979.82 -0.70

-0.33 980.51 0.00 980.50 -0.16 -10.12 979.82 -7.12 976.82 -8.07

0.00 980.50 0.67 980.48 -0.35 -7.12 976.82 0.00 976.82 -29.83

0.67 980.48 10.56 980.26 -6.30 0.00 976.82 7.12 976.82 -29.83

7.12 976.82 10.12 979.82 -8.07

10.12 979.82 10.56 980.26 -0.43

-10.18 -76.91 66.74

10.56 980.26 15.19 980.15 -3.72 10.56 980.26 12.92 982.62 1.02

15.19 980.15 15.51 980.14 -0.28 12.92 982.62 15.32 982.62 3.87

15.32 982.62 15.51 982.43 0.29

-4.00 5.17 -9.17

TOTAL AREAS(M2): 66.74 -13.84

Página 17

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

1+180.00 -14.90 980.98 -11.20 980.84 -0.25 -14.90 982.57 -12.92 982.57 3.14

-12.92 982.57 -11.20 980.84 1.25

-0.25 4.39 -4.63

-11.20 980.84 -0.34 980.45 -3.59 -11.20 980.84 -10.12 979.77 -0.73

-0.34 980.45 0.00 980.44 -0.18 -10.12 979.77 -7.12 976.77 -8.14

0.00 980.44 0.63 980.42 -0.34 -7.12 976.77 0.00 976.77 -29.99

0.63 980.42 10.56 980.20 -6.59 0.00 976.77 7.12 976.77 -29.99

7.12 976.77 10.12 979.77 -8.14

10.12 979.77 10.56 980.20 -0.43

-10.71 -77.43 66.72

10.56 980.20 15.14 980.10 -3.79 10.56 980.20 12.92 982.57 0.96

15.14 980.10 15.30 980.10 -0.14 12.92 982.57 15.30 982.57 3.77

-3.93 4.73 -8.66

TOTAL AREAS(M2): 66.72 -13.29

1+200.00 -15.42 980.93 -15.05 980.92 0.00 -15.42 982.42 -15.32 982.51 0.15

-15.05 980.92 -11.18 980.78 -0.31 -15.32 982.51 -12.92 982.51 3.81

-12.92 982.51 -11.18 980.78 1.25

-0.31 5.20 -5.51

-11.18 980.78 -0.32 980.37 -3.85 -11.18 980.78 -10.12 979.71 -0.73

-0.32 980.37 0.00 980.36 -0.18 -10.12 979.71 -7.12 976.71 -8.14

0.00 980.36 0.68 980.35 -0.39 -7.12 976.71 0.00 976.71 -30.01

0.68 980.35 10.55 980.15 -6.73 0.00 976.71 7.12 976.71 -30.01

7.12 976.71 10.12 979.71 -8.14

10.12 979.71 10.55 980.15 -0.43

-11.15 -77.46 66.31

10.55 980.15 14.95 980.06 -3.62 10.55 980.15 12.92 982.51 0.95

12.92 982.51 14.95 982.51 3.22

-3.62 4.17 -7.79

TOTAL AREAS(M2): 66.31 -13.30

1+220.00 -16.11 980.90 -15.31 980.88 -0.01 -16.11 981.67 -15.32 982.46 0.93

-15.31 980.88 -11.18 980.72 -0.40 -15.32 982.46 -12.92 982.46 3.76

-12.92 982.46 -11.18 980.72 1.21

-0.41 5.89 -6.31

-11.18 980.72 -0.31 980.30 -4.19 -11.18 980.72 -10.12 979.66 -0.75

-0.31 980.30 0.00 980.29 -0.19 -10.12 979.66 -7.12 976.66 -8.20

0.00 980.29 0.96 980.27 -0.59 -7.12 976.66 0.00 976.66 -30.15

0.96 980.27 10.54 980.08 -6.91 0.00 976.66 7.12 976.66 -30.15

7.12 976.66 10.12 979.66 -8.20

10.12 979.66 10.54 980.08 -0.43

-11.88 -77.88 66.00

10.54 980.08 14.66 980.00 -3.54 10.54 980.08 12.92 982.46 0.89

12.92 982.46 14.66 982.46 2.73

-3.54 3.62 -7.17

TOTAL AREAS(M2): 66.00 -13.47

1+240.00 -15.00 980.85 -11.19 980.68 -0.32 -15.00 982.41 -12.92 982.41 3.24

-12.92 982.41 -11.19 980.68 1.20

-0.32 4.44 -4.76

-11.19 980.68 -0.31 980.20 -4.45 -11.19 980.68 -10.12 979.61 -0.76

-0.31 980.20 0.00 980.19 -0.20 -10.12 979.61 -7.12 976.61 -8.23

0.00 980.19 0.97 980.17 -0.65 -7.12 976.61 0.00 976.61 -30.21

Página 18

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

0.97 980.17 10.52 980.01 -7.27 0.00 976.61 7.12 976.61 -30.21

7.12 976.61 10.12 979.61 -8.23

10.12 979.61 10.52 980.01 -0.42

-12.57 -78.04 65.47

10.52 980.01 15.00 979.93 -3.94 10.52 980.01 12.92 982.41 0.86

12.92 982.41 15.00 982.41 3.24

-3.94 4.09 -8.04

TOTAL AREAS(M2): 65.47 -12.80

1+260.00 -15.09 980.79 -11.18 980.62 -0.34 -15.09 982.36 -12.92 982.36 3.41

-12.92 982.36 -11.18 980.62 1.22

-0.34 4.62 -4.96

-11.18 980.62 -0.33 980.13 -4.50 -11.18 980.62 -10.12 979.56 -0.74

-0.33 980.13 0.00 980.12 -0.22 -10.12 979.56 -7.12 976.56 -8.19

0.00 980.12 0.88 980.11 -0.60 -7.12 976.56 0.00 976.56 -30.13

0.88 980.11 10.52 979.96 -7.30 0.00 976.56 7.12 976.56 -30.13

7.12 976.56 10.12 979.56 -8.19

10.12 979.56 10.52 979.96 -0.41

-12.62 -77.80 65.18

10.52 979.96 14.90 979.89 -3.79 10.52 979.96 12.92 982.36 0.88

12.92 982.36 14.90 982.36 3.11

-3.79 3.99 -7.78

TOTAL AREAS(M2): 65.18 -12.75

1+280.00 -14.21 980.72 -11.20 980.58 -0.20 -14.21 982.31 -12.92 982.31 2.05

-12.92 982.31 -11.20 980.58 1.25

-0.20 3.30 -3.50

-11.20 980.58 -0.77 980.11 -3.87 -11.20 980.58 -10.12 979.51 -0.73

-0.77 980.11 0.00 980.08 -0.48 -10.12 979.51 -7.12 976.51 -8.14

0.00 980.08 0.73 980.07 -0.47 -7.12 976.51 0.00 976.51 -29.99

0.73 980.07 10.57 979.95 -6.95 0.00 976.51 7.12 976.51 -29.99

7.12 976.51 10.12 979.51 -8.14

10.12 979.51 10.57 979.95 -0.44

-11.78 -77.41 65.64

10.57 979.95 16.88 979.88 -5.08 10.57 979.95 12.92 982.31 0.97

16.88 979.88 17.75 979.87 -0.74 12.92 982.31 15.32 982.31 3.81

15.32 982.31 17.75 979.87 0.90

-5.82 5.68 -11.50

TOTAL AREAS(M2): 65.64 -15.00

1+300.00 -15.07 980.65 -11.16 980.49 -0.31 -15.07 982.25 -12.92 982.25 3.46

-12.92 982.25 -11.16 980.49 1.28

-0.31 4.73 -5.04

-11.16 980.49 -0.79 980.07 -3.81 -11.16 980.49 -10.12 979.45 -0.70

-0.79 980.07 0.00 980.04 -0.47 -10.12 979.45 -7.12 976.45 -8.08

0.00 980.04 0.72 980.03 -0.44 -7.12 976.45 0.00 976.45 -29.86

0.72 980.03 10.58 979.91 -6.67 0.00 976.45 7.12 976.45 -29.86

7.12 976.45 10.12 979.45 -8.08

10.12 979.45 10.58 979.91 -0.44

-11.39 -77.02 65.64

10.58 979.91 14.93 979.86 -3.32 10.58 979.91 12.92 982.25 1.02

14.93 979.86 15.81 979.86 -0.69 12.92 982.25 15.32 982.25 3.86

15.32 982.25 15.81 981.77 0.66

Página 19

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-4.00 5.54 -9.54

TOTAL AREAS(M2): 65.64 -14.59

1+320.00 -14.62 980.61 -11.19 980.47 -0.23 -14.62 982.20 -12.92 982.20 2.72

-12.92 982.20 -11.19 980.47 1.26

-0.23 3.98 -4.21

-11.19 980.47 -0.97 980.07 -3.46 -11.19 980.47 -10.12 979.40 -0.72

-0.97 980.07 0.00 980.03 -0.54 -10.12 979.40 -7.12 976.40 -8.12

0.00 980.03 0.65 980.02 -0.38 -7.12 976.40 0.00 976.40 -29.94

0.65 980.02 10.62 979.90 -6.45 0.00 976.40 7.12 976.40 -29.94

7.12 976.40 10.12 979.40 -8.12

10.12 979.40 10.62 979.90 -0.48

-10.83 -77.32 66.49

10.62 979.90 15.43 979.84 -3.54 10.62 979.90 12.92 982.20 1.02

12.92 982.20 15.32 982.20 3.83

15.32 982.20 15.43 982.09 0.16

-3.54 5.01 -8.55

TOTAL AREAS(M2): 66.49 -12.77

1+340.00 -15.00 980.56 -11.20 980.43 -0.26 -15.00 982.15 -12.92 982.15 3.30

-12.92 982.15 -11.20 980.43 1.25

-0.26 4.55 -4.81

-11.20 980.43 -0.97 980.06 -3.25 -11.20 980.43 -10.12 979.35 -0.73

-0.97 980.06 0.00 980.03 -0.50 -10.12 979.35 -7.12 976.35 -8.14

0.00 980.03 0.65 980.02 -0.35 -7.12 976.35 0.00 976.35 -29.99

0.65 980.02 10.65 979.88 -6.10 0.00 976.35 7.12 976.35 -29.99

7.12 976.35 10.12 979.35 -8.14

10.12 979.35 10.65 979.88 -0.51

-10.20 -77.50 67.30

10.65 979.88 15.00 979.83 -3.07 10.65 979.88 12.92 982.15 1.03

12.92 982.15 15.00 982.15 3.30

-3.07 4.33 -7.41

TOTAL AREAS(M2): 67.30 -12.21

1+360.00 -15.00 980.48 -11.17 980.35 -0.24 -15.00 982.10 -12.92 982.10 3.37

-12.92 982.10 -11.17 980.35 1.30

-0.24 4.68 -4.91

-11.17 980.35 -0.97 980.02 -2.98 -11.17 980.35 -10.12 979.30 -0.69

-0.97 980.02 0.00 979.99 -0.46 -10.12 979.30 -7.12 976.30 -8.04

0.00 979.99 0.65 979.98 -0.32 -7.12 976.30 0.00 976.30 -29.76

0.65 979.98 10.67 979.85 -5.65 0.00 976.30 7.12 976.30 -29.76

7.12 976.30 10.12 979.30 -8.04

10.12 979.30 10.67 979.85 -0.50

-9.41 -76.78 67.37

10.67 979.85 15.00 979.79 -2.85 10.67 979.85 12.92 982.10 1.11

12.92 982.10 15.00 982.10 3.37

-2.85 4.48 -7.34

TOTAL AREAS(M2): 67.37 -12.25

1+380.00 -15.00 980.42 -11.18 980.30 -0.23 -15.00 982.05 -12.92 982.05 3.38

-12.92 982.05 -11.18 980.30 1.31

-0.23 4.69 -4.92

-11.18 980.30 -0.97 979.99 -2.81 -11.18 980.30 -10.12 979.25 -0.68

-0.97 979.99 0.00 979.96 -0.44 -10.12 979.25 -7.12 976.25 -8.03

Página 20

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

0.00 979.96 0.66 979.95 -0.31 -7.12 976.25 0.00 976.25 -29.73

0.66 979.95 10.67 979.79 -5.52 0.00 976.25 7.12 976.25 -29.73

7.12 976.25 10.12 979.25 -8.03

10.12 979.25 10.67 979.79 -0.49

-9.07 -76.68 67.62

10.67 979.79 15.00 979.72 -2.87 10.67 979.79 12.92 982.05 1.12

12.92 982.05 15.00 982.05 3.38

-2.87 4.50 -7.38

TOTAL AREAS(M2): 67.62 -12.29

1+400.00 -15.01 980.35 -11.16 980.23 -0.23 -15.01 981.99 -12.92 981.99 3.42

-12.92 981.99 -11.16 980.23 1.34

-0.23 4.76 -4.99

-11.16 980.23 -1.00 979.92 -2.82 -11.16 980.23 -10.12 979.19 -0.66

-1.00 979.92 0.00 979.89 -0.45 -10.12 979.19 -7.12 976.19 -7.98

0.00 979.89 0.64 979.88 -0.30 -7.12 976.19 0.00 976.19 -29.61

0.64 979.88 10.67 979.74 -5.42 0.00 976.19 7.12 976.19 -29.61

7.12 976.19 10.12 979.19 -7.98

10.12 979.19 10.67 979.74 -0.49

-8.98 -76.33 67.35

10.67 979.74 15.00 979.69 -2.76 10.67 979.74 12.92 981.99 1.16

12.92 981.99 15.00 981.99 3.41

-2.76 4.57 -7.33

TOTAL AREAS(M2): 67.35 -12.32

1+420.00 -14.81 980.27 -11.14 980.16 -0.20 -14.81 981.94 -12.92 981.94 3.17

-12.92 981.94 -11.14 980.16 1.40

-0.20 4.57 -4.77

-11.14 980.16 -1.12 979.86 -2.58 -11.14 980.16 -10.12 979.14 -0.63

-1.12 979.86 0.00 979.83 -0.47 -10.12 979.14 -7.12 976.14 -7.87

0.00 979.83 0.61 979.82 -0.27 -7.12 976.14 0.00 976.14 -29.36

0.61 979.82 10.68 979.70 -5.08 0.00 976.14 7.12 976.14 -29.36

7.12 976.14 10.12 979.14 -7.87

10.12 979.14 10.68 979.70 -0.47

-8.40 -75.57 67.17

10.68 979.70 15.17 979.65 -2.65 10.68 979.70 12.92 981.94 1.25

12.92 981.94 15.17 981.94 3.77

-2.65 5.02 -7.67

TOTAL AREAS(M2): 67.17 -12.43

1+440.00 -14.96 980.18 -11.11 980.08 -0.19 -14.96 981.89 -12.92 981.89 3.49

-12.92 981.89 -11.11 980.08 1.46

-0.19 4.95 -5.13

-11.11 980.08 -1.15 979.83 -2.24 -11.11 980.08 -10.12 979.09 -0.59

-1.15 979.83 0.00 979.80 -0.42 -10.12 979.09 -7.12 976.09 -7.77

0.00 979.80 0.60 979.79 -0.23 -7.12 976.09 0.00 976.09 -29.11

0.60 979.79 10.68 979.65 -4.63 0.00 976.09 7.12 976.09 -29.11

7.12 976.09 10.12 979.09 -7.77

10.12 979.09 10.68 979.65 -0.45

-7.52 -74.79 67.26

10.68 979.65 15.03 979.59 -2.45 10.68 979.65 12.92 981.89 1.32

12.92 981.89 15.03 981.89 3.62

-2.45 4.94 -7.39

Página 21

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 67.26 -12.52

1+460.00 -15.00 980.15 -11.13 980.05 -0.19 -15.00 981.84 -12.92 981.84 3.50

-12.92 981.84 -11.13 980.05 1.42

-0.19 4.92 -5.11

-11.13 980.05 -1.12 979.80 -2.25 -11.13 980.05 -10.12 979.04 -0.61

-1.12 979.80 0.00 979.77 -0.41 -10.12 979.04 -7.12 976.04 -7.84

0.00 979.77 0.61 979.76 -0.24 -7.12 976.04 0.00 976.04 -29.28

0.61 979.76 10.69 979.61 -4.70 0.00 976.04 7.12 976.04 -29.28

7.12 976.04 10.12 979.04 -7.84

10.12 979.04 10.69 979.61 -0.47

-7.60 -75.30 67.70

10.69 979.61 15.01 979.54 -2.49 10.69 979.61 12.92 981.84 1.28

12.92 981.84 15.01 981.84 3.52

-2.49 4.80 -7.29

TOTAL AREAS(M2): 67.70 -12.40

1+480.00 -15.20 980.10 -11.12 979.99 -0.23 -15.20 981.79 -12.92 981.79 3.84

-12.92 981.79 -11.12 979.99 1.42

-0.23 5.26 -5.49

-11.12 979.99 -1.04 979.71 -2.54 -11.12 979.99 -10.12 978.99 -0.61

-1.04 979.71 0.00 979.68 -0.42 -10.12 978.99 -7.12 975.99 -7.84

0.00 979.68 0.64 979.67 -0.27 -7.12 975.99 0.00 975.99 -29.28

0.64 979.67 10.69 979.56 -4.86 0.00 975.99 7.12 975.99 -29.28

7.12 975.99 10.12 978.99 -7.84

10.12 978.99 10.69 979.56 -0.47

-8.09 -75.32 67.22

10.69 979.56 14.86 979.51 -2.35 10.69 979.56 12.92 981.79 1.28

12.92 981.79 14.86 981.79 3.27

-2.35 4.55 -6.90

TOTAL AREAS(M2): 67.22 -12.39

1+500.00 -15.02 980.07 -11.13 979.95 -0.24 -15.02 981.73 -12.92 981.73 3.49

-12.92 981.73 -11.13 979.95 1.38

-0.24 4.87 -5.11

-11.13 979.95 -1.39 979.63 -2.74 -11.13 979.95 -10.12 978.93 -0.64

-1.39 979.63 0.00 979.59 -0.64 -10.12 978.93 -7.12 975.93 -7.91

0.00 979.59 0.53 979.59 -0.26 -7.12 975.93 0.00 975.93 -29.45

0.53 979.59 10.71 979.52 -5.25 0.00 975.93 7.12 975.93 -29.45

7.12 975.93 10.12 978.93 -7.91

10.12 978.93 10.71 979.52 -0.50

-8.88 -75.84 66.96

10.71 979.52 15.10 979.50 -2.46 10.71 979.52 12.92 981.73 1.24

15.10 979.50 16.65 979.49 -0.90 12.92 981.73 15.32 981.73 3.99

15.32 981.73 16.65 980.40 1.33

-3.35 6.56 -9.91

TOTAL AREAS(M2): 66.96 -15.02

1+520.00 -15.03 980.05 -15.01 980.05 0.00 -15.03 981.68 -12.92 981.68 3.45

-15.01 980.05 -14.49 980.03 0.00 -12.92 981.68 -11.15 979.92 1.33

-14.49 980.03 -11.15 979.92 -0.25

-0.26 4.78 -5.03

-11.15 979.92 0.00 979.54 -3.60 -11.15 979.92 -10.12 978.88 -0.67

0.00 979.54 0.67 979.53 -0.35 -10.12 978.88 -7.12 975.88 -8.00

Página 22

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

0.67 979.53 10.72 979.49 -5.42 -7.12 975.88 0.00 975.88 -29.66

0.00 975.88 7.12 975.88 -29.66

7.12 975.88 10.12 978.88 -8.00

10.12 978.88 10.72 979.49 -0.52

-9.36 -76.51 67.15

10.72 979.49 15.01 979.47 -2.46 10.72 979.49 12.92 981.68 1.18

15.01 979.47 17.55 979.45 -1.50 12.92 981.68 15.32 981.68 3.92

15.32 981.68 17.55 979.45 1.16

-3.95 6.26 -10.21

TOTAL AREAS(M2): 67.15 -15.24

1+540.00 -15.90 980.01 -15.13 979.99 -0.01 -15.90 981.05 -15.32 981.63 0.77

-15.13 979.99 -11.14 979.85 -0.34 -15.32 981.63 -12.92 981.63 3.90

-12.92 981.63 -11.14 979.85 1.31

-0.35 5.97 -6.32

-11.14 979.85 -8.52 979.76 -0.54 -11.14 979.85 -10.12 978.83 -0.68

-8.52 979.76 0.00 979.45 -3.45 -10.12 978.83 -7.12 975.83 -8.03

0.00 979.45 0.74 979.45 -0.42 -7.12 975.83 0.00 975.83 -29.73

0.74 979.45 10.69 979.40 -5.80 0.00 975.83 7.12 975.83 -29.73

7.12 975.83 10.12 978.83 -8.03

10.12 978.83 10.69 979.40 -0.51

-10.20 -76.71 66.51

10.69 979.40 15.05 979.38 -2.69 10.69 979.40 12.92 981.63 1.13

15.05 979.38 15.26 979.38 -0.13 12.92 981.63 15.26 981.63 3.80

-2.82 4.93 -7.75

TOTAL AREAS(M2): 66.51 -14.08

1+560.00 -15.00 979.96 -11.16 979.82 -0.28 -15.00 981.58 -12.92 981.58 3.37

-12.92 981.58 -11.16 979.82 1.30

-0.28 4.68 -4.95

-11.16 979.82 -0.76 979.43 -3.51 -11.16 979.82 -10.12 978.78 -0.69

-0.76 979.43 0.00 979.40 -0.41 -10.12 978.78 -7.12 975.78 -8.04

0.00 979.40 10.73 979.38 -6.09 -7.12 975.78 0.00 975.78 -29.77

0.00 975.78 7.12 975.78 -29.77

7.12 975.78 10.12 978.78 -8.04

10.12 978.78 10.73 979.38 -0.53

-10.02 -76.83 66.82

10.73 979.38 14.85 979.38 -2.38 10.73 979.38 12.92 981.58 1.15

14.85 979.38 15.01 979.38 -0.09 12.92 981.58 15.32 981.58 3.89

15.01 979.38 16.63 979.37 -0.95 15.32 981.58 16.63 980.27 1.26

-3.42 6.30 -9.71

TOTAL AREAS(M2): 66.82 -14.66

1+580.00 -15.05 979.95 -15.01 979.95 0.00 -15.05 981.53 -12.92 981.53 3.37

-15.01 979.95 -14.30 979.92 -0.01 -12.92 981.53 -11.19 979.80 1.24

-14.30 979.92 -11.19 979.80 -0.27

-0.28 4.61 -4.90

-11.19 979.80 0.00 979.35 -4.18 -11.19 979.80 -10.12 978.73 -0.73

0.00 979.35 0.74 979.35 -0.44 -10.12 978.73 -7.12 975.73 -8.15

0.74 979.35 10.75 979.36 -5.94 -7.12 975.73 0.00 975.73 -30.03

0.00 975.73 7.12 975.73 -30.03

7.12 975.73 10.12 978.73 -8.15

10.12 978.73 10.75 979.36 -0.57

Página 23

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-10.56 -77.68 67.11

10.75 979.36 15.01 979.37 -2.48 10.75 979.36 12.92 981.53 1.08

12.92 981.53 15.01 981.53 3.30

-2.48 4.38 -6.86

TOTAL AREAS(M2): 67.11 -11.76

1+600.00 -16.01 979.88 -15.06 979.86 -0.01 -16.01 980.79 -15.32 981.48 0.87

-15.06 979.86 -11.16 979.72 -0.35 -15.32 981.48 -12.92 981.48 3.84

-12.92 981.48 -11.16 979.72 1.26

-0.35 5.97 -6.32

-11.16 979.72 -9.46 979.66 -0.32 -11.16 979.72 -10.12 978.68 -0.71

-9.46 979.66 0.00 979.33 -3.65 -10.12 978.68 -7.12 975.68 -8.11

0.00 979.33 0.81 979.33 -0.45 -7.12 975.68 0.00 975.68 -29.92

0.81 979.33 10.74 979.30 -5.67 0.00 975.68 7.12 975.68 -29.92

7.12 975.68 10.12 978.68 -8.11

10.12 978.68 10.74 979.30 -0.55

-10.08 -77.30 67.22

10.74 979.30 15.00 979.28 -2.52 10.74 979.30 12.92 981.48 1.11

12.92 981.48 15.00 981.48 3.32

-2.52 4.43 -6.95

TOTAL AREAS(M2): 67.22 -13.27

1+620.00 -15.06 979.81 -14.96 979.81 0.00 -15.06 981.43 -12.92 981.43 3.47

-14.96 979.81 -11.17 979.68 -0.25 -12.92 981.43 -11.17 979.68 1.31

-0.25 4.78 -5.03

-11.17 979.68 0.00 979.32 -3.47 -11.17 979.68 -10.12 978.63 -0.68

0.00 979.32 0.80 979.31 -0.39 -10.12 978.63 -7.12 975.63 -8.03

0.80 979.31 10.75 979.26 -5.20 -7.12 975.63 0.00 975.63 -29.74

0.00 975.63 7.12 975.63 -29.74

7.12 975.63 10.12 978.63 -8.03

10.12 978.63 10.75 979.26 -0.54

-9.06 -76.77 67.71

10.75 979.26 15.07 979.24 -2.40 10.75 979.26 12.92 981.43 1.17

15.07 979.24 15.20 979.25 -0.08 12.92 981.43 15.20 981.43 3.71

-2.48 4.87 -7.35

TOTAL AREAS(M2): 67.71 -12.38

1+640.00 -15.66 979.77 -15.12 979.77 0.00 -15.66 981.05 -15.32 981.38 0.49

-15.12 979.77 -11.16 979.63 -0.28 -15.32 981.38 -12.92 981.38 3.88

-12.92 981.38 -11.16 979.63 1.29

-0.28 5.66 -5.94

-11.16 979.63 -0.90 979.26 -3.33 -11.16 979.63 -10.12 978.58 -0.69

-0.90 979.26 0.00 979.23 -0.47 -10.12 978.58 -7.12 975.58 -8.05

0.00 979.23 10.72 979.19 -6.04 -7.12 975.58 0.00 975.58 -29.79

0.00 975.58 7.12 975.58 -29.79

7.12 975.58 10.12 978.58 -8.05

10.12 978.58 10.72 979.19 -0.53

-9.84 -76.92 67.08

10.72 979.19 11.88 979.18 -0.68 10.72 979.19 12.92 981.38 1.14

11.88 979.18 14.94 979.17 -1.81 12.92 981.38 15.32 981.38 3.88

14.94 979.17 15.16 979.17 -0.13 15.32 981.38 16.59 980.11 1.25

15.16 979.17 16.59 979.21 -0.83

-3.45 6.26 -9.71

Página 24

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 67.08 -15.65

1+660.00 -16.89 979.76 -15.57 979.76 0.00 -16.89 979.76 -15.32 981.34 1.23

-15.57 979.76 -13.89 979.70 -0.06 -15.32 981.34 -12.92 981.34 3.77

-13.89 979.70 -11.18 979.60 -0.31 -12.92 981.34 -11.18 979.60 1.22

-0.37 6.22 -6.59

-11.18 979.60 -5.12 979.36 -1.73 -11.18 979.60 -10.12 978.54 -0.74

-5.12 979.36 0.00 979.15 -2.62 -10.12 978.54 -7.12 975.54 -8.19

0.00 979.15 1.25 979.14 -0.78 -7.12 975.54 0.00 975.54 -30.11

1.25 979.14 10.73 979.15 -5.89 0.00 975.54 7.12 975.54 -30.11

7.12 975.54 10.12 978.54 -8.19

10.12 978.54 10.73 979.15 -0.56

-11.01 -77.90 66.89

10.73 979.15 15.14 979.15 -2.74 10.73 979.15 12.92 981.34 1.04

12.92 981.34 15.14 981.34 3.49

-2.74 4.54 -7.28

TOTAL AREAS(M2): 66.89 -13.87

1+680.00 -16.85 979.76 -16.29 979.76 0.00 -16.85 979.76 -15.32 981.29 1.17

-16.29 979.76 -11.19 979.56 -0.52 -15.32 981.29 -12.92 981.29 3.66

-12.92 981.29 -11.19 979.56 1.15

-0.52 5.98 -6.50

-11.19 979.56 -2.76 979.23 -3.10 -11.19 979.56 -10.12 978.49 -0.79

-2.76 979.23 0.00 979.11 -1.64 -10.12 978.49 -7.12 975.49 -8.32

0.00 979.11 1.86 979.10 -1.22 -7.12 975.49 0.00 975.49 -30.42

1.86 979.10 10.71 979.08 -5.94 0.00 975.49 7.12 975.49 -30.42

7.12 975.49 10.12 978.49 -8.32

10.12 978.49 10.71 979.08 -0.58

-11.89 -78.85 66.96

10.71 979.08 14.82 979.07 -2.84 10.71 979.08 12.92 981.29 0.93

12.92 981.29 14.82 981.29 2.89

-2.84 3.82 -6.66

TOTAL AREAS(M2): 66.96 -13.16

1+700.00 -15.00 979.72 -11.23 979.55 -0.31 -15.00 981.24 -12.92 981.24 3.16

-12.92 981.24 -11.23 979.55 1.14

-0.31 4.31 -4.62

-11.23 979.55 -2.76 979.18 -3.00 -11.23 979.55 -10.12 978.44 -0.80

-2.76 979.18 0.00 979.06 -1.66 -10.12 978.44 -7.12 975.44 -8.34

0.00 979.06 1.86 979.06 -1.24 -7.12 975.44 0.00 975.44 -30.47

1.86 979.06 10.73 979.05 -5.89 0.00 975.44 7.12 975.44 -30.47

7.12 975.44 10.12 978.44 -8.34

10.12 978.44 10.73 979.05 -0.60

-11.80 -79.01 67.21

10.73 979.05 15.00 979.05 -2.85 10.73 979.05 12.92 981.24 0.93

12.92 981.24 15.00 981.24 3.16

-2.85 4.10 -6.95

TOTAL AREAS(M2): 67.21 -11.57

1+720.00 -15.00 979.67 -11.22 979.50 -0.32 -15.00 981.19 -12.92 981.19 3.17

-12.92 981.19 -11.22 979.50 1.15

-0.32 4.33 -4.64

-11.22 979.50 -2.76 979.12 -3.03 -11.22 979.50 -10.12 978.39 -0.80

-2.76 979.12 0.00 978.99 -1.68 -10.12 978.39 -7.12 975.39 -8.32

Página 25

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

0.00 978.99 1.86 979.00 -1.25 -7.12 975.39 0.00 975.39 -30.43

1.86 979.00 10.73 979.01 -5.89 0.00 975.39 7.12 975.39 -30.43

7.12 975.39 10.12 978.39 -8.32

10.12 978.39 10.73 979.01 -0.59

-11.85 -78.89 67.03

10.73 979.01 15.00 979.01 -2.80 10.73 979.01 12.92 981.19 0.95

12.92 981.19 15.00 981.19 3.17

-2.80 4.12 -6.93

TOTAL AREAS(M2): 67.03 -11.57

1+740.00 -15.00 979.62 -11.21 979.44 -0.34 -15.00 981.14 -12.92 981.14 3.18

-12.92 981.14 -11.21 979.44 1.15

-0.34 4.33 -4.67

-11.21 979.44 -2.76 979.04 -3.21 -11.21 979.44 -10.12 978.34 -0.79

-2.76 979.04 0.00 978.91 -1.78 -10.12 978.34 -7.12 975.34 -8.31

0.00 978.91 1.86 978.92 -1.31 -7.12 975.34 0.00 975.34 -30.41

1.86 978.92 10.73 978.96 -6.03 0.00 975.34 7.12 975.34 -30.41

7.12 975.34 10.12 978.34 -8.31

10.12 978.34 10.73 978.96 -0.59

-12.32 -78.84 66.52

10.73 978.96 15.00 978.98 -2.78 10.73 978.96 12.92 981.14 0.95

12.92 981.14 15.00 981.14 3.18

-2.78 4.13 -6.91

TOTAL AREAS(M2): 66.52 -11.58

1+760.00 -15.00 979.59 -11.24 979.41 -0.32 -15.00 981.10 -12.92 981.10 3.14

-12.92 981.10 -11.24 979.41 1.13

-0.32 4.27 -4.59

-11.24 979.41 -2.76 979.03 -3.11 -11.24 979.41 -10.12 978.30 -0.82

-2.76 979.03 0.00 978.89 -1.73 -10.12 978.30 -7.12 975.30 -8.37

0.00 978.89 1.86 978.91 -1.28 -7.12 975.30 0.00 975.30 -30.54

1.86 978.91 10.77 978.95 -5.87 0.00 975.30 7.12 975.30 -30.54

7.12 975.30 10.12 978.30 -8.37

10.12 978.30 10.77 978.95 -0.63

-12.00 -79.27 67.27

10.77 978.95 15.00 978.97 -2.67 10.77 978.95 12.92 981.10 0.94

12.92 981.10 15.00 981.10 3.14

-2.67 4.08 -6.74

TOTAL AREAS(M2): 67.27 -11.34

1+780.00 -15.00 979.54 -11.22 979.35 -0.35 -15.00 981.05 -12.92 981.05 3.14

-12.92 981.05 -11.22 979.35 1.12

-0.35 4.26 -4.61

-11.22 979.35 -2.76 978.93 -3.36 -11.22 979.35 -10.12 978.25 -0.82

-2.76 978.93 0.00 978.80 -1.86 -10.12 978.25 -7.12 975.25 -8.37

0.00 978.80 1.86 978.81 -1.37 -7.12 975.25 0.00 975.25 -30.55

1.86 978.81 10.76 978.89 -6.15 0.00 975.25 7.12 975.25 -30.55

7.12 975.25 10.12 978.25 -8.37

10.12 978.25 10.76 978.89 -0.62

-12.75 -79.28 66.53

10.76 978.89 15.00 978.92 -2.70 10.76 978.89 12.92 981.05 0.92

12.92 981.05 15.00 981.05 3.14

-2.70 4.06 -6.76

Página 26

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 66.53 -11.38

1+800.00 -15.00 979.45 -11.19 979.27 -0.34 -15.00 981.00 -12.92 981.00 3.22

-12.92 981.00 -11.19 979.27 1.18

-0.34 4.40 -4.75

-11.19 979.27 -2.76 978.87 -3.20 -11.19 979.27 -10.12 978.20 -0.77

-2.76 978.87 0.00 978.75 -1.77 -10.12 978.20 -7.12 975.20 -8.26

0.00 978.75 1.86 978.76 -1.30 -7.12 975.20 0.00 975.20 -30.27

1.86 978.76 10.75 978.83 -5.85 0.00 975.20 7.12 975.20 -30.27

7.12 975.20 10.12 978.20 -8.26

10.12 978.20 10.75 978.83 -0.59

-12.12 -78.42 66.29

10.75 978.83 15.00 978.86 -2.59 10.75 978.83 12.92 981.00 1.00

12.92 981.00 15.00 981.00 3.22

-2.59 4.22 -6.81

TOTAL AREAS(M2): 66.29 -11.55

1+820.00 -16.80 979.38 -14.93 979.37 -0.02 -16.80 979.47 -15.32 980.95 1.23

-14.93 979.37 -11.17 979.21 -0.37 -15.32 980.95 -12.92 980.95 3.77

-12.92 980.95 -11.17 979.21 1.22

-0.38 6.21 -6.60

-11.17 979.21 -2.27 978.83 -3.27 -11.17 979.21 -10.12 978.15 -0.74

-2.27 978.83 0.00 978.72 -1.38 -10.12 978.15 -7.12 975.15 -8.19

0.00 978.72 2.23 978.74 -1.45 -7.12 975.15 0.00 975.15 -30.12

2.23 978.74 10.77 978.80 -5.22 0.00 975.15 7.12 975.15 -30.12

7.12 975.15 10.12 978.15 -8.19

10.12 978.15 10.77 978.80 -0.59

-11.32 -77.94 66.62

10.77 978.80 15.18 978.83 -2.51 10.77 978.80 12.92 980.95 1.06

12.92 980.95 15.18 980.95 3.55

-2.51 4.61 -7.12

TOTAL AREAS(M2): 66.62 -13.72

1+840.00 -16.90 979.32 -16.20 979.32 -0.01 -16.90 979.32 -15.32 980.91 1.23

-16.20 979.32 -11.13 979.11 -0.62 -15.32 980.91 -12.92 980.91 3.77

-12.92 980.91 -11.13 979.11 1.21

-0.63 6.20 -6.83

-11.13 979.11 -2.08 978.74 -3.69 -11.13 979.11 -10.12 978.11 -0.73

-2.08 978.74 -0.17 978.66 -1.21 -10.12 978.11 -7.12 975.11 -8.19

-0.17 978.66 3.85 978.69 -2.68 -7.12 975.11 0.00 975.11 -30.12

3.85 978.69 10.76 978.75 -4.28 0.00 975.11 7.12 975.11 -30.12

7.12 975.11 10.12 978.11 -8.19

10.12 978.11 10.76 978.75 -0.58

-11.87 -77.95 66.08

10.76 978.75 14.26 978.78 -2.02 10.76 978.75 12.92 980.91 1.06

12.92 980.91 14.26 980.91 2.10

-2.02 3.16 -5.17

TOTAL AREAS(M2): 66.08 -12.00

1+860.00 -16.94 979.24 -11.05 978.98 -1.00 -16.94 979.24 -15.32 980.86 1.24

-15.32 980.86 -12.92 980.86 3.78

-12.92 980.86 -11.05 978.98 1.20

-1.00 6.21 -7.21

-11.05 978.98 -4.68 978.71 -2.79 -11.05 978.98 -10.12 978.06 -0.71

Página 27

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-4.68 978.71 -2.41 978.61 -1.42 -10.12 978.06 -7.12 975.06 -8.18

