1

MINISTÉRIO DO DESENVOLVIMENTO AGRÁRIO - MDA

INSTITUTO NACIONAL DE COLONIZAÇÃO E REFORMA AGRÁRIA INCRA

SUPERINTENDÊNCIA REGIONAL DO RIO GRANDE DO SUL - SR 11 / RS

MEMORIAL DE CALCULO

UMBU – PIRATINI

2

1. Apresentação ................................................................................................................ 3

2. Referências Normativas ............................................................................................... 3

3. Terminologia ................................................................................................................. 4

4. Demanda Hidráulica ................................................................................................. 5

5. Fator de Consumo .................................................................................................... 5

6. Perda de Carga .......................................................................................................... 7

7. Disposição Geral da Rede de Abastecimento ............................................................ 7

8. Comportamento da Rede............................................................................................. 9

3

1. Apresentação

Este memorial tem por finalidade apresentar as bases fundamentadas para o

dimensionamento e escolhas utilizadas no projeto do sistema de abastecimento de água do

assentamento de Piratini, no Município de Umbu - RS.

2. Referências Normativas

A presente especificação técnica possui referências nas seguintes normas

2.1. Da ABNT:

NBR 5626 – Instalação predial de água fria.

NBR 12211 – Estudos de concepção de sistemas públicos de abastecimento de

água.

NBR 12212 – Projeto de poço para captação de água subterrânea.

NBR 12214 – Projeto de sistema de bombeamento de água para abastecimento

público.

NBR 12217 – Projeto de reservatório de distribuição de água para abastecimento

público.

NBR 12218 – Projeto de rede de distribuição de água para abastecimento

público.

NBR 12266 – Projeto e execução de valas para assentamento de tubulação de

água, esgoto ou drenagem urbana.

2.2. Da CORSAN/RS:

Regulamento dos Serviços de Água e de Esgoto (RSAE) - Resolução 1093 da

Agência Estadual de Regulação dos Serviços Públicos Delegados do Rio Grande

do Sul (AGERGS).

4

2.3. Do INCRA/RS:

Norma de Execução nº 54 – Dispõe sobre a implantação de obras de engenharia

componentes de infra-estrutura básica de projetos de assentamento.

2.4. Atualização:

Cada referência citada neste texto deve ser observada em sua edição em vigor, desde

que mantidos os mesmos objetivos da data de aprovação da presente Norma.

3. Terminologia

Para efeito deste memorial, são adotadas as seguintes definições:

REDE DE DISTRIBUIÇÃO - Parte do sistema de abastecimento formada de tubulações

e órgãos acessórios, destinada a colocar água potável à disposição dos consumidores, de

forma contínua, em quantidade e pressão recomendadas.

CONSUMO – Quantidade de água utilizada por uma unidade consumidora, expressa

em unidade de volume por unidade de tempo;

VAZÃO DE PROJETO – Vazão determinada para funcionamento da rede de

abastecimento na pior hipótese possível de trabalho, expressa em litros por segundo;

PRESSÃO ESTÁTICA – Pressão de trabalho da rede de abastecimento na hipótese de

consumo nulo, expresso em M.C.A (metro de coluna d’água);

PRESSÃO DINÂMICA – Pressão de trabalho da rede de abastecimento na hipótese de

consumo não nulo, expresso em M.C.A (metro de coluna d’água);

PERDA DE CARGA – Perda de pressão na rede de abastecimento devido ao atrito da

água com as tubulações e órgãos acessórios, expresso em m/km;

5

PROJETO EXECUTIVO - Conjunto dos elementos necessários e suficientes à

execução completa da obra, de acordo com as normas pertinentes da Associação Brasileira

de Normas Técnicas – ABNT.

4. Demanda Hidráulica

Será estabelecido um consumo por pessoa de 150l/dia (incluindo neste insumo perdas

de água, naturais nestes sistemas), projeção um pouco acima ao creditado a famílias em

zonas de características rurais.

Para fins de cálculo da demanda considerou-se a capacidade máxima do

Assentamento, considerando-se o número de lotes multiplicado por cinco. Portanto, a

população considerada é de 170 pessoas, com um consumo diário teórico total de 25,50 m³

de água.

A vazão média teórica total no final do plano de atuação será de aproximadamente

(25.500 / 24 x 60 x 60) 0,29514 L/s, muito baixo em comparação a outros sistemas de

abastecimento de água.

Será creditada uma taxa sazonal e diária de pico de consumo de 1.5, razoável para o

tipo de consumo existente, tendo, portanto, um consumo de pico total teórico de

aproximadamente (0,29514 x 1.5) 0,44271 L/s.

Como solicita a ABNT, será creditada uma taxa de erro de 1.2 ao cálculo de pico final,

concluindo que, teoricamente, a rede de abastecimento trabalhará no pior caso, com uma

vazão total de aproximadamente (0,44271 x 1.2) 0,53125 L/s.

A perda de carga com a vazão requerida pelo sistema é baixa ao utilizar tubulações de

médio diâmetro nos trechos principais.

5. Fator de Consumo

Existem diferenças nas taxas de consumo de uma unidade consumidora de acordo

com o horário, mostrando seu pico durante o dia e baixo consumo durante a noite.

6

Tendo em vista esta variação, será estabelecido um fator de consumo em relação a

média diária de acordo com o horário analizado:

1:00h = 50% consumo diário;

2:00h = 40% consumo diário;

3:00h = 40% consumo diário;

4:00h = 60% consumo diário;

5:00h = 65% consumo diário;

6:00h = 70% consumo diário;

7:00h = 80% consumo diário;

8:00h = 85% consumo diário;

9:00h = 90% consumo diário;

10:00h = 130% consumo diário;

11:00h = 150% consumo diário;

12:00h = 180% consumo diário;

13:00h = 160% consumo diário;

14:00h = 140% consumo diário;

15:00h = 150% consumo diário;

16:00h = 160% consumo diário;

17:00h = 180% consumo diário;

18:00h = 130% consumo diário;

19:00h = 100% consumo diário;

20:00h = 90% consumo diário;

21:00h = 75% consumo diário;

22:00h = 60% consumo diário;

7

23:00h = 55% consumo diário;

24:00h = 50% consumo diário.