-2.41 978.61 2.10 978.63 -3.00 -7.12 975.06 0.00 975.06 -30.09

2.10 978.63 10.75 978.69 -5.40 0.00 975.06 7.12 975.06 -30.09

7.12 975.06 10.12 978.06 -8.18

10.12 978.06 10.75 978.69 -0.57

-12.60 -77.80 65.20

10.75 978.69 12.58 978.70 -1.08 10.75 978.69 12.58 980.52 0.59

-1.08 0.59 -1.67

TOTAL AREAS(M2): 65.20 -8.88

1+880.00 -15.03 979.25 -11.19 979.07 -0.34 -15.03 980.81 -12.92 980.81 3.28

-12.92 980.81 -11.19 979.07 1.20

-0.34 4.48 -4.82

-11.19 979.07 -0.78 978.59 -4.35 -11.19 979.07 -10.12 978.01 -0.76

-0.78 978.59 0.00 978.56 -0.53 -10.12 978.01 -7.12 975.01 -8.23

0.00 978.56 9.41 978.59 -6.37 -7.12 975.01 0.00 975.01 -30.21

9.41 978.59 10.71 978.60 -0.85 0.00 975.01 7.12 975.01 -30.21

7.12 975.01 10.12 978.01 -8.23

10.12 978.01 10.71 978.60 -0.56

-12.11 -78.20 66.09

10.71 978.60 15.00 978.61 -2.78 10.71 978.60 12.92 980.81 1.00

12.92 980.81 15.00 980.81 3.24

-2.78 4.23 -7.02

TOTAL AREAS(M2): 66.09 -11.84

1+900.00 -15.00 979.20 -11.19 979.03 -0.32 -15.00 980.76 -12.92 980.76 3.25

-12.92 980.76 -11.19 979.03 1.21

-0.32 4.46 -4.78

-11.19 979.03 -0.76 978.57 -4.13 -11.19 979.03 -10.12 977.96 -0.75

-0.76 978.57 0.00 978.54 -0.49 -10.12 977.96 -7.12 974.96 -8.21

0.00 978.54 10.73 978.57 -6.89 -7.12 974.96 0.00 974.96 -30.15

0.00 974.96 7.12 974.96 -30.15

7.12 974.96 10.12 977.96 -8.21

10.12 977.96 10.73 978.57 -0.57

-11.51 -78.03 66.52

10.73 978.57 14.66 978.58 -2.45 10.73 978.57 12.92 980.76 1.03

14.66 978.58 15.00 978.58 -0.21 12.92 980.76 15.00 980.76 3.25

-2.66 4.27 -6.93

TOTAL AREAS(M2): 66.52 -11.71

1+920.00 -15.00 979.15 -11.20 978.99 -0.30 -15.00 980.71 -12.92 980.71 3.25

-12.92 980.71 -11.20 978.99 1.21

-0.30 4.46 -4.76

-11.20 978.99 -0.79 978.56 -3.87 -11.20 978.99 -10.12 977.91 -0.75

-0.79 978.56 0.00 978.53 -0.48 -10.12 977.91 -7.12 974.91 -8.21

0.00 978.53 10.76 978.55 -6.58 -7.12 974.91 0.00 974.91 -30.17

0.00 974.91 7.12 974.91 -30.17

7.12 974.91 10.12 977.91 -8.21

10.12 977.91 10.76 978.55 -0.59

-10.94 -78.09 67.16

10.76 978.55 12.68 978.56 -1.15 10.76 978.55 12.92 980.71 1.04

12.68 978.56 15.01 978.56 -1.38 12.92 980.71 15.01 980.71 3.26

-2.53 4.30 -6.83

Página 28

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 67.16 -11.59

1+940.00 -14.99 979.14 -11.22 978.97 -0.34 -14.99 980.67 -12.92 980.67 3.15

-12.92 980.67 -11.22 978.97 1.14

-0.34 4.29 -4.63

-11.22 978.97 -0.81 978.48 -4.41 -11.22 978.97 -10.12 977.87 -0.80

-0.81 978.48 0.00 978.44 -0.55 -10.12 977.87 -7.12 974.87 -8.34

0.00 978.44 10.56 978.47 -7.28 -7.12 974.87 0.00 974.87 -30.46

10.56 978.47 10.72 978.47 -0.11 0.00 974.87 7.12 974.87 -30.46

7.12 974.87 10.12 977.87 -8.34

10.12 977.87 10.72 978.47 -0.59

-12.36 -78.99 66.63

10.72 978.47 14.99 978.48 -2.85 10.72 978.47 12.92 980.67 0.93

12.92 980.67 14.99 980.67 3.14

-2.85 4.07 -6.92

TOTAL AREAS(M2): 66.63 -11.55

1+960.00 -15.01 979.09 -11.23 978.92 -0.32 -15.01 980.62 -12.92 980.62 3.19

-12.92 980.62 -11.23 978.92 1.15

-0.32 4.34 -4.66

-11.23 978.92 -0.91 978.47 -4.08 -11.23 978.92 -10.12 977.82 -0.80

-0.91 978.47 0.00 978.43 -0.59 -10.12 977.82 -7.12 974.82 -8.32

0.00 978.43 5.20 978.44 -3.42 -7.12 974.82 0.00 974.82 -30.42

5.20 978.44 10.75 978.45 -3.60 0.00 974.82 7.12 974.82 -30.42

7.12 974.82 10.12 977.82 -8.32

10.12 977.82 10.75 978.45 -0.60

-11.69 -78.89 67.20

10.75 978.45 15.05 978.45 -2.76 10.75 978.45 12.92 980.62 0.96

12.92 980.62 15.05 980.62 3.25

-2.76 4.21 -6.97

TOTAL AREAS(M2): 67.20 -11.63

1+980.00 -15.01 979.02 -11.21 978.86 -0.31 -15.01 980.57 -12.92 980.57 3.23

-12.92 980.57 -11.21 978.86 1.18

-0.31 4.41 -4.72

-11.21 978.86 -1.10 978.42 -3.88 -11.21 978.86 -10.12 977.77 -0.77

-1.10 978.42 0.00 978.38 -0.68 -10.12 977.77 -7.12 974.77 -8.27

0.00 978.38 3.08 978.39 -1.97 -7.12 974.77 0.00 974.77 -30.30

3.08 978.39 10.76 978.41 -4.80 0.00 974.77 7.12 974.77 -30.30

7.12 974.77 10.12 977.77 -8.27

10.12 977.77 10.76 978.41 -0.60

-11.34 -78.51 67.17

10.76 978.41 15.44 978.43 -2.83 10.76 978.41 12.92 980.57 1.00

15.44 978.43 16.49 978.41 -0.64 12.92 980.57 15.32 980.57 3.71

15.32 980.57 16.49 979.40 1.12

-3.47 5.83 -9.30

TOTAL AREAS(M2): 67.17 -14.03

2+000.00 -15.00 978.96 -11.21 978.81 -0.28 -15.00 980.52 -12.92 980.52 3.24

-12.92 980.52 -11.21 978.81 1.21

-0.28 4.45 -4.73

-11.21 978.81 -1.13 978.42 -3.45 -11.21 978.81 -10.12 977.72 -0.76

-1.13 978.42 0.00 978.38 -0.63 -10.12 977.72 -7.12 974.72 -8.22

0.00 978.38 2.80 978.37 -1.63 -7.12 974.72 0.00 974.72 -30.18

Página 29

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

2.80 978.37 10.76 978.36 -4.71 0.00 974.72 7.12 974.72 -30.18

7.12 974.72 10.12 977.72 -8.22

10.12 977.72 10.76 978.36 -0.59

-10.43 -78.13 67.70

10.76 978.36 15.10 978.36 -2.59 10.76 978.36 12.92 980.52 1.04

15.10 978.36 15.41 978.35 -0.19 12.92 980.52 15.32 980.52 3.75

15.32 980.52 15.41 980.44 0.13

-2.78 4.92 -7.70

TOTAL AREAS(M2): 67.70 -12.43

2+020.00 -15.33 978.93 -14.97 978.93 0.00 -15.33 980.46 -15.32 980.47 0.02

-14.97 978.93 -11.23 978.79 -0.25 -15.32 980.47 -12.92 980.47 3.72

-12.92 980.47 -11.23 978.79 1.19

-0.25 4.92 -5.17

-11.23 978.79 -1.08 978.40 -3.36 -11.23 978.79 -10.12 977.67 -0.77

-1.08 978.40 0.00 978.36 -0.59 -10.12 977.67 -7.12 974.67 -8.26

0.00 978.36 2.97 978.35 -1.70 -7.12 974.67 0.00 974.67 -30.27

2.97 978.35 10.78 978.33 -4.57 0.00 974.67 7.12 974.67 -30.27

7.12 974.67 10.12 977.67 -8.26

10.12 977.67 10.78 978.33 -0.61

-10.22 -78.44 68.21

10.78 978.33 15.07 978.32 -2.59 10.78 978.33 12.92 980.47 1.02

12.92 980.47 15.07 980.47 3.32

-2.59 4.34 -6.93

TOTAL AREAS(M2): 68.21 -12.10

2+040.00 -15.87 978.88 -15.12 978.89 0.00 -15.87 979.88 -15.32 980.43 0.70

-15.12 978.89 -11.23 978.73 -0.27 -15.32 980.43 -12.92 980.43 3.71

-12.92 980.43 -11.23 978.73 1.18

-0.27 5.59 -5.85

-11.23 978.73 -1.21 978.32 -3.54 -11.23 978.73 -10.12 977.63 -0.78

-1.21 978.32 0.00 978.28 -0.70 -10.12 977.63 -7.12 974.63 -8.27

0.00 978.28 3.01 978.28 -1.81 -7.12 974.63 0.00 974.63 -30.30

3.01 978.28 10.78 978.29 -4.62 0.00 974.63 7.12 974.63 -30.30

7.12 974.63 10.12 977.63 -8.27

10.12 977.63 10.78 978.29 -0.61

-10.67 -78.51 67.85

10.78 978.29 14.73 978.29 -2.32 10.78 978.29 12.92 980.43 1.02

12.92 980.43 14.73 980.43 2.79

-2.32 3.81 -6.13

TOTAL AREAS(M2): 67.85 -11.99

2+060.00 -14.93 978.83 -11.23 978.69 -0.26 -14.93 980.38 -12.92 980.38 3.11

-12.92 980.38 -11.23 978.69 1.19

-0.26 4.30 -4.55

-11.23 978.69 -1.69 978.33 -3.06 -11.23 978.69 -10.12 977.58 -0.77

-1.69 978.33 0.00 978.27 -0.90 -10.12 977.58 -7.12 974.58 -8.26

0.00 978.27 2.11 978.26 -1.19 -7.12 974.58 0.00 974.58 -30.28

2.11 978.26 10.80 978.26 -4.95 0.00 974.58 7.12 974.58 -30.28

7.12 974.58 10.12 977.58 -8.26

10.12 977.58 10.80 978.26 -0.62

-10.09 -78.47 68.38

10.80 978.26 15.81 978.25 -2.88 10.80 978.26 12.92 980.38 1.03

Página 30

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

15.81 978.25 16.91 978.26 -0.63 12.92 980.38 15.32 980.38 3.71

15.32 980.38 16.91 978.79 1.20

-3.51 5.94 -9.45

TOTAL AREAS(M2): 68.38 -14.01

2+080.00 -15.66 978.79 -14.81 978.77 -0.01 -15.66 979.99 -15.32 980.33 0.47

-14.81 978.77 -11.23 978.64 -0.31 -15.32 980.33 -12.92 980.33 3.69

-12.92 980.33 -11.23 978.64 1.17

-0.32 5.33 -5.65

-11.23 978.64 -1.60 978.28 -3.21 -11.23 978.64 -10.12 977.53 -0.78

-1.60 978.28 0.00 978.22 -0.87 -10.12 977.53 -7.12 974.53 -8.28

0.00 978.22 2.25 978.22 -1.29 -7.12 974.53 0.00 974.53 -30.33

2.25 978.22 10.80 978.21 -4.91 0.00 974.53 7.12 974.53 -30.33

7.12 974.53 10.12 977.53 -8.28

10.12 977.53 10.80 978.21 -0.63

-10.28 -78.64 68.36

10.80 978.21 15.29 978.21 -2.59 10.80 978.21 12.92 980.33 1.02

15.29 978.21 15.95 978.22 -0.38 12.92 980.33 15.32 980.33 3.69

15.32 980.33 15.95 979.70 0.77

-2.97 5.48 -8.45

TOTAL AREAS(M2): 68.36 -14.11

2+100.00 -16.28 978.75 -15.30 978.73 -0.01 -16.28 979.32 -15.32 980.28 1.01

-15.30 978.73 -11.23 978.59 -0.38 -15.32 980.28 -12.92 980.28 3.67

-12.92 980.28 -11.23 978.59 1.15

-0.39 5.83 -6.22

-11.23 978.59 -1.64 978.26 -3.17 -11.23 978.59 -10.12 977.48 -0.79

-1.64 978.26 0.00 978.20 -0.86 -10.12 977.48 -7.12 974.48 -8.31

0.00 978.20 2.77 978.19 -1.55 -7.12 974.48 0.00 974.48 -30.41

2.77 978.19 10.82 978.18 -4.54 0.00 974.48 7.12 974.48 -30.41

7.12 974.48 10.12 977.48 -8.31

10.12 977.48 10.82 978.18 -0.65

-10.12 -78.90 68.78

10.82 978.18 14.62 978.18 -2.17 10.82 978.18 12.92 980.28 1.01

12.92 980.28 14.62 980.28 2.59

-2.17 3.60 -5.77

TOTAL AREAS(M2): 68.78 -11.99

2+120.00 -14.94 978.72 -11.27 978.58 -0.27 -14.94 980.23 -12.92 980.23 3.05

-12.92 980.23 -11.27 978.58 1.13

-0.27 4.18 -4.45

-11.27 978.58 -1.89 978.21 -3.08 -11.27 978.58 -10.12 977.43 -0.82

-1.89 978.21 0.00 978.14 -1.04 -10.12 977.43 -7.12 974.43 -8.37

0.00 978.14 2.32 978.13 -1.37 -7.12 974.43 0.00 974.43 -30.55

2.32 978.13 10.81 978.12 -5.09 0.00 974.43 7.12 974.43 -30.55

7.12 974.43 10.12 977.43 -8.37

10.12 977.43 10.81 978.12 -0.65

-10.58 -79.33 68.75

10.81 978.12 15.28 978.11 -2.72 10.81 978.12 12.92 980.23 0.95

15.28 978.11 15.85 978.12 -0.35 12.92 980.23 15.32 980.23 3.62

15.32 980.23 15.85 979.70 0.66

-3.07 5.24 -8.31

TOTAL AREAS(M2): 68.75 -12.75

Página 31

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

2+140.00 -14.93 978.71 -11.31 978.57 -0.25 -14.93 980.19 -12.92 980.19 2.96

-12.92 980.19 -11.31 978.57 1.07

-0.25 4.03 -4.29

-11.31 978.57 -2.05 978.22 -2.95 -11.31 978.57 -10.12 977.39 -0.87

-2.05 978.22 0.00 978.14 -1.10 -10.12 977.39 -7.12 974.39 -8.49

0.00 978.14 2.14 978.12 -1.25 -7.12 974.39 0.00 974.39 -30.82

2.14 978.12 10.80 978.06 -5.40 0.00 974.39 7.12 974.39 -30.82

7.12 974.39 10.12 977.39 -8.49

10.12 977.39 10.80 978.06 -0.67

-10.70 -80.16 69.46

10.80 978.06 15.12 978.03 -2.88 10.80 978.06 12.92 980.19 0.87

15.12 978.03 15.50 978.04 -0.26 12.92 980.19 15.32 980.19 3.53

15.32 980.19 15.50 980.01 0.25

-3.14 4.65 -7.79

TOTAL AREAS(M2): 69.46 -12.07

2+160.00 -15.75 978.68 -14.88 978.66 -0.01 -15.75 979.71 -15.32 980.14 0.54

-14.88 978.66 -11.31 978.52 -0.32 -15.32 980.14 -12.92 980.14 3.49

-12.92 980.14 -11.31 978.52 1.04

-0.33 5.07 -5.40

-11.31 978.52 -1.86 978.16 -3.23 -11.31 978.52 -10.12 977.34 -0.89

-1.86 978.16 0.00 978.09 -1.04 -10.12 977.34 -7.12 974.34 -8.54

0.00 978.09 2.38 978.07 -1.45 -7.12 974.34 0.00 974.34 -30.94

2.38 978.07 10.79 978.00 -5.44 0.00 974.34 7.12 974.34 -30.94

7.12 974.34 10.12 977.34 -8.54

10.12 977.34 10.79 978.00 -0.67

-11.16 -80.53 69.37

10.79 978.00 15.17 977.97 -3.06 10.79 978.00 12.92 980.14 0.83

12.92 980.14 15.17 980.14 3.28

-3.06 4.10 -7.16

TOTAL AREAS(M2): 69.37 -12.56

2+180.00 -16.20 978.64 -15.24 978.62 -0.01 -16.20 979.21 -15.32 980.09 0.89

-15.24 978.62 -11.29 978.46 -0.40 -15.32 980.09 -12.92 980.09 3.48

-12.92 980.09 -11.29 978.46 1.04

-0.41 5.41 -5.81

-11.29 978.46 -1.69 978.09 -3.50 -11.29 978.46 -10.12 977.29 -0.89

-1.69 978.09 0.00 978.01 -1.00 -10.12 977.29 -7.12 974.29 -8.55

0.00 978.01 3.18 977.99 -2.03 -7.12 974.29 0.00 974.29 -30.97

3.18 977.99 10.76 977.93 -5.17 0.00 974.29 7.12 974.29 -30.97

7.12 974.29 10.12 977.29 -8.55

10.12 977.29 10.76 977.93 -0.66

-11.69 -80.58 68.89

10.76 977.93 14.75 977.89 -2.91 10.76 977.93 12.92 980.09 0.80

12.92 980.09 14.75 980.09 2.65

-2.91 3.45 -6.36

TOTAL AREAS(M2): 68.89 -12.18

2+200.00 -15.15 978.57 -11.29 978.41 -0.31 -15.15 980.04 -12.92 980.04 3.27

-12.92 980.04 -11.29 978.41 1.07

-0.31 4.34 -4.65

-11.29 978.41 -1.92 978.02 -3.35 -11.29 978.41 -10.12 977.24 -0.87

-1.92 978.02 0.00 977.95 -1.13 -10.12 977.24 -7.12 974.24 -8.49

Página 32

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

0.00 977.95 2.79 977.92 -1.78 -7.12 974.24 0.00 974.24 -30.84

2.79 977.92 10.73 977.85 -5.46 0.00 974.24 7.12 974.24 -30.84

7.12 974.24 10.12 977.24 -8.49

10.12 977.24 10.73 977.85 -0.63

-11.73 -80.17 68.44

10.73 977.85 14.86 977.81 -3.06 10.73 977.85 12.92 980.04 0.82

14.86 977.81 15.87 977.81 -0.76 12.92 980.04 15.32 980.04 3.52

15.32 980.04 15.87 979.49 0.66

-3.83 5.00 -8.83

TOTAL AREAS(M2): 68.44 -13.48

2+220.00 -14.88 978.48 -11.27 978.35 -0.25 -14.88 979.99 -12.92 979.99 2.96

-12.92 979.99 -11.27 978.35 1.13

-0.25 4.09 -4.34

-11.27 978.35 -2.44 978.01 -2.67 -11.27 978.35 -10.12 977.19 -0.82

-2.44 978.01 0.00 977.93 -1.25 -10.12 977.19 -7.12 974.19 -8.37

0.00 977.93 2.31 977.90 -1.32 -7.12 974.19 0.00 974.19 -30.54

2.31 977.90 10.73 977.80 -5.35 0.00 974.19 7.12 974.19 -30.54

7.12 974.19 10.12 977.19 -8.37

10.12 977.19 10.73 977.80 -0.60

-10.59 -79.24 68.64

10.73 977.80 15.45 977.74 -3.36 10.73 977.80 12.92 979.99 0.91

15.45 977.74 16.09 977.74 -0.47 12.92 979.99 15.32 979.99 3.63

15.32 979.99 16.09 979.23 0.86

-3.83 5.40 -9.23

TOTAL AREAS(M2): 68.64 -13.56

2+240.00 -15.58 978.43 -14.84 978.43 0.00 -15.58 979.69 -15.32 979.95 0.36

-14.84 978.43 -11.28 978.31 -0.21 -15.32 979.95 -12.92 979.95 3.64

-12.92 979.95 -11.28 978.31 1.14

-0.21 5.14 -5.35

-11.28 978.31 -2.29 978.00 -2.48 -11.28 978.31 -10.12 977.15 -0.82

-2.29 978.00 0.00 977.92 -1.08 -10.12 977.15 -7.12 974.15 -8.35

0.00 977.92 2.49 977.88 -1.32 -7.12 974.15 0.00 974.15 -30.50

2.49 977.88 10.73 977.76 -5.02 0.00 974.15 7.12 974.15 -30.50

7.12 974.15 10.12 977.15 -8.35

10.12 977.15 10.73 977.76 -0.60

-9.90 -79.12 69.22

10.73 977.76 15.18 977.69 -3.13 10.73 977.76 12.92 979.95 0.92

12.92 979.95 15.18 979.95 3.43

-3.13 4.35 -7.49

TOTAL AREAS(M2): 69.22 -12.83

2+260.00 -15.88 978.40 -15.24 978.40 0.00 -15.88 979.34 -15.32 979.90 0.68

-15.24 978.40 -11.29 978.26 -0.26 -15.32 979.90 -12.92 979.90 3.60

-12.92 979.90 -11.29 978.26 1.12

-0.26 5.40 -5.66

-11.29 978.26 -2.11 977.95 -2.66 -11.29 978.26 -10.12 977.10 -0.84

-2.11 977.95 0.00 977.88 -1.02 -10.12 977.10 -7.12 974.10 -8.40

0.00 977.88 2.97 977.83 -1.62 -7.12 974.10 0.00 974.10 -30.62

2.97 977.83 10.74 977.71 -4.84 0.00 974.10 7.12 974.10 -30.62

7.12 974.10 10.12 977.10 -8.40

10.12 977.10 10.74 977.71 -0.61

Página 33

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-10.14 -79.48 69.33

10.74 977.71 14.79 977.65 -2.89 10.74 977.71 12.92 979.90 0.89

12.92 979.90 14.79 979.90 2.81

-2.89 3.70 -6.59

TOTAL AREAS(M2): 69.33 -12.25

2+280.00 -15.02 978.34 -11.29 978.22 -0.24 -15.02 979.85 -12.92 979.85 3.17

-12.92 979.85 -11.29 978.22 1.12

-0.24 4.29 -4.53

-11.29 978.22 -2.17 977.91 -2.57 -11.29 978.22 -10.12 977.05 -0.83

-2.17 977.91 0.00 977.84 -1.02 -10.12 977.05 -7.12 974.05 -8.38

0.00 977.84 2.88 977.80 -1.51 -7.12 974.05 0.00 974.05 -30.58

2.88 977.80 10.76 977.69 -4.72 0.00 974.05 7.12 974.05 -30.58

7.12 974.05 10.12 977.05 -8.38

10.12 977.05 10.76 977.69 -0.62

-9.83 -79.38 69.55

10.76 977.69 14.98 977.63 -2.88 10.76 977.69 12.92 979.85 0.92

12.92 979.85 14.98 979.85 3.10

-2.88 4.02 -6.90

TOTAL AREAS(M2): 69.55 -11.42

2+300.00 -15.05 978.28 -11.28 978.16 -0.22 -15.05 979.80 -12.92 979.80 3.24

-12.92 979.80 -11.28 978.16 1.16

-0.22 4.40 -4.62

-11.28 978.16 -2.45 977.89 -2.23 -11.28 978.16 -10.12 977.00 -0.81

-2.45 977.89 0.00 977.81 -1.04 -10.12 977.00 -7.12 974.00 -8.32

0.00 977.81 2.53 977.77 -1.22 -7.12 974.00 0.00 974.00 -30.43

2.53 977.77 10.77 977.65 -4.67 0.00 974.00 7.12 974.00 -30.43

7.12 974.00 10.12 977.00 -8.32

10.12 977.00 10.77 977.65 -0.61

-9.15 -78.94 69.78

10.77 977.65 15.02 977.58 -2.82 10.77 977.65 12.92 979.80 0.97

15.02 977.58 15.71 977.59 -0.48 12.92 979.80 15.32 979.80 3.66

15.32 979.80 15.71 979.41 0.52

-3.29 5.15 -8.44

TOTAL AREAS(M2): 69.78 -13.07

2+320.00 -15.10 978.22 -14.80 978.19 0.00 -15.10 979.75 -12.92 979.75 3.35

-14.80 978.19 -11.25 978.08 -0.29 -12.92 979.75 -11.25 978.08 1.17

-0.29 4.52 -4.81

-11.25 978.08 -2.59 977.82 -2.30 -11.25 978.08 -10.12 976.95 -0.79

-2.59 977.82 0.00 977.74 -1.13 -10.12 976.95 -7.12 973.95 -8.29

0.00 977.74 2.48 977.71 -1.22 -7.12 973.95 0.00 973.95 -30.35

2.48 977.71 10.76 977.59 -4.68 0.00 973.95 7.12 973.95 -30.35

7.12 973.95 10.12 976.95 -8.29

10.12 976.95 10.76 977.59 -0.60

-9.32 -78.67 69.35

10.76 977.59 15.24 977.53 -2.95 10.76 977.59 12.92 979.75 0.99

15.24 977.53 15.74 977.54 -0.34 12.92 979.75 15.32 979.75 3.69

15.32 979.75 15.74 979.33 0.56

-3.29 5.24 -8.52

TOTAL AREAS(M2): 69.35 -13.34

2+340.00 -15.43 978.16 -15.23 978.14 0.00 -15.43 979.60 -15.32 979.71 0.16

Página 34

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-15.23 978.14 -11.23 978.02 -0.33 -15.32 979.71 -12.92 979.71 3.71

-12.92 979.71 -11.23 978.02 1.18

-0.33 5.04 -5.37

-11.23 978.02 -2.75 977.75 -2.38 -11.23 978.02 -10.12 976.91 -0.78

-2.75 977.75 0.00 977.66 -1.27 -10.12 976.91 -7.12 973.91 -8.27

0.00 977.66 2.37 977.63 -1.23 -7.12 973.91 0.00 973.91 -30.30

2.37 977.63 10.74 977.53 -4.91 0.00 973.91 7.12 973.91 -30.30

7.12 973.91 10.12 976.91 -8.27

10.12 976.91 10.74 977.53 -0.59

-9.79 -78.50 68.72

10.74 977.53 14.82 977.48 -2.70 10.74 977.53 12.92 979.71 0.99

14.82 977.48 15.55 977.46 -0.50 12.92 979.71 15.32 979.71 3.71

15.32 979.71 15.55 979.48 0.32

-3.20 5.02 -8.22

TOTAL AREAS(M2): 68.72 -13.59

2+360.00 -14.80 978.13 -11.28 978.01 -0.20 -14.80 979.66 -12.92 979.66 2.88

-12.92 979.66 -11.28 978.01 1.17

-0.20 4.04 -4.24

-11.28 978.01 -3.29 977.76 -1.90 -11.28 978.01 -10.12 976.86 -0.80

-3.29 977.76 0.00 977.66 -1.38 -10.12 976.86 -7.12 973.86 -8.30

0.00 977.66 2.20 977.61 -1.08 -7.12 973.86 0.00 973.86 -30.39

2.20 977.61 10.74 977.47 -4.96 0.00 973.86 7.12 973.86 -30.39

7.12 973.86 10.12 976.86 -8.30

10.12 976.86 10.74 977.47 -0.59

-9.33 -78.78 69.45

10.74 977.47 15.20 977.40 -3.07 10.74 977.47 12.92 979.66 0.96

15.20 977.40 15.86 977.39 -0.48 12.92 979.66 15.32 979.66 3.68

15.32 979.66 15.86 979.12 0.68

-3.56 5.32 -8.88

TOTAL AREAS(M2): 69.45 -13.12

2+380.00 -16.42 978.08 -14.90 978.08 0.00 -16.42 978.51 -15.32 979.61 1.07

-14.90 978.08 -11.28 977.97 -0.21 -15.32 979.61 -12.92 979.61 3.66

-12.92 979.61 -11.28 977.97 1.16

-0.21 5.90 -6.11

-11.28 977.97 -2.63 977.69 -2.18 -11.28 977.97 -10.12 976.81 -0.80

-2.63 977.69 0.00 977.61 -1.13 -10.12 976.81 -7.12 973.81 -8.32

0.00 977.61 2.71 977.56 -1.35 -7.12 973.81 0.00 973.81 -30.42

2.71 977.56 10.73 977.42 -4.76 0.00 973.81 7.12 973.81 -30.42

7.12 973.81 10.12 976.81 -8.32

10.12 976.81 10.73 977.42 -0.59

-9.43 -78.88 69.45

10.73 977.42 15.25 977.33 -3.21 10.73 977.42 12.92 979.61 0.94

12.92 979.61 15.25 979.61 3.55

-3.21 4.50 -7.70

TOTAL AREAS(M2): 69.45 -13.81

2+400.00 -16.79 978.03 -15.44 978.03 0.00 -16.79 978.09 -15.32 979.56 1.17

-15.44 978.03 -11.28 977.92 -0.24 -15.32 979.56 -12.92 979.56 3.67

-12.92 979.56 -11.28 977.92 1.16

-0.24 6.00 -6.24

-11.28 977.92 -2.30 977.67 -2.14 -11.28 977.92 -10.12 976.76 -0.80

Página 35

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-2.30 977.67 0.00 977.61 -0.91 -10.12 976.76 -7.12 973.76 -8.31

0.00 977.61 3.97 977.51 -1.88 -7.12 973.76 0.00 973.76 -30.41

3.97 977.51 10.71 977.36 -4.03 0.00 973.76 7.12 973.76 -30.41

7.12 973.76 10.12 976.76 -8.31

10.12 976.76 10.71 977.36 -0.58

-8.97 -78.82 69.85

10.71 977.36 14.75 977.26 -2.92 10.71 977.36 12.92 979.56 0.94

12.92 979.56 14.75 979.56 2.80

-2.92 3.74 -6.66

TOTAL AREAS(M2): 69.85 -12.90

2+420.00 -15.01 977.98 -11.28 977.88 -0.20 -15.01 979.51 -12.92 979.51 3.20

-12.92 979.51 -11.28 977.88 1.17

-0.20 4.37 -4.56

-11.28 977.88 -2.27 977.62 -2.10 -11.28 977.88 -10.12 976.71 -0.80

-2.27 977.62 0.00 977.55 -0.90 -10.12 976.71 -7.12 973.71 -8.30

0.00 977.55 4.13 977.45 -1.98 -7.12 973.71 0.00 973.71 -30.39

4.13 977.45 10.70 977.29 -4.00 0.00 973.71 7.12 973.71 -30.39

7.12 973.71 10.12 976.71 -8.30

10.12 976.71 10.70 977.29 -0.57

-8.98 -78.74 69.76

10.70 977.29 14.95 977.19 -3.16 10.70 977.29 12.92 979.51 0.94

12.92 979.51 14.95 979.51 3.12

-3.16 4.05 -7.21

TOTAL AREAS(M2): 69.76 -11.77

2+440.00 -15.03 977.95 -11.29 977.84 -0.22 -15.03 979.47 -12.92 979.47 3.20

-12.92 979.47 -11.29 977.84 1.14

-0.22 4.34 -4.56

-11.29 977.84 -2.34 977.56 -2.27 -11.29 977.84 -10.12 976.67 -0.82

-2.34 977.56 0.00 977.48 -1.01 -10.12 976.67 -7.12 973.67 -8.35

0.00 977.48 3.97 977.38 -2.07 -7.12 973.67 0.00 973.67 -30.51

3.97 977.38 10.66 977.21 -4.40 0.00 973.67 7.12 973.67 -30.51

7.12 973.67 10.12 976.67 -8.35

10.12 976.67 10.66 977.21 -0.55

-9.75 -79.09 69.34

10.66 977.21 14.97 977.10 -3.44 10.66 977.21 12.92 979.47 0.87

12.92 979.47 14.97 979.47 3.11

-3.44 3.98 -7.42

TOTAL AREAS(M2): 69.34 -11.98

2+460.00 -15.18 977.93 -11.30 977.80 -0.27 -15.18 979.42 -12.92 979.42 3.36

-12.92 979.42 -11.30 977.80 1.09

-0.27 4.45 -4.72

-11.30 977.80 -2.82 977.49 -2.46 -11.30 977.80 -10.12 976.62 -0.86

-2.82 977.49 0.00 977.40 -1.38 -10.12 976.62 -7.12 973.62 -8.45

0.00 977.40 3.16 977.31 -1.84 -7.12 973.62 0.00 973.62 -30.73

3.16 977.31 10.63 977.13 -5.33 0.00 973.62 7.12 973.62 -30.73

7.12 973.62 10.12 976.62 -8.45

10.12 976.62 10.63 977.13 -0.54

-11.00 -79.76 68.76

10.63 977.13 14.98 977.02 -3.73 10.63 977.13 12.92 979.42 0.78

14.98 977.02 16.24 977.02 -1.15 12.92 979.42 15.32 979.42 3.56

Página 36

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

15.32 979.42 16.24 978.49 0.94

-4.88 5.28 -10.16

TOTAL AREAS(M2): 68.76 -14.88

2+480.00 -14.81 977.89 -11.31 977.76 -0.23 -14.81 979.37 -12.92 979.37 2.80

-12.92 979.37 -11.31 977.76 1.09

-0.23 3.89 -4.12

-11.31 977.76 -3.49 977.47 -2.15 -11.31 977.76 -10.12 976.57 -0.86

-3.49 977.47 0.00 977.35 -1.68 -10.12 976.57 -7.12 973.57 -8.46

0.00 977.35 2.80 977.27 -1.63 -7.12 973.57 0.00 973.57 -30.76

2.80 977.27 10.62 977.07 -5.64 0.00 973.57 7.12 973.57 -30.76

7.12 973.57 10.12 976.57 -8.46

10.12 976.57 10.62 977.07 -0.54

-11.10 -79.84 68.74

10.62 977.07 15.36 976.95 -4.17 10.62 977.07 12.92 979.37 0.76

15.36 976.95 16.25 976.95 -0.84 12.92 979.37 15.32 979.37 3.55

15.32 979.37 16.25 978.44 0.94

-5.01 5.25 -10.26

TOTAL AREAS(M2): 68.74 -14.37

2+500.00 -15.00 977.84 -11.31 977.71 -0.24 -15.00 979.32 -12.92 979.32 3.09

-12.92 979.32 -11.31 977.71 1.09

-0.24 4.18 -4.42

-11.31 977.71 -3.49 977.44 -2.07 -11.31 977.71 -10.12 976.52 -0.86

-3.49 977.44 0.00 977.31 -1.61 -10.12 976.52 -7.12 973.52 -8.44

0.00 977.31 2.80 977.23 -1.58 -7.12 973.52 0.00 973.52 -30.72

2.80 977.23 10.60 977.01 -5.61 0.00 973.52 7.12 973.52 -30.72

7.12 973.52 10.12 976.52 -8.44

10.12 976.52 10.60 977.01 -0.52

-10.87 -79.71 68.84

10.60 977.01 15.00 976.88 -3.94 10.60 977.01 12.92 979.32 0.76

12.92 979.32 15.00 979.32 3.09

-3.94 3.85 -7.79

TOTAL AREAS(M2): 68.84 -12.21

2+520.00 -15.00 977.75 -11.27 977.63 -0.23 -15.00 979.27 -12.92 979.27 3.16

-12.92 979.27 -11.27 977.63 1.15

-0.23 4.31 -4.54

-11.27 977.63 -3.49 977.37 -2.00 -11.27 977.63 -10.12 976.47 -0.81

-3.49 977.37 0.00 977.25 -1.55 -10.12 976.47 -7.12 973.47 -8.34

0.00 977.25 2.80 977.18 -1.51 -7.12 973.47 0.00 973.47 -30.47

2.80 977.18 10.60 976.95 -5.38 0.00 973.47 7.12 973.47 -30.47

7.12 973.47 10.12 976.47 -8.34

10.12 976.47 10.60 976.95 -0.50

-10.43 -78.93 68.51

10.60 976.95 15.00 976.83 -3.80 10.60 976.95 12.92 979.27 0.83

12.92 979.27 15.00 979.27 3.16

-3.80 4.00 -7.80

TOTAL AREAS(M2): 68.51 -12.34

2+540.00 -16.70 977.67 -14.86 977.67 0.00 -16.70 977.85 -15.32 979.23 1.20

-14.86 977.67 -11.25 977.56 -0.20 -15.32 979.23 -12.92 979.23 3.74

-12.92 979.23 -11.25 977.56 1.21

-0.20 6.14 -6.34

Página 37

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-11.25 977.56 -2.69 977.29 -2.09 -11.25 977.56 -10.12 976.43 -0.77

-2.69 977.29 0.00 977.20 -1.13 -10.12 976.43 -7.12 973.43 -8.23

0.00 977.20 3.65 977.11 -1.87 -7.12 973.43 0.00 973.43 -30.20

3.65 977.11 10.60 976.91 -4.60 0.00 973.43 7.12 973.43 -30.20

7.12 973.43 10.12 976.43 -8.23

10.12 976.43 10.60 976.91 -0.48

-9.69 -78.11 68.42

10.60 976.91 15.36 976.77 -3.95 10.60 976.91 12.92 979.23 0.92

12.92 979.23 15.32 979.23 3.74

15.32 979.23 15.36 979.18 0.06

-3.95 4.73 -8.67

TOTAL AREAS(M2): 68.42 -15.02

2+560.00 -16.90 977.60 -15.30 977.59 0.00 -16.90 977.60 -15.32 979.18 1.25

-15.30 977.59 -11.22 977.47 -0.25 -15.32 979.18 -12.92 979.18 3.80

-12.92 979.18 -11.22 977.47 1.24

-0.26 6.29 -6.55

-11.22 977.47 -2.43 977.21 -2.22 -11.22 977.47 -10.12 976.38 -0.73

-2.43 977.21 0.00 977.15 -1.01 -10.12 976.38 -7.12 973.38 -8.15

0.00 977.15 6.26 976.96 -3.39 -7.12 973.38 0.00 973.38 -30.03

6.26 976.96 10.57 976.83 -3.03 0.00 973.38 7.12 973.38 -30.03

7.12 973.38 10.12 976.38 -8.15

10.12 976.38 10.57 976.83 -0.45

-9.65 -77.55 67.90

10.57 976.83 14.76 976.70 -3.49 10.57 976.83 12.92 979.18 0.96

12.92 979.18 14.76 979.18 2.92

-3.49 3.88 -7.37

TOTAL AREAS(M2): 67.90 -13.92

2+580.00 -15.01 977.54 -11.23 977.44 -0.19 -15.01 979.13 -12.92 979.13 3.33

-12.92 979.13 -11.23 977.44 1.26

-0.19 4.59 -4.78

-11.23 977.44 -2.28 977.20 -1.96 -11.23 977.44 -10.12 976.33 -0.73

-2.28 977.20 0.00 977.14 -0.84 -10.12 976.33 -7.12 973.33 -8.13

0.00 977.14 7.40 976.88 -3.93 -7.12 973.33 0.00 973.33 -29.97

7.40 976.88 10.56 976.77 -2.26 0.00 973.33 7.12 973.33 -29.97

7.12 973.33 10.12 976.33 -8.13

10.12 976.33 10.56 976.77 -0.44

-8.99 -77.37 68.38

10.56 976.77 15.06 976.62 -3.79 10.56 976.77 12.92 979.13 0.97

12.92 979.13 15.06 979.13 3.40

-3.79 4.38 -8.17

TOTAL AREAS(M2): 68.38 -12.95

2+600.00 -15.86 977.53 -15.33 977.52 0.00 -15.86 978.54 -15.32 979.08 0.69

-15.33 977.52 -11.25 977.41 -0.25 -15.32 979.08 -12.92 979.08 3.73

-12.92 979.08 -11.25 977.41 1.20

-0.26 5.62 -5.87

-11.25 977.41 -1.98 977.16 -2.28 -11.25 977.41 -10.12 976.28 -0.77

-1.98 977.16 0.00 977.11 -0.79 -10.12 976.28 -7.12 973.28 -8.24

0.00 977.11 10.54 976.70 -6.59 -7.12 973.28 0.00 973.28 -30.24

0.00 973.28 7.12 973.28 -30.24

7.12 973.28 10.12 976.28 -8.24

Página 38

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

10.12 976.28 10.54 976.70 -0.44

-9.66 -78.17 68.51

10.54 976.70 14.82 976.54 -3.88 10.54 976.70 12.92 979.08 0.86

14.82 976.54 15.39 976.52 -0.57 12.92 979.08 15.32 979.08 3.73

15.32 979.08 15.39 979.02 0.10

-4.45 4.69 -9.14

TOTAL AREAS(M2): 68.51 -15.02

2+620.00 -16.87 977.48 -15.00 977.46 -0.04 -16.87 977.48 -15.32 979.03 1.19

-15.00 977.46 -14.40 977.44 -0.02 -15.32 979.03 -12.92 979.03 3.71

-14.40 977.44 -11.24 977.36 -0.28 -12.92 979.03 -11.24 977.36 1.19

-0.34 6.09 -6.43

-11.24 977.36 0.00 977.06 -3.14 -11.24 977.36 -10.12 976.23 -0.78

0.00 977.06 2.26 976.97 -1.07 -10.12 976.23 -7.12 973.23 -8.26

2.26 976.97 10.53 976.64 -5.64 -7.12 973.23 0.00 973.23 -30.30

0.00 973.23 7.12 973.23 -30.30

7.12 973.23 10.12 976.23 -8.26

10.12 976.23 10.53 976.64 -0.43

-9.84 -78.33 68.49

10.53 976.64 15.00 976.47 -4.18 10.53 976.64 12.92 979.03 0.84

12.92 979.03 15.00 979.03 3.21

-4.18 4.05 -8.23

TOTAL AREAS(M2): 68.49 -14.65

2+640.00 -15.00 977.44 -14.40 977.42 0.00 -15.00 978.99 -12.92 978.99 3.22

-14.40 977.42 -11.27 977.33 -0.19 -12.92 978.99 -11.27 977.33 1.19

-0.19 4.41 -4.61

-11.27 977.33 0.00 977.01 -3.01 -11.27 977.33 -10.12 976.19 -0.78

0.00 977.01 2.26 976.92 -1.07 -10.12 976.19 -7.12 973.19 -8.25

2.26 976.92 10.53 976.59 -5.64 -7.12 973.19 0.00 973.19 -30.27

0.00 973.19 7.12 973.19 -30.27

7.12 973.19 10.12 976.19 -8.25

10.12 976.19 10.53 976.59 -0.43

-9.73 -78.25 68.52

10.53 976.59 15.00 976.42 -4.18 10.53 976.59 12.92 978.99 0.84

12.92 978.99 15.00 978.99 3.22

-4.18 4.06 -8.24

TOTAL AREAS(M2): 68.52 -12.85

2+660.00 -15.00 977.38 -14.40 977.36 -0.01 -15.00 978.94 -12.92 978.94 3.25

-14.40 977.36 -11.26 977.28 -0.18 -12.92 978.94 -11.26 977.28 1.21

-0.18 4.46 -4.64

-11.26 977.28 0.00 976.99 -2.74 -11.26 977.28 -10.12 976.14 -0.76

0.00 976.99 2.26 976.90 -0.98 -10.12 976.14 -7.12 973.14 -8.22

2.26 976.90 10.55 976.56 -5.36 -7.12 973.14 0.00 973.14 -30.19

0.00 973.14 7.12 973.14 -30.19

7.12 973.14 10.12 976.14 -8.22

10.12 976.14 10.55 976.56 -0.44

-9.08 -78.01 68.93

10.55 976.56 15.00 976.38 -4.03 10.55 976.56 12.92 978.94 0.89

12.92 978.94 15.00 978.94 3.25

-4.03 4.13 -8.16

TOTAL AREAS(M2): 68.93 -12.80

Página 39

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

2+680.00 -15.00 977.33 -14.40 977.31 -0.01 -15.00 978.89 -12.92 978.89 3.25

-14.40 977.31 -11.25 977.22 -0.19 -12.92 978.89 -11.25 977.22 1.22

-0.20 4.47 -4.67

-11.25 977.22 0.00 976.91 -2.95 -11.25 977.22 -10.12 976.09 -0.76

0.00 976.91 2.26 976.82 -1.04 -10.12 976.09 -7.12 973.09 -8.21

2.26 976.82 10.53 976.50 -5.52 -7.12 973.09 0.00 973.09 -30.16

0.00 973.09 7.12 973.09 -30.16

7.12 973.09 10.12 976.09 -8.21

10.12 976.09 10.53 976.50 -0.42

-9.51 -77.93 68.42

10.53 976.50 15.00 976.32 -4.12 10.53 976.50 12.92 978.89 0.88

12.92 978.89 15.00 978.89 3.25

-4.12 4.13 -8.25

TOTAL AREAS(M2): 68.42 -12.91

2+700.00 -15.00 977.25 -14.40 977.23 0.00 -15.00 978.84 -12.92 978.84 3.31

-14.40 977.23 -11.22 977.14 -0.19 -12.92 978.84 -11.22 977.14 1.26

-0.20 4.58 -4.78

-11.22 977.14 0.00 976.83 -2.95 -11.22 977.14 -10.12 976.04 -0.72

0.00 976.83 2.26 976.74 -1.05 -10.12 976.04 -7.12 973.04 -8.12

2.26 976.74 10.51 976.43 -5.46 -7.12 973.04 0.00 973.04 -29.95

0.00 973.04 7.12 973.04 -29.95

7.12 973.04 10.12 976.04 -8.12

10.12 976.04 10.51 976.43 -0.40

-9.46 -77.25 67.79

10.51 976.43 15.00 976.27 -4.03 10.51 976.43 12.92 978.84 0.94

12.92 978.84 15.00 978.84 3.31

-4.03 4.25 -8.28

TOTAL AREAS(M2): 67.79 -13.06

2+720.00 -15.00 977.22 -14.40 977.20 0.00 -15.00 978.79 -12.92 978.79 3.28

-14.40 977.20 -11.24 977.12 -0.18 -12.92 978.79 -11.24 977.12 1.24

-0.19 4.51 -4.70

-11.24 977.12 0.00 976.82 -2.82 -11.24 977.12 -10.12 975.99 -0.74

0.00 976.82 2.26 976.73 -1.01 -10.12 975.99 -7.12 972.99 -8.17

2.26 976.73 10.53 976.40 -5.41 -7.12 972.99 0.00 972.99 -30.08

0.00 972.99 7.12 972.99 -30.08

7.12 972.99 10.12 975.99 -8.17

10.12 975.99 10.53 976.40 -0.42

-9.24 -77.66 68.42

10.53 976.40 15.00 976.23 -4.05 10.53 976.40 12.92 978.79 0.91

12.92 978.79 15.00 978.79 3.28

-4.05 4.18 -8.23

TOTAL AREAS(M2): 68.42 -12.94

2+740.00 -15.00 977.19 -14.40 977.17 0.00 -15.00 978.75 -12.92 978.75 3.24

-14.40 977.17 -11.27 977.09 -0.18 -12.92 978.75 -11.27 977.09 1.21

-0.18 4.45 -4.63

-11.27 977.09 0.00 976.80 -2.75 -11.27 977.09 -10.12 975.95 -0.77

0.00 976.80 2.26 976.70 -1.00 -10.12 975.95 -7.12 972.95 -8.23

2.26 976.70 10.54 976.37 -5.43 -7.12 972.95 0.00 972.95 -30.20

0.00 972.95 7.12 972.95 -30.20

7.12 972.95 10.12 975.95 -8.23

Página 40

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

10.12 975.95 10.54 976.37 -0.43

-9.18 -78.06 68.87

10.54 976.37 15.00 976.19 -4.06 10.54 976.37 12.92 978.75 0.88

12.92 978.75 15.00 978.75 3.24

-4.06 4.12 -8.18

TOTAL AREAS(M2): 68.87 -12.81

2+760.00 -15.00 977.15 -14.40 977.13 -0.01 -15.00 978.70 -12.92 978.70 3.22

-14.40 977.13 -11.27 977.05 -0.18 -12.92 978.70 -11.27 977.05 1.20

-0.18 4.42 -4.60

-11.27 977.05 0.00 976.77 -2.69 -11.27 977.05 -10.12 975.90 -0.78

0.00 976.77 2.26 976.67 -0.97 -10.12 975.90 -7.12 972.90 -8.25

2.26 976.67 10.53 976.30 -5.46 -7.12 972.90 0.00 972.90 -30.26

0.00 972.90 7.12 972.90 -30.26

7.12 972.90 10.12 975.90 -8.25

10.12 975.90 10.53 976.30 -0.43

-9.12 -78.23 69.10

10.53 976.30 15.00 976.11 -4.22 10.53 976.30 12.92 978.70 0.84

12.92 978.70 15.00 978.70 3.22

-4.22 4.07 -8.29

TOTAL AREAS(M2): 69.10 -12.89

2+780.00 -15.00 977.12 -14.40 977.10 -0.01 -15.00 978.65 -12.92 978.65 3.19

-14.40 977.10 -11.28 977.01 -0.19 -12.92 978.65 -11.28 977.01 1.17

-0.20 4.36 -4.56

-11.28 977.01 0.00 976.68 -3.06 -11.28 977.01 -10.12 975.85 -0.80

0.00 976.68 2.26 976.59 -1.09 -10.12 975.85 -7.12 972.85 -8.30

2.26 976.59 10.51 976.24 -5.77 -7.12 972.85 0.00 972.85 -30.38

0.00 972.85 7.12 972.85 -30.38

7.12 972.85 10.12 975.85 -8.30

10.12 975.85 10.51 976.24 -0.42

-9.91 -78.57 68.65

10.51 976.24 15.00 976.06 -4.34 10.51 976.24 12.92 978.65 0.80

12.92 978.65 15.00 978.65 3.19

-4.34 3.98 -8.32

TOTAL AREAS(M2): 68.65 -12.88

2+800.00 -15.00 977.04 -14.40 977.02 0.00 -15.00 978.60 -12.92 978.60 3.26

-14.40 977.02 -11.25 976.94 -0.18 -12.92 978.60 -11.25 976.94 1.22

-0.18 4.48 -4.66

-11.25 976.94 0.00 976.63 -2.87 -11.25 976.94 -10.12 975.80 -0.76

0.00 976.63 2.26 976.53 -1.04 -10.12 975.80 -7.12 972.80 -8.20

2.26 976.53 10.52 976.20 -5.54 -7.12 972.80 0.00 972.80 -30.15

0.00 972.80 7.12 972.80 -30.15

7.12 972.80 10.12 975.80 -8.20

10.12 975.80 10.52 976.20 -0.41

-9.44 -77.88 68.44

10.52 976.20 15.00 976.02 -4.14 10.52 976.20 12.92 978.60 0.88

12.92 978.60 15.00 978.60 3.26

-4.14 4.13 -8.28

TOTAL AREAS(M2): 68.44 -12.94

2+820.00 -15.00 976.97 -14.40 976.95 -0.01 -15.00 978.55 -12.92 978.55 3.30

-14.40 976.95 -11.24 976.88 -0.17 -12.92 978.55 -11.24 976.88 1.25

Página 41

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-0.18 4.55 -4.73

-11.24 976.88 0.00 976.61 -2.55 -11.24 976.88 -10.12 975.75 -0.73

0.00 976.61 2.26 976.51 -0.93 -10.12 975.75 -7.12 972.75 -8.14

2.26 976.51 10.51 976.15 -5.28 -7.12 972.75 0.00 972.75 -30.00

0.00 972.75 7.12 972.75 -30.00

7.12 972.75 10.12 975.75 -8.14

10.12 975.75 10.51 976.15 -0.40

-8.76 -77.43 68.67

10.51 976.15 15.00 975.95 -4.13 10.51 976.15 12.92 978.55 0.92

12.92 978.55 15.00 978.55 3.30

-4.13 4.22 -8.35

TOTAL AREAS(M2): 68.67 -13.07

2+840.00 -15.00 976.94 -14.40 976.92 -0.01 -15.00 978.51 -12.92 978.51 3.26

-14.40 976.92 -11.25 976.83 -0.20 -12.92 978.51 -11.25 976.83 1.22

-0.21 4.48 -4.69

-11.25 976.83 0.00 976.52 -2.98 -11.25 976.83 -10.12 975.71 -0.75

0.00 976.52 2.26 976.43 -1.05 -10.12 975.71 -7.12 972.71 -8.20

2.26 976.43 10.50 976.08 -5.62 -7.12 972.71 0.00 972.71 -30.14

0.00 972.71 7.12 972.71 -30.14

7.12 972.71 10.12 975.71 -8.20

10.12 975.71 10.50 976.08 -0.39

-9.65 -77.83 68.18

10.50 976.08 15.00 975.89 -4.30 10.50 976.08 12.92 978.51 0.86

12.92 978.51 15.00 978.51 3.26

-4.30 4.12 -8.42

TOTAL AREAS(M2): 68.18 -13.10

2+860.00 -15.00 976.94 -14.40 976.92 -0.01 -15.00 978.46 -12.92 978.46 3.16

-14.40 976.92 -11.27 976.81 -0.24 -12.92 978.46 -11.27 976.81 1.15

-0.24 4.31 -4.55

-11.27 976.81 0.00 976.43 -3.59 -11.27 976.81 -10.12 975.66 -0.81

0.00 976.43 2.26 976.36 -1.24 -10.12 975.66 -7.12 972.66 -8.34

2.26 976.36 10.51 976.05 -6.07 -7.12 972.66 0.00 972.66 -30.48

0.00 972.66 7.12 972.66 -30.48

7.12 972.66 10.12 975.66 -8.34

10.12 975.66 10.51 976.05 -0.43

-10.90 -78.88 67.98

10.51 976.05 15.00 975.89 -4.35 10.51 976.05 12.92 978.46 0.76

12.92 978.46 15.00 978.46 3.16

-4.35 3.92 -8.27

TOTAL AREAS(M2): 67.98 -12.82

2+880.00 -15.00 976.93 -14.40 976.90 -0.01 -15.00 978.41 -12.92 978.41 3.09

-14.40 976.90 -11.30 976.79 -0.25 -12.92 978.41 -11.30 976.79 1.09

-0.26 4.18 -4.44

-11.30 976.79 0.00 976.36 -3.99 -11.30 976.79 -10.12 975.61 -0.86

0.00 976.36 2.26 976.28 -1.37 -10.12 975.61 -7.12 972.61 -8.45

2.26 976.28 10.52 976.01 -6.45 -7.12 972.61 0.00 972.61 -30.73

0.00 972.61 7.12 972.61 -30.73

7.12 972.61 10.12 975.61 -8.45

10.12 975.61 10.52 976.01 -0.44

-11.81 -79.64 67.83

Página 42

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

10.52 976.01 15.00 975.86 -4.45 10.52 976.01 12.92 978.41 0.68

12.92 978.41 15.00 978.41 3.09

-4.45 3.77 -8.22

TOTAL AREAS(M2): 67.83 -12.66

2+900.00 -15.00 976.83 -14.40 976.81 -0.01 -15.00 978.36 -12.92 978.36 3.19

-14.40 976.81 -11.25 976.69 -0.25 -12.92 978.36 -11.25 976.69 1.17

-0.26 4.36 -4.62

-11.25 976.69 0.00 976.28 -3.85 -11.25 976.69 -10.12 975.56 -0.79

0.00 976.28 2.26 976.21 -1.32 -10.12 975.56 -7.12 972.56 -8.30

2.26 976.21 10.49 975.93 -6.22 -7.12 972.56 0.00 972.56 -30.37

0.00 972.56 7.12 972.56 -30.37

7.12 972.56 10.12 975.56 -8.30

10.12 975.56 10.49 975.93 -0.40

-11.39 -78.52 67.13

10.49 975.93 15.00 975.78 -4.37 10.49 975.93 12.92 978.36 0.78

12.92 978.36 15.00 978.36 3.19

-4.37 3.97 -8.34

TOTAL AREAS(M2): 67.13 -12.96

2+920.00 -15.00 976.78 -14.40 976.75 -0.01 -15.00 978.31 -12.92 978.31 3.20

-14.40 976.75 -11.24 976.63 -0.26 -12.92 978.31 -11.24 976.63 1.17

-0.27 4.37 -4.64

-11.24 976.63 0.00 976.21 -3.99 -11.24 976.63 -10.12 975.51 -0.79

0.00 976.21 2.26 976.14 -1.36 -10.12 975.51 -7.12 972.51 -8.29

2.26 976.14 10.49 975.88 -6.30 -7.12 972.51 0.00 972.51 -30.34

0.00 972.51 7.12 972.51 -30.34

7.12 972.51 10.12 975.51 -8.29

10.12 975.51 10.49 975.88 -0.40

-11.66 -78.44 66.78

10.49 975.88 15.00 975.74 -4.36 10.49 975.88 12.92 978.31 0.78

12.92 978.31 15.00 978.31 3.20

-4.36 3.98 -8.34

TOTAL AREAS(M2): 66.78 -12.98

2+940.00 -15.00 976.69 -14.40 976.67 -0.01 -15.00 978.27 -12.92 978.27 3.28

-14.40 976.67 -11.20 976.55 -0.26 -12.92 978.27 -11.20 976.55 1.24

-0.26 4.52 -4.78

-11.20 976.55 0.00 976.14 -3.86 -11.20 976.55 -10.12 975.47 -0.74

0.00 976.14 2.26 976.07 -1.33 -10.12 975.47 -7.12 972.47 -8.17

2.26 976.07 10.47 975.81 -6.15 -7.12 972.47 0.00 972.47 -30.06

0.00 972.47 7.12 972.47 -30.06

7.12 972.47 10.12 975.47 -8.17

10.12 975.47 10.47 975.81 -0.36

-11.33 -77.55 66.22

10.47 975.81 15.00 975.67 -4.29 10.47 975.81 12.92 978.27 0.86

12.92 978.27 15.00 978.27 3.28

-4.29 4.14 -8.43

TOTAL AREAS(M2): 66.22 -13.21

2+960.00 -15.00 976.66 -14.40 976.64 -0.01 -15.00 978.22 -12.92 978.22 3.25

-14.40 976.64 -11.23 976.52 -0.25 -12.92 978.22 -11.23 976.52 1.21

-0.25 4.45 -4.71

-11.23 976.52 0.00 976.12 -3.75 -11.23 976.52 -10.12 975.42 -0.76

Página 43

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

0.00 976.12 2.26 976.05 -1.29 -10.12 975.42 -7.12 972.42 -8.22

2.26 976.05 10.49 975.79 -6.07 -7.12 972.42 0.00 972.42 -30.19

0.00 972.42 7.12 972.42 -30.19

7.12 972.42 10.12 975.42 -8.22

10.12 975.42 10.49 975.79 -0.39

-11.11 -77.96 66.84

10.49 975.79 15.00 975.64 -4.25 10.49 975.79 12.92 978.22 0.84

12.92 978.22 15.00 978.22 3.25

-4.25 4.08 -8.34

TOTAL AREAS(M2): 66.84 -13.05

2+980.00 -15.01 976.62 -14.33 976.59 -0.01 -15.01 978.17 -12.92 978.17 3.24

-14.33 976.59 -11.23 976.48 -0.25 -12.92 978.17 -11.23 976.48 1.19

-0.26 4.44 -4.70

-11.23 976.48 0.00 976.08 -3.77 -11.23 976.48 -10.12 975.37 -0.77

0.00 976.08 2.25 976.01 -1.28 -10.12 975.37 -7.12 972.37 -8.25

2.25 976.01 10.50 975.75 -6.08 -7.12 972.37 0.00 972.37 -30.25

0.00 972.37 7.12 972.37 -30.25

7.12 972.37 10.12 975.37 -8.25

10.12 975.37 10.50 975.75 -0.40

-11.13 -78.16 67.04

10.50 975.75 15.00 975.61 -4.22 10.50 975.75 12.92 978.17 0.83

12.92 978.17 15.00 978.17 3.23

-4.22 4.06 -8.29

TOTAL AREAS(M2): 67.04 -12.98

3+000.00 -15.00 976.60 -14.18 976.58 -0.01 -15.00 978.12 -12.92 978.12 3.16

-14.18 976.58 -11.26 976.47 -0.24 -12.92 978.12 -11.26 976.47 1.14

-0.25 4.30 -4.56

-11.26 976.47 0.00 976.04 -3.94 -11.26 976.47 -10.12 975.32 -0.81

0.00 976.04 2.23 975.98 -1.32 -10.12 975.32 -7.12 972.32 -8.35

2.23 975.98 10.52 975.72 -6.27 -7.12 972.32 0.00 972.32 -30.49

0.00 972.32 7.12 972.32 -30.49

7.12 972.32 10.12 975.32 -8.35

10.12 975.32 10.52 975.72 -0.43

-11.53 -78.90 67.37

10.52 975.72 15.00 975.58 -4.29 10.52 975.72 12.92 978.12 0.76

12.92 978.12 15.00 978.12 3.16

-4.29 3.92 -8.21

TOTAL AREAS(M2): 67.37 -12.77

3+020.00 -14.98 976.51 -14.28 976.48 -0.01 -14.98 978.08 -12.92 978.08 3.22

-14.28 976.48 -11.22 976.38 -0.24 -12.92 978.08 -11.22 976.38 1.22

-0.25 4.44 -4.69

-11.22 976.38 0.00 975.99 -3.65 -11.22 976.38 -10.12 975.28 -0.75

0.00 975.99 2.26 975.93 -1.24 -10.12 975.28 -7.12 972.28 -8.20

2.26 975.93 10.53 975.69 -5.79 -7.12 972.28 0.00 972.28 -30.15

0.00 972.28 7.12 972.28 -30.15

7.12 972.28 10.12 975.28 -8.20

10.12 975.28 10.53 975.69 -0.43

-10.69 -77.88 67.20

10.53 975.69 14.99 975.56 -3.94 10.53 975.69 12.92 978.08 0.89

12.92 978.08 14.99 978.08 3.24

Página 44

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-3.94 4.13 -8.08

TOTAL AREAS(M2): 67.20 -12.77

3+040.00 -14.99 976.50 -14.66 976.49 0.00 -14.99 978.03 -12.92 978.03 3.16

-14.66 976.49 -11.25 976.35 -0.27 -12.92 978.03 -11.25 976.35 1.16

-0.27 4.32 -4.59

-11.25 976.35 0.00 975.92 -4.08 -11.25 976.35 -10.12 975.23 -0.80

0.00 975.92 2.31 975.86 -1.41 -10.12 975.23 -7.12 972.23 -8.31

2.31 975.86 10.54 975.64 -6.13 -7.12 972.23 0.00 972.23 -30.41

0.00 972.23 7.12 972.23 -30.41

7.12 972.23 10.12 975.23 -8.31

10.12 975.23 10.54 975.64 -0.44

-11.61 -78.69 67.07

10.54 975.64 15.00 975.52 -4.09 10.54 975.64 12.92 978.03 0.80

12.92 978.03 15.00 978.03 3.17

-4.09 3.98 -8.06

TOTAL AREAS(M2): 67.07 -12.65

3+060.00 -15.01 976.42 -15.00 976.42 0.00 -15.01 977.98 -12.92 977.98 3.26

-15.00 976.42 -14.80 976.41 0.00 -12.92 977.98 -11.21 976.27 1.21

-14.80 976.41 -11.21 976.27 -0.27

-0.27 4.47 -4.74

-11.21 976.27 0.00 975.84 -4.06 -11.21 976.27 -10.12 975.18 -0.76

0.00 975.84 2.33 975.79 -1.41 -10.12 975.18 -7.12 972.18 -8.22

2.33 975.79 10.54 975.60 -5.95 -7.12 972.18 0.00 972.18 -30.19

0.00 972.18 7.12 972.18 -30.19

7.12 972.18 10.12 975.18 -8.22

10.12 975.18 10.54 975.60 -0.43

-11.42 -78.00 66.58

10.54 975.60 15.00 975.50 -3.87 10.54 975.60 12.92 977.98 0.88

12.92 977.98 15.00 977.98 3.25

-3.87 4.13 -8.00

TOTAL AREAS(M2): 66.58 -12.74

3+080.00 -15.63 976.33 -14.88 976.33 0.00 -15.63 977.62 -15.32 977.93 0.46

-14.88 976.33 -12.35 976.25 -0.09 -15.32 977.93 -12.92 977.93 3.85

-12.35 976.25 -11.20 976.21 -0.11 -12.92 977.93 -11.20 976.21 1.28

-0.21 5.58 -5.79

-11.20 976.21 0.00 975.83 -3.44 -11.20 976.21 -10.12 975.13 -0.71

0.00 975.83 2.50 975.78 -1.30 -10.12 975.13 -7.12 972.13 -8.09

2.50 975.78 10.58 975.60 -5.17 -7.12 972.13 0.00 972.13 -29.88

0.00 972.13 7.12 972.13 -29.88

7.12 972.13 10.12 975.13 -8.09

10.12 975.13 10.58 975.60 -0.45

-9.91 -77.09 67.18

10.58 975.60 15.00 975.49 -3.46 10.58 975.60 12.92 977.93 1.02

12.92 977.93 15.00 977.93 3.33

-3.46 4.35 -7.81

TOTAL AREAS(M2): 67.18 -13.60

3+100.00 -15.18 976.24 -15.11 976.24 0.00 -15.18 977.88 -12.92 977.88 3.72

-15.11 976.24 -11.15 976.12 -0.24 -12.92 977.88 -11.15 976.12 1.34

-0.24 5.07 -5.31

-11.15 976.12 -8.83 976.05 -0.37 -11.15 976.12 -10.12 975.08 -0.66

Página 45

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-8.83 976.05 0.00 975.78 -2.88 -10.12 975.08 -7.12 972.08 -7.97