6. Perda de Carga

Para os cálculos de perda de carga foram utilizadas as formulas de Hazen-Williams.

O projeto foi concebido para ser executado em PVC, devido as baixas vazões

apresentadas, e nos cálculos foi atribuído um coeficiente de rugosidade para estas

tubulações de 130, caracterizadas para tubos já desgastados.

7. Disposição Geral da Rede de Abastecimento

Trecho (ID) Início (Nó) Fim (Nó) Comprimento (m) Diâmetro (mm)

T1 U1 3 12 50

T2 U2 U1 696.1 75

8

T3 U3 U2 693.1 75

T4 U4 U3 511.3 75

T5A PV2 U4 206.9 75

T5B PV2 U5 48.6 75

T6 U5 U6 147.1 75

T7 U6 U7 618.4 75

T8 U8 PV2 1003.1 75

T9 U9 A7 454.1 75

T10 U10 U9 305.7 75

T11 U11 U10 32.1 75

T12 U12 U11 243.3 75

T13 U13 U12 38.8 75

T14 U14 U13 1513.9 75

T15 U15 U14 46.8 75

T16 U16 U15 1148.7 75

T17 U17 U16 268.1 75

T18 U18 A6 409.8 75

T19 U19 U18 116.1 75

T20 U20 U19 132.4 75

T21 U21 U20 45.1 75

T22 U22 U21 230.5 75

T23 U23 U22 388.6 75

T24 U23 PV6 384.1 75

T25 PV6 U24 119.5 75

T25B U24 U25 340.2 75

T26 U25 A3 779.2 75

T27 U26 U27 55.9 75

T28 U27 U28 421.5 75

T29 U28 U29 34.3 75

T30 U29 A4 435.6 75

T31 PV6 U31 1211.3 75

T32 U31 U32 64.5 75

T33 U32 A5 280.7 75

T34 U33 U34 272.1 75

T35 U34 16 20 50

T36 U2 2 12 50

T37 U3 1 20 50

T38 U4 5 20 50

T39 U5 13 20 50

T40 U6 15 155.2 50

T41 U7 14 20 50

T42 U8 4 22 50

T43 U9 12 12 50

T44 U10 11 12 50

T45 U11 10 12 50

T46 U12 7 12 50

T47 U13 6 22 50

T48 U14 8 12 50

T49 U15 9 12 50

T50 U16 22 17 50

9

T51 U17 23 12 50

T52 U18 24 12 50

T53 U19 21 12 50

T54 U20 20 17 50

T55 U21 34 17 50

T56 U22 25 12 50

T57 U23 26 17 50

T58 U24 27 17 50

T59 U25 28 17 50

T60 U26 29 17 50

T61 U27 30 17 50

T62 U28 31 17 50

T63 U29 32 17 50

T64 U30 33 12 50

T65 U31 19 17 50

T66 U32 18 17 50

T67 U33 17 17 50

T68 R1 U23 40 75

T69 A1 R1 468.1 50

T70 A2 R1 2498.9 50

1 P1 A1 - Bomba

2 P2 A2 - Bomba

3 A3 U26 75 Válvula

4 A4 U30 75 Válvula

5 A5 U33 75 Válvula

6 A6 U17 75 Válvula

7 A7 U8 75 Válvula

8. Comportamento da Rede

Resultado nos Nós às 0:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

10

1 0.03 238.51 114.51

2 0.03 238.50 132.50

3 0.03 238.50 157.50

4 0.03 238.57 103.57

5 0.03 238.51 110.51

6 0.03 243.18 64.18

7 0.03 243.17 63.17

8 0.03 243.43 98.43

9 0.03 243.43 103.43

10 0.03 243.14 50.14

11 0.03 243.14 50.14

12 0.03 243.11 55.11

13 0.03 238.52 122.52

14 0.03 238.52 106.52

15 0.03 238.52 125.52

16 0.03 243.03 78.03

17 0.03 243.03 53.03

18 0.03 247.06 37.06

19 0.03 247.06 32.06

20 0.03 246.85 30.85

21 0.03 246.80 43.80

22 0.03 243.68 85.68

23 0.03 243.75 87.75

24 0.03 246.77 53.77

25 0.03 246.95 19.95

26 0.03 247.12 12.12

27 0.03 247.07 25.07

28 0.03 247.06 24.06

29 0.03 243.26 49.26

30 0.03 243.26 54.26

31 0.03 243.26 75.26

32 0.03 243.26 78.26

33 0.03 239.23 103.23

34 0.03 246.86 27.86

U1 0.00 238.50 157.50

U2 0.00 238.50 132.50

U3 0.00 238.51 116.51

U4 0.00 238.51 110.51

U5 0.00 238.52 122.52

U6 0.00 238.52 125.52

U7 0.00 238.52 105.52

U8 0.00 238.57 101.57

U9 0.00 243.11 54.11

U10 0.00 243.14 49.14

U11 0.00 243.14 50.14

U12 0.00 243.17 62.17

U13 0.00 243.18 65.18

U14 0.00 243.43 98.43

U15 0.00 243.43 102.43

U16 0.00 243.68 86.68

11

U17 0.00 243.75 88.75

U18 0.00 246.77 52.77

U19 0.00 246.80 43.80

U20 0.00 246.85 31.85

U21 0.00 246.86 27.86

U22 0.00 246.96 19.96

U23 0.00 247.12 12.12

U24 0.00 247.07 24.07

U25 0.00 247.06 23.06

U26 0.00 243.26 48.26

U27 0.00 243.26 53.26

U28 0.00 243.26 76.26

U29 0.00 243.26 78.26

U30 0.00 239.23 104.23

U31 0.00 247.06 33.06

U32 0.00 247.06 36.06

U33 0.00 243.03 53.03

U34 0.00 243.03 79.03

PV2 0.00 238.52 121.52

PV6 0.00 247.08 25.08

A1 0.00 251.03 49.03

A2 0.00 262.80 160.80

A3 0.00 247.04 52.04

A4 0.00 243.25 108.25

A5 0.00 247.05 57.05

A6 0.00 246.66 91.66

A7 0.00 243.08 106.08

P1 -1.03 202.00 0.00

P2 -0.89 102.00 0.00

R1 0.97 247.16 11.16

Resultado nos Trechos às 0:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.03 0.01 0.01