0.00 975.78 2.72 975.71 -1.34 -7.12 972.08 0.00 972.08 -29.59

2.72 975.71 10.59 975.55 -4.77 0.00 972.08 7.12 972.08 -29.59

7.12 972.08 10.12 975.08 -7.97

10.12 975.08 10.59 975.55 -0.43

-9.36 -76.21 66.85

10.59 975.55 15.00 975.46 -3.25 10.59 975.55 12.92 977.88 1.11

12.92 977.88 15.00 977.88 3.42

-3.25 4.53 -7.78

TOTAL AREAS(M2): 66.85 -13.09

3+120.00 -15.56 976.22 -15.28 976.21 0.00 -15.56 977.60 -15.32 977.84 0.35

-15.28 976.21 -11.18 976.09 -0.28 -15.32 977.84 -12.92 977.84 3.88

-12.92 977.84 -11.18 976.09 1.30

-0.28 5.53 -5.81

-11.18 976.09 0.00 975.77 -3.23 -11.18 976.09 -10.12 975.04 -0.69

0.00 975.77 2.40 975.72 -1.14 -10.12 975.04 -7.12 972.04 -8.05

2.40 975.72 10.61 975.52 -4.92 -7.12 972.04 0.00 972.04 -29.79

0.00 972.04 7.12 972.04 -29.79

7.12 972.04 10.12 975.04 -8.05

10.12 975.04 10.61 975.52 -0.46

-9.30 -76.84 67.55

10.61 975.52 15.39 975.41 -3.59 10.61 975.52 12.92 977.84 1.06

15.39 975.41 15.87 975.41 -0.39 12.92 977.84 15.32 977.84 3.88

15.32 977.84 15.87 977.28 0.74

-3.98 5.68 -9.66

TOTAL AREAS(M2): 67.55 -15.48

3+140.00 -15.27 976.19 -15.09 976.19 0.00 -15.27 977.79 -12.92 977.79 3.74

-15.09 976.19 -12.80 976.11 -0.10 -12.92 977.79 -11.19 976.06 1.26

-12.80 976.11 -11.19 976.06 -0.17

-0.27 5.00 -5.27

-11.19 976.06 0.00 975.69 -3.58 -11.19 976.06 -10.12 974.99 -0.72

0.00 975.69 2.45 975.64 -1.30 -10.12 974.99 -7.12 971.99 -8.12

2.45 975.64 10.60 975.47 -5.22 -7.12 971.99 0.00 971.99 -29.95

0.00 971.99 7.12 971.99 -29.95

7.12 971.99 10.12 974.99 -8.12

10.12 974.99 10.60 975.47 -0.46

-10.10 -77.31 67.20

10.60 975.47 15.09 975.38 -3.46 10.60 975.47 12.92 977.79 1.01

15.09 975.38 16.61 975.36 -1.26 12.92 977.79 15.32 977.79 3.83

15.32 977.79 16.61 976.50 1.22

-4.71 6.06 -10.77

TOTAL AREAS(M2): 67.20 -16.05

3+160.00 -16.12 976.15 -15.00 976.11 -0.02 -16.12 976.94 -15.32 977.74 0.95

-15.00 976.11 -13.95 976.07 -0.07 -15.32 977.74 -12.92 977.74 3.81

-13.95 976.07 -11.16 975.98 -0.36 -12.92 977.74 -11.16 975.98 1.24

-0.45 6.00 -6.45

-11.16 975.98 0.00 975.61 -4.02 -11.16 975.98 -10.12 974.94 -0.72

0.00 975.61 2.77 975.56 -1.58 -10.12 974.94 -7.12 971.94 -8.14

2.77 975.56 10.57 975.39 -5.28 -7.12 971.94 0.00 971.94 -30.00

0.00 971.94 7.12 971.94 -30.00

Página 46

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

7.12 971.94 10.12 974.94 -8.14

10.12 974.94 10.57 975.39 -0.45

-10.88 -77.44 66.56

10.57 975.39 15.00 975.30 -3.56 10.57 975.39 12.92 977.74 0.97

12.92 977.74 15.00 977.74 3.30

-3.56 4.27 -7.83

TOTAL AREAS(M2): 66.56 -14.28

3+180.00 -14.98 976.11 -14.07 976.07 -0.02 -14.98 977.69 -12.92 977.69 3.26

-14.07 976.07 -11.19 975.96 -0.26 -12.92 977.69 -11.19 975.96 1.24

-0.28 4.50 -4.78

-11.19 975.96 0.00 975.53 -4.03 -11.19 975.96 -10.12 974.89 -0.73

0.00 975.53 2.81 975.48 -1.69 -10.12 974.89 -7.12 971.89 -8.15

2.81 975.48 10.57 975.34 -5.42 -7.12 971.89 0.00 971.89 -30.02

0.00 971.89 7.12 971.89 -30.02

7.12 971.89 10.12 974.89 -8.15

10.12 974.89 10.57 975.34 -0.44

-11.14 -77.50 66.36

10.57 975.34 14.99 975.26 -3.57 10.57 975.34 12.92 977.69 0.96

12.92 977.69 14.99 977.69 3.28

-3.57 4.24 -7.81

TOTAL AREAS(M2): 66.36 -12.58

3+200.00 -14.80 976.06 -13.77 976.02 -0.02 -14.80 977.64 -12.92 977.64 2.97

-13.77 976.02 -11.20 975.92 -0.23 -12.92 977.64 -11.20 975.92 1.24

-0.25 4.21 -4.46

-11.20 975.92 0.00 975.48 -4.05 -11.20 975.92 -10.12 974.84 -0.73

0.00 975.48 3.11 975.42 -1.90 -10.12 974.84 -7.12 971.84 -8.15

3.11 975.42 10.55 975.28 -5.30 -7.12 971.84 0.00 971.84 -30.03

0.00 971.84 7.12 971.84 -30.03

7.12 971.84 10.12 974.84 -8.15

10.12 974.84 10.55 975.28 -0.43

-11.25 -77.52 66.27

10.55 975.28 14.97 975.19 -3.66 10.55 975.28 12.92 977.64 0.94

12.92 977.64 14.97 977.64 3.24

-3.66 4.18 -7.84

TOTAL AREAS(M2): 66.27 -12.30

3+220.00 -16.72 976.02 -14.89 975.97 -0.04 -16.72 976.20 -15.32 977.60 1.23

-14.89 975.97 -11.16 975.84 -0.42 -15.32 977.60 -12.92 977.60 3.79

-12.92 977.60 -11.16 975.84 1.23

-0.46 6.25 -6.70

-11.16 975.84 -7.85 975.71 -0.80 -11.16 975.84 -10.12 974.80 -0.73

-7.85 975.71 0.00 975.41 -3.59 -10.12 974.80 -7.12 971.80 -8.17

0.00 975.41 3.89 975.34 -2.51 -7.12 971.80 0.00 971.80 -30.06

3.89 975.34 10.53 975.21 -4.96 0.00 971.80 7.12 971.80 -30.06

7.12 971.80 10.12 974.80 -8.17

10.12 974.80 10.53 975.21 -0.42

-11.87 -77.60 65.73

10.53 975.21 15.07 975.12 -3.89 10.53 975.21 12.92 977.60 0.92

12.92 977.60 15.07 977.60 3.40

-3.89 4.31 -8.20

TOTAL AREAS(M2): 65.73 -14.91

Página 47

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

3+240.00 -15.61 975.97 -15.06 975.96 0.00 -15.61 977.26 -15.32 977.55 0.42

-15.06 975.96 -11.18 975.80 -0.35 -15.32 977.55 -12.92 977.55 3.78

-12.92 977.55 -11.18 975.80 1.23

-0.36 5.42 -5.78

-11.18 975.80 -5.98 975.59 -1.42 -11.18 975.80 -10.12 974.75 -0.74

-5.98 975.59 0.00 975.34 -3.04 -10.12 974.75 -7.12 971.75 -8.18

0.00 975.34 4.68 975.25 -3.18 -7.12 971.75 0.00 971.75 -30.08

4.68 975.25 10.52 975.15 -4.52 0.00 971.75 7.12 971.75 -30.08

7.12 971.75 10.12 974.75 -8.18

10.12 974.75 10.52 975.15 -0.41

-12.16 -77.67 65.51

10.52 975.15 15.10 975.06 -3.98 10.52 975.15 12.92 977.55 0.90

12.92 977.55 15.10 977.55 3.43

-3.98 4.33 -8.31

TOTAL AREAS(M2): 65.51 -14.09

3+260.00 -15.33 975.96 -11.21 975.78 -0.36 -15.33 977.48 -15.32 977.50 0.02

-15.32 977.50 -12.92 977.50 3.70

-12.92 977.50 -11.21 975.78 1.17

-0.36 4.89 -5.25

-11.21 975.78 -6.78 975.60 -1.19 -11.21 975.78 -10.12 974.70 -0.78

-6.78 975.60 0.00 975.31 -3.42 -10.12 974.70 -7.12 971.70 -8.28

0.00 975.31 4.27 975.23 -2.93 -7.12 971.70 0.00 971.70 -30.33

4.27 975.23 10.54 975.12 -4.91 0.00 971.70 7.12 971.70 -30.33

7.12 971.70 10.12 974.70 -8.28

10.12 974.70 10.54 975.12 -0.44

-12.45 -78.45 66.00

10.54 975.12 14.94 975.04 -3.88 10.54 975.12 12.92 977.50 0.83

14.94 975.04 15.79 975.04 -0.79 12.92 977.50 15.32 977.50 3.70

15.32 977.50 15.79 977.03 0.62

-4.67 5.14 -9.81

TOTAL AREAS(M2): 66.00 -15.06

3+280.00 -15.08 975.87 -11.18 975.71 -0.31 -15.08 977.45 -12.92 977.45 3.41

-12.92 977.45 -11.18 975.71 1.23

-0.31 4.64 -4.95

-11.18 975.71 -8.35 975.60 -0.62 -11.18 975.71 -10.12 974.65 -0.74

-8.35 975.60 0.00 975.28 -3.64 -10.12 974.65 -7.12 971.65 -8.17

0.00 975.28 3.90 975.21 -2.46 -7.12 971.65 0.00 971.65 -30.07

3.90 975.21 10.56 975.10 -4.81 0.00 971.65 7.12 971.65 -30.07

7.12 971.65 10.12 974.65 -8.17

10.12 974.65 10.56 975.10 -0.44

-11.54 -77.65 66.11

10.56 975.10 15.01 975.02 -3.63 10.56 975.10 12.92 977.45 0.94

15.01 975.02 15.74 975.02 -0.63 12.92 977.45 15.32 977.45 3.78

15.32 977.45 15.74 977.03 0.58

-4.26 5.30 -9.56

TOTAL AREAS(M2): 66.11 -14.51

3+300.00 -16.67 975.84 -14.57 975.86 0.02 -16.67 976.05 -15.32 977.40 1.20

-14.57 975.86 -11.25 975.73 -0.14 -15.32 977.40 -12.92 977.40 3.76

-12.92 977.40 -11.25 975.73 1.22

-0.12 6.19 -6.30

Página 48

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-11.25 975.73 -5.97 975.52 -1.11 -11.25 975.73 -10.12 974.60 -0.76

-5.97 975.52 0.00 975.27 -2.63 -10.12 974.60 -7.12 971.60 -8.20

0.00 975.27 5.15 975.17 -3.19 -7.12 971.60 0.00 971.60 -30.14

5.15 975.17 10.58 975.06 -3.92 0.00 971.60 7.12 971.60 -30.14

7.12 971.60 10.12 974.60 -8.20

10.12 974.60 10.58 975.06 -0.46

-10.85 -77.90 67.05

10.58 975.06 15.45 974.97 -4.01 10.58 975.06 12.92 977.40 0.93

12.92 977.40 15.32 977.40 3.76

15.32 977.40 15.45 977.27 0.20

-4.01 4.88 -8.89

TOTAL AREAS(M2): 67.05 -15.19

3+320.00 -16.19 975.81 -15.30 975.82 0.00 -16.19 976.48 -15.32 977.36 0.97

-15.30 975.82 -11.23 975.67 -0.27 -15.32 977.36 -12.92 977.36 3.71

-12.92 977.36 -11.23 975.67 1.18

-0.27 5.86 -6.13

-11.23 975.67 -5.78 975.46 -1.34 -11.23 975.67 -10.12 974.56 -0.78

-5.78 975.46 0.00 975.25 -2.63 -10.12 974.56 -7.12 971.56 -8.26

0.00 975.25 5.70 975.13 -3.54 -7.12 971.56 0.00 971.56 -30.29

5.70 975.13 10.59 975.03 -3.58 0.00 971.56 7.12 971.56 -30.29

7.12 971.56 10.12 974.56 -8.26

10.12 974.56 10.59 975.03 -0.48

-11.08 -78.36 67.28

10.59 975.03 14.86 974.93 -3.55 10.59 975.03 12.92 977.36 0.89

14.86 974.93 15.41 974.92 -0.48 12.92 977.36 15.32 977.36 3.71

15.32 977.36 15.41 977.27 0.13

-4.03 4.73 -8.76

TOTAL AREAS(M2): 67.28 -14.89

3+340.00 -15.00 975.75 -11.22 975.61 -0.27 -15.00 977.31 -12.92 977.31 3.24

-12.92 977.31 -11.22 975.61 1.20

-0.27 4.44 -4.72

-11.22 975.61 -5.99 975.41 -1.28 -11.22 975.61 -10.12 974.51 -0.76

-5.99 975.41 0.00 975.17 -2.76 -10.12 974.51 -7.12 971.51 -8.23

0.00 975.17 5.53 975.08 -3.46 -7.12 971.51 0.00 971.51 -30.21

5.53 975.08 10.59 974.98 -3.65 0.00 971.51 7.12 971.51 -30.21

7.12 971.51 10.12 974.51 -8.23

10.12 974.51 10.59 974.98 -0.48

-11.16 -78.10 66.94

10.59 974.98 15.00 974.90 -3.58 10.59 974.98 12.92 977.31 0.92

15.00 974.90 15.26 974.89 -0.22 12.92 977.31 15.26 977.31 3.64

-3.80 4.56 -8.36

TOTAL AREAS(M2): 66.94 -13.07

3+360.00 -14.97 975.72 -11.23 975.57 -0.29 -14.97 977.26 -12.92 977.26 3.15

-12.92 977.26 -11.23 975.57 1.17

-0.29 4.32 -4.61

-11.23 975.57 -5.88 975.34 -1.43 -11.23 975.57 -10.12 974.46 -0.79

-5.88 975.34 0.00 975.09 -2.97 -10.12 974.46 -7.12 971.46 -8.29

0.00 975.09 5.63 974.99 -3.85 -7.12 971.46 0.00 971.46 -30.35

5.63 974.99 10.56 974.90 -3.83 0.00 971.46 7.12 971.46 -30.35

7.12 971.46 10.12 974.46 -8.29

Página 49

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

10.12 974.46 10.56 974.90 -0.46

-12.08 -78.53 66.46

10.56 974.90 15.03 974.83 -3.83 10.56 974.90 12.92 977.26 0.84

12.92 977.26 15.03 977.26 3.24

-3.83 4.09 -7.92

TOTAL AREAS(M2): 66.46 -12.53

3+380.00 -15.00 975.70 -11.25 975.54 -0.30 -15.00 977.21 -12.92 977.21 3.15

-12.92 977.21 -11.25 975.54 1.13

-0.30 4.28 -4.58

-11.25 975.54 -5.83 975.30 -1.50 -11.25 975.54 -10.12 974.41 -0.82

-5.83 975.30 0.00 975.04 -3.06 -10.12 974.41 -7.12 971.41 -8.36

0.00 975.04 5.68 974.94 -4.03 -7.12 971.41 0.00 971.41 -30.52

5.68 974.94 10.55 974.84 -3.95 0.00 971.41 7.12 971.41 -30.52

7.12 971.41 10.12 974.41 -8.36

10.12 974.41 10.55 974.84 -0.46

-12.54 -79.05 66.51

10.55 974.84 15.00 974.75 -4.02 10.55 974.84 12.92 977.21 0.77

12.92 977.21 15.00 977.21 3.15

-4.02 3.92 -7.94

TOTAL AREAS(M2): 66.51 -12.52

3+400.00 -15.00 975.68 -11.26 975.50 -0.33 -15.00 977.16 -12.92 977.16 3.10

-12.92 977.16 -11.26 975.50 1.09

-0.33 4.19 -4.51

-11.26 975.50 -5.83 975.25 -1.63 -11.26 975.50 -10.12 974.36 -0.85

-5.83 975.25 0.00 974.98 -3.29 -10.12 974.36 -7.12 971.36 -8.44

0.00 974.98 5.68 974.88 -4.25 -7.12 971.36 0.00 971.36 -30.70

5.68 974.88 10.55 974.79 -4.09 0.00 971.36 7.12 971.36 -30.70

7.12 971.36 10.12 974.36 -8.44

10.12 974.36 10.55 974.79 -0.47

-13.27 -79.60 66.33

10.55 974.79 15.00 974.72 -4.10 10.55 974.79 12.92 977.16 0.72

12.92 977.16 15.00 977.16 3.09

-4.10 3.81 -7.91

TOTAL AREAS(M2): 66.33 -12.42

3+420.00 -15.00 975.63 -11.26 975.46 -0.32 -15.00 977.12 -12.92 977.12 3.09

-12.92 977.12 -11.26 975.46 1.09

-0.32 4.19 -4.50

-11.26 975.46 -5.83 975.21 -1.59 -11.26 975.46 -10.12 974.32 -0.85

-5.83 975.21 0.00 974.95 -3.20 -10.12 974.32 -7.12 971.32 -8.44

0.00 974.95 5.68 974.85 -4.13 -7.12 971.32 0.00 971.32 -30.70

5.68 974.85 10.57 974.77 -4.00 0.00 971.32 7.12 971.32 -30.70

7.12 971.32 10.12 974.32 -8.44

10.12 974.32 10.57 974.77 -0.49

-12.92 -79.62 66.70

10.57 974.77 15.00 974.69 -3.98 10.57 974.77 12.92 977.12 0.74

12.92 977.12 15.00 977.12 3.09

-3.98 3.83 -7.82

TOTAL AREAS(M2): 66.70 -12.32

3+440.00 -15.00 975.58 -11.25 975.40 -0.33 -15.00 977.07 -12.92 977.07 3.11

-12.92 977.07 -11.25 975.40 1.10

Página 50

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-0.33 4.20 -4.53

-11.25 975.40 -5.83 975.15 -1.62 -11.25 975.40 -10.12 974.27 -0.84

-5.83 975.15 0.00 974.87 -3.29 -10.12 974.27 -7.12 971.27 -8.42

0.00 974.87 5.68 974.79 -4.23 -7.12 971.27 0.00 971.27 -30.67

5.68 974.79 10.56 974.71 -4.04 0.00 971.27 7.12 971.27 -30.67

7.12 971.27 10.12 974.27 -8.42

10.12 974.27 10.56 974.71 -0.48

-13.18 -79.50 66.31

10.56 974.71 15.00 974.64 -4.00 10.56 974.71 12.92 977.07 0.74

12.92 977.07 15.00 977.07 3.11

-4.00 3.85 -7.84

TOTAL AREAS(M2): 66.31 -12.37

3+460.00 -15.02 975.50 -11.21 975.31 -0.35 -15.02 977.02 -12.92 977.02 3.20

-12.92 977.02 -11.21 975.31 1.14

-0.35 4.35 -4.70

-11.21 975.31 -5.91 975.06 -1.65 -11.21 975.31 -10.12 974.22 -0.80

-5.91 975.06 0.00 974.77 -3.44 -10.12 974.22 -7.12 971.22 -8.33

0.00 974.77 5.60 974.70 -4.27 -7.12 971.22 0.00 971.22 -30.45

5.60 974.70 10.53 974.63 -4.11 0.00 971.22 7.12 971.22 -30.45

7.12 971.22 10.12 974.22 -8.33

10.12 974.22 10.53 974.63 -0.44

-13.48 -78.80 65.32

10.53 974.63 14.98 974.57 -4.01 10.53 974.63 12.92 977.02 0.78

12.92 977.02 14.98 977.02 3.14

-4.01 3.92 -7.93

TOTAL AREAS(M2): 65.32 -12.62

3+480.00 -15.01 975.41 -11.17 975.22 -0.36 -15.01 976.97 -12.92 976.97 3.27

-12.92 976.97 -11.17 975.22 1.21

-0.36 4.48 -4.84

-11.17 975.22 -5.98 974.97 -1.61 -11.17 975.22 -10.12 974.17 -0.74

-5.98 974.97 0.00 974.68 -3.46 -10.12 974.17 -7.12 971.17 -8.20

0.00 974.68 5.55 974.63 -4.16 -7.12 971.17 0.00 971.17 -30.15

5.55 974.63 10.52 974.57 -4.00 0.00 971.17 7.12 971.17 -30.15

7.12 971.17 10.12 974.17 -8.20

10.12 974.17 10.52 974.57 -0.41

-13.24 -77.86 64.62

10.52 974.57 14.99 974.52 -3.85 10.52 974.57 12.92 976.97 0.88

12.92 976.97 14.99 976.97 3.24

-3.85 4.12 -7.97

TOTAL AREAS(M2): 64.62 -12.81

3+500.00 -14.90 975.35 -11.16 975.16 -0.35 -14.90 976.92 -12.92 976.92 3.13

-12.92 976.92 -11.16 975.16 1.23

-0.35 4.36 -4.71

-11.16 975.16 -5.64 974.89 -1.78 -11.16 975.16 -10.12 974.12 -0.73

-5.64 974.89 0.00 974.60 -3.39 -10.12 974.12 -7.12 971.12 -8.16

0.00 974.60 5.88 974.57 -4.47 -7.12 971.12 0.00 971.12 -30.06

5.88 974.57 10.53 974.54 -3.69 0.00 971.12 7.12 971.12 -30.06

7.12 971.12 10.12 974.12 -8.16

10.12 974.12 10.53 974.54 -0.42

-13.34 -77.59 64.25

Página 51

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

10.53 974.54 15.11 974.50 -3.78 10.53 974.54 12.92 976.92 0.92

12.92 976.92 15.11 976.92 3.46

-3.78 4.38 -8.16

TOTAL AREAS(M2): 64.25 -12.87

3+520.00 -15.42 975.29 -14.92 975.30 0.00 -15.42 976.77 -15.32 976.88 0.16

-14.92 975.30 -11.16 975.11 -0.33 -15.32 976.88 -12.92 976.88 3.79

-12.92 976.88 -11.16 975.11 1.23

-0.33 5.19 -5.52

-11.16 975.11 -5.08 974.82 -2.00 -11.16 975.11 -10.12 974.08 -0.73

-5.08 974.82 0.00 974.56 -3.08 -10.12 974.08 -7.12 971.08 -8.16

0.00 974.56 6.65 974.54 -4.95 -7.12 971.08 0.00 971.08 -30.04

6.65 974.54 10.57 974.52 -2.99 0.00 971.08 7.12 971.08 -30.04

7.12 971.08 10.12 974.08 -8.16

10.12 974.08 10.57 974.52 -0.44

-13.02 -77.56 64.54

10.57 974.52 15.18 974.50 -3.62 10.57 974.52 12.92 976.88 0.95

12.92 976.88 15.18 976.88 3.57

-3.62 4.53 -8.14

TOTAL AREAS(M2): 64.54 -13.66

3+540.00 -15.31 975.24 -15.00 975.24 0.00 -15.31 976.83 -12.92 976.83 3.80

-15.00 975.24 -11.15 975.06 -0.35 -12.92 976.83 -11.15 975.06 1.24

-0.35 5.04 -5.39

-11.15 975.06 -4.94 974.76 -2.07 -11.15 975.06 -10.12 974.03 -0.72

-4.94 974.76 0.00 974.51 -3.00 -10.12 974.03 -7.12 971.03 -8.14

0.00 974.51 6.99 974.50 -5.15 -7.12 971.03 0.00 971.03 -30.00

6.99 974.50 10.58 974.48 -2.69 0.00 971.03 7.12 971.03 -30.00

7.12 971.03 10.12 974.03 -8.14

10.12 974.03 10.58 974.48 -0.45

-12.91 -77.45 64.54

10.58 974.48 14.98 974.47 -3.37 10.58 974.48 12.92 976.83 0.97

12.92 976.83 14.98 976.83 3.27

-3.37 4.25 -7.62

TOTAL AREAS(M2): 64.54 -13.01

3+560.00 -15.04 975.16 -11.11 974.97 -0.38 -15.04 976.78 -12.92 976.78 3.43

-12.92 976.78 -11.11 974.97 1.29

-0.38 4.71 -5.10

-11.11 974.97 -5.05 974.67 -2.09 -11.11 974.97 -10.12 973.98 -0.68

-5.05 974.67 -0.04 974.43 -3.09 -10.12 973.98 -7.12 970.98 -8.05

-0.04 974.43 6.82 974.43 -5.07 -7.12 970.98 0.00 970.98 -29.79

6.82 974.43 10.56 974.42 -2.77 0.00 970.98 7.12 970.98 -29.79

7.12 970.98 10.12 973.98 -8.05

10.12 973.98 10.56 974.42 -0.43

-13.01 -76.80 63.80

10.56 974.42 14.96 974.42 -3.26 10.56 974.42 12.92 976.78 1.03

12.92 976.78 14.96 976.78 3.30

-3.26 4.33 -7.59

TOTAL AREAS(M2): 63.80 -12.68

3+580.00 -15.33 975.12 -11.10 974.91 -0.45 -15.33 976.72 -15.32 976.73 0.02

-15.32 976.73 -12.92 976.73 3.86

-12.92 976.73 -11.10 974.91 1.27

Página 52

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-0.45 5.15 -5.60

-11.10 974.91 -5.63 974.63 -1.92 -11.10 974.91 -10.12 973.93 -0.69

-5.63 974.63 -0.17 974.36 -3.41 -10.12 973.93 -7.12 970.93 -8.07

-0.17 974.36 6.09 974.35 -4.79 -7.12 970.93 0.00 970.93 -29.84

6.09 974.35 10.54 974.35 -3.43 0.00 970.93 7.12 970.93 -29.84

7.12 970.93 10.12 973.93 -8.07

10.12 973.93 10.54 974.35 -0.41

-13.56 -76.93 63.38

10.54 974.35 14.63 974.35 -3.16 10.54 974.35 12.92 976.73 1.00

12.92 976.73 14.63 976.73 2.74

-3.16 3.74 -6.90

TOTAL AREAS(M2): 63.38 -12.50

3+600.00 -15.06 975.10 -11.13 974.90 -0.39 -15.06 976.68 -12.92 976.68 3.39

-12.92 976.68 -11.13 974.90 1.24

-0.39 4.63 -5.02

-11.13 974.90 -6.02 974.64 -1.69 -11.13 974.90 -10.12 973.88 -0.72

-6.02 974.64 0.00 974.34 -3.68 -10.12 973.88 -7.12 970.88 -8.14

0.00 974.34 5.70 974.31 -4.42 -7.12 970.88 0.00 970.88 -30.01

5.70 974.31 10.53 974.30 -3.85 0.00 970.88 7.12 970.88 -30.01

7.12 970.88 10.12 973.88 -8.14

10.12 973.88 10.53 974.30 -0.41

-13.63 -77.44 63.80

10.53 974.30 14.98 974.28 -3.60 10.53 974.30 12.92 976.68 0.93

12.92 976.68 14.98 976.68 3.26

-3.60 4.20 -7.80

TOTAL AREAS(M2): 63.80 -12.82

3+620.00 -15.52 975.05 -11.12 974.84 -0.47 -15.52 976.43 -15.32 976.64 0.30

-15.32 976.64 -12.92 976.64 3.81

-12.92 976.64 -11.12 974.84 1.24

-0.47 5.34 -5.81

-11.12 974.84 -7.89 974.68 -0.94 -11.12 974.84 -10.12 973.84 -0.71

-7.89 974.68 0.00 974.33 -4.30 -10.12 973.84 -7.12 970.84 -8.14

0.00 974.33 4.64 974.30 -3.40 -7.12 970.84 0.00 970.84 -30.00

4.64 974.30 10.56 974.28 -4.50 0.00 970.84 7.12 970.84 -30.00

7.12 970.84 10.12 973.84 -8.14

10.12 973.84 10.56 974.28 -0.44

-13.14 -77.44 64.30

10.56 974.28 14.94 974.25 -3.44 10.56 974.28 12.92 976.64 0.96

14.94 974.25 16.28 974.25 -1.06 12.92 976.64 15.32 976.64 3.81

15.32 976.64 16.28 975.68 1.06

-4.51 5.83 -10.34

TOTAL AREAS(M2): 64.30 -16.15

3+640.00 -15.29 974.97 -11.66 974.81 -0.29 -15.29 976.59 -12.92 976.59 3.84

-11.66 974.81 -11.12 974.78 -0.09 -12.92 976.59 -11.12 974.78 1.30

-0.38 5.14 -5.52

-11.12 974.78 0.00 974.31 -4.64 -11.12 974.78 -10.12 973.79 -0.68

0.00 974.31 4.04 974.31 -2.65 -10.12 973.79 -7.12 970.79 -8.03

4.04 974.31 10.60 974.27 -4.45 -7.12 970.79 0.00 970.79 -29.74

0.00 970.79 7.12 970.79 -29.74

7.12 970.79 10.12 973.79 -8.03

Página 53

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

10.12 973.79 10.60 974.27 -0.45

-11.74 -76.67 64.93

10.60 974.27 15.08 974.25 -3.17 10.60 974.27 12.92 976.59 1.08

15.08 974.25 16.29 974.25 -0.87 12.92 976.59 15.32 976.59 3.90

15.32 976.59 16.29 975.62 1.10

-4.04 6.07 -10.11

TOTAL AREAS(M2): 64.93 -15.63

3+660.00 -16.01 974.92 -14.56 974.94 0.01 -16.01 975.85 -15.32 976.54 0.88

-14.56 974.94 -11.16 974.78 -0.21 -15.32 976.54 -12.92 976.54 3.88

-12.92 976.54 -11.16 974.78 1.30

-0.20 6.05 -6.25

-11.16 974.78 -9.41 974.70 -0.32 -11.16 974.78 -10.12 973.74 -0.69

-9.41 974.70 0.00 974.23 -4.34 -10.12 973.74 -7.12 970.74 -8.05

0.00 974.23 4.67 974.21 -3.28 -7.12 970.74 0.00 970.74 -29.79

4.67 974.21 10.58 974.20 -4.24 0.00 970.74 7.12 970.74 -29.79

7.12 970.74 10.12 973.74 -8.05

10.12 973.74 10.58 974.20 -0.44

-12.18 -76.81 64.63

10.58 974.20 15.05 974.19 -3.25 10.58 974.20 12.92 976.54 1.04

12.92 976.54 15.05 976.54 3.45

-3.25 4.49 -7.74

TOTAL AREAS(M2): 64.63 -13.99

3+680.00 -15.41 974.89 -15.12 974.89 0.00 -15.41 976.40 -15.32 976.49 0.14

-15.12 974.89 -11.13 974.70 -0.36 -15.32 976.49 -12.92 976.49 3.85

-12.92 976.49 -11.13 974.70 1.27

-0.36 5.26 -5.63

-11.13 974.70 -8.10 974.56 -0.78 -11.13 974.70 -10.12 973.69 -0.70

-8.10 974.56 0.00 974.17 -4.24 -10.12 973.69 -7.12 970.69 -8.08

0.00 974.17 5.12 974.14 -3.76 -7.12 970.69 0.00 970.69 -29.87

5.12 974.14 10.54 974.12 -4.12 0.00 970.69 7.12 970.69 -29.87

7.12 970.69 10.12 973.69 -8.08

10.12 973.69 10.54 974.12 -0.42

-12.89 -77.02 64.12

10.54 974.12 15.00 974.10 -3.48 10.54 974.12 12.92 976.49 0.99

12.92 976.49 15.00 976.49 3.34

-3.48 4.33 -7.81

TOTAL AREAS(M2): 64.12 -13.44

3+700.00 -15.00 974.81 -11.10 974.63 -0.35 -15.00 976.44 -12.92 976.44 3.41

-12.92 976.44 -11.10 974.63 1.33

-0.35 4.73 -5.08

-11.10 974.63 -8.10 974.49 -0.75 -11.10 974.63 -10.12 973.64 -0.66

-8.10 974.49 0.00 974.11 -4.12 -10.12 973.64 -7.12 970.64 -7.98

0.00 974.11 5.12 974.11 -3.58 -7.12 970.64 0.00 970.64 -29.63

5.12 974.11 10.56 974.08 -3.87 0.00 970.64 7.12 970.64 -29.63

7.12 970.64 10.12 973.64 -7.98

10.12 973.64 10.56 974.08 -0.41

-12.32 -76.30 63.98

10.56 974.08 15.00 974.06 -3.27 10.56 974.08 12.92 976.44 1.08

12.92 976.44 15.00 976.44 3.41

-3.27 4.49 -7.76

Página 54

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 63.98 -12.84

3+720.00 -15.29 974.72 -11.04 974.52 -0.43 -15.29 976.40 -12.92 976.40 3.98

-12.92 976.40 -11.04 974.52 1.38

-0.43 5.36 -5.79

-11.04 974.52 -9.52 974.45 -0.36 -11.04 974.52 -10.12 973.60 -0.61

-9.52 974.45 0.00 974.01 -4.66 -10.12 973.60 -7.12 970.60 -7.87

0.00 974.01 4.66 974.02 -3.28 -7.12 970.60 0.00 970.60 -29.36

4.66 974.02 10.54 974.02 -4.13 0.00 970.60 7.12 970.60 -29.36

7.12 970.60 10.12 973.60 -7.87

10.12 973.60 10.54 974.02 -0.39

-12.43 -75.47 63.03

10.54 974.02 15.02 974.02 -3.13 10.54 974.02 12.92 976.40 1.16

15.02 974.02 15.65 974.04 -0.43 12.92 976.40 15.32 976.40 4.02

15.32 976.40 15.65 976.06 0.50

-3.57 5.68 -9.25

TOTAL AREAS(M2): 63.03 -15.04

3+740.00 -15.19 974.63 -12.04 974.49 -0.23 -15.19 976.35 -12.92 976.35 3.89

-12.04 974.49 -11.01 974.44 -0.18 -12.92 976.35 -11.01 974.44 1.45

-0.41 5.34 -5.74

-11.01 974.44 0.00 973.95 -4.86 -11.01 974.44 -10.12 973.55 -0.57

0.00 973.95 4.27 973.96 -2.91 -10.12 973.55 -7.12 970.55 -7.76

4.27 973.96 10.55 973.98 -4.18 -7.12 970.55 0.00 970.55 -29.09

0.00 970.55 7.12 970.55 -29.09

7.12 970.55 10.12 973.55 -7.76

10.12 973.55 10.55 973.98 -0.37

-11.94 -74.65 62.71

10.55 973.98 15.04 973.99 -2.92 10.55 973.98 12.92 976.35 1.25

15.04 973.99 15.64 974.01 -0.38 12.92 976.35 15.32 976.35 4.11

15.32 976.35 15.64 976.02 0.50

-3.30 5.87 -9.17

TOTAL AREAS(M2): 62.71 -14.92

3+760.00 -14.90 974.54 -12.31 974.43 -0.14 -14.90 976.30 -12.92 976.30 3.48

-12.31 974.43 -11.00 974.38 -0.18 -12.92 976.30 -11.00 974.38 1.53

-0.32 5.01 -5.33

-11.00 974.38 0.00 973.93 -4.30 -11.00 974.38 -10.12 973.50 -0.53

0.00 973.93 4.29 973.92 -2.66 -10.12 973.50 -7.12 970.50 -7.63

4.29 973.92 10.56 973.94 -3.83 -7.12 970.50 0.00 970.50 -28.79

0.00 970.50 7.12 970.50 -28.79

7.12 970.50 10.12 973.50 -7.63

10.12 973.50 10.56 973.94 -0.36

-10.79 -73.73 62.94

10.56 973.94 14.99 973.95 -2.64 10.56 973.94 12.92 976.30 1.36

12.92 976.30 14.99 976.30 3.63

-2.64 4.99 -7.63

TOTAL AREAS(M2): 62.94 -12.96

3+780.00 -15.40 974.52 -14.89 974.53 0.00 -15.40 976.17 -15.32 976.25 0.13

-14.89 974.53 -11.04 974.37 -0.25 -15.32 976.25 -12.92 976.25 4.17

-12.92 976.25 -11.04 974.37 1.50

-0.25 5.80 -6.04

-11.04 974.37 -10.73 974.36 -0.05 -11.04 974.37 -10.12 973.45 -0.56

Página 55

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-10.73 974.36 0.00 973.89 -4.20 -10.12 973.45 -7.12 970.45 -7.69