12

T2 0.03 0.01 0.00

T3 0.06 0.01 0.01

T4 0.08 0.02 0.01

T5A 0.11 0.03 0.02

T5B 0.08 0.02 0.01

T6 0.06 0.01 0.01

T7 0.03 0.01 0.00

T8 0.19 0.04 0.05

T9 0.22 0.05 0.07

T10 0.25 0.06 0.08

T11 0.28 0.06 0.10

T12 0.31 0.07 0.12

T13 0.33 0.08 0.14

T14 0.36 0.08 0.16

T15 0.39 0.09 0.19

T16 0.42 0.09 0.21

T17 0.44 0.10 0.24

T18 0.47 0.11 0.27

T19 0.50 0.11 0.30

T20 0.53 0.12 0.33

T21 0.56 0.13 0.37

T22 0.58 0.13 0.40

T23 0.61 0.14 0.44

T24 0.31 0.07 0.12

T25 0.19 0.04 0.05

T25B 0.17 0.04 0.04

T26 0.14 0.03 0.03

T27 0.11 0.03 0.02

T28 0.08 0.02 0.01

T29 0.06 0.01 0.00

T30 0.03 0.01 0.00

T31 0.11 0.03 0.02

T32 0.08 0.02 0.01

T33 0.06 0.01 0.01

T34 0.03 0.01 0.00

T35 0.03 0.01 0.01

T36 0.03 0.01 0.01

T37 0.03 0.01 0.01

T38 0.03 0.01 0.01

T39 0.03 0.01 0.01

T40 0.03 0.01 0.01

T41 0.03 0.01 0.01

T42 0.03 0.01 0.01

T43 0.03 0.01 0.01

T44 0.03 0.01 0.01

T45 0.03 0.01 0.01

T46 0.03 0.01 0.01

T47 0.03 0.01 0.01

T48 0.03 0.01 0.01

T49 0.03 0.01 0.01

13

T50 0.03 0.01 0.01

T51 0.03 0.01 0.01

T52 0.03 0.01 0.01

T53 0.03 0.01 0.01

T54 0.03 0.01 0.01

T55 0.03 0.01 0.01

T56 0.03 0.01 0.01

T57 0.03 0.01 0.01

T58 0.03 0.01 0.01

T59 0.03 0.01 0.01

T60 0.03 0.01 0.01

T61 0.03 0.01 0.01

T62 0.03 0.01 0.01

T63 0.03 0.01 0.01

T64 0.03 0.01 0.01

T65 0.03 0.01 0.01

T66 0.03 0.01 0.01

T67 0.03 0.01 0.01

T68 0.94 0.21 0.98

T69 1.03 0.52 8.26

T70 0.89 0.45 6.26

1 1.03 0.00 -49.03

2 0.89 0.00 -160.80

3 0.14 0.03 3.78

4 0.03 0.01 4.03

5 0.06 0.01 4.03

6 0.47 0.11 2.91

7 0.22 0.05 4.51

Resultado nos Nós às 1:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.02 242.09 118.09

14

2 0.02 242.09 136.09

3 0.02 242.09 161.09

4 0.02 242.13 107.13

5 0.02 242.10 114.10

6 0.02 245.08 66.08

7 0.02 245.08 65.08

8 0.02 245.25 100.25

9 0.02 245.25 105.25

10 0.02 245.06 52.06

11 0.02 245.06 52.06

12 0.02 245.04 57.04

13 0.02 242.10 126.10

14 0.02 242.10 110.10

15 0.02 242.10 129.10

16 0.02 245.01 80.01

17 0.02 245.01 55.01

18 0.02 247.59 37.59

19 0.02 247.59 32.59

20 0.02 247.45 31.45

21 0.02 247.42 44.42

22 0.02 245.42 87.42

23 0.02 245.46 89.46

24 0.02 247.40 54.40

25 0.02 247.52 20.52

26 0.02 247.63 12.63

27 0.02 247.60 25.60

28 0.02 247.59 24.59

29 0.02 245.16 51.16

30 0.02 245.16 56.16

31 0.02 245.15 77.15

32 0.02 245.15 80.15

33 0.02 242.58 106.58

34 0.02 247.46 28.46

U1 0.00 242.09 161.09

U2 0.00 242.09 136.09

U3 0.00 242.09 120.09

U4 0.00 242.10 114.10

U5 0.00 242.10 126.10

U6 0.00 242.10 129.10

U7 0.00 242.10 109.10

U8 0.00 242.13 105.13

U9 0.00 245.04 56.04

U10 0.00 245.06 51.06

U11 0.00 245.06 52.06

U12 0.00 245.08 64.08

U13 0.00 245.08 67.08

U14 0.00 245.25 100.25

U15 0.00 245.25 104.25

U16 0.00 245.42 88.42

U17 0.00 245.46 90.46

15

U18 0.00 247.40 53.40

U19 0.00 247.42 44.42

U20 0.00 247.45 32.45

U21 0.00 247.46 28.46

U22 0.00 247.52 20.52

U23 0.00 247.63 12.63

U24 0.00 247.60 24.60

U25 0.00 247.59 23.59

U26 0.00 245.16 50.16

U27 0.00 245.16 55.16

U28 0.00 245.15 78.15

U29 0.00 245.15 80.15

U30 0.00 242.58 107.58

U31 0.00 247.59 33.59

U32 0.00 247.59 36.59

U33 0.00 245.01 55.01

U34 0.00 245.01 81.01

PV2 0.00 242.10 125.10

PV6 0.00 247.60 25.60

A1 0.00 251.44 49.44

A2 0.00 263.16 161.16

A3 0.00 247.57 52.57

A4 0.00 245.15 110.15

A5 0.00 247.58 57.58

A6 0.00 247.32 92.32

A7 0.00 245.02 108.02

P1 -1.02 202.00 0.00

P2 -0.88 102.00 0.00

R1 1.14 247.66 11.66

Resultado nos Trechos às 1:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.02 0.01 0.01