0.00 973.89 4.54 973.89 -2.84 -7.12 970.45 0.00 970.45 -28.94

4.54 973.89 10.55 973.88 -3.80 0.00 970.45 7.12 970.45 -28.94

7.12 970.45 10.12 973.45 -7.69

10.12 973.45 10.55 973.88 -0.36

-10.88 -74.19 63.30

10.55 973.88 14.99 973.87 -2.84 10.55 973.88 12.92 976.25 1.30

12.92 976.25 14.99 976.25 3.59

-2.84 4.90 -7.74

TOTAL AREAS(M2): 63.30 -13.78

3+800.00 -15.07 974.49 -15.02 974.49 0.00 -15.07 976.20 -12.92 976.20 3.69

-15.02 974.49 -11.03 974.32 -0.35 -12.92 976.20 -11.03 974.32 1.45

-0.35 5.14 -5.49

-11.03 974.32 -10.20 974.28 -0.16 -11.03 974.32 -10.12 973.40 -0.58

-10.20 974.28 0.00 973.83 -4.47 -10.12 973.40 -7.12 970.40 -7.76

0.00 973.83 4.63 973.81 -3.10 -7.12 970.40 0.00 970.40 -29.11

4.63 973.81 10.53 973.81 -4.01 0.00 970.40 7.12 970.40 -29.11

7.12 970.40 10.12 973.40 -7.76

10.12 973.40 10.53 973.81 -0.36

-11.74 -74.68 62.93

10.53 973.81 15.00 973.81 -3.05 10.53 973.81 12.92 976.20 1.23

12.92 976.20 15.00 976.20 3.56

-3.05 4.79 -7.85

TOTAL AREAS(M2): 62.93 -13.34

3+820.00 -15.00 974.40 -11.01 974.24 -0.31 -15.00 976.16 -12.92 976.16 3.65

-12.92 976.16 -11.01 974.24 1.53

-0.31 5.18 -5.50

-11.01 974.24 -10.20 974.21 -0.14 -11.01 974.24 -10.12 973.36 -0.53

-10.20 974.21 0.00 973.82 -3.90 -10.12 973.36 -7.12 970.36 -7.63

0.00 973.82 4.63 973.81 -2.70 -7.12 970.36 0.00 970.36 -28.79

4.63 973.81 10.55 973.79 -3.57 0.00 970.36 7.12 970.36 -28.79

7.12 970.36 10.12 973.36 -7.63

10.12 973.36 10.55 973.79 -0.36

-10.32 -73.73 63.41

10.55 973.79 15.00 973.77 -2.77 10.55 973.79 12.92 976.16 1.35

12.92 976.16 15.00 976.16 3.65

-2.77 5.01 -7.78

TOTAL AREAS(M2): 63.41 -13.28

3+840.00 -15.00 974.33 -10.99 974.18 -0.29 -15.00 976.11 -12.92 976.11 3.71

-12.92 976.11 -10.99 974.18 1.58

-0.29 5.28 -5.57

-10.99 974.18 -10.20 974.15 -0.13 -10.99 974.18 -10.12 973.31 -0.51

-10.20 974.15 0.00 973.78 -3.67 -10.12 973.31 -7.12 970.31 -7.56

0.00 973.78 4.63 973.78 -2.53 -7.12 970.31 0.00 970.31 -28.61

4.63 973.78 10.57 973.76 -3.32 0.00 970.31 7.12 970.31 -28.61

7.12 970.31 10.12 973.31 -7.56

10.12 973.31 10.57 973.76 -0.36

-9.65 -73.20 63.55

10.57 973.76 15.00 973.74 -2.55 10.57 973.76 12.92 976.11 1.43

12.92 976.11 15.00 976.11 3.71

Página 56

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-2.55 5.13 -7.68

TOTAL AREAS(M2): 63.55 -13.25

3+860.00 -14.91 974.27 -10.98 974.12 -0.29 -14.91 976.06 -12.92 976.06 3.58

-12.92 976.06 -10.98 974.12 1.60

-0.29 5.17 -5.47

-10.98 974.12 -9.61 974.07 -0.24 -10.98 974.12 -10.12 973.26 -0.50

-9.61 974.07 0.00 973.71 -3.65 -10.12 973.26 -7.12 970.26 -7.52

0.00 973.71 4.78 973.70 -2.69 -7.12 970.26 0.00 970.26 -28.52

4.78 973.70 10.56 973.70 -3.27 0.00 970.26 7.12 970.26 -28.52

7.12 970.26 10.12 973.26 -7.52

10.12 973.26 10.56 973.70 -0.35

-9.85 -72.93 63.07

10.56 973.70 15.00 973.70 -2.51 10.56 973.70 12.92 976.06 1.45

12.92 976.06 15.00 976.06 3.73

-2.51 5.18 -7.68

TOTAL AREAS(M2): 63.07 -13.15

3+880.00 -15.00 974.24 -11.00 974.10 -0.29 -15.00 976.01 -12.92 976.01 3.68

-12.92 976.01 -11.00 974.10 1.56

-0.29 5.23 -5.52

-11.00 974.10 -9.25 974.03 -0.31 -11.00 974.10 -10.12 973.21 -0.52

-9.25 974.03 0.00 973.69 -3.52 -10.12 973.21 -7.12 970.21 -7.59

0.00 973.69 4.86 973.68 -2.71 -7.12 970.21 0.00 970.21 -28.69

4.86 973.68 10.57 973.67 -3.25 0.00 970.21 7.12 970.21 -28.69

7.12 970.21 10.12 973.21 -7.59

10.12 973.21 10.57 973.67 -0.37

-9.78 -73.45 63.67

10.57 973.67 15.00 973.66 -2.57 10.57 973.67 12.92 976.01 1.40

12.92 976.01 15.00 976.01 3.68

-2.57 5.08 -7.65

TOTAL AREAS(M2): 63.67 -13.17

3+900.00 -15.00 974.21 -11.02 974.07 -0.30 -15.00 975.96 -12.92 975.96 3.65

-12.92 975.96 -11.02 974.07 1.52

-0.30 5.17 -5.46

-11.02 974.07 -9.21 974.00 -0.33 -11.02 974.07 -10.12 973.16 -0.54

-9.21 974.00 0.00 973.66 -3.57 -10.12 973.16 -7.12 970.16 -7.65

0.00 973.66 4.87 973.63 -2.77 -7.12 970.16 0.00 970.16 -28.83

4.87 973.63 10.57 973.62 -3.35 0.00 970.16 7.12 970.16 -28.83

7.12 970.16 10.12 973.16 -7.65

10.12 973.16 10.57 973.62 -0.37

-10.02 -73.87 63.85

10.57 973.62 15.00 973.61 -2.66 10.57 973.62 12.92 975.96 1.36

12.92 975.96 15.00 975.96 3.64

-2.66 5.00 -7.66

TOTAL AREAS(M2): 63.85 -13.12

3+920.00 -16.12 974.18 -14.63 974.16 -0.01 -16.12 975.12 -15.32 975.92 1.07

-14.63 974.16 -11.04 974.04 -0.29 -15.32 975.92 -12.92 975.92 4.17

-12.92 975.92 -11.04 974.04 1.50

-0.30 6.74 -7.04

-11.04 974.04 -7.09 973.90 -0.84 -11.04 974.04 -10.12 973.12 -0.55

-7.09 973.90 0.00 973.63 -2.95 -10.12 973.12 -7.12 970.12 -7.69

Página 57

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

0.00 973.63 5.89 973.59 -3.36 -7.12 970.12 0.00 970.12 -28.92

5.89 973.59 10.56 973.56 -2.83 0.00 970.12 7.12 970.12 -28.92

7.12 970.12 10.12 973.12 -7.69

10.12 973.12 10.56 973.56 -0.37

-9.98 -74.13 64.15

10.56 973.56 15.22 973.53 -2.96 10.56 973.56 12.92 975.92 1.32

12.92 975.92 15.22 975.92 3.99

-2.96 5.31 -8.27

TOTAL AREAS(M2): 64.15 -15.30

3+940.00 -16.37 974.14 -16.13 974.13 0.00 -16.37 974.82 -15.32 975.87 1.27

-16.13 974.13 -11.00 973.95 -0.48 -15.32 975.87 -12.92 975.87 4.16

-12.92 975.87 -11.00 973.95 1.49

-0.48 6.92 -7.40

-11.00 973.95 -10.55 973.93 -0.09 -11.00 973.95 -10.12 973.07 -0.55

-10.55 973.93 0.00 973.59 -3.96 -10.12 973.07 -7.12 970.07 -7.70

0.00 973.59 4.79 973.55 -2.71 -7.12 970.07 0.00 970.07 -28.95

4.79 973.55 10.57 973.52 -3.47 0.00 970.07 7.12 970.07 -28.95

7.12 970.07 10.12 973.07 -7.70

10.12 973.07 10.57 973.52 -0.38

-10.23 -74.23 64.00

10.57 973.52 15.21 973.49 -2.93 10.57 973.52 12.92 975.87 1.31

15.21 973.49 16.72 973.49 -0.98 12.92 975.87 15.32 975.87 4.16

15.32 975.87 16.72 974.46 1.45

-3.92 6.92 -10.84

TOTAL AREAS(M2): 64.00 -18.24

3+960.00 -15.00 974.04 -14.54 974.03 0.00 -15.00 975.82 -12.92 975.82 3.70

-14.54 974.03 -11.01 973.91 -0.25 -12.92 975.82 -11.01 973.91 1.58

-0.26 5.27 -5.53

-11.01 973.91 0.00 973.56 -3.38 -11.01 973.91 -10.12 973.02 -0.51

0.00 973.56 4.55 973.53 -2.25 -10.12 973.02 -7.12 970.02 -7.56

4.55 973.53 10.59 973.49 -3.18 -7.12 970.02 0.00 970.02 -28.62

0.00 970.02 7.12 970.02 -28.62

7.12 970.02 10.12 973.02 -7.56

10.12 973.02 10.59 973.49 -0.37

-8.82 -73.24 64.43

10.59 973.49 15.00 973.47 -2.47 10.59 973.49 12.92 975.82 1.44

15.00 973.47 16.43 973.46 -0.82 12.92 975.82 15.32 975.82 4.27

15.32 975.82 16.43 974.71 1.36

-3.29 7.07 -10.36

TOTAL AREAS(M2): 64.43 -15.89

3+980.00 -17.09 974.00 -14.36 974.01 0.01 -17.09 974.00 -15.32 975.77 1.57

-14.36 974.01 -11.04 973.90 -0.17 -15.32 975.77 -12.92 975.77 4.25

-12.92 975.77 -11.04 973.90 1.56

-0.16 7.38 -7.54

-11.04 973.90 -8.23 973.80 -0.43 -11.04 973.90 -10.12 972.97 -0.52

-8.23 973.80 0.00 973.49 -2.93 -10.12 972.97 -7.12 969.97 -7.59

0.00 973.49 6.35 973.47 -3.33 -7.12 969.97 0.00 969.97 -28.69

6.35 973.47 10.59 973.44 -2.32 0.00 969.97 7.12 969.97 -28.69

7.12 969.97 10.12 972.97 -7.59

10.12 972.97 10.59 973.44 -0.37

Página 58

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-9.00 -73.45 64.45

10.59 973.44 15.40 973.42 -2.75 10.59 973.44 12.92 975.77 1.41

12.92 975.77 15.32 975.77 4.25

15.32 975.77 15.40 975.69 0.15

-2.75 5.81 -8.55

TOTAL AREAS(M2): 64.45 -16.10

4+000.00 -16.13 973.96 -15.46 973.96 0.00 -16.13 974.92 -15.32 975.72 1.10

-15.46 973.96 -10.99 973.80 -0.36 -15.32 975.72 -12.92 975.72 4.24

-12.92 975.72 -10.99 973.80 1.55

-0.36 6.89 -7.24

-10.99 973.80 -8.65 973.71 -0.48 -10.99 973.80 -10.12 972.92 -0.52

-8.65 973.71 0.00 973.42 -3.42 -10.12 972.92 -7.12 969.92 -7.60

0.00 973.42 6.51 973.38 -3.64 -7.12 969.92 0.00 969.92 -28.72

6.51 973.38 10.57 973.37 -2.36 0.00 969.92 7.12 969.92 -28.72

7.12 969.92 10.12 972.92 -7.60

10.12 972.92 10.57 973.37 -0.36

-9.90 -73.54 63.64

10.57 973.37 14.88 973.36 -2.57 10.57 973.37 12.92 975.72 1.39

14.88 973.36 15.75 973.36 -0.52 12.92 975.72 15.32 975.72 4.24

15.32 975.72 15.75 975.30 0.66

-3.08 6.29 -9.37

TOTAL AREAS(M2): 63.64 -16.62

4+020.00 -15.00 973.92 -11.03 973.78 -0.28 -15.00 975.68 -12.92 975.68 3.65

-12.92 975.68 -11.03 973.78 1.53

-0.28 5.17 -5.45

-11.03 973.78 -9.25 973.72 -0.31 -11.03 973.78 -10.12 972.88 -0.54

-9.25 973.72 0.00 973.40 -3.39 -10.12 972.88 -7.12 969.88 -7.64

0.00 973.40 6.27 973.35 -3.45 -7.12 969.88 0.00 969.88 -28.82

6.27 973.35 10.57 973.33 -2.50 0.00 969.88 7.12 969.88 -28.82

7.12 969.88 10.12 972.88 -7.64

10.12 972.88 10.57 973.33 -0.37

-9.65 -73.84 64.18

10.57 973.33 15.00 973.31 -2.68 10.57 973.33 12.92 975.68 1.36

15.00 973.31 15.43 973.31 -0.27 12.92 975.68 15.32 975.68 4.21

15.32 975.68 15.43 975.57 0.19

-2.95 5.75 -8.70

TOTAL AREAS(M2): 64.18 -14.15

4+040.00 -15.75 973.89 -14.72 973.89 0.00 -15.75 975.20 -15.32 975.63 0.66

-14.72 973.89 -11.05 973.76 -0.23 -15.32 975.63 -12.92 975.63 4.18

-12.92 975.63 -11.05 973.76 1.51

-0.23 6.34 -6.57

-11.05 973.76 -7.76 973.65 -0.60 -11.05 973.76 -10.12 972.83 -0.55

-7.76 973.65 0.00 973.37 -2.93 -10.12 972.83 -7.12 969.83 -7.68

0.00 973.37 7.26 973.30 -4.02 -7.12 969.83 0.00 969.83 -28.90

7.26 973.30 10.56 973.27 -2.00 0.00 969.83 7.12 969.83 -28.90

7.12 969.83 10.12 972.83 -7.68

10.12 972.83 10.56 973.27 -0.37

-9.56 -74.09 64.53

10.56 973.27 15.21 973.23 -2.99 10.56 973.27 12.92 975.63 1.32

12.92 975.63 15.21 975.63 3.98

Página 59

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-2.99 5.30 -8.28

TOTAL AREAS(M2): 64.53 -14.86

4+060.00 -15.37 973.85 -15.05 973.85 0.00 -15.37 975.53 -15.32 975.58 0.08

-15.05 973.85 -11.05 973.71 -0.27 -15.32 975.58 -12.92 975.58 4.15

-12.92 975.58 -11.05 973.71 1.49

-0.27 5.73 -6.00

-11.05 973.71 -7.66 973.60 -0.66 -11.05 973.71 -10.12 972.78 -0.56

-7.66 973.60 0.00 973.35 -2.89 -10.12 972.78 -7.12 969.78 -7.71

0.00 973.35 7.43 973.26 -4.06 -7.12 969.78 0.00 969.78 -28.97

7.43 973.26 10.56 973.23 -1.90 0.00 969.78 7.12 969.78 -28.97

7.12 969.78 10.12 972.78 -7.71

10.12 972.78 10.56 973.23 -0.38

-9.50 -74.29 64.79

10.56 973.23 14.96 973.18 -2.85 10.56 973.23 12.92 975.58 1.30

12.92 975.58 14.96 975.58 3.53

-2.85 4.83 -7.68

TOTAL AREAS(M2): 64.79 -13.68

4+080.00 -15.23 973.80 -11.05 973.67 -0.28 -15.23 975.53 -12.92 975.53 4.01

-12.92 975.53 -11.05 973.67 1.49

-0.28 5.50 -5.78

-11.05 973.67 -8.71 973.59 -0.40 -11.05 973.67 -10.12 972.73 -0.56

-8.71 973.59 0.00 973.32 -2.97 -10.12 972.73 -7.12 969.73 -7.70

0.00 973.32 6.67 973.22 -3.54 -7.12 969.73 0.00 969.73 -28.95

6.67 973.22 10.55 973.16 -2.36 0.00 969.73 7.12 969.73 -28.95

7.12 969.73 10.12 972.73 -7.70

10.12 972.73 10.55 973.16 -0.37

-9.27 -74.23 64.96

10.55 973.16 14.93 973.10 -2.93 10.55 973.16 12.92 975.53 1.30

14.93 973.10 15.49 973.11 -0.39 12.92 975.53 15.32 975.53 4.16

15.32 975.53 15.49 975.37 0.27

-3.31 5.73 -9.04

TOTAL AREAS(M2): 64.96 -14.82

4+100.00 -15.00 973.78 -11.08 973.65 -0.26 -15.00 975.49 -12.92 975.49 3.54

-12.92 975.49 -11.08 973.65 1.44

-0.26 4.99 -5.25

-11.08 973.65 -9.07 973.58 -0.34 -11.08 973.65 -10.12 972.69 -0.59

-9.07 973.58 0.00 973.26 -3.28 -10.12 972.69 -7.12 969.69 -7.79

0.00 973.26 6.51 973.16 -3.72 -7.12 969.69 0.00 969.69 -29.17

6.51 973.16 10.53 973.10 -2.63 0.00 969.69 7.12 969.69 -29.17

7.12 969.69 10.12 972.69 -7.79

10.12 972.69 10.53 973.10 -0.37

-9.97 -74.87 64.90

10.53 973.10 15.00 973.03 -3.21 10.53 973.10 12.92 975.49 1.22

15.00 973.03 15.26 973.04 -0.20 12.92 975.49 15.26 975.49 3.99

-3.41 5.21 -8.62

TOTAL AREAS(M2): 64.90 -13.87

4+120.00 -15.00 973.75 -11.10 973.62 -0.26 -15.00 975.44 -12.92 975.44 3.50

-12.92 975.44 -11.10 973.62 1.41

-0.26 4.90 -5.17

-11.10 973.62 -9.07 973.55 -0.35 -11.10 973.62 -10.12 972.64 -0.62

Página 60

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-9.07 973.55 0.00 973.22 -3.34 -10.12 972.64 -7.12 969.64 -7.85

0.00 973.22 6.51 973.12 -3.80 -7.12 969.64 0.00 969.64 -29.32

6.51 973.12 10.53 973.05 -2.70 0.00 969.64 7.12 969.64 -29.32

7.12 969.64 10.12 972.64 -7.85

10.12 972.64 10.53 973.05 -0.38

-10.18 -75.34 65.15

10.53 973.05 15.00 972.98 -3.31 10.53 973.05 12.92 975.44 1.17

12.92 975.44 15.00 975.44 3.50

-3.31 4.67 -7.98

TOTAL AREAS(M2): 65.15 -13.15

4+140.00 -14.62 973.71 -11.12 973.59 -0.22 -14.62 975.39 -12.92 975.39 2.85

-12.92 975.39 -11.12 973.59 1.40

-0.22 4.25 -4.47

-11.12 973.59 -7.39 973.45 -0.72 -11.12 973.59 -10.12 972.59 -0.62

-7.39 973.45 0.31 973.17 -3.07 -10.12 972.59 -7.12 969.59 -7.87

0.31 973.17 7.83 973.03 -4.59 -7.12 969.59 0.00 969.59 -29.35

7.83 973.03 10.51 972.98 -1.90 0.00 969.59 7.12 969.59 -29.35

7.12 969.59 10.12 972.59 -7.87

10.12 972.59 10.51 972.98 -0.36

-10.28 -75.42 65.14

10.51 972.98 15.41 972.89 -3.80 10.51 972.98 12.92 975.39 1.14

12.92 975.39 15.32 975.39 4.03

15.32 975.39 15.41 975.30 0.15

-3.80 5.32 -9.12

TOTAL AREAS(M2): 65.14 -13.59

4+160.00 -14.90 973.66 -13.87 973.68 0.01 -14.90 975.34 -12.92 975.34 3.32

-13.87 973.68 -11.17 973.59 -0.06 -12.92 975.34 -11.17 973.59 1.41

-0.05 4.73 -4.78

-11.17 973.59 -6.64 973.43 -0.68 -11.17 973.59 -10.12 972.54 -0.62

-6.64 973.43 0.92 973.14 -2.83 -10.12 972.54 -7.12 969.54 -7.86

0.92 973.14 8.80 973.01 -4.63 -7.12 969.54 0.00 969.54 -29.34

8.80 973.01 10.55 972.97 -1.18 0.00 969.54 7.12 969.54 -29.34

7.12 969.54 10.12 972.54 -7.86

10.12 972.54 10.55 972.97 -0.39

-9.31 -75.41 66.09

10.55 972.97 16.28 972.86 -4.29 10.55 972.97 12.92 975.34 1.17

12.92 975.34 15.32 975.34 4.03

15.32 975.34 16.28 974.39 1.15

-4.29 6.35 -10.64

TOTAL AREAS(M2): 66.09 -15.42

4+180.00 -15.66 973.61 -15.33 973.62 0.00 -15.66 974.95 -15.32 975.29 0.51

-15.33 973.62 -11.09 973.46 -0.30 -15.32 975.29 -12.92 975.29 4.03

-12.92 975.29 -11.09 973.46 1.40

-0.30 5.95 -6.25

-11.09 973.46 -8.15 973.35 -0.60 -11.09 973.46 -10.12 972.49 -0.61

-8.15 973.35 0.00 973.08 -3.21 -10.12 972.49 -7.12 969.49 -7.86

0.00 973.08 7.58 972.94 -4.55 -7.12 969.49 0.00 969.49 -29.33

7.58 972.94 10.52 972.89 -2.04 0.00 969.49 7.12 969.49 -29.33

7.12 969.49 10.12 972.49 -7.86

10.12 972.49 10.52 972.89 -0.37

Página 61

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-10.41 -75.35 64.94

10.52 972.89 14.74 972.82 -3.19 10.52 972.89 12.92 975.29 1.15

14.74 972.82 16.03 972.81 -1.03 12.92 975.29 15.32 975.29 4.03

15.32 975.29 16.03 974.58 0.94

-4.23 6.13 -10.35

TOTAL AREAS(M2): 64.94 -16.60

4+200.00 -15.04 973.58 -11.12 973.45 -0.27 -15.04 975.25 -12.92 975.25 3.52

-12.92 975.25 -11.12 973.45 1.37

-0.27 4.89 -5.16

-11.12 973.45 -8.96 973.37 -0.38 -11.12 973.45 -10.12 972.45 -0.64

-8.96 973.37 0.00 973.04 -3.41 -10.12 972.45 -7.12 969.45 -7.91

0.00 973.04 7.11 972.91 -4.35 -7.12 969.45 0.00 969.45 -29.46

7.11 972.91 10.52 972.84 -2.41 0.00 969.45 7.12 969.45 -29.46

7.12 969.45 10.12 972.45 -7.91

10.12 972.45 10.52 972.84 -0.37

-10.56 -75.77 65.22

10.52 972.84 14.98 972.76 -3.49 10.52 972.84 12.92 975.25 1.11

14.98 972.76 15.48 972.76 -0.41 12.92 975.25 15.32 975.25 3.99

15.32 975.25 15.48 975.09 0.25

-3.90 5.34 -9.24

TOTAL AREAS(M2): 65.22 -14.40

4+220.00 -15.00 973.53 -11.10 973.38 -0.29 -15.00 975.20 -12.92 975.20 3.47

-12.92 975.20 -11.10 973.38 1.38

-0.29 4.85 -5.14

-11.10 973.38 -9.02 973.30 -0.40 -11.10 973.38 -10.12 972.40 -0.63

-9.02 973.30 0.00 972.96 -3.61 -10.12 972.40 -7.12 969.40 -7.90

0.00 972.96 7.08 972.83 -4.49 -7.12 969.40 0.00 969.40 -29.43

7.08 972.83 10.50 972.77 -2.49 0.00 969.40 7.12 969.40 -29.43

7.12 969.40 10.12 972.40 -7.90

10.12 972.40 10.50 972.77 -0.36

-10.98 -75.64 64.66

10.50 972.77 15.00 972.70 -3.58 10.50 972.77 12.92 975.20 1.10

12.92 975.20 15.00 975.20 3.47

-3.58 4.57 -8.15

TOTAL AREAS(M2): 64.66 -13.28

4+240.00 -15.08 973.44 -11.06 973.29 -0.29 -15.08 975.15 -12.92 975.15 3.70

-12.92 975.15 -11.06 973.29 1.46

-0.29 5.15 -5.44

-11.06 973.29 -9.37 973.23 -0.29 -11.06 973.29 -10.12 972.35 -0.58

-9.37 973.23 0.00 972.90 -3.44 -10.12 972.35 -7.12 969.35 -7.76

0.00 972.90 6.88 972.78 -4.08 -7.12 969.35 0.00 969.35 -29.10

6.88 972.78 10.49 972.72 -2.48 0.00 969.35 7.12 969.35 -29.10

7.12 969.35 10.12 972.35 -7.76

10.12 972.35 10.49 972.72 -0.33

-10.30 -74.63 64.33

10.49 972.72 14.98 972.63 -3.43 10.49 972.72 12.92 975.15 1.21

12.92 975.15 14.98 975.15 3.53

-3.43 4.73 -8.16

TOTAL AREAS(M2): 64.33 -13.60

4+260.00 -15.09 973.42 -11.08 973.26 -0.32 -15.09 975.10 -12.92 975.10 3.64

Página 62

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-12.92 975.10 -11.08 973.26 1.40