16

T2 0.02 0.01 0.00

T3 0.04 0.01 0.00

T4 0.07 0.02 0.01

T5A 0.09 0.02 0.01

T5B 0.07 0.02 0.01

T6 0.04 0.01 0.00

T7 0.02 0.01 0.00

T8 0.16 0.04 0.03

T9 0.18 0.04 0.04

T10 0.20 0.05 0.06

T11 0.22 0.05 0.07

T12 0.24 0.06 0.08

T13 0.27 0.06 0.09

T14 0.29 0.07 0.11

T15 0.31 0.07 0.13

T16 0.33 0.08 0.14

T17 0.36 0.08 0.16

T18 0.38 0.09 0.18

T19 0.40 0.09 0.20

T20 0.42 0.10 0.22

T21 0.44 0.10 0.24

T22 0.47 0.11 0.27

T23 0.49 0.11 0.29

T24 0.24 0.06 0.08

T25 0.16 0.04 0.03

T25B 0.13 0.03 0.03

T26 0.11 0.03 0.02

T27 0.09 0.02 0.01

T28 0.07 0.02 0.01

T29 0.04 0.01 0.00

T30 0.02 0.01 0.00

T31 0.09 0.02 0.01

T32 0.07 0.02 0.01

T33 0.04 0.01 0.00

T34 0.02 0.01 0.00

T35 0.02 0.01 0.01

T36 0.02 0.01 0.01

T37 0.02 0.01 0.01

T38 0.02 0.01 0.01

T39 0.02 0.01 0.01

T40 0.02 0.01 0.01

T41 0.02 0.01 0.01

T42 0.02 0.01 0.01

T43 0.02 0.01 0.01

T44 0.02 0.01 0.01

T45 0.02 0.01 0.01

T46 0.02 0.01 0.01

T47 0.02 0.01 0.01

T48 0.02 0.01 0.01

T49 0.02 0.01 0.01

17

T50 0.02 0.01 0.01

T51 0.02 0.01 0.01

T52 0.02 0.01 0.01

T53 0.02 0.01 0.01

T54 0.02 0.01 0.01

T55 0.02 0.01 0.01

T56 0.02 0.01 0.01

T57 0.02 0.01 0.01

T58 0.02 0.01 0.01

T59 0.02 0.01 0.01

T60 0.02 0.01 0.01

T61 0.02 0.01 0.01

T62 0.02 0.01 0.01

T63 0.02 0.01 0.01

T64 0.02 0.01 0.01

T65 0.02 0.01 0.01

T66 0.02 0.01 0.01

T67 0.02 0.01 0.01

T68 0.76 0.17 0.65

T69 1.02 0.52 8.08

T70 0.88 0.45 6.20

1 1.02 0.00 -49.44

2 0.88 0.00 -161.16

3 0.11 0.03 2.42

4 0.02 0.01 2.58

5 0.04 0.01 2.58

6 0.38 0.09 1.86

7 0.18 0.04 2.89

Resultado nos Nós às 2:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.02 242.67 118.67

18

2 0.02 242.67 136.67

3 0.02 242.67 161.67

4 0.02 242.71 107.71

5 0.02 242.68 114.68

6 0.02 245.66 66.66

7 0.02 245.66 65.66

8 0.02 245.83 100.83

9 0.02 245.83 105.83

10 0.02 245.64 52.64

11 0.02 245.64 52.64

12 0.02 245.62 57.62

13 0.02 242.68 126.68

14 0.02 242.68 110.68

15 0.02 242.68 129.68

16 0.02 245.59 80.59

17 0.02 245.59 55.59

18 0.02 248.17 38.17

19 0.02 248.17 33.17

20 0.02 248.03 32.03

21 0.02 248.00 45.00

22 0.02 246.00 88.00

23 0.02 246.04 90.04

24 0.02 247.98 54.98

25 0.02 248.10 21.10

26 0.02 248.21 13.21

27 0.02 248.18 26.18

28 0.02 248.17 25.17

29 0.02 245.74 51.74

30 0.02 245.74 56.74

31 0.02 245.74 77.74

32 0.02 245.74 80.74

33 0.02 243.16 107.16

34 0.02 248.04 29.04

U1 0.00 242.67 161.67

U2 0.00 242.67 136.67

U3 0.00 242.67 120.67

U4 0.00 242.68 114.68

U5 0.00 242.68 126.68

U6 0.00 242.68 129.68

U7 0.00 242.68 109.68

U8 0.00 242.71 105.71

U9 0.00 245.62 56.62

U10 0.00 245.64 51.64

U11 0.00 245.64 52.64

U12 0.00 245.66 64.66

U13 0.00 245.66 67.66

U14 0.00 245.83 100.83

U15 0.00 245.83 104.83

U16 0.00 246.00 89.00

U17 0.00 246.04 91.04

19

U18 0.00 247.98 53.98

U19 0.00 248.00 45.00

U20 0.00 248.03 33.03

U21 0.00 248.04 29.04

U22 0.00 248.10 21.10

U23 0.00 248.21 13.21

U24 0.00 248.18 25.18

U25 0.00 248.17 24.17

U26 0.00 245.74 50.74

U27 0.00 245.74 55.74

U28 0.00 245.74 78.74

U29 0.00 245.74 80.74

U30 0.00 243.16 108.16

U31 0.00 248.17 34.17

U32 0.00 248.17 37.17

U33 0.00 245.59 55.59

U34 0.00 245.59 81.59

PV2 0.00 242.68 125.68

PV6 0.00 248.18 26.18

A1 0.00 251.92 49.92

A2 0.00 263.59 161.59

A3 0.00 248.16 53.16

A4 0.00 245.73 110.73

A5 0.00 248.17 58.17

A6 0.00 247.90 92.90

A7 0.00 245.60 108.60

P1 -1.00 202.00 0.00

P2 -0.88 102.00 0.00

R1 1.12 248.24 12.24

Resultado nos Trechos às 2:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.02 0.01 0.01

20

T2 0.02 0.01 0.00

T3 0.04 0.01 0.00

T4 0.07 0.02 0.01

T5A 0.09 0.02 0.01

T5B 0.07 0.02 0.01

T6 0.04 0.01 0.00

T7 0.02 0.01 0.00

T8 0.16 0.04 0.03

T9 0.18 0.04 0.04

T10 0.20 0.05 0.06

T11 0.22 0.05 0.07

T12 0.24 0.06 0.08

T13 0.27 0.06 0.09

T14 0.29 0.07 0.11

T15 0.31 0.07 0.13

T16 0.33 0.08 0.14

T17 0.36 0.08 0.16

T18 0.38 0.09 0.18

T19 0.40 0.09 0.20

T20 0.42 0.10 0.22

T21 0.44 0.10 0.24

T22 0.47 0.11 0.27

T23 0.49 0.11 0.29

T24 0.24 0.06 0.08

T25 0.16 0.04 0.03

T25B 0.13 0.03 0.03

T26 0.11 0.03 0.02

T27 0.09 0.02 0.01

T28 0.07 0.02 0.01

T29 0.04 0.01 0.00

T30 0.02 0.01 0.00

T31 0.09 0.02 0.01

T32 0.07 0.02 0.01

T33 0.04 0.01 0.00

T34 0.02 0.01 0.00

T35 0.02 0.01 0.01

T36 0.02 0.01 0.01

T37 0.02 0.01 0.01

T38 0.02 0.01 0.01

T39 0.02 0.01 0.01

T40 0.02 0.01 0.01

T41 0.02 0.01 0.01

T42 0.02 0.01 0.01

T43 0.02 0.01 0.01

T44 0.02 0.01 0.01

T45 0.02 0.01 0.01

T46 0.02 0.01 0.01

T47 0.02 0.01 0.01

T48 0.02 0.01 0.01

T49 0.02 0.01 0.01

21

T50 0.02 0.01 0.01

T51 0.02 0.01 0.01

T52 0.02 0.01 0.01

T53 0.02 0.01 0.01

T54 0.02 0.01 0.01

T55 0.02 0.01 0.01

T56 0.02 0.01 0.01

T57 0.02 0.01 0.01

T58 0.02 0.01 0.01

T59 0.02 0.01 0.01

T60 0.02 0.01 0.01

T61 0.02 0.01 0.01

T62 0.02 0.01 0.01

T63 0.02 0.01 0.01

T64 0.02 0.01 0.01

T65 0.02 0.01 0.01

T66 0.02 0.01 0.01

T67 0.02 0.01 0.01

T68 0.76 0.17 0.65

T69 1.00 0.51 7.87

T70 0.88 0.45 6.14

1 1.00 0.00 -49.92

2 0.88 0.00 -161.59

3 0.11 0.03 2.42

4 0.02 0.01 2.58

5 0.04 0.01 2.58

6 0.38 0.09 1.86

7 0.18 0.04 2.89

Resultado nos Nós às 3:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.03 236.39 112.39