-0.32 5.04 -5.36

-11.08 973.26 -9.85 973.21 -0.22 -11.08 973.26 -10.12 972.30 -0.61

-9.85 973.21 0.00 972.81 -4.02 -10.12 972.30 -7.12 969.30 -7.86

0.00 972.81 6.64 972.69 -4.45 -7.12 969.30 0.00 969.30 -29.32

6.64 972.69 10.45 972.63 -2.89 0.00 969.30 7.12 969.30 -29.32

7.12 969.30 10.12 972.30 -7.86

10.12 972.30 10.45 972.63 -0.31

-11.59 -75.28 63.70

10.45 972.63 14.99 972.55 -3.78 10.45 972.63 12.92 975.10 1.10

12.92 975.10 14.99 975.10 3.47

-3.78 4.57 -8.35

TOTAL AREAS(M2): 63.70 -13.71

4+280.00 -15.08 973.39 -11.09 973.22 -0.35 -15.08 975.05 -12.92 975.05 3.59

-12.92 975.05 -11.09 973.22 1.36

-0.35 4.95 -5.30

-11.09 973.22 -10.35 973.19 -0.14 -11.09 973.22 -10.12 972.25 -0.63

-10.35 973.19 0.00 972.73 -4.49 -10.12 972.25 -7.12 969.25 -7.92

0.00 972.73 6.44 972.62 -4.60 -7.12 969.25 0.00 969.25 -29.48

6.44 972.62 10.42 972.56 -3.20 0.00 969.25 7.12 969.25 -29.48

7.12 969.25 10.12 972.25 -7.92

10.12 972.25 10.42 972.56 -0.30

-12.43 -75.73 63.30

10.42 972.56 14.99 972.48 -3.99 10.42 972.56 12.92 975.05 1.03

12.92 975.05 14.99 975.05 3.44

-3.99 4.47 -8.46

TOTAL AREAS(M2): 63.30 -13.76

4+300.00 -15.00 973.31 -11.05 973.14 -0.34 -15.00 975.01 -12.92 975.01 3.53

-12.92 975.01 -11.05 973.14 1.42

-0.34 4.95 -5.29

-11.05 973.14 -10.47 973.11 -0.11 -11.05 973.14 -10.12 972.21 -0.60

-10.47 973.11 0.00 972.67 -4.39 -10.12 972.21 -7.12 969.21 -7.81

0.00 972.67 6.39 972.57 -4.40 -7.12 969.21 0.00 969.21 -29.23

6.39 972.57 10.43 972.51 -3.10 0.00 969.21 7.12 969.21 -29.23

7.12 969.21 10.12 972.21 -7.81

10.12 972.21 10.43 972.51 -0.29

-12.00 -74.97 62.97

10.43 972.51 15.00 972.44 -3.82 10.43 972.51 12.92 975.01 1.12

12.92 975.01 15.00 975.01 3.53

-3.82 4.64 -8.46

TOTAL AREAS(M2): 62.97 -13.75

4+320.00 -16.30 973.25 -14.64 973.25 0.00 -16.30 973.98 -15.32 974.96 1.19

-14.64 973.25 -11.06 973.10 -0.28 -15.32 974.96 -12.92 974.96 4.10

-12.92 974.96 -11.06 973.10 1.45

-0.28 6.74 -7.02

-11.06 973.10 -7.74 972.96 -0.72 -11.06 973.10 -10.12 972.16 -0.58

-7.74 972.96 0.00 972.62 -3.56 -10.12 972.16 -7.12 969.16 -7.78

0.00 972.62 8.30 972.48 -5.81 -7.12 969.16 0.00 969.16 -29.13

8.30 972.48 10.41 972.45 -1.65 0.00 969.16 7.12 969.16 -29.13

7.12 969.16 10.12 972.16 -7.78

Página 63

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

10.12 972.16 10.41 972.45 -0.28

-11.73 -74.68 62.94

10.41 972.45 15.44 972.36 -4.25 10.41 972.45 12.92 974.96 1.14

12.92 974.96 15.32 974.96 4.10

15.32 974.96 15.44 974.83 0.21

-4.25 5.44 -9.69

TOTAL AREAS(M2): 62.94 -16.71

4+340.00 -15.64 973.19 -15.10 973.19 0.00 -15.64 974.59 -15.32 974.91 0.50

-15.10 973.19 -11.02 973.01 -0.37 -15.32 974.91 -12.92 974.91 4.13

-12.92 974.91 -11.02 973.01 1.47

-0.37 6.10 -6.47

-11.02 973.01 -7.87 972.87 -0.78 -11.02 973.01 -10.12 972.11 -0.56

-7.87 972.87 0.00 972.55 -3.76 -10.12 972.11 -7.12 969.11 -7.73

0.00 972.55 8.45 972.41 -6.00 -7.12 969.11 0.00 969.11 -29.03

8.45 972.41 10.39 972.38 -1.54 0.00 969.11 7.12 969.11 -29.03

7.12 969.11 10.12 972.11 -7.73

10.12 972.11 10.39 972.38 -0.25

-12.08 -74.34 62.25

10.39 972.38 14.87 972.31 -3.78 10.39 972.38 12.92 974.91 1.16

14.87 972.31 15.38 972.31 -0.45 12.92 974.91 15.32 974.91 4.13

15.32 974.91 15.38 974.85 0.11

-4.24 5.40 -9.64

TOTAL AREAS(M2): 62.25 -16.11

4+360.00 -15.03 973.15 -11.05 972.99 -0.33 -15.03 974.86 -12.92 974.86 3.60

-12.92 974.86 -11.05 972.99 1.44

-0.33 5.04 -5.37

-11.05 972.99 -8.20 972.87 -0.64 -11.05 972.99 -10.12 972.06 -0.58

-8.20 972.87 0.00 972.54 -3.69 -10.12 972.06 -7.12 969.06 -7.78

0.00 972.54 8.11 972.39 -5.59 -7.12 969.06 0.00 969.06 -29.14

8.11 972.39 10.41 972.35 -1.79 0.00 969.06 7.12 969.06 -29.14

7.12 969.06 10.12 972.06 -7.78

10.12 972.06 10.41 972.35 -0.28

-11.71 -74.70 62.99

10.41 972.35 14.97 972.28 -3.83 10.41 972.35 12.92 974.86 1.14

14.97 972.28 15.12 972.28 -0.13 12.92 974.86 15.12 974.86 3.76

-3.96 4.90 -8.85

TOTAL AREAS(M2): 62.99 -14.22

4+380.00 -14.95 973.11 -11.06 972.96 -0.30 -14.95 974.81 -12.92 974.81 3.46

-12.92 974.81 -11.06 972.96 1.44

-0.30 4.90 -5.20

-11.06 972.96 -7.97 972.84 -0.67 -11.06 972.96 -10.12 972.01 -0.59

-7.97 972.84 0.00 972.52 -3.45 -10.12 972.01 -7.12 969.01 -7.79

0.00 972.52 8.36 972.38 -5.52 -7.12 969.01 0.00 969.01 -29.18

8.36 972.38 10.45 972.34 -1.57 0.00 969.01 7.12 969.01 -29.18

7.12 969.01 10.12 972.01 -7.79

10.12 972.01 10.45 972.34 -0.31

-11.21 -74.85 63.64

10.45 972.34 15.05 972.26 -3.72 10.45 972.34 12.92 974.81 1.15

12.92 974.81 15.05 974.81 3.63

-3.72 4.79 -8.51

Página 64

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 63.64 -13.71

4+400.00 -15.49 973.09 -14.92 973.09 0.00 -15.49 974.60 -15.32 974.77 0.27

-14.92 973.09 -11.10 972.94 -0.27 -15.32 974.77 -12.92 974.77 4.02

-12.92 974.77 -11.10 972.94 1.39

-0.27 5.69 -5.96

-11.10 972.94 -7.15 972.79 -0.89 -11.10 972.94 -10.12 971.97 -0.62

-7.15 972.79 0.00 972.48 -3.25 -10.12 971.97 -7.12 968.97 -7.87

0.00 972.48 9.54 972.35 -6.42 -7.12 968.97 0.00 968.97 -29.36

9.54 972.35 10.49 972.34 -0.71 0.00 968.97 7.12 968.97 -29.36

7.12 968.97 10.12 971.97 -7.87

10.12 971.97 10.49 972.34 -0.35

-11.27 -75.43 64.16

10.49 972.34 15.25 972.26 -3.77 10.49 972.34 12.92 974.77 1.12

12.92 974.77 15.25 974.77 3.91

-3.77 5.03 -8.80

TOTAL AREAS(M2): 64.16 -14.76

4+420.00 -15.25 973.07 -15.00 973.08 0.00 -15.25 974.72 -12.92 974.72 3.83

-15.00 973.08 -11.11 972.91 -0.32 -12.92 974.72 -11.11 972.91 1.34

-0.32 5.16 -5.49

-11.11 972.91 -6.98 972.73 -1.06 -11.11 972.91 -10.12 971.92 -0.66

-6.98 972.73 0.00 972.41 -3.55 -10.12 971.92 -7.12 968.92 -7.97

0.00 972.41 9.92 972.26 -7.37 -7.12 968.92 0.00 968.92 -29.60

9.92 972.26 10.45 972.25 -0.44 0.00 968.92 7.12 968.92 -29.60

7.12 968.92 10.12 971.92 -7.97

10.12 971.92 10.45 972.25 -0.33

-12.42 -76.12 63.71

10.45 972.25 15.00 972.18 -3.90 10.45 972.25 12.92 974.72 1.01

12.92 974.72 15.00 974.72 3.41

-3.90 4.42 -8.32

TOTAL AREAS(M2): 63.71 -13.81

4+440.00 -16.83 972.99 -12.79 972.81 -0.36 -16.83 973.16 -15.32 974.67 1.40

-12.79 972.81 -10.99 972.74 -0.38 -15.32 974.67 -12.92 974.67 4.03

-12.92 974.67 -10.99 972.74 1.38

-0.74 6.81 -7.55

-10.99 972.74 0.00 972.33 -4.96 -10.99 972.74 -10.12 971.87 -0.60

0.00 972.33 6.34 972.22 -4.53 -10.12 971.87 -7.12 968.87 -7.86

6.34 972.22 10.41 972.16 -3.25 -7.12 968.87 0.00 968.87 -29.33

0.00 968.87 7.12 968.87 -29.33

7.12 968.87 10.12 971.87 -7.86

10.12 971.87 10.41 972.16 -0.29

-12.74 -75.26 62.52

10.41 972.16 15.13 972.10 -4.04 10.41 972.16 12.92 974.67 1.07

15.13 972.10 17.60 972.13 -2.15 12.92 974.67 15.32 974.67 4.03

15.32 974.67 17.60 972.39 1.23

-6.19 6.34 -12.53

TOTAL AREAS(M2): 62.52 -20.08

4+460.00 -15.13 972.91 -13.86 972.86 -0.03 -15.13 974.62 -12.92 974.62 3.78

-13.86 972.86 -11.05 972.75 -0.30 -12.92 974.62 -11.05 972.75 1.44

-0.33 5.22 -5.55

-11.05 972.75 0.00 972.30 -4.32 -11.05 972.75 -10.12 971.82 -0.58

Página 65

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

0.00 972.30 5.74 972.21 -3.80 -10.12 971.82 -7.12 968.82 -7.78

5.74 972.21 10.43 972.13 -3.50 -7.12 968.82 0.00 968.82 -29.14

0.00 968.82 7.12 968.82 -29.14

7.12 968.82 10.12 971.82 -7.78

10.12 971.82 10.43 972.13 -0.29

-11.62 -74.71 63.09

10.43 972.13 15.02 972.05 -3.78 10.43 972.13 12.92 974.62 1.15

15.02 972.05 16.82 972.07 -1.53 12.92 974.62 15.32 974.62 4.10

15.32 974.62 16.82 973.12 1.44

-5.31 6.68 -11.99

TOTAL AREAS(M2): 63.09 -17.55

4+480.00 -15.06 972.84 -13.31 972.77 -0.06 -15.06 974.57 -12.92 974.57 3.72

-13.31 972.77 -11.03 972.68 -0.25 -12.92 974.57 -11.03 972.68 1.50

-0.30 5.22 -5.52

-11.03 972.68 0.00 972.26 -3.98 -11.03 972.68 -10.12 971.77 -0.55

0.00 972.26 5.56 972.18 -3.42 -10.12 971.77 -7.12 968.77 -7.68

5.56 972.18 10.45 972.10 -3.41 -7.12 968.77 0.00 968.77 -28.92

0.00 968.77 7.12 968.77 -28.92

7.12 968.77 10.12 971.77 -7.68

10.12 971.77 10.45 972.10 -0.29

-10.81 -74.05 63.25

10.45 972.10 15.01 972.03 -3.52 10.45 972.10 12.92 974.57 1.24

12.92 974.57 15.01 974.57 3.64

-3.52 4.88 -8.40

TOTAL AREAS(M2): 63.25 -13.92

4+500.00 -15.00 972.79 -13.10 972.71 -0.07 -15.00 974.53 -12.92 974.53 3.61

-13.10 972.71 -11.03 972.64 -0.24 -12.92 974.53 -11.03 972.64 1.49

-0.31 5.11 -5.42

-11.03 972.64 0.00 972.23 -3.94 -11.03 972.64 -10.12 971.73 -0.55

0.00 972.23 5.52 972.15 -3.30 -10.12 971.73 -7.12 968.73 -7.69

5.52 972.15 10.47 972.08 -3.34 -7.12 968.73 0.00 968.73 -28.94

0.00 968.73 7.12 968.73 -28.94

7.12 968.73 10.12 971.73 -7.69

10.12 971.73 10.47 972.08 -0.31

-10.58 -74.12 63.54

10.47 972.08 15.00 972.01 -3.39 10.47 972.08 12.92 974.53 1.25

12.92 974.53 15.00 974.53 3.61

-3.39 4.86 -8.26

TOTAL AREAS(M2): 63.54 -13.67

4+520.00 -15.00 972.78 -13.11 972.70 -0.08 -15.00 974.48 -12.92 974.48 3.52

-13.11 972.70 -11.06 972.61 -0.26 -12.92 974.48 -11.06 972.61 1.42

-0.34 4.94 -5.28

-11.06 972.61 0.00 972.15 -4.44 -11.06 972.61 -10.12 971.68 -0.60

0.00 972.15 5.52 972.10 -3.63 -10.12 971.68 -7.12 968.68 -7.82

5.52 972.10 10.48 972.04 -3.54 -7.12 968.68 0.00 968.68 -29.23

0.00 968.68 7.12 968.68 -29.23

7.12 968.68 10.12 971.68 -7.82

10.12 971.68 10.48 972.04 -0.33

-11.61 -75.04 63.43

10.48 972.04 15.00 971.98 -3.50 10.48 972.04 12.92 974.48 1.16

Página 66

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

12.92 974.48 15.00 974.48 3.52

-3.50 4.68 -8.18

TOTAL AREAS(M2): 63.43 -13.46

4+540.00 -15.00 972.72 -13.10 972.64 -0.08 -15.00 974.43 -12.92 974.43 3.56

-13.10 972.64 -11.03 972.54 -0.27 -12.92 974.43 -11.03 972.54 1.44

-0.35 5.00 -5.35

-11.03 972.54 0.00 972.05 -4.66 -11.03 972.54 -10.12 971.63 -0.58

0.00 972.05 5.52 972.02 -3.78 -10.12 971.63 -7.12 968.63 -7.77

5.52 972.02 10.47 971.98 -3.58 -7.12 968.63 0.00 968.63 -29.13

0.00 968.63 7.12 968.63 -29.13

7.12 968.63 10.12 971.63 -7.77

10.12 971.63 10.47 971.98 -0.32

-12.02 -74.70 62.68

10.47 971.98 15.00 971.94 -3.45 10.47 971.98 12.92 974.43 1.18

12.92 974.43 15.00 974.43 3.55

-3.45 4.74 -8.19

TOTAL AREAS(M2): 62.68 -13.54

4+560.00 -15.04 972.63 -12.99 972.55 -0.09 -15.04 974.38 -12.92 974.38 3.72

-12.99 972.55 -11.00 972.46 -0.25 -12.92 974.38 -11.00 972.46 1.52

-0.34 5.24 -5.57

-11.00 972.46 0.00 971.98 -4.50 -11.00 972.46 -10.12 971.58 -0.53

0.00 971.98 5.44 971.94 -3.63 -10.12 971.58 -7.12 968.58 -7.64

5.44 971.94 10.45 971.91 -3.52 -7.12 968.58 0.00 968.58 -28.82

0.00 968.58 7.12 968.58 -28.82

7.12 968.58 10.12 971.58 -7.64

10.12 971.58 10.45 971.91 -0.29

-11.65 -73.76 62.10

10.45 971.91 15.01 971.89 -3.33 10.45 971.91 12.92 974.38 1.28

15.01 971.89 15.25 971.88 -0.18 12.92 974.38 15.25 974.38 4.08

-3.51 5.35 -8.86

TOTAL AREAS(M2): 62.10 -14.43

4+580.00 -15.12 972.53 -12.42 972.44 -0.13 -15.12 974.33 -12.92 974.33 3.96

-12.42 972.44 -10.97 972.38 -0.18 -12.92 974.33 -10.97 972.38 1.61

-0.31 5.56 -5.87

-10.97 972.38 0.00 971.95 -4.01 -10.97 972.38 -10.12 971.53 -0.49

0.00 971.95 5.16 971.90 -3.12 -10.12 971.53 -7.12 968.53 -7.50

5.16 971.90 10.45 971.87 -3.44 -7.12 968.53 0.00 968.53 -28.48

0.00 968.53 7.12 968.53 -28.48

7.12 968.53 10.12 971.53 -7.50

10.12 971.53 10.45 971.87 -0.28

-10.57 -72.74 62.17

10.45 971.87 15.05 971.83 -3.15 10.45 971.87 12.92 974.33 1.40

15.05 971.83 15.33 971.83 -0.19 12.92 974.33 15.32 974.33 4.32

15.32 974.33 15.33 974.33 0.01

-3.34 5.73 -9.07

TOTAL AREAS(M2): 62.17 -14.94

4+600.00 -15.00 972.44 -11.97 972.33 -0.16 -15.00 974.29 -12.92 974.29 3.84

-11.97 972.33 -10.93 972.29 -0.13 -12.92 974.29 -10.93 972.29 1.69

-0.30 5.54 -5.83

-10.93 972.29 0.00 971.92 -3.65 -10.93 972.29 -10.12 971.49 -0.44

Página 67

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

0.00 971.92 5.06 971.88 -2.73 -10.12 971.49 -7.12 968.49 -7.36

5.06 971.88 10.46 971.83 -3.15 -7.12 968.49 0.00 968.49 -28.15

0.00 968.49 7.12 968.49 -28.15

7.12 968.49 10.12 971.49 -7.36

10.12 971.49 10.46 971.83 -0.27

-9.53 -71.73 62.20

10.46 971.83 15.00 971.79 -2.86 10.46 971.83 12.92 974.29 1.52

12.92 974.29 15.00 974.29 3.84

-2.86 5.36 -8.22

TOTAL AREAS(M2): 62.20 -14.05

4+620.00 -15.01 972.38 -11.92 972.28 -0.16 -15.01 974.24 -12.92 974.24 3.89

-11.92 972.28 -10.92 972.24 -0.12 -12.92 974.24 -10.92 972.24 1.72

-0.27 5.61 -5.88

-10.92 972.24 0.00 971.85 -3.60 -10.92 972.24 -10.12 971.44 -0.43

0.00 971.85 5.03 971.82 -2.73 -10.12 971.44 -7.12 968.44 -7.32

5.03 971.82 10.46 971.78 -3.14 -7.12 968.44 0.00 968.44 -28.05

0.00 968.44 7.12 968.44 -28.05

7.12 968.44 10.12 971.44 -7.32

10.12 971.44 10.46 971.78 -0.26

-9.47 -71.42 61.96

10.46 971.78 15.00 971.75 -2.77 10.46 971.78 12.92 974.24 1.55

12.92 974.24 15.00 974.24 3.88

-2.77 5.43 -8.20

TOTAL AREAS(M2): 61.96 -14.08

4+640.00 -15.01 972.30 -11.80 972.21 -0.14 -15.01 974.19 -12.92 974.19 3.95

-11.80 972.21 -10.91 972.18 -0.09 -12.92 974.19 -10.91 972.18 1.77

-0.24 5.72 -5.96

-10.91 972.18 0.00 971.83 -3.20 -10.91 972.18 -10.12 971.39 -0.41

0.00 971.83 4.98 971.78 -2.46 -10.12 971.39 -7.12 968.39 -7.24

4.98 971.78 10.47 971.74 -2.97 -7.12 968.39 0.00 968.39 -27.86

0.00 968.39 7.12 968.39 -27.86

7.12 968.39 10.12 971.39 -7.24

10.12 971.39 10.47 971.74 -0.26

-8.63 -70.86 62.23

10.47 971.74 15.01 971.71 -2.63 10.47 971.74 12.92 974.19 1.62

12.92 974.19 15.01 974.19 3.94

-2.63 5.56 -8.19

TOTAL AREAS(M2): 62.23 -14.15

4+660.00 -15.00 972.21 -11.74 972.14 -0.12 -15.00 974.14 -12.92 974.14 4.02

-11.74 972.14 -10.89 972.11 -0.07 -12.92 974.14 -10.89 972.11 1.86

-0.19 5.88 -6.07

-10.89 972.11 0.00 971.81 -2.69 -10.89 972.11 -10.12 971.34 -0.37

0.00 971.81 4.96 971.77 -2.07 -10.12 971.34 -7.12 968.34 -7.10

4.96 971.77 10.49 971.72 -2.59 -7.12 968.34 0.00 968.34 -27.54

0.00 968.34 7.12 968.34 -27.54

7.12 968.34 10.12 971.34 -7.10

10.12 971.34 10.49 971.72 -0.25

-7.35 -69.92 62.57

10.49 971.72 15.00 971.67 -2.33 10.49 971.72 12.92 974.14 1.74

12.92 974.14 15.00 974.14 4.02

Página 68

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-2.33 5.76 -8.10

TOTAL AREAS(M2): 62.57 -14.17

4+680.00 -15.02 972.12 -11.64 972.05 -0.12 -15.02 974.09 -12.92 974.09 4.14

-11.64 972.05 -10.86 972.03 -0.06 -12.92 974.09 -10.86 972.03 1.95

-0.18 6.09 -6.27

-10.86 972.03 0.00 971.79 -2.24 -10.86 972.03 -10.12 971.29 -0.34

0.00 971.79 4.91 971.75 -1.70 -10.12 971.29 -7.12 968.29 -6.97

4.91 971.75 10.53 971.70 -2.20 -7.12 968.29 0.00 968.29 -27.22

0.00 968.29 7.12 968.29 -27.22

7.12 968.29 10.12 971.29 -6.97

10.12 971.29 10.53 971.70 -0.25

-6.14 -68.98 62.83

10.53 971.70 15.01 971.66 -1.95 10.53 971.70 12.92 974.09 1.87

15.01 971.66 15.32 971.65 -0.14 12.92 974.09 15.32 974.09 4.74

-2.09 6.60 -8.70

TOTAL AREAS(M2): 62.83 -14.97

4+700.00 -15.21 972.07 -15.06 972.07 0.00 -15.21 974.05 -12.92 974.05 4.54

-15.06 972.07 -10.93 971.98 -0.17 -12.92 974.05 -10.86 971.98 1.96

-10.93 971.98 -10.86 971.98 -0.01

-0.17 6.50 -6.67

-10.86 971.98 0.00 971.77 -2.07 -10.86 971.98 -10.12 971.25 -0.33

0.00 971.77 4.60 971.71 -1.50 -10.12 971.25 -7.12 968.25 -6.96

4.60 971.71 10.54 971.67 -2.23 -7.12 968.25 0.00 968.25 -27.20

0.00 968.25 7.12 968.25 -27.20

7.12 968.25 10.12 971.25 -6.96

10.12 971.25 10.54 971.67 -0.26

-5.80 -68.90 63.10

10.54 971.67 15.05 971.63 -1.88 10.54 971.67 12.92 974.05 1.88

15.05 971.63 15.59 971.62 -0.24 12.92 974.05 15.32 974.05 4.75

15.32 974.05 15.59 973.78 0.49

-2.12 7.13 -9.24

TOTAL AREAS(M2): 63.10 -15.91

4+720.00 -15.42 972.05 -14.98 972.06 0.00 -15.42 973.90 -15.32 974.00 0.18

-14.98 972.06 -11.18 971.98 -0.13 -15.32 974.00 -12.92 974.00 4.67

-11.18 971.98 -10.89 971.97 -0.02 -12.92 974.00 -10.89 971.97 1.89

-0.16 6.75 -6.90

-10.89 971.97 0.00 971.75 -2.07 -10.89 971.97 -10.12 971.20 -0.36

0.00 971.75 4.84 971.69 -1.60 -10.12 971.20 -7.12 968.20 -7.06

4.84 971.69 10.55 971.62 -2.26 -7.12 968.20 0.00 968.20 -27.43

0.00 968.20 7.12 968.20 -27.43

7.12 968.20 10.12 971.20 -7.06

10.12 971.20 10.55 971.62 -0.27

-5.93 -69.62 63.69

10.55 971.62 15.00 971.57 -2.02 10.55 971.62 12.92 974.00 1.80

12.92 974.00 15.00 974.00 4.05

-2.02 5.86 -7.88

TOTAL AREAS(M2): 63.69 -14.78

4+740.00 -15.13 972.03 -10.91 971.94 -0.18 -15.13 973.95 -12.92 973.95 4.25

-12.92 973.95 -10.91 971.94 1.84

-0.18 6.09 -6.27

Página 69

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-10.91 971.94 -4.64 971.82 -0.94 -10.91 971.94 -10.12 971.15 -0.38