22

2 0.03 236.39 130.39

3 0.03 236.39 155.39

4 0.03 236.48 101.48

5 0.03 236.40 108.40

6 0.03 243.11 64.11

7 0.03 243.10 63.10

8 0.03 243.46 98.46

9 0.03 243.47 103.47

10 0.03 243.06 50.06

11 0.03 243.06 50.06

12 0.03 243.02 55.02

13 0.03 236.41 120.41

14 0.03 236.40 104.40

15 0.03 236.40 123.40

16 0.03 242.86 77.86

17 0.03 242.86 52.86

18 0.03 248.66 38.66

19 0.03 248.66 33.66

20 0.03 248.37 32.37

21 0.03 248.30 45.30

22 0.03 243.82 85.82

23 0.03 243.91 87.91

24 0.03 248.26 55.26

25 0.03 248.52 21.52

26 0.03 248.76 13.76

27 0.03 248.68 26.68

28 0.03 248.66 25.66

29 0.03 243.20 49.20

30 0.03 243.19 54.19

31 0.03 243.19 75.19

32 0.03 243.19 78.19

33 0.03 237.39 101.39

34 0.03 248.39 29.39

U1 0.00 236.39 155.39

U2 0.00 236.39 130.39

U3 0.00 236.40 114.40

U4 0.00 236.40 108.40

U5 0.00 236.41 120.41

U6 0.00 236.41 123.41

U7 0.00 236.41 103.41

U8 0.00 236.48 99.48

U9 0.00 243.02 54.02

U10 0.00 243.06 49.06

U11 0.00 243.06 50.06

U12 0.00 243.10 62.10

U13 0.00 243.11 65.11

U14 0.00 243.46 98.46

U15 0.00 243.47 102.47

U16 0.00 243.82 86.82

U17 0.00 243.91 88.91

23

U18 0.00 248.26 54.26

U19 0.00 248.30 45.30

U20 0.00 248.37 33.37

U21 0.00 248.39 29.39

U22 0.00 248.52 21.52

U23 0.00 248.76 13.76

U24 0.00 248.68 25.68

U25 0.00 248.66 24.66

U26 0.00 243.20 48.20

U27 0.00 243.19 53.19

U28 0.00 243.19 76.19

U29 0.00 243.19 78.19

U30 0.00 237.39 102.39

U31 0.00 248.66 34.66

U32 0.00 248.66 37.66

U33 0.00 242.86 52.86

U34 0.00 242.86 78.86

PV2 0.00 236.41 119.41

PV6 0.00 248.69 26.69

A1 0.00 252.40 50.40

A2 0.00 264.01 162.01

A3 0.00 248.63 53.63

A4 0.00 243.19 108.19

A5 0.00 248.66 58.66

A6 0.00 248.10 93.10

A7 0.00 242.98 105.98

P1 -0.99 202.00 0.00

P2 -0.87 102.00 0.00

R1 0.73 248.81 12.81

Resultado nos Trechos às 3:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.03 0.02 0.02

24

T2 0.03 0.01 0.00

T3 0.07 0.02 0.01

T4 0.10 0.02 0.02

T5A 0.13 0.03 0.03

T5B 0.10 0.02 0.02

T6 0.07 0.02 0.01

T7 0.03 0.01 0.00

T8 0.23 0.05 0.07

T9 0.27 0.06 0.09

T10 0.30 0.07 0.12

T11 0.33 0.08 0.14

T12 0.37 0.08 0.17

T13 0.40 0.09 0.20

T14 0.43 0.10 0.23

T15 0.47 0.11 0.27

T16 0.50 0.11 0.30

T17 0.53 0.12 0.34

T18 0.57 0.13 0.38

T19 0.60 0.14 0.42

T20 0.63 0.14 0.47

T21 0.67 0.15 0.51

T22 0.70 0.16 0.56

T23 0.73 0.17 0.61

T24 0.37 0.08 0.17

T25 0.23 0.05 0.07

T25B 0.20 0.05 0.06

T26 0.17 0.04 0.04

T27 0.13 0.03 0.03

T28 0.10 0.02 0.02

T29 0.07 0.02 0.01

T30 0.03 0.01 0.00

T31 0.13 0.03 0.03

T32 0.10 0.02 0.02

T33 0.07 0.02 0.01

T34 0.03 0.01 0.00

T35 0.03 0.02 0.01

T36 0.03 0.02 0.02

T37 0.03 0.02 0.01

T38 0.03 0.02 0.01

T39 0.03 0.02 0.01

T40 0.03 0.02 0.01

T41 0.03 0.02 0.01

T42 0.03 0.02 0.01

T43 0.03 0.02 0.01

T44 0.03 0.02 0.01

T45 0.03 0.02 0.01

T46 0.03 0.02 0.01

T47 0.03 0.02 0.01

T48 0.03 0.02 0.01

T49 0.03 0.02 0.01

25

T50 0.03 0.02 0.01

T51 0.03 0.02 0.01

T52 0.03 0.02 0.01

T53 0.03 0.02 0.01

T54 0.03 0.02 0.01

T55 0.03 0.02 0.02

T56 0.03 0.02 0.01

T57 0.03 0.02 0.01

T58 0.03 0.02 0.01

T59 0.03 0.02 0.01

T60 0.03 0.02 0.01

T61 0.03 0.02 0.01

T62 0.03 0.02 0.01

T63 0.03 0.02 0.01

T64 0.03 0.02 0.01

T65 0.03 0.02 0.01

T66 0.03 0.02 0.01

T67 0.03 0.02 0.02

T68 1.13 0.26 1.37

T69 0.99 0.50 7.67

T70 0.87 0.44 6.08

1 0.99 0.00 -50.40

2 0.87 0.00 -162.01

3 0.17 0.04 5.44

4 0.03 0.01 5.80

5 0.07 0.02 5.80

6 0.57 0.13 4.19

7 0.27 0.06 6.50

Resultado nos Nós às 4:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.04 234.63 110.63

2 0.04 234.63 128.63

26

3 0.04 234.63 153.63

4 0.04 234.73 99.73

5 0.04 234.64 106.64

6 0.04 242.51 63.51

7 0.04 242.50 62.50

8 0.04 242.92 97.92

9 0.04 242.93 102.93

10 0.04 242.45 49.45

11 0.04 242.45 49.45

12 0.04 242.41 54.41

13 0.04 234.65 118.65

14 0.04 234.64 102.64

15 0.04 234.64 121.64

16 0.04 242.19 77.19

17 0.04 242.20 52.20

18 0.04 249.00 39.00

19 0.04 249.01 34.01

20 0.04 248.66 32.66

21 0.04 248.59 45.59

22 0.04 243.33 85.33

23 0.04 243.44 87.44

24 0.04 248.54 55.54

25 0.04 248.84 21.84

26 0.04 249.12 14.12

27 0.04 249.03 27.03

28 0.04 249.01 26.01

29 0.04 242.59 48.59

30 0.04 242.59 53.59

31 0.04 242.58 74.58

32 0.04 242.58 77.58

33 0.04 235.78 99.78

34 0.04 248.69 29.69

U1 0.00 234.63 153.63

U2 0.00 234.63 128.63

U3 0.00 234.63 112.63

U4 0.00 234.64 106.64

U5 0.00 234.65 118.65

U6 0.00 234.65 121.65

U7 0.00 234.65 101.65

U8 0.00 234.73 97.73

U9 0.00 242.41 53.41

U10 0.00 242.45 48.45

U11 0.00 242.45 49.45

U12 0.00 242.50 61.50

U13 0.00 242.51 64.51

U14 0.00 242.92 97.92

U15 0.00 242.93 101.93

U16 0.00 243.33 86.33

U17 0.00 243.44 88.44

U18 0.00 248.54 54.54

27

U19 0.00 248.59 45.59

U20 0.00 248.66 33.66

U21 0.00 248.69 29.69

U22 0.00 248.84 21.84

U23 0.00 249.12 14.12

U24 0.00 249.03 26.03

U25 0.00 249.01 25.01

U26 0.00 242.59 47.59

U27 0.00 242.59 52.59

U28 0.00 242.58 75.58

U29 0.00 242.58 77.58

U30 0.00 235.78 100.78

U31 0.00 249.01 35.01

U32 0.00 249.00 38.00

U33 0.00 242.20 52.20

U34 0.00 242.20 78.20

PV2 0.00 234.65 117.65

PV6 0.00 249.04 27.04

A1 0.00 252.71 50.71

A2 0.00 264.28 162.28

A3 0.00 248.97 53.97

A4 0.00 242.58 107.58

A5 0.00 249.00 59.00

A6 0.00 248.36 93.36

A7 0.00 242.36 105.36

P1 -0.98 202.00 0.00

P2 -0.87 102.00 0.00

R1 0.62 249.18 13.18

Resultado nos Trechos às 4:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.04 0.02 0.02

T2 0.04 0.01 0.00

T3 0.07 0.02 0.01

28

T4 0.11 0.02 0.02

T5A 0.14 0.03 0.03

T5B 0.11 0.02 0.02

T6 0.07 0.02 0.01

T7 0.04 0.01 0.00

T8 0.25 0.06 0.09

T9 0.29 0.07 0.11

T10 0.32 0.07 0.14

T11 0.36 0.08 0.17

T12 0.40 0.09 0.20

T13 0.43 0.10 0.23

T14 0.47 0.11 0.27

T15 0.51 0.11 0.31

T16 0.54 0.12 0.35

T17 0.58 0.13 0.39

T18 0.61 0.14 0.44

T19 0.65 0.15 0.49

T20 0.69 0.16 0.54

T21 0.72 0.16 0.60

T22 0.76 0.17 0.65

T23 0.79 0.18 0.71

T24 0.40 0.09 0.20

T25 0.25 0.06 0.09

T25B 0.22 0.05 0.06

T26 0.18 0.04 0.05

T27 0.14 0.03 0.03

T28 0.11 0.02 0.02

T29 0.07 0.02 0.01

T30 0.04 0.01 0.00

T31 0.14 0.03 0.03

T32 0.11 0.02 0.02

T33 0.07 0.02 0.01

T34 0.04 0.01 0.00

T35 0.04 0.02 0.02

T36 0.04 0.02 0.02

T37 0.04 0.02 0.02

T38 0.04 0.02 0.02

T39 0.04 0.02 0.02

T40 0.04 0.02 0.02

T41 0.04 0.02 0.02

T42 0.04 0.02 0.02

T43 0.04 0.02 0.02

T44 0.04 0.02 0.02

T45 0.04 0.02 0.02

T46 0.04 0.02 0.02

T47 0.04 0.02 0.02

T48 0.04 0.02 0.02

T49 0.04 0.02 0.02

T50 0.04 0.02 0.02

T51 0.04 0.02 0.02

29

T52 0.04 0.02 0.02

T53 0.04 0.02 0.02

T54 0.04 0.02 0.02

T55 0.04 0.02 0.02

T56 0.04 0.02 0.02

T57 0.04 0.02 0.02

T58 0.04 0.02 0.02

T59 0.04 0.02 0.02

T60 0.04 0.02 0.02

T61 0.04 0.02 0.02

T62 0.04 0.02 0.02

T63 0.04 0.02 0.02

T64 0.04 0.02 0.02

T65 0.04 0.02 0.02

T66 0.04 0.02 0.02

T67 0.04 0.02 0.02

T68 1.23 0.28 1.59

T69 0.98 0.50 7.53

T70 0.87 0.44 6.04

1 0.98 0.00 -50.71

2 0.87 0.00 -162.28

3 0.18 0.04 6.38

4 0.04 0.01 6.81

5 0.07 0.02 6.81

6 0.61 0.14 4.92

7 0.29 0.07 7.62

Resultado nos Nós às 5:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.04 232.65 108.65