-4.64 971.82 0.00 971.71 -1.24 -10.12 971.15 -7.12 968.15 -7.14

0.00 971.71 10.55 971.58 -4.06 -7.12 968.15 0.00 968.15 -27.63

0.00 968.15 7.12 968.15 -27.63

7.12 968.15 10.12 971.15 -7.14

10.12 971.15 10.55 971.58 -0.29

-6.24 -70.21 63.97

10.55 971.58 10.67 971.58 -0.05 10.55 971.58 12.92 973.95 1.74

10.67 971.58 15.13 971.53 -2.14 12.92 973.95 15.32 973.95 4.61

15.13 971.53 15.89 971.53 -0.38 15.32 973.95 15.89 973.38 0.93

-2.57 7.28 -9.85

TOTAL AREAS(M2): 63.97 -16.12

4+760.00 -14.97 972.00 -10.92 971.90 -0.19 -14.97 973.90 -12.92 973.90 3.90

-12.92 973.90 -10.92 971.90 1.81

-0.19 5.72 -5.90

-10.92 971.90 -5.78 971.79 -0.77 -10.92 971.90 -10.12 971.10 -0.39

-5.78 971.79 0.00 971.65 -1.60 -10.12 971.10 -7.12 968.10 -7.18

0.00 971.65 10.55 971.53 -4.27 -7.12 968.10 0.00 968.10 -27.72

0.00 968.10 7.12 968.10 -27.72

7.12 968.10 10.12 971.10 -7.18

10.12 971.10 10.55 971.53 -0.29

-6.64 -70.48 63.84

10.55 971.53 12.32 971.51 -0.84 10.55 971.53 12.92 973.90 1.71

12.32 971.51 14.75 971.48 -1.21 12.92 973.90 15.32 973.90 4.58

14.75 971.48 16.98 971.49 -1.13 15.32 973.90 16.98 972.25 1.79

-3.19 8.07 -11.26

TOTAL AREAS(M2): 63.84 -17.16

4+780.00 -15.46 971.95 -15.14 971.94 0.00 -15.46 973.72 -15.32 973.85 0.25

-15.14 971.94 -10.90 971.84 -0.27 -15.32 973.85 -12.92 973.85 4.57

-12.92 973.85 -10.90 971.84 1.80

-0.27 6.62 -6.89

-10.90 971.84 -5.52 971.71 -0.94 -10.90 971.84 -10.12 971.05 -0.40

-5.52 971.71 0.00 971.58 -1.67 -10.12 971.05 -7.12 968.05 -7.19

0.00 971.58 10.55 971.48 -4.41 -7.12 968.05 0.00 968.05 -27.75

0.00 968.05 7.12 968.05 -27.75

7.12 968.05 10.12 971.05 -7.19

10.12 971.05 10.55 971.48 -0.29

-7.02 -70.58 63.56

10.55 971.48 12.46 971.47 -0.91 10.55 971.48 12.92 973.85 1.70

12.46 971.47 15.31 971.44 -1.42 12.92 973.85 15.31 973.85 4.54

-2.33 6.24 -8.57

TOTAL AREAS(M2): 63.56 -15.46

4+800.00 -15.36 971.89 -14.99 971.88 0.00 -15.36 973.76 -15.32 973.81 0.08

-14.99 971.88 -10.89 971.78 -0.27 -15.32 973.81 -12.92 973.81 4.59

-12.92 973.81 -10.89 971.78 1.82

-0.27 6.50 -6.77

-10.89 971.78 -5.44 971.65 -0.98 -10.89 971.78 -10.12 971.01 -0.39

-5.44 971.65 0.00 971.53 -1.66 -10.12 971.01 -7.12 968.01 -7.16

0.00 971.53 10.54 971.43 -4.38 -7.12 968.01 0.00 968.01 -27.68

0.00 968.01 7.12 968.01 -27.68

Página 70

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

7.12 968.01 10.12 971.01 -7.16

10.12 971.01 10.54 971.43 -0.29

-7.02 -70.35 63.33

10.54 971.43 11.70 971.42 -0.54 10.54 971.43 12.92 973.81 1.72

11.70 971.42 14.97 971.38 -1.61 12.92 973.81 14.97 973.81 3.92

-2.15 5.64 -7.80

TOTAL AREAS(M2): 63.33 -14.57

4+820.00 -14.97 971.82 -10.89 971.73 -0.18 -14.97 973.76 -12.92 973.76 3.97

-12.92 973.76 -10.89 971.73 1.88

-0.18 5.84 -6.03

-10.89 971.73 -6.04 971.62 -0.69 -10.89 971.73 -10.12 970.96 -0.37

-6.04 971.62 0.00 971.50 -1.54 -10.12 970.96 -7.12 967.96 -7.08

0.00 971.50 10.56 971.40 -3.89 -7.12 967.96 0.00 967.96 -27.48

0.00 967.96 7.12 967.96 -27.48

7.12 967.96 10.12 970.96 -7.08

10.12 970.96 10.56 971.40 -0.28

-6.12 -69.78 63.66

10.56 971.40 12.56 971.38 -0.86 10.56 971.40 12.92 973.76 1.79

12.56 971.38 14.76 971.36 -0.99 12.92 973.76 15.06 973.76 4.14

14.76 971.36 15.06 971.35 -0.14

-2.00 5.93 -7.93

TOTAL AREAS(M2): 63.66 -13.96

4+840.00 -15.11 971.74 -10.87 971.66 -0.18 -15.11 973.71 -12.92 973.71 4.31

-12.92 973.71 -10.87 971.66 1.94

-0.18 6.25 -6.43

-10.87 971.66 -7.76 971.59 -0.36 -10.87 971.66 -10.12 970.91 -0.34

-7.76 971.59 0.00 971.45 -1.70 -10.12 970.91 -7.12 967.91 -6.99

0.00 971.45 10.58 971.37 -3.51 -7.12 967.91 0.00 967.91 -27.26

0.00 967.91 7.12 967.91 -27.26

7.12 967.91 10.12 970.91 -6.99

10.12 970.91 10.58 971.37 -0.27

-5.56 -69.11 63.56

10.58 971.37 12.81 971.35 -0.85 10.58 971.37 12.92 973.71 1.87

12.81 971.35 14.20 971.34 -0.55 12.92 973.71 15.32 973.71 4.73

14.20 971.34 16.65 971.32 -1.01 15.32 973.71 16.65 972.38 1.74

-2.40 8.34 -10.74

TOTAL AREAS(M2): 63.56 -17.17

4+860.00 -16.38 971.69 -15.51 971.70 0.00 -16.38 972.60 -15.32 973.66 1.53

-15.51 971.70 -10.87 971.61 -0.16 -15.32 973.66 -12.92 973.66 4.74

-12.92 973.66 -10.87 971.61 1.95

-0.15 8.22 -8.37

-10.87 971.61 -6.13 971.52 -0.59 -10.87 971.61 -10.12 970.86 -0.34

-6.13 971.52 0.00 971.37 -1.49 -10.12 970.86 -7.12 967.86 -6.98

0.00 971.37 10.56 971.30 -3.73 -7.12 967.86 0.00 967.86 -27.24

0.00 967.86 7.12 967.86 -27.24

7.12 967.86 10.12 970.86 -6.98

10.12 970.86 10.56 971.30 -0.27

-5.81 -69.03 63.22

10.56 971.30 14.06 971.28 -1.40 10.56 971.30 12.92 973.66 1.87

14.06 971.28 16.38 971.26 -0.97 12.92 973.66 15.32 973.66 4.74

Página 71

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

15.32 973.66 16.38 972.60 1.53

-2.38 8.15 -10.52

TOTAL AREAS(M2): 63.22 -18.89

4+880.00 -15.72 971.63 -14.97 971.64 0.00 -15.72 973.22 -15.32 973.61 0.71

-14.97 971.64 -10.84 971.54 -0.17 -15.32 973.61 -12.92 973.61 4.77

-12.92 973.61 -10.84 971.54 1.97

-0.16 7.44 -7.61

-10.84 971.54 -6.44 971.43 -0.63 -10.84 971.54 -10.12 970.81 -0.33

-6.44 971.43 0.00 971.28 -1.76 -10.12 970.81 -7.12 967.81 -6.94

0.00 971.28 10.50 971.20 -4.09 -7.12 967.81 0.00 967.81 -27.15

0.00 967.81 7.12 967.81 -27.15

7.12 967.81 10.12 970.81 -6.94

10.12 970.81 10.50 971.20 -0.24

-6.48 -68.76 62.28

10.50 971.20 11.92 971.19 -0.61 10.50 971.20 12.92 973.61 1.88

11.92 971.19 14.79 971.17 -1.29 12.92 973.61 15.26 973.61 4.65

14.79 971.17 15.26 971.17 -0.21

-2.12 6.53 -8.65

TOTAL AREAS(M2): 62.28 -16.26

4+900.00 -15.21 971.53 -10.78 971.42 -0.23 -15.21 973.57 -12.92 973.57 4.68

-12.92 973.57 -10.78 971.42 2.07

-0.23 6.75 -6.98

-10.78 971.42 -8.85 971.38 -0.25 -10.78 971.42 -10.12 970.77 -0.28

-8.85 971.38 0.00 971.22 -2.04 -10.12 970.77 -7.12 967.77 -6.78

0.00 971.22 10.49 971.14 -3.68 -7.12 967.77 0.00 967.77 -26.78

0.00 967.77 7.12 967.77 -26.78

7.12 967.77 10.12 970.77 -6.78

10.12 970.77 10.49 971.14 -0.21

-5.96 -67.61 61.65

10.49 971.14 12.88 971.12 -0.96 10.49 971.14 12.92 973.57 2.00

12.88 971.12 14.07 971.11 -0.49 12.92 973.57 15.32 973.57 4.89

14.07 971.11 16.98 971.14 -1.17 15.32 973.57 16.98 971.91 2.01

-2.62 8.90 -11.52

TOTAL AREAS(M2): 61.65 -18.50

4+920.00 -15.34 971.48 -14.96 971.49 0.00 -15.34 973.49 -15.32 973.52 0.05

-14.96 971.49 -10.82 971.41 -0.11 -15.32 973.52 -12.92 973.52 4.89

-12.92 973.52 -10.82 971.41 2.07

-0.11 7.01 -7.13

-10.82 971.41 -9.02 971.38 -0.15 -10.82 971.41 -10.12 970.72 -0.29

-9.02 971.38 0.00 971.20 -1.74 -10.12 970.72 -7.12 967.72 -6.79

0.00 971.20 10.53 971.12 -3.37 -7.12 967.72 0.00 967.72 -26.79

0.00 967.72 7.12 967.72 -26.79

7.12 967.72 10.12 970.72 -6.79

10.12 970.72 10.53 971.12 -0.23

-5.26 -67.66 62.40

10.53 971.12 12.88 971.11 -0.86 10.53 971.12 12.92 973.52 2.01

12.88 971.11 15.17 971.09 -0.87 12.92 973.52 15.32 973.52 4.89

15.17 971.09 15.36 971.09 -0.07 15.32 973.52 15.36 973.48 0.08

-1.80 6.99 -8.79

TOTAL AREAS(M2): 62.40 -15.92

Página 72

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

4+940.00 -15.12 971.46 -14.99 971.46 0.00 -15.12 973.47 -12.92 973.47 4.42

-14.99 971.46 -10.83 971.38 -0.16 -12.92 973.47 -10.83 971.38 2.03

-0.16 6.45 -6.61

-10.83 971.38 -8.69 971.33 -0.22 -10.83 971.38 -10.12 970.67 -0.31

-8.69 971.33 0.00 971.16 -1.83 -10.12 970.67 -7.12 967.67 -6.86

0.00 971.16 10.55 971.10 -3.46 -7.12 967.67 0.00 967.67 -26.95

0.00 967.67 7.12 967.67 -26.95

7.12 967.67 10.12 970.67 -6.86

10.12 970.67 10.55 971.10 -0.24

-5.50 -68.17 62.67

10.55 971.10 13.64 971.08 -1.14 10.55 971.10 12.92 973.47 1.96

13.64 971.08 15.08 971.07 -0.55 12.92 973.47 15.08 973.47 4.35

-1.69 6.32 -8.00

TOTAL AREAS(M2): 62.67 -14.61

4+960.00 -15.00 971.44 -10.85 971.35 -0.17 -15.00 973.42 -12.92 973.42 4.12

-12.92 973.42 -10.85 971.35 1.97

-0.17 6.10 -6.27

-10.85 971.35 -8.52 971.31 -0.25 -10.85 971.35 -10.12 970.62 -0.33

-8.52 971.31 0.00 971.14 -1.83 -10.12 970.62 -7.12 967.62 -6.94

0.00 971.14 10.55 971.06 -3.58 -7.12 967.62 0.00 967.62 -27.15

0.00 967.62 7.12 967.62 -27.15

7.12 967.62 10.12 970.62 -6.94

10.12 970.62 10.55 971.06 -0.26

-5.66 -68.75 63.09

10.55 971.06 14.08 971.03 -1.39 10.55 971.06 12.92 973.42 1.90

14.08 971.03 15.05 971.02 -0.40 12.92 973.42 15.05 973.42 4.24

-1.79 6.14 -7.93

TOTAL AREAS(M2): 63.09 -14.20

4+980.00 -15.01 971.42 -10.89 971.34 -0.17 -15.01 973.37 -12.92 973.37 4.07

-12.92 973.37 -10.89 971.34 1.90

-0.17 5.98 -6.14

-10.89 971.34 -7.94 971.28 -0.32 -10.89 971.34 -10.12 970.57 -0.36

-7.94 971.28 0.00 971.11 -1.81 -10.12 970.57 -7.12 967.57 -7.05

0.00 971.11 10.54 971.00 -3.92 -7.12 967.57 0.00 967.57 -27.40

0.00 967.57 7.12 967.57 -27.40

7.12 967.57 10.12 970.57 -7.05

10.12 970.57 10.54 971.00 -0.27

-6.05 -69.52 63.47

10.54 971.00 14.91 970.95 -1.95 10.54 971.00 12.92 973.37 1.81

14.91 970.95 15.30 970.95 -0.19 12.92 973.37 15.30 973.37 4.64

-2.14 6.46 -8.60

TOTAL AREAS(M2): 63.47 -14.74

5+000.00 -15.74 971.39 -15.05 971.40 0.00 -15.74 972.91 -15.32 973.33 0.72

-15.05 971.40 -10.90 971.31 -0.15 -15.32 973.33 -12.92 973.33 4.65

-12.92 973.33 -10.90 971.31 1.87

-0.14 7.25 -7.39

-10.90 971.31 -7.21 971.22 -0.46 -10.90 971.31 -10.12 970.53 -0.37

-7.21 971.22 0.00 971.03 -1.91 -10.12 970.53 -7.12 967.53 -7.09

0.00 971.03 10.53 970.94 -4.29 -7.12 967.53 0.00 967.53 -27.50

0.00 967.53 7.12 967.53 -27.50

Página 73

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

7.12 967.53 10.12 970.53 -7.09

10.12 970.53 10.53 970.94 -0.27

-6.66 -69.80 63.14

10.53 970.94 13.58 970.91 -1.43 10.53 970.94 12.92 973.33 1.78

13.58 970.91 15.35 970.90 -0.86 12.92 973.33 15.32 973.33 4.65

15.32 973.33 15.35 973.30 0.06

-2.29 6.49 -8.77

TOTAL AREAS(M2): 63.14 -16.17

5+020.00 -15.58 971.34 -15.08 971.35 0.00 -15.58 973.02 -15.32 973.28 0.47

-15.08 971.35 -10.88 971.24 -0.20 -15.32 973.28 -12.92 973.28 4.65

-12.92 973.28 -10.88 971.24 1.87

-0.20 6.99 -7.18

-10.88 971.24 -6.55 971.12 -0.70 -10.88 971.24 -10.12 970.48 -0.37

-6.55 971.12 0.00 970.97 -1.94 -10.12 970.48 -7.12 967.48 -7.09

0.00 970.97 10.54 970.89 -4.33 -7.12 967.48 0.00 967.48 -27.51

0.00 967.48 7.12 967.48 -27.51

7.12 967.48 10.12 970.48 -7.09

10.12 970.48 10.54 970.89 -0.27

-6.96 -69.85 62.89

10.54 970.89 12.19 970.88 -0.75 10.54 970.89 12.92 973.28 1.77

12.19 970.88 15.25 970.85 -1.47 12.92 973.28 15.32 973.28 4.65

15.25 970.85 15.65 970.85 -0.20 15.32 973.28 15.65 972.95 0.58

-2.42 7.00 -9.42

TOTAL AREAS(M2): 62.89 -16.60

5+040.00 -15.06 971.31 -10.90 971.21 -0.20 -15.06 973.23 -12.92 973.23 4.11

-12.92 973.23 -10.90 971.21 1.85

-0.20 5.96 -6.16

-10.90 971.21 -7.94 971.14 -0.39 -10.90 971.21 -10.12 970.43 -0.38

-7.94 971.14 0.00 970.97 -2.02 -10.12 970.43 -7.12 967.43 -7.13

0.00 970.97 10.51 970.82 -4.34 -7.12 967.43 0.00 967.43 -27.60

0.00 967.43 7.12 967.43 -27.60

7.12 967.43 10.12 970.43 -7.13

10.12 970.43 10.51 970.82 -0.27

-6.76 -70.10 63.34

10.51 970.82 12.91 970.79 -1.21 10.51 970.82 12.92 973.23 1.73

12.91 970.79 14.30 970.77 -0.73 12.92 973.23 15.32 973.23 4.62

14.30 970.77 16.54 970.79 -1.19 15.32 973.23 16.54 972.01 1.61

-3.13 7.96 -11.08

TOTAL AREAS(M2): 63.34 -17.24

5+060.00 -15.08 971.25 -10.89 971.16 -0.18 -15.08 973.18 -12.92 973.18 4.19

-12.92 973.18 -10.89 971.16 1.87

-0.18 6.07 -6.25

-10.89 971.16 -9.53 971.13 -0.14 -10.89 971.16 -10.12 970.38 -0.37

-9.53 971.13 0.00 970.96 -1.94 -10.12 970.38 -7.12 967.38 -7.09

0.00 970.96 10.53 970.79 -3.90 -7.12 967.38 0.00 967.38 -27.50

0.00 967.38 7.12 967.38 -27.50

7.12 967.38 10.12 970.38 -7.09

10.12 970.38 10.53 970.79 -0.27

-5.98 -69.82 63.84

10.53 970.79 12.81 970.76 -1.07 10.53 970.79 12.92 973.18 1.77

Página 74

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

12.81 970.76 14.70 970.73 -0.95 12.92 973.18 14.83 973.18 3.70

14.70 970.73 14.83 970.73 -0.06

-2.08 5.48 -7.56

TOTAL AREAS(M2): 63.84 -13.81

5+080.00 -16.54 971.18 -15.35 971.17 -0.01 -16.54 971.91 -15.32 973.13 1.64

-15.35 971.17 -10.89 971.10 -0.20 -15.32 973.13 -12.92 973.13 4.68

-12.92 973.13 -10.89 971.10 1.90

-0.21 8.22 -8.43

-10.89 971.10 -7.28 971.04 -0.40 -10.89 971.10 -10.12 970.33 -0.36

-7.28 971.04 0.00 970.92 -1.45 -10.12 970.33 -7.12 967.33 -7.05

0.00 970.92 10.55 970.76 -3.58 -7.12 967.33 0.00 967.33 -27.40

0.00 967.33 7.12 967.33 -27.40

7.12 967.33 10.12 970.33 -7.05

10.12 970.33 10.55 970.76 -0.27

-5.43 -69.52 64.09

10.55 970.76 13.96 970.71 -1.52 10.55 970.76 12.92 973.13 1.82

13.96 970.71 16.28 970.68 -1.14 12.92 973.13 15.32 973.13 4.68

15.32 973.13 16.28 972.18 1.41

-2.66 7.91 -10.57

TOTAL AREAS(M2): 64.09 -19.00

5+100.00 -15.80 971.11 -14.99 971.11 0.00 -15.80 972.60 -15.32 973.09 0.84

-14.99 971.11 -10.87 971.04 -0.17 -15.32 973.09 -12.92 973.09 4.74

-12.92 973.09 -10.87 971.04 1.95

-0.17 7.52 -7.69

-10.87 971.04 -7.05 970.97 -0.41 -10.87 971.04 -10.12 970.29 -0.34

-7.05 970.97 0.00 970.85 -1.41 -10.12 970.29 -7.12 967.29 -6.98

0.00 970.85 10.53 970.69 -3.59 -7.12 967.29 0.00 967.29 -27.24

0.00 967.29 7.12 967.29 -27.24

7.12 967.29 10.12 970.29 -6.98

10.12 970.29 10.53 970.69 -0.25

-5.42 -69.02 63.60

10.53 970.69 11.62 970.68 -0.47 10.53 970.69 12.92 973.09 1.86

11.62 970.68 14.96 970.63 -1.53 12.92 973.09 15.21 973.09 4.52

14.96 970.63 15.21 970.63 -0.12

-2.12 6.38 -8.50

TOTAL AREAS(M2): 63.60 -16.20

5+120.00 -14.99 971.02 -10.83 970.95 -0.15 -14.99 973.04 -12.92 973.04 4.18

-12.92 973.04 -10.83 970.95 2.03

-0.15 6.21 -6.36

-10.83 970.95 -7.96 970.90 -0.28 -10.83 970.95 -10.12 970.24 -0.30

-7.96 970.90 0.00 970.78 -1.44 -10.12 970.24 -7.12 967.24 -6.85

0.00 970.78 10.53 970.65 -3.24 -7.12 967.24 0.00 967.24 -26.93

0.00 967.24 7.12 967.24 -26.93

7.12 967.24 10.12 970.24 -6.85

10.12 970.24 10.53 970.65 -0.24

-4.95 -68.09 63.13

10.53 970.65 12.51 970.62 -0.77 10.53 970.65 12.92 973.04 1.97

12.51 970.62 14.61 970.59 -0.87 12.92 973.04 15.32 973.04 4.84

14.61 970.59 15.88 970.57 -0.56 15.32 973.04 15.88 972.48 0.97

-2.20 7.78 -9.98

Página 75

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 63.13 -16.34

5+140.00 -15.03 970.93 -10.80 970.87 -0.13 -15.03 972.99 -12.92 972.99 4.34

-12.92 972.99 -10.80 970.87 2.12

-0.13 6.46 -6.59

-10.80 970.87 -8.95 970.84 -0.14 -10.80 970.87 -10.12 970.19 -0.27

-8.95 970.84 0.00 970.74 -1.23 -10.12 970.19 -7.12 967.19 -6.72

0.00 970.74 10.51 970.58 -2.82 -7.12 967.19 0.00 967.19 -26.63

0.00 967.19 7.12 967.19 -26.63

7.12 967.19 10.12 970.19 -6.72

10.12 970.19 10.51 970.58 -0.21

-4.19 -67.19 62.99

10.51 970.58 14.15 970.53 -1.37 10.51 970.58 12.92 972.99 2.06

14.15 970.53 14.69 970.52 -0.22 12.92 972.99 14.72 972.99 3.70

14.69 970.52 14.72 970.52 -0.01

-1.60 5.76 -7.36

TOTAL AREAS(M2): 62.99 -13.95

5+160.00 -15.19 970.83 -10.78 970.79 -0.09 -15.19 972.94 -12.92 972.94 4.78

-10.78 970.79 -10.77 970.79 0.00 -12.92 972.94 -10.77 970.79 2.22

-0.09 7.00 -7.09

-10.77 970.79 0.00 970.71 -0.91 -10.77 970.79 -10.12 970.14 -0.24

0.00 970.71 10.49 970.52 -2.33 -10.12 970.14 -7.12 967.14 -6.57

-7.12 967.14 0.00 967.14 -26.28

0.00 967.14 7.12 967.14 -26.28

7.12 967.14 10.12 970.14 -6.57

10.12 970.14 10.49 970.52 -0.19

-3.24 -66.15 62.90

10.49 970.52 12.14 970.49 -0.55 10.49 970.52 12.92 972.94 2.17

12.14 970.49 14.69 970.45 -0.94 12.92 972.94 15.32 972.94 5.06

14.69 970.45 15.84 970.47 -0.44 15.32 972.94 15.84 972.42 0.97

-1.92 8.20 -10.12

TOTAL AREAS(M2): 62.90 -17.21

5+180.00 -14.99 970.77 -11.11 970.74 -0.06 -14.99 972.90 -12.92 972.90 4.41

-11.11 970.74 -10.76 970.73 -0.01 -12.92 972.90 -10.76 970.73 2.26

-0.07 6.67 -6.74

-10.76 970.73 0.00 970.66 -0.75 -10.76 970.73 -10.12 970.10 -0.23

0.00 970.66 10.51 970.49 -2.03 -10.12 970.10 -7.12 967.10 -6.52

-7.12 967.10 0.00 967.10 -26.15

0.00 967.10 7.12 967.10 -26.15

7.12 967.10 10.12 970.10 -6.52

10.12 970.10 10.51 970.49 -0.19

-2.78 -65.75 62.97

10.51 970.49 11.80 970.47 -0.38 10.51 970.49 12.92 972.90 2.22

11.80 970.47 15.01 970.41 -1.05 12.92 972.90 15.14 972.90 4.72

15.01 970.41 15.14 970.42 -0.05

-1.48 6.94 -8.42

TOTAL AREAS(M2): 62.97 -15.16

5+200.00 -14.95 970.73 -10.78 970.71 -0.06 -14.95 972.85 -12.92 972.85 4.28

-12.92 972.85 -10.78 970.71 2.23

-0.06 6.51 -6.57

-10.78 970.71 -10.44 970.71 -0.01 -10.78 970.71 -10.12 970.05 -0.24

Página 76

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-10.44 970.71 0.00 970.63 -0.67 -10.12 970.05 -7.12 967.05 -6.56

0.00 970.63 10.49 970.41 -2.22 -7.12 967.05 0.00 967.05 -26.26

0.00 967.05 7.12 967.05 -26.26

7.12 967.05 10.12 970.05 -6.56

10.12 970.05 10.49 970.41 -0.18

-2.90 -66.06 63.16

10.49 970.41 12.68 970.37 -0.76 10.49 970.41 12.92 972.85 2.18

12.68 970.37 15.12 970.32 -0.96 12.92 972.85 15.12 972.85 4.65

-1.72 6.82 -8.54

TOTAL AREAS(M2): 63.16 -15.11

5+220.00 -16.07 970.70 -14.98 970.68 -0.01 -16.07 972.05 -15.32 972.80 1.29

-14.98 970.68 -10.78 970.66 -0.14 -15.32 972.80 -12.92 972.80 5.03

-12.92 972.80 -10.78 970.66 2.20

-0.15 8.52 -8.66

-10.78 970.66 -9.16 970.65 -0.08 -10.78 970.66 -10.12 970.00 -0.25

-9.16 970.65 0.00 970.58 -0.84 -10.12 970.00 -7.12 967.00 -6.61

0.00 970.58 10.48 970.35 -2.50 -7.12 967.00 0.00 967.00 -26.37

0.00 967.00 7.12 967.00 -26.37

7.12 967.00 10.12 970.00 -6.61

10.12 970.00 10.48 970.35 -0.19

-3.42 -66.40 62.98

10.48 970.35 15.37 970.25 -1.96 10.48 970.35 12.92 972.80 2.14

15.37 970.25 15.40 970.25 -0.02 12.92 972.80 15.32 972.80 5.03

15.32 972.80 15.40 972.72 0.17

-1.98 7.33 -9.31

TOTAL AREAS(M2): 62.98 -17.97

5+240.00 -15.59 970.67 -15.10 970.66 0.00 -15.59 972.49 -15.32 972.75 0.52

-15.10 970.66 -10.79 970.62 -0.13 -15.32 972.75 -12.92 972.75 4.99

-12.92 972.75 -10.79 970.62 2.16

-0.13 7.67 -7.79

-10.79 970.62 -7.85 970.59 -0.19 -10.79 970.62 -10.12 969.95 -0.26

-7.85 970.59 0.00 970.50 -0.98 -10.12 969.95 -7.12 966.95 -6.66

0.00 970.50 10.46 970.30 -2.87 -7.12 966.95 0.00 966.95 -26.49

0.00 966.95 7.12 966.95 -26.49

7.12 966.95 10.12 969.95 -6.66

10.12 969.95 10.46 970.30 -0.19

-4.03 -66.76 62.73

10.46 970.30 13.27 970.24 -1.13 10.46 970.30 12.92 972.75 2.09

13.27 970.24 15.53 970.19 -1.03 12.92 972.75 15.32 972.75 4.99

15.32 972.75 15.53 972.55 0.41

-2.16 7.49 -9.65

TOTAL AREAS(M2): 62.73 -17.45

5+260.00 -15.05 970.61 -10.78 970.56 -0.10 -15.05 972.70 -12.92 972.70 4.46

-12.92 972.70 -10.78 970.56 2.18

-0.10 6.64 -6.75

-10.78 970.56 -7.23 970.52 -0.25 -10.78 970.56 -10.12 969.90 -0.25

-7.23 970.52 0.00 970.46 -0.88 -10.12 969.90 -7.12 966.90 -6.63

0.00 970.46 10.43 970.22 -2.87 -7.12 966.90 0.00 966.90 -26.41

0.00 966.90 7.12 966.90 -26.41

7.12 966.90 10.12 969.90 -6.63

Página 77

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

10.12 969.90 10.43 970.22 -0.17

-4.00 -66.51 62.50

10.43 970.22 11.76 970.19 -0.55 10.43 970.22 12.92 972.70 2.11

11.76 970.19 15.19 970.11 -1.60 12.92 972.70 15.19 972.70 4.73

-2.14 6.84 -8.98

TOTAL AREAS(M2): 62.50 -15.73

5+280.00 -15.00 970.54 -10.77 970.50 -0.08 -15.00 972.66 -12.92 972.66 4.39

-12.92 972.66 -10.77 970.50 2.24

-0.08 6.63 -6.70

-10.77 970.50 -7.18 970.47 -0.18 -10.77 970.50 -10.12 969.86 -0.23

-7.18 970.47 0.00 970.41 -0.72 -10.12 969.86 -7.12 966.86 -6.55

0.00 970.41 10.44 970.18 -2.58 -7.12 966.86 0.00 966.86 -26.23

0.00 966.86 7.12 966.86 -26.23

7.12 966.86 10.12 969.86 -6.55

10.12 969.86 10.44 970.18 -0.17

-3.48 -65.97 62.49

10.44 970.18 11.39 970.16 -0.35 10.44 970.18 12.92 972.66 2.17

11.39 970.16 14.98 970.10 -1.47 12.92 972.66 15.22 972.66 4.87

14.98 970.10 15.22 970.10 -0.11

-1.93 7.04 -8.97

TOTAL AREAS(M2): 62.49 -15.68

5+300.00 -14.98 970.45 -10.72 970.41 -0.08 -14.98 972.61 -12.92 972.61 4.43

-12.92 972.61 -10.72 970.41 2.32

-0.08 6.76 -6.84

-10.72 970.41 -7.97 970.39 -0.14 -10.72 970.41 -10.12 969.81 -0.21

-7.97 970.39 0.00 970.31 -0.82 -10.12 969.81 -7.12 966.81 -6.43

0.00 970.31 10.46 970.14 -2.34 -7.12 966.81 0.00 966.81 -25.95

0.00 966.81 7.12 966.81 -25.95

7.12 966.81 10.12 969.81 -6.43

10.12 969.81 10.46 970.14 -0.16

-3.30 -65.13 61.82

10.46 970.14 12.13 970.12 -0.54 10.46 970.14 12.92 972.61 2.28

12.13 970.12 14.66 970.09 -0.89 12.92 972.61 15.32 972.61 5.17

14.66 970.09 15.73 970.07 -0.40 15.32 972.61 15.73 972.20 0.80

-1.82 8.25 -10.08

TOTAL AREAS(M2): 61.82 -16.91

5+320.00 -15.00 970.39 -10.71 970.35 -0.10 -15.00 972.56 -12.92 972.56 4.51

-12.92 972.56 -10.71 970.35 2.35

-0.10 6.85 -6.95

-10.71 970.35 -8.18 970.32 -0.15 -10.71 970.35 -10.12 969.76 -0.20

-8.18 970.32 0.00 970.22 -0.99 -10.12 969.76 -7.12 966.76 -6.40

0.00 970.22 10.46 970.10 -2.43 -7.12 966.76 0.00 966.76 -25.87

0.00 966.76 7.12 966.76 -25.87

7.12 966.76 10.12 969.76 -6.40

10.12 969.76 10.46 970.10 -0.16

-3.57 -64.90 61.33

10.46 970.10 12.92 970.07 -0.76 10.46 970.10 12.92 972.56 2.30

12.92 970.07 15.01 970.05 -0.70 12.92 972.56 15.10 972.56 4.72

15.01 970.05 15.10 970.05 -0.03

-1.50 7.02 -8.52

Página 78

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 61.33 -15.47

5+340.00 -15.01 970.36 -10.71 970.30 -0.12 -15.01 972.51 -12.92 972.51 4.51

-12.92 972.51 -10.71 970.30 2.32

-0.12 6.83 -6.95

-10.71 970.30 -8.94 970.28 -0.12 -10.71 970.30 -10.12 969.71 -0.21

-8.94 970.28 0.00 970.18 -1.16 -10.12 969.71 -7.12 966.71 -6.44

0.00 970.18 10.47 970.06 -2.49 -7.12 966.71 0.00 966.71 -25.96

0.00 966.71 7.12 966.71 -25.96

7.12 966.71 10.12 969.71 -6.44

10.12 969.71 10.47 970.06 -0.17

-3.77 -65.18 61.41

10.47 970.06 13.62 970.03 -0.98 10.47 970.06 12.92 972.51 2.28

13.62 970.03 14.69 970.02 -0.36 12.92 972.51 15.32 972.51 5.17

14.69 970.02 15.54 970.01 -0.29 15.32 972.51 15.54 972.29 0.45

-1.63 7.89 -9.52

TOTAL AREAS(M2): 61.41 -16.46

5+360.00 -15.82 970.32 -15.00 970.31 0.00 -15.82 971.97 -15.32 972.46 0.94

-15.00 970.31 -10.72 970.26 -0.14 -15.32 972.46 -12.92 972.46 5.15

-12.92 972.46 -10.72 970.26 2.30

-0.15 8.40 -8.55

-10.72 970.26 -9.02 970.24 -0.11 -10.72 970.26 -10.12 969.66 -0.21

-9.02 970.24 0.00 970.16 -1.05 -10.12 969.66 -7.12 966.66 -6.46

0.00 970.16 10.49 970.03 -2.31 -7.12 966.66 0.00 966.66 -26.01

0.00 966.66 7.12 966.66 -26.01

7.12 966.66 10.12 969.66 -6.46

10.12 969.66 10.49 970.03 -0.17

-3.47 -65.32 61.85

10.49 970.03 14.26 969.99 -1.15 10.49 970.03 12.92 972.46 2.26

14.26 969.99 15.03 969.98 -0.26 12.92 972.46 15.03 972.46 4.54

-1.41 6.80 -8.21

TOTAL AREAS(M2): 61.85 -16.76

5+380.00 -15.63 970.28 -15.21 970.27 0.00 -15.63 972.10 -15.32 972.42 0.62

-15.21 970.27 -10.74 970.23 -0.12 -15.32 972.42 -12.92 972.42 5.13

-12.92 972.42 -10.74 970.23 2.29

-0.12 8.04 -8.16

-10.74 970.23 -7.49 970.20 -0.20 -10.74 970.23 -10.12 969.62 -0.22

-7.49 970.20 0.00 970.13 -0.83 -10.12 969.62 -7.12 966.62 -6.49

0.00 970.13 10.50 970.00 -2.23 -7.12 966.62 0.00 966.62 -26.07

0.00 966.62 7.12 966.62 -26.07

7.12 966.62 10.12 969.62 -6.49

10.12 969.62 10.50 970.00 -0.18

-3.26 -65.51 62.25

10.50 970.00 12.55 969.97 -0.60 10.50 970.00 12.92 972.42 2.25

12.55 969.97 15.72 969.92 -1.06 12.92 972.42 15.32 972.42 5.13

15.72 969.92 15.85 969.92 -0.04 15.32 972.42 15.85 971.89 0.99

-1.70 8.36 -10.07

TOTAL AREAS(M2): 62.25 -18.23

5+400.00 -14.97 970.25 -10.77 970.21 -0.08 -14.97 972.37 -12.92 972.37 4.33

-12.92 972.37 -10.77 970.21 2.23

-0.08 6.57 -6.65

Página 79

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-10.77 970.21 -7.71 970.19 -0.16 -10.77 970.21 -10.12 969.57 -0.23

-7.71 970.19 0.00 970.12 -0.79 -10.12 969.57 -7.12 966.57 -6.56

0.00 970.12 10.48 969.93 -2.44 -7.12 966.57 0.00 966.57 -26.25

0.00 966.57 7.12 966.57 -26.25

7.12 966.57 10.12 969.57 -6.56

10.12 969.57 10.48 969.93 -0.18

-3.39 -66.03 62.63

10.48 969.93 11.62 969.91 -0.39 10.48 969.93 12.92 972.37 2.18

11.62 969.91 14.81 969.84 -1.22 12.92 972.37 15.32 972.37 5.07

14.81 969.84 15.44 969.83 -0.26 15.32 972.37 15.44 972.25 0.25

-1.87 7.50 -9.38

TOTAL AREAS(M2): 62.63 -16.03

5+420.00 -15.68 970.22 -14.99 970.20 0.00 -15.68 971.96 -15.32 972.32 0.68

-14.99 970.20 -10.77 970.17 -0.13 -15.32 972.32 -12.92 972.32 5.05

-12.92 972.32 -10.77 970.17 2.21

-0.13 7.94 -8.07

-10.77 970.17 -8.06 970.15 -0.16 -10.77 970.17 -10.12 969.52 -0.24

-8.06 970.15 0.00 970.07 -0.85 -10.12 969.52 -7.12 966.52 -6.59

0.00 970.07 10.45 969.85 -2.68 -7.12 966.52 0.00 966.52 -26.33

0.00 966.52 7.12 966.52 -26.33

7.12 966.52 10.12 969.52 -6.59

10.12 969.52 10.45 969.85 -0.17

-3.69 -66.25 62.56

10.45 969.85 12.26 969.81 -0.71 10.45 969.85 12.92 972.32 2.14

12.26 969.81 14.89 969.76 -1.14 12.92 972.32 14.89 972.32 4.15

-1.85 6.29 -8.14

TOTAL AREAS(M2): 62.56 -16.21

5+440.00 -15.72 970.17 -15.24 970.16 0.00 -15.72 971.87 -15.32 972.27 0.76

-15.24 970.16 -10.77 970.12 -0.14 -15.32 972.27 -12.92 972.27 5.04

-12.92 972.27 -10.77 970.12 2.20

-0.14 8.00 -8.14

-10.77 970.12 -6.91 970.08 -0.28 -10.77 970.12 -10.12 969.47 -0.24

-6.91 970.08 0.00 969.98 -0.97 -10.12 969.47 -7.12 966.47 -6.60

0.00 969.98 10.47 969.82 -2.84 -7.12 966.47 0.00 966.47 -26.35

0.00 966.47 7.12 966.47 -26.35

7.12 966.47 10.12 969.47 -6.60

10.12 969.47 10.47 969.82 -0.18

-4.09 -66.34 62.25

10.47 969.82 11.10 969.81 -0.23 10.47 969.82 12.92 972.27 2.14

11.10 969.81 15.48 969.75 -1.73 12.92 972.27 15.32 972.27 5.04

15.48 969.75 16.19 969.75 -0.30 15.32 972.27 16.19 971.40 1.44

-2.26 8.62 -10.88

TOTAL AREAS(M2): 62.25 -19.02

5+460.00 -15.01 970.09 -10.73 970.03 -0.12 -15.01 972.22 -12.92 972.22 4.45

-12.92 972.22 -10.73 970.03 2.28

-0.12 6.73 -6.85

-10.73 970.03 -8.48 970.00 -0.16 -10.73 970.03 -10.12 969.42 -0.22

-8.48 970.00 0.00 969.91 -1.15 -10.12 969.42 -7.12 966.42 -6.50

0.00 969.91 10.44 969.75 -2.74 -7.12 966.42 0.00 966.42 -26.10

0.00 966.42 7.12 966.42 -26.10

Página 80

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

7.12 966.42 10.12 969.42 -6.50

10.12 969.42 10.44 969.75 -0.16

-4.06 -65.58 61.53

10.44 969.75 11.60 969.73 -0.40 10.44 969.75 12.92 972.22 2.22

11.60 969.73 14.42 969.70 -1.06 12.92 972.22 15.32 972.22 5.12

14.42 969.70 16.87 969.71 -0.95 15.32 972.22 16.87 970.67 2.11

-2.41 9.45 -11.86

TOTAL AREAS(M2): 61.53 -18.71

5+480.00 -15.07 970.05 -10.74 970.00 -0.12 -15.07 972.18 -12.92 972.18 4.57

-12.92 972.18 -10.74 970.00 2.25

-0.12 6.83 -6.95

-10.74 970.00 -10.47 969.99 -0.02 -10.74 970.00 -10.12 969.38 -0.23

-10.47 969.99 0.00 969.85 -1.36 -10.12 969.38 -7.12 966.38 -6.53

0.00 969.85 10.47 969.72 -2.79 -7.12 966.38 0.00 966.38 -26.17

0.00 966.38 7.12 966.38 -26.17

7.12 966.38 10.12 969.38 -6.53

10.12 969.38 10.47 969.72 -0.17

-4.17 -65.81 61.64

10.47 969.72 14.60 969.67 -1.47 10.47 969.72 12.92 972.18 2.20

14.60 969.67 14.61 969.67 -0.01 12.92 972.18 14.61 972.18 3.59

-1.48 5.80 -7.27

TOTAL AREAS(M2): 61.64 -14.22

5+500.00 -15.05 970.02 -11.43 969.96 -0.09 -15.05 972.13 -12.92 972.13 4.49

-11.43 969.96 -10.75 969.95 -0.04 -12.92 972.13 -10.75 969.95 2.23

-0.13 6.72 -6.86

-10.75 969.95 0.00 969.78 -1.58 -10.75 969.95 -10.12 969.33 -0.23

0.00 969.78 10.49 969.69 -2.91 -10.12 969.33 -7.12 966.33 -6.56

-7.12 966.33 0.00 966.33 -26.26

0.00 966.33 7.12 966.33 -26.26

7.12 966.33 10.12 969.33 -6.56

10.12 969.33 10.49 969.69 -0.18

-4.49 -66.06 61.57

10.49 969.69 13.15 969.67 -0.89 10.49 969.69 12.92 972.13 2.18

13.15 969.67 14.91 969.65 -0.62 12.92 972.13 14.91 972.13 4.20

-1.51 6.38 -7.89

TOTAL AREAS(M2): 61.57 -14.74

5+520.00 -14.98 969.97 -11.11 969.90 -0.13 -14.98 972.08 -12.92 972.08 4.35

-11.11 969.90 -10.74 969.90 -0.03 -12.92 972.08 -10.74 969.90 2.23

-0.15 6.57 -6.73

-10.74 969.90 0.00 969.73 -1.66 -10.74 969.90 -10.12 969.28 -0.23

0.00 969.73 10.47 969.63 -3.03 -10.12 969.28 -7.12 966.28 -6.56

-7.12 966.28 0.00 966.28 -26.25

0.00 966.28 7.12 966.28 -26.25

7.12 966.28 10.12 969.28 -6.56

10.12 969.28 10.47 969.63 -0.18

-4.68 -66.04 61.36

10.47 969.63 13.60 969.59 -1.12 10.47 969.63 12.92 972.08 2.17

13.60 969.59 15.06 969.58 -0.55 12.92 972.08 15.06 972.08 4.53

-1.67 6.70 -8.37

TOTAL AREAS(M2): 61.36 -15.10

Página 81

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

5+540.00 -14.98 969.90 -10.73 969.85 -0.12 -14.98 972.03 -12.92 972.03 4.39

-12.92 972.03 -10.73 969.85 2.27

-0.12 6.66 -6.78

-10.73 969.85 -10.45 969.84 -0.02 -10.73 969.85 -10.12 969.23 -0.22

-10.45 969.84 0.00 969.72 -1.28 -10.12 969.23 -7.12 966.23 -6.51

0.00 969.72 10.50 969.62 -2.47 -7.12 966.23 0.00 966.23 -26.13

0.00 966.23 7.12 966.23 -26.13

7.12 966.23 10.12 969.23 -6.51

10.12 969.23 10.50 969.62 -0.18

-3.77 -65.70 61.93

10.50 969.62 14.76 969.57 -1.31 10.50 969.62 12.92 972.03 2.23

14.76 969.57 15.12 969.57 -0.12 12.92 972.03 15.12 972.03 4.69

-1.43 6.92 -8.35

TOTAL AREAS(M2): 61.93 -15.13

5+560.00 -15.00 969.89 -10.77 969.84 -0.11 -15.00 971.98 -12.92 971.98 4.35

-12.92 971.98 -10.77 969.84 2.19

-0.11 6.55 -6.66

-10.77 969.84 -10.37 969.83 -0.02 -10.77 969.84 -10.12 969.18 -0.25

-10.37 969.83 0.00 969.68 -1.40 -10.12 969.18 -7.12 966.18 -6.62

0.00 969.68 10.47 969.53 -2.97 -7.12 966.18 0.00 966.18 -26.39

0.00 966.18 7.12 966.18 -26.39

7.12 966.18 10.12 969.18 -6.62

10.12 969.18 10.47 969.53 -0.19

-4.39 -66.45 62.06

10.47 969.53 14.93 969.47 -1.73 10.47 969.53 12.92 971.98 2.13

14.93 969.47 15.00 969.47 -0.03 12.92 971.98 15.00 971.98 4.35

-1.76 6.48 -8.24

TOTAL AREAS(M2): 62.06 -14.90

5+580.00 -15.60 969.86 -15.02 969.84 0.00 -15.60 971.66 -15.32 971.94 0.54

-15.02 969.84 -10.77 969.78 -0.19 -15.32 971.94 -12.92 971.94 4.98

-12.92 971.94 -10.77 969.78 2.15

-0.20 7.67 -7.87

-10.77 969.78 -9.39 969.76 -0.12 -10.77 969.78 -10.12 969.14 -0.26

-9.39 969.76 0.00 969.65 -1.43 -10.12 969.14 -7.12 966.14 -6.67

0.00 969.65 10.47 969.49 -3.05 -7.12 966.14 0.00 966.14 -26.51

0.00 966.14 7.12 966.14 -26.51

7.12 966.14 10.12 969.14 -6.67

10.12 969.14 10.47 969.49 -0.19

-4.61 -66.82 62.21

10.47 969.49 13.99 969.43 -1.41 10.47 969.49 12.92 971.94 2.09

13.99 969.43 15.26 969.41 -0.56 12.92 971.94 15.26 971.94 4.85

-1.97 6.94 -8.91

TOTAL AREAS(M2): 62.21 -16.78

5+600.00 -15.23 969.82 -15.02 969.82 0.00 -15.23 971.89 -12.92 971.89 4.76

-15.02 969.82 -10.80 969.77 -0.13 -12.92 971.89 -10.80 969.77 2.13

-0.13 6.90 -7.03

-10.80 969.77 -8.91 969.75 -0.12 -10.80 969.77 -10.12 969.09 -0.27

-8.91 969.75 0.00 969.64 -1.15 -10.12 969.09 -7.12 966.09 -6.70

0.00 969.64 10.45 969.42 -3.07 -7.12 966.09 0.00 966.09 -26.58

0.00 966.09 7.12 966.09 -26.58

Página 82

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

7.12 966.09 10.12 969.09 -6.70

10.12 969.09 10.45 969.42 -0.19

-4.35 -67.01 62.67

10.45 969.42 13.04 969.36 -1.12 10.45 969.42 12.92 971.89 2.05

13.04 969.36 15.10 969.31 -0.99 12.92 971.89 15.10 971.89 4.50

-2.12 6.56 -8.67

TOTAL AREAS(M2): 62.67 -15.70

5+620.00 -15.06 969.78 -10.81 969.73 -0.11 -15.06 971.84 -12.92 971.84 4.39

-12.92 971.84 -10.81 969.73 2.11

-0.11 6.50 -6.61

-10.81 969.73 -8.26 969.70 -0.17 -10.81 969.73 -10.12 969.04 -0.27

-8.26 969.70 0.00 969.60 -1.11 -10.12 969.04 -7.12 966.04 -6.73

0.00 969.60 10.43 969.35 -3.22 -7.12 966.04 0.00 966.04 -26.65

0.00 966.04 7.12 966.04 -26.65

7.12 966.04 10.12 969.04 -6.73

10.12 969.04 10.43 969.35 -0.18

-4.49 -67.22 62.73

10.43 969.35 12.21 969.31 -0.80 10.43 969.35 12.92 971.84 2.02

12.21 969.31 15.21 969.25 -1.51 12.92 971.84 15.21 971.84 4.72

-2.31 6.74 -9.05

TOTAL AREAS(M2): 62.73 -15.66

5+640.00 -15.00 969.72 -10.79 969.66 -0.11 -15.00 971.79 -12.92 971.79 4.32

-12.92 971.79 -10.79 969.66 2.15

-0.11 6.47 -6.58

-10.79 969.66 -8.14 969.63 -0.19 -10.79 969.66 -10.12 968.99 -0.26

-8.14 969.63 0.00 969.55 -1.05 -10.12 968.99 -7.12 965.99 -6.68

0.00 969.55 10.45 969.32 -2.95 -7.12 965.99 0.00 965.99 -26.53

0.00 965.99 7.12 965.99 -26.53

7.12 965.99 10.12 968.99 -6.68

10.12 968.99 10.45 969.32 -0.19

-4.18 -66.85 62.67

10.45 969.32 11.75 969.30 -0.53 10.45 969.32 12.92 971.79 2.07

11.75 969.30 15.20 969.23 -1.57 12.92 971.79 15.32 971.79 4.98

15.20 969.23 15.77 969.23 -0.28 15.32 971.79 15.77 971.34 0.84

-2.39 7.89 -10.28

TOTAL AREAS(M2): 62.67 -16.86

5+660.00 -15.45 969.66 -12.20 969.63 -0.05 -15.45 971.62 -15.32 971.74 0.26

-12.20 969.63 -10.79 969.62 -0.06 -15.32 971.74 -12.92 971.74 4.99

-12.92 971.74 -10.79 969.62 2.16

-0.11 7.42 -7.52

-10.79 969.62 0.00 969.53 -0.99 -10.79 969.62 -10.12 968.94 -0.26

0.00 969.53 10.47 969.29 -2.66 -10.12 968.94 -7.12 965.94 -6.66

-7.12 965.94 0.00 965.94 -26.48

0.00 965.94 7.12 965.94 -26.48

7.12 965.94 10.12 968.94 -6.66

10.12 968.94 10.47 969.29 -0.19

-3.65 -66.74 63.09

10.47 969.29 12.89 969.24 -0.96 10.47 969.29 12.92 971.74 2.10

12.89 969.24 14.37 969.21 -0.65 12.92 971.74 15.32 971.74 4.99

14.37 969.21 17.62 969.21 -1.48 15.32 971.74 17.62 969.44 2.14

Página 83

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-3.09 9.23 -12.32

TOTAL AREAS(M2): 63.09 -19.84

5+680.00 -15.25 969.56 -15.15 969.56 0.00 -15.25 971.70 -12.92 971.70 4.97

-15.15 969.56 -10.77 969.54 -0.04 -12.92 971.70 -10.77 969.54 2.28

-0.04 7.25 -7.29

-10.77 969.54 0.00 969.51 -0.37 -10.77 969.54 -10.12 968.90 -0.22

0.00 969.51 10.50 969.28 -1.75 -10.12 968.90 -7.12 965.90 -6.49

-7.12 965.90 0.00 965.90 -26.09

0.00 965.90 7.12 965.90 -26.09

7.12 965.90 10.12 968.90 -6.49

10.12 968.90 10.50 969.28 -0.18

-2.12 -65.56 63.44

10.50 969.28 10.73 969.27 -0.06 10.50 969.28 12.92 971.70 2.24

10.73 969.27 14.97 969.18 -1.40 12.92 971.70 15.32 971.70 5.13

14.97 969.18 15.53 969.18 -0.21 15.32 971.70 15.53 971.48 0.43

-1.68 7.80 -9.48

TOTAL AREAS(M2): 63.44 -16.76

5+700.00 -15.00 969.56 -14.50 969.56 0.00 -15.00 971.65 -12.92 971.65 4.34

-14.50 969.56 -10.81 969.54 -0.04 -12.92 971.65 -10.81 969.54 2.18

-0.04 6.52 -6.57

-10.81 969.54 0.00 969.49 -0.51 -10.81 969.54 -10.12 968.85 -0.25

0.00 969.49 10.52 969.25 -2.01 -10.12 968.85 -7.12 965.85 -6.64

-7.12 965.85 0.00 965.85 -26.43

0.00 965.85 7.12 965.85 -26.43

7.12 965.85 10.12 968.85 -6.64

10.12 968.85 10.52 969.25 -0.21

-2.52 -66.58 64.06

10.52 969.25 10.58 969.25 -0.02 10.52 969.25 12.92 971.65 2.13

10.58 969.25 15.00 969.16 -1.58 12.92 971.65 15.00 971.65 4.34

-1.60 6.48 -8.07

TOTAL AREAS(M2): 64.06 -14.64

5+720.00 -15.09 969.55 -14.40 969.55 0.00 -15.09 971.60 -12.92 971.60 4.46

-14.40 969.55 -10.85 969.53 -0.05 -12.92 971.60 -10.85 969.53 2.10

-0.05 6.56 -6.61

-10.85 969.53 -0.09 969.47 -0.56 -10.85 969.53 -10.12 968.80 -0.28

-0.09 969.47 10.35 969.19 -2.31 -10.12 968.80 -7.12 965.80 -6.75

10.35 969.19 10.50 969.18 -0.06 -7.12 965.80 0.00 965.80 -26.69

0.00 965.80 7.12 965.80 -26.69

7.12 965.80 10.12 968.80 -6.75

10.12 968.80 10.50 969.18 -0.21

-2.92 -67.36 64.44

10.50 969.18 14.91 969.08 -1.84 10.50 969.18 12.92 971.60 2.04

12.92 971.60 14.91 971.60 4.08

-1.84 6.12 -7.96

TOTAL AREAS(M2): 64.44 -14.57

5+740.00 -15.13 969.50 -14.83 969.50 0.00 -15.13 971.55 -12.92 971.55 4.53

-14.83 969.50 -10.84 969.48 -0.05 -12.92 971.55 -10.84 969.48 2.11

-0.05 6.63 -6.68

-10.84 969.48 -0.12 969.42 -0.55 -10.84 969.48 -10.12 968.75 -0.28

-0.12 969.42 10.53 969.16 -2.24 -10.12 968.75 -7.12 965.75 -6.74

Página 84

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-7.12 965.75 0.00 965.75 -26.68

0.00 965.75 7.12 965.75 -26.68

7.12 965.75 10.12 968.75 -6.74

10.12 968.75 10.53 969.16 -0.22

-2.79 -67.35 64.57

10.53 969.16 10.59 969.16 -0.02 10.53 969.16 12.92 971.55 2.05

10.59 969.16 14.88 969.04 -1.71 12.92 971.55 14.88 971.55 4.01

-1.73 6.06 -7.80

TOTAL AREAS(M2): 64.57 -14.48

5+760.00 -15.00 969.48 -14.51 969.48 0.00 -15.00 971.50 -12.92 971.50 4.21

-14.51 969.48 -10.86 969.45 -0.07 -12.92 971.50 -10.86 969.45 2.05

-0.07 6.26 -6.33

-10.86 969.45 0.00 969.36 -0.84 -10.86 969.45 -10.12 968.70 -0.30

0.00 969.36 10.49 969.07 -2.77 -10.12 968.70 -7.12 965.70 -6.83

-7.12 965.70 0.00 965.70 -26.88

0.00 965.70 7.12 965.70 -26.88

7.12 965.70 10.12 968.70 -6.83

10.12 968.70 10.49 969.07 -0.22

-3.61 -67.94 64.33

10.49 969.07 10.57 969.07 -0.04 10.49 969.07 12.92 971.50 1.97

10.57 969.07 15.00 968.96 -2.06 12.92 971.50 15.00 971.50 4.21

-2.10 6.18 -8.27

TOTAL AREAS(M2): 64.33 -14.61

5+780.00 -15.00 969.47 -14.51 969.46 0.00 -15.00 971.46 -12.92 971.46 4.13

-14.51 969.46 -10.89 969.42 -0.09 -12.92 971.46 -10.89 969.42 1.97

-0.10 6.11 -6.20

-10.89 969.42 0.00 969.30 -1.17 -10.89 969.42 -10.12 968.66 -0.33

0.00 969.30 10.50 969.04 -3.16 -10.12 968.66 -7.12 965.66 -6.94

-7.12 965.66 0.00 965.66 -27.15

0.00 965.66 7.12 965.66 -27.15

7.12 965.66 10.12 968.66 -6.94

10.12 968.66 10.50 969.04 -0.24

-4.33 -68.73 64.41

10.50 969.04 10.57 969.03 -0.03 10.50 969.04 12.92 971.46 1.88

10.57 969.03 15.00 968.92 -2.19 12.92 971.46 15.00 971.46 4.13

-2.22 6.01 -8.23

TOTAL AREAS(M2): 64.41 -14.44

5+800.00 -15.00 969.41 -14.51 969.40 0.00 -15.00 971.41 -12.92 971.41 4.16

-14.51 969.40 -10.87 969.36 -0.11 -12.92 971.41 -10.87 969.36 2.00

-0.11 6.16 -6.26

-10.87 969.36 0.00 969.22 -1.29 -10.87 969.36 -10.12 968.61 -0.32

0.00 969.22 10.48 968.97 -3.26 -10.12 968.61 -7.12 965.61 -6.90

-7.12 965.61 0.00 965.61 -27.06

0.00 965.61 7.12 965.61 -27.06

7.12 965.61 10.12 968.61 -6.90

10.12 968.61 10.48 968.97 -0.23

-4.55 -68.46 63.91

10.48 968.97 10.57 968.97 -0.04 10.48 968.97 12.92 971.41 1.90

10.57 968.97 15.00 968.86 -2.18 12.92 971.41 15.00 971.41 4.16

-2.22 6.06 -8.28

Página 85

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 63.91 -14.55

5+820.00 -15.00 969.33 -14.51 969.32 0.00 -15.00 971.36 -12.92 971.36 4.23

-14.51 969.32 -10.84 969.28 -0.10 -12.92 971.36 -10.84 969.28 2.06

-0.10 6.29 -6.39

-10.84 969.28 0.00 969.15 -1.21 -10.84 969.28 -10.12 968.56 -0.29

0.00 969.15 10.47 968.91 -3.10 -10.12 968.56 -7.12 965.56 -6.80

-7.12 965.56 0.00 965.56 -26.83

0.00 965.56 7.12 965.56 -26.83

7.12 965.56 10.12 968.56 -6.80

10.12 968.56 10.47 968.91 -0.21

-4.31 -67.77 63.46

10.47 968.91 10.57 968.91 -0.04 10.47 968.91 12.92 971.36 1.98

10.57 968.91 15.00 968.81 -2.08 12.92 971.36 15.00 971.36 4.23

-2.12 6.20 -8.32

TOTAL AREAS(M2): 63.46 -14.71

5+840.00 -15.00 969.24 -14.51 969.24 0.00 -15.00 971.31 -12.92 971.31 4.31

-14.51 969.24 -10.81 969.21 -0.07 -12.92 971.31 -10.81 969.21 2.15

-0.07 6.46 -6.53

-10.81 969.21 0.00 969.12 -0.85 -10.81 969.21 -10.12 968.51 -0.26

0.00 969.12 10.46 968.85 -2.67 -10.12 968.51 -7.12 965.51 -6.68

-7.12 965.51 0.00 965.51 -26.54

0.00 965.51 7.12 965.51 -26.54

7.12 965.51 10.12 968.51 -6.68

10.12 968.51 10.46 968.85 -0.19

-3.52 -66.89 63.38

10.46 968.85 10.58 968.85 -0.05 10.46 968.85 12.92 971.31 2.07

10.58 968.85 15.00 968.74 -1.97 12.92 971.31 15.00 971.31 4.31

-2.01 6.38 -8.40

TOTAL AREAS(M2): 63.38 -14.93

5+860.00 -15.00 969.22 -14.51 969.21 0.00 -15.00 971.26 -12.92 971.26 4.25

-14.51 969.21 -10.83 969.17 -0.09 -12.92 971.26 -10.83 969.17 2.09

-0.09 6.34 -6.44

-10.83 969.17 0.00 969.06 -1.09 -10.83 969.17 -10.12 968.46 -0.28

0.00 969.06 10.44 968.78 -3.11 -10.12 968.46 -7.12 965.46 -6.76

-7.12 965.46 0.00 965.46 -26.73

0.00 965.46 7.12 965.46 -26.73

7.12 965.46 10.12 968.46 -6.76

10.12 968.46 10.44 968.78 -0.19

-4.20 -67.47 63.27

10.44 968.78 10.58 968.78 -0.06 10.44 968.78 12.92 971.26 2.00

10.58 968.78 15.00 968.66 -2.23 12.92 971.26 15.00 971.26 4.25

-2.29 6.25 -8.54

TOTAL AREAS(M2): 63.27 -14.98

5+880.00 -15.00 969.17 -14.51 969.16 0.00 -15.00 971.22 -12.92 971.22 4.26

-14.51 969.16 -10.82 969.12 -0.11 -12.92 971.22 -10.82 969.12 2.09

-0.11 6.35 -6.46

-10.82 969.12 0.00 968.98 -1.31 -10.82 969.12 -10.12 968.42 -0.28

0.00 968.98 10.43 968.73 -3.27 -10.12 968.42 -7.12 965.42 -6.76

-7.12 965.42 0.00 965.42 -26.72

0.00 965.42 7.12 965.42 -26.72

Página 86

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

7.12 965.42 10.12 968.42 -6.76

10.12 968.42 10.43 968.73 -0.19

-4.57 -67.42 62.85

10.43 968.73 10.58 968.73 -0.06 10.43 968.73 12.92 971.22 2.00

10.58 968.73 15.00 968.62 -2.20 12.92 971.22 15.00 971.22 4.26

-2.26 6.26 -8.52

TOTAL AREAS(M2): 62.85 -14.99

5+900.00 -15.00 969.12 -14.51 969.11 0.00 -15.00 971.17 -12.92 971.17 4.26

-14.51 969.11 -10.81 969.06 -0.12 -12.92 971.17 -10.81 969.06 2.10

-0.12 6.36 -6.48

-10.81 969.06 0.00 968.92 -1.38 -10.81 969.06 -10.12 968.37 -0.28

0.00 968.92 10.41 968.66 -3.45 -10.12 968.37 -7.12 965.37 -6.75

-7.12 965.37 0.00 965.37 -26.70

0.00 965.37 7.12 965.37 -26.70

7.12 965.37 10.12 968.37 -6.75

10.12 968.37 10.41 968.66 -0.17

-4.84 -67.37 62.53

10.41 968.66 10.58 968.65 -0.08 10.41 968.66 12.92 971.17 1.99

10.58 968.65 15.00 968.54 -2.31 12.92 971.17 15.00 971.17 4.26

-2.39 6.26 -8.64

TOTAL AREAS(M2): 62.53 -15.12

5+920.00 -14.99 969.07 -14.51 969.06 0.00 -14.99 971.12 -12.92 971.12 4.25

-14.51 969.06 -10.82 969.02 -0.10 -12.92 971.12 -10.82 969.02 2.10

-0.10 6.36 -6.46

-10.82 969.02 0.00 968.89 -1.26 -10.82 969.02 -10.12 968.32 -0.28

0.00 968.89 10.38 968.58 -3.49 -10.12 968.32 -7.12 965.32 -6.74

-7.12 965.32 0.00 965.32 -26.69

0.00 965.32 7.12 965.32 -26.69

7.12 965.32 10.12 968.32 -6.74

10.12 968.32 10.38 968.58 -0.16

-4.75 -67.30 62.55

10.38 968.58 10.57 968.57 -0.10 10.38 968.58 12.92 971.12 1.99

10.57 968.57 15.00 968.46 -2.45 12.92 971.12 15.00 971.12 4.27

-2.55 6.25 -8.80

TOTAL AREAS(M2): 62.55 -15.26

5+940.00 -15.38 968.99 -12.86 968.96 -0.03 -15.38 971.01 -15.32 971.07 0.12

-12.86 968.96 -10.80 968.95 -0.06 -15.32 971.07 -12.92 971.07 5.01

-12.92 971.07 -10.80 968.95 2.18

-0.09 7.31 -7.40

-10.80 968.95 0.00 968.86 -0.86 -10.80 968.95 -10.12 968.27 -0.25

0.00 968.86 9.03 968.59 -2.35 -10.12 968.27 -7.12 965.27 -6.64

9.03 968.59 10.40 968.55 -0.57 -7.12 965.27 0.00 965.27 -26.44

0.00 965.27 7.12 965.27 -26.44

7.12 965.27 10.12 968.27 -6.64

10.12 968.27 10.40 968.55 -0.16

-3.78 -66.56 62.78

10.40 968.55 15.10 968.41 -2.38 10.40 968.55 12.92 971.07 2.08

15.10 968.41 15.79 968.41 -0.40 12.92 971.07 15.32 971.07 5.01

15.32 971.07 15.79 970.60 0.87

-2.78 7.96 -10.74

Página 87

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 62.78 -18.14

5+960.00 -15.33 968.94 -15.11 968.95 0.00 -15.33 971.01 -15.32 971.02 0.03

-15.11 968.95 -11.93 968.91 -0.03 -15.32 971.02 -12.92 971.02 5.00

-11.93 968.91 -10.80 968.91 -0.03 -12.92 971.02 -10.80 968.91 2.17

-0.07 7.20 -7.27

-10.80 968.91 0.00 968.81 -0.87 -10.80 968.91 -10.12 968.22 -0.26

0.00 968.81 8.74 968.56 -2.21 -10.12 968.22 -7.12 965.22 -6.65

8.74 968.56 10.41 968.51 -0.67 -7.12 965.22 0.00 965.22 -26.46

0.00 965.22 7.12 965.22 -26.46

7.12 965.22 10.12 968.22 -6.65

10.12 968.22 10.41 968.51 -0.16

-3.75 -66.62 62.87

10.41 968.51 15.01 968.37 -2.30 10.41 968.51 12.92 971.02 2.08

15.01 968.37 15.30 968.37 -0.16 12.92 971.02 15.30 971.02 4.95

-2.46 7.03 -9.49

TOTAL AREAS(M2): 62.87 -16.76

5+980.00 -16.04 968.88 -14.65 968.92 0.02 -16.04 970.25 -15.32 970.98 1.25

-14.65 968.92 -13.52 968.90 0.03 -15.32 970.98 -12.92 970.98 5.03

-13.52 968.90 -10.82 968.87 0.02 -12.92 970.98 -10.82 968.87 2.19

0.08 8.47 -8.40

-10.82 968.87 0.00 968.75 -0.73 -10.82 968.87 -10.12 968.18 -0.25

0.00 968.75 10.42 968.48 -2.77 -10.12 968.18 -7.12 965.18 -6.62

-7.12 965.18 0.00 965.18 -26.38

0.00 965.18 7.12 965.18 -26.38

7.12 965.18 10.12 968.18 -6.62

10.12 968.18 10.42 968.48 -0.17

-3.50 -66.42 62.92

10.42 968.48 10.43 968.48 0.00 10.42 968.48 12.92 970.98 2.11

10.43 968.48 15.01 968.34 -2.16 12.92 970.98 15.01 970.98 4.38

-2.16 6.49 -8.65

TOTAL AREAS(M2): 62.92 -17.05

6+000.00 -14.99 968.82 -14.40 968.81 0.00 -14.99 970.93 -12.92 970.93 4.36

-14.40 968.81 -10.78 968.79 -0.06 -12.92 970.93 -10.78 968.79 2.23

-0.06 6.59 -6.65

-10.78 968.79 0.00 968.71 -0.76 -10.78 968.79 -10.12 968.13 -0.24

0.00 968.71 10.38 968.39 -2.81 -10.12 968.13 -7.12 965.13 -6.57

-7.12 965.13 0.00 965.13 -26.27

0.00 965.13 7.12 965.13 -26.27

7.12 965.13 10.12 968.13 -6.57

10.12 968.13 10.38 968.39 -0.15

-3.57 -66.06 62.49

10.38 968.39 10.68 968.38 -0.13 10.38 968.39 12.92 970.93 2.13

10.68 968.38 15.00 968.26 -2.16 12.92 970.93 15.32 970.93 5.07

15.00 968.26 16.80 968.28 -0.99 15.32 970.93 16.80 969.45 2.03

-3.28 9.23 -12.51

TOTAL AREAS(M2): 62.49 -19.16

6+020.00 -15.97 968.74 -15.80 968.73 0.00 -15.97 970.23 -15.32 970.88 1.18

-15.80 968.73 -10.88 968.70 -0.09 -15.32 970.88 -12.92 970.88 5.14

-10.88 968.70 -10.74 968.70 0.00 -12.92 970.88 -10.74 968.70 2.30

-0.09 8.62 -8.71

Página 88

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

-10.74 968.70 0.00 968.66 -0.57 -10.74 968.70 -10.12 968.08 -0.22

0.00 968.66 7.61 968.43 -1.44 -10.12 968.08 -7.12 965.08 -6.47

7.61 968.43 10.40 968.36 -0.95 -7.12 965.08 0.00 965.08 -26.04

0.00 965.08 7.12 965.08 -26.04

7.12 965.08 10.12 968.08 -6.47

10.12 968.08 10.40 968.36 -0.14

-2.96 -65.37 62.40

10.40 968.36 15.62 968.21 -2.37 10.40 968.36 12.92 970.88 2.22

15.62 968.21 16.53 968.22 -0.47 12.92 970.88 15.32 970.88 5.14

15.32 970.88 16.53 969.67 1.86

-2.85 9.23 -12.08

TOTAL AREAS(M2): 62.40 -20.79

6+040.00 -15.34 968.73 -14.91 968.72 0.00 -15.34 970.81 -15.32 970.83 0.04

-14.91 968.72 -10.77 968.69 -0.10 -15.32 970.83 -12.92 970.83 5.05

-12.92 970.83 -10.77 968.69 2.22

-0.10 7.31 -7.41

-10.77 968.69 -9.82 968.68 -0.04 -10.77 968.69 -10.12 968.03 -0.24

-9.82 968.68 0.00 968.62 -0.78 -10.12 968.03 -7.12 965.03 -6.58

0.00 968.62 7.71 968.37 -1.79 -7.12 965.03 0.00 965.03 -26.30

7.71 968.37 10.38 968.29 -1.05 0.00 965.03 7.12 965.03 -26.30

7.12 965.03 10.12 968.03 -6.58

10.12 968.03 10.38 968.29 -0.15

-3.66 -66.16 62.51

10.38 968.29 14.96 968.15 -2.31 10.38 968.29 12.92 970.83 2.12

12.92 970.83 14.96 970.83 4.30

-2.31 6.42 -8.73

TOTAL AREAS(M2): 62.51 -16.14

6+060.00 -15.02 968.69 -10.79 968.66 -0.07 -15.02 970.78 -12.92 970.78 4.40

-12.92 970.78 -10.79 968.66 2.19

-0.07 6.59 -6.66

-10.79 968.66 -9.93 968.65 -0.03 -10.79 968.66 -10.12 967.98 -0.25

-9.93 968.65 0.00 968.57 -0.82 -10.12 967.98 -7.12 964.98 -6.62

0.00 968.57 7.69 968.31 -1.96 -7.12 964.98 0.00 964.98 -26.39

7.69 968.31 10.36 968.22 -1.14 0.00 964.98 7.12 964.98 -26.39

7.12 964.98 10.12 967.98 -6.62

10.12 967.98 10.36 968.22 -0.14

-3.95 -66.41 62.46

10.36 968.22 15.01 968.07 -2.53 10.36 968.22 12.92 970.78 2.08

12.92 970.78 15.01 970.78 4.37

-2.53 6.45 -8.99

TOTAL AREAS(M2): 62.46 -15.64

6+080.00 -15.46 968.60 -15.08 968.61 0.00 -15.46 970.59 -15.32 970.74 0.29

-15.08 968.61 -10.77 968.59 -0.02 -15.32 970.74 -12.92 970.74 5.12

-12.92 970.74 -10.77 968.59 2.28

-0.02 7.69 -7.71

-10.77 968.59 -9.53 968.58 -0.03 -10.77 968.59 -10.12 967.94 -0.22

-9.53 968.58 0.00 968.52 -0.53 -10.12 967.94 -7.12 964.94 -6.50

0.00 968.52 7.33 968.28 -1.51 -7.12 964.94 0.00 964.94 -26.11

7.33 968.28 10.37 968.18 -1.13 0.00 964.94 7.12 964.94 -26.11

7.12 964.94 10.12 967.94 -6.50

Página 89

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

10.12 967.94 10.37 968.18 -0.13

-3.20 -65.57 62.37

10.37 968.18 15.05 968.03 -2.33 10.37 968.18 12.92 970.74 2.19

12.92 970.74 15.05 970.74 4.54

-2.33 6.73 -9.06

TOTAL AREAS(M2): 62.37 -16.77

6+100.00 -15.66 968.56 -14.82 968.57 0.01 -15.66 970.35 -15.32 970.69 0.67

-14.82 968.57 -10.78 968.55 0.01 -15.32 970.69 -12.92 970.69 5.12

-12.92 970.69 -10.78 968.55 2.27

0.02 8.06 -8.04

-10.78 968.55 -10.02 968.54 -0.01 -10.78 968.55 -10.12 967.89 -0.22

-10.02 968.54 0.00 968.48 -0.46 -10.12 967.89 -7.12 964.89 -6.50

0.00 968.48 7.99 968.24 -1.58 -7.12 964.89 0.00 964.89 -26.12

7.99 968.24 10.39 968.16 -0.86 0.00 964.89 7.12 964.89 -26.12

7.12 964.89 10.12 967.89 -6.50

10.12 967.89 10.39 968.16 -0.14

-2.91 -65.61 62.70

10.39 968.16 14.94 968.01 -2.14 10.39 968.16 12.92 970.69 2.19

12.92 970.69 14.94 970.69 4.30

-2.14 6.49 -8.63

TOTAL AREAS(M2): 62.70 -16.68

6+120.00 -15.00 968.50 -10.77 968.49 -0.02 -15.00 970.64 -12.92 970.64 4.45

-12.92 970.64 -10.77 968.49 2.29

-0.02 6.74 -6.77

-10.77 968.49 -10.38 968.49 0.00 -10.77 968.49 -10.12 967.84 -0.22

-10.38 968.49 0.00 968.43 -0.41 -10.12 967.84 -7.12 964.84 -6.48

0.00 968.43 8.10 968.19 -1.53 -7.12 964.84 0.00 964.84 -26.05

8.10 968.19 10.40 968.12 -0.79 0.00 964.84 7.12 964.84 -26.05

7.12 964.84 10.12 967.84 -6.48

10.12 967.84 10.40 968.12 -0.15

-2.73 -65.43 62.69

10.40 968.12 15.00 967.99 -2.04 10.40 968.12 12.92 970.64 2.22

15.00 967.99 15.44 967.99 -0.23 12.92 970.64 15.32 970.64 5.14

15.32 970.64 15.44 970.52 0.25

-2.27 7.61 -9.88

TOTAL AREAS(M2): 62.69 -16.64

6+140.00 -15.17 968.44 -10.76 968.43 -0.03 -15.17 970.59 -12.92 970.59 4.85

-12.92 970.59 -10.76 968.43 2.32

-0.03 7.16 -7.19

-10.76 968.43 -9.78 968.43 -0.01 -10.76 968.43 -10.12 967.79 -0.21

-9.78 968.43 0.00 968.41 -0.21 -10.12 967.79 -7.12 964.79 -6.44

0.00 968.41 7.49 968.19 -1.05 -7.12 964.79 0.00 964.79 -25.97

7.49 968.19 10.43 968.10 -0.86 0.00 964.79 7.12 964.79 -25.97

7.12 964.79 10.12 967.79 -6.44

10.12 967.79 10.43 968.10 -0.15

-2.13 -65.18 63.05

10.43 968.10 15.09 967.97 -1.88 10.43 968.10 12.92 970.59 2.26

15.09 967.97 15.40 967.97 -0.14 12.92 970.59 15.32 970.59 5.17

15.32 970.59 15.40 970.51 0.17

-2.03 7.60 -9.63

Página 90

Areas 12/12/2015 17:15

MEMORIA DE CALCULO DE AREAS DE CORTE Y TERRAPLEN

Obra: RIO SAN CARLOS

Autor: ORLANDO LEON

AREA(M2)

�������

OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) OFFSET(M) ELEV(M) CORTE TERRAPLEN

SEGMENTOS RASANTE

INICIAL FINAL

A2(M2) AREA

BAJO

SEGMENTO

�������ESTACION

SEGMENTOS TERRENO

INICIAL FINAL

A1(M2) AREA

BAJO

SEGMENTO

�������

TOTAL AREAS(M2): 63.05 -16.82

6+160.00 -15.00 968.43 -10.78 968.41 -0.04 -15.00 970.54 -12.92 970.54 4.41

-12.92 970.54 -10.78 968.41 2.24

-0.04 6.65 -6.69

-10.78 968.41 -9.47 968.40 -0.03 -10.78 968.41 -10.12 967.74 -0.23

-9.47 968.40 0.00 968.37 -0.40 -10.12 967.74 -7.12 964.74 -6.55

0.00 968.37 7.41 968.16 -1.21 -7.12 964.74 0.00 964.74 -26.22

7.41 968.16 10.44 968.07 -0.95 0.00 964.74 7.12 964.74 -26.22

7.12 964.74 10.12 967.74 -6.55

10.12 967.74 10.44 968.07 -0.17

-2.60 -65.92 63.33

10.44 968.07 15.00 967.93 -1.94 10.44 968.07 12.92 970.54 2.18

12.92 970.54 15.00 970.54 4.41

-1.94 6.59 -8.53

TOTAL AREAS(M2): 63.33 -15.22

6+180.00 -15.00 968.37 -10.79 968.36 -0.02 -15.00 970.50 -12.92 970.50 4.42

-12.92 970.50 -10.79 968.36 2.26

-0.02 6.68 -6.70

-10.79 968.36 -9.47 968.36 -0.01 -10.79 968.36 -10.12 967.70 -0.23

-9.47 968.36 0.00 968.31 -0.33 -10.12 967.70 -7.12 964.70 -6.52

0.00 968.31 7.41 968.09 -1.24 -7.12 964.70 0.00 964.70 -26.16

7.41 968.09 10.43 968.01 -0.97 0.00 964.70 7.12 964.70 -26.16

7.12 964.70 10.12 967.70 -6.52

10.12 967.70 10.43 968.01 -0.16

-2.55 -65.74 63.19

10.43 968.01 15.00 967.88 -1.96 10.43 968.01 12.92 970.50 2.19

12.92 970.50 15.00 970.50 4.42

-1.96 6.62 -8.58

TOTAL AREAS(M2): 63.19 -15.28

Página 91