2 0.04 232.64 126.64

3 0.04 232.64 151.64

4 0.04 232.76 97.76

30

5 0.04 232.66 104.66

6 0.04 241.78 62.78

7 0.04 241.77 61.77

8 0.04 242.25 97.25

9 0.04 242.26 102.26

10 0.04 241.72 48.72

11 0.04 241.71 48.71

12 0.04 241.66 53.66

13 0.04 232.67 116.67

14 0.04 232.66 100.66

15 0.04 232.66 119.66

16 0.04 241.40 76.40

17 0.04 241.40 51.40

18 0.04 249.29 39.29

19 0.04 249.30 34.30

20 0.04 248.90 32.90

21 0.04 248.82 45.82

22 0.04 242.72 84.72

23 0.04 242.85 86.85

24 0.04 248.76 55.76

25 0.04 249.11 22.11

26 0.04 249.42 14.42

27 0.04 249.33 27.33

28 0.04 249.30 26.30

29 0.04 241.86 47.86

30 0.04 241.86 52.86

31 0.04 241.85 73.85

32 0.04 241.85 76.85

33 0.04 233.95 97.95

34 0.04 248.93 29.93

U1 0.00 232.64 151.64

U2 0.00 232.64 126.64

U3 0.00 232.65 110.65

U4 0.00 232.66 104.66

U5 0.00 232.67 116.67

U6 0.00 232.66 119.66

U7 0.00 232.66 99.66

U8 0.00 232.77 95.77

U9 0.00 241.66 52.66

U10 0.00 241.71 47.71

U11 0.00 241.72 48.72

U12 0.00 241.77 60.77

U13 0.00 241.78 63.78

U14 0.00 242.25 97.25

U15 0.00 242.26 101.26

U16 0.00 242.73 85.73

U17 0.00 242.85 87.85

U18 0.00 248.76 54.76

U19 0.00 248.82 45.82

U20 0.00 248.90 33.90

31

U21 0.00 248.94 29.94

U22 0.00 249.11 22.11

U23 0.00 249.42 14.42

U24 0.00 249.33 26.33

U25 0.00 249.30 25.30

U26 0.00 241.86 46.86

U27 0.00 241.86 51.86

U28 0.00 241.85 74.85

U29 0.00 241.85 76.85

U30 0.00 233.95 98.95

U31 0.00 249.30 35.30

U32 0.00 249.29 38.29

U33 0.00 241.40 51.40

U34 0.00 241.40 77.40

PV2 0.00 232.67 115.67

PV6 0.00 249.34 27.34

A1 0.00 252.97 50.97

A2 0.00 264.51 162.51

A3 0.00 249.26 54.26

A4 0.00 241.85 106.85

A5 0.00 249.29 59.29

A6 0.00 248.55 93.55

A7 0.00 241.61 104.61

P1 -0.97 202.00 0.00

P2 -0.87 102.00 0.00

R1 0.51 249.50 13.50

Resultado nos Trechos às 5:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.04 0.02 0.02

T2 0.04 0.01 0.00

T3 0.08 0.02 0.01

T4 0.12 0.03 0.02

32

T5A 0.16 0.04 0.03

T5B 0.12 0.03 0.02

T6 0.08 0.02 0.01

T7 0.04 0.01 0.00

T8 0.27 0.06 0.10

T9 0.31 0.07 0.13

T10 0.35 0.08 0.16

T11 0.39 0.09 0.19

T12 0.43 0.10 0.23

T13 0.47 0.11 0.27

T14 0.51 0.11 0.31

T15 0.54 0.12 0.35

T16 0.58 0.13 0.40

T17 0.62 0.14 0.45

T18 0.66 0.15 0.51

T19 0.70 0.16 0.56

T20 0.74 0.17 0.62

T21 0.78 0.18 0.68

T22 0.82 0.18 0.75

T23 0.86 0.19 0.81

T24 0.43 0.10 0.23

T25 0.27 0.06 0.10

T25B 0.23 0.05 0.07

T26 0.19 0.04 0.05

T27 0.16 0.04 0.03

T28 0.12 0.03 0.02

T29 0.08 0.02 0.01

T30 0.04 0.01 0.00

T31 0.16 0.04 0.03

T32 0.12 0.03 0.02

T33 0.08 0.02 0.01

T34 0.04 0.01 0.00

T35 0.04 0.02 0.02

T36 0.04 0.02 0.02

T37 0.04 0.02 0.02

T38 0.04 0.02 0.02

T39 0.04 0.02 0.02

T40 0.04 0.02 0.02

T41 0.04 0.02 0.02

T42 0.04 0.02 0.02

T43 0.04 0.02 0.02

T44 0.04 0.02 0.02

T45 0.04 0.02 0.02

T46 0.04 0.02 0.02

T47 0.04 0.02 0.02

T48 0.04 0.02 0.02

T49 0.04 0.02 0.02

T50 0.04 0.02 0.02

T51 0.04 0.02 0.02

T52 0.04 0.02 0.02

33

T53 0.04 0.02 0.02

T54 0.04 0.02 0.02

T55 0.04 0.02 0.02

T56 0.04 0.02 0.02

T57 0.04 0.02 0.02

T58 0.04 0.02 0.02

T59 0.04 0.02 0.02

T60 0.04 0.02 0.02

T61 0.04 0.02 0.02

T62 0.04 0.02 0.02

T63 0.04 0.02 0.02

T64 0.04 0.02 0.02

T65 0.04 0.02 0.02

T66 0.04 0.02 0.02

T67 0.04 0.02 0.02

T68 1.32 0.30 1.83

T69 0.97 0.49 7.42

T70 0.87 0.44 6.01

1 0.97 0.00 -50.97

2 0.87 0.00 -162.51

3 0.19 0.04 7.40

4 0.04 0.01 7.89

5 0.08 0.02 7.89

6 0.66 0.15 5.70

7 0.31 0.07 8.84

Resultado nos Nós às 6:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.04 227.81 103.81

2 0.04 227.80 121.80

3 0.04 227.80 146.80

4 0.04 227.96 92.96

34

5 0.04 227.83 99.83

6 0.04 239.73 60.73

7 0.04 239.72 59.72

8 0.04 240.33 95.33

9 0.04 240.35 100.35

10 0.04 239.65 46.65

11 0.04 239.64 46.64

12 0.04 239.58 51.58

13 0.04 227.83 111.83

14 0.04 227.83 95.83

15 0.04 227.83 114.83

16 0.04 239.18 74.18

17 0.04 239.18 49.18

18 0.04 249.50 39.50

19 0.04 249.50 34.50

20 0.04 249.00 33.00

21 0.04 248.89 45.89

22 0.04 240.94 82.94

23 0.04 241.10 85.10

24 0.04 248.81 55.81

25 0.04 249.26 22.26

26 0.04 249.67 14.67

27 0.04 249.54 27.54

28 0.04 249.51 26.51

29 0.04 239.79 45.79

30 0.04 239.79 50.79

31 0.04 239.78 71.78

32 0.04 239.77 74.77

33 0.04 229.46 93.46

34 0.04 249.04 30.04

U1 0.00 227.80 146.80

U2 0.00 227.80 121.80

U3 0.00 227.81 105.81

U4 0.00 227.83 99.83

U5 0.00 227.83 111.83

U6 0.00 227.83 114.83

U7 0.00 227.83 94.83

U8 0.00 227.96 90.96

U9 0.00 239.58 50.58

U10 0.00 239.64 45.64

U11 0.00 239.65 46.65

U12 0.00 239.72 58.72

U13 0.00 239.73 61.73

U14 0.00 240.33 95.33

U15 0.00 240.35 99.35

U16 0.00 240.94 83.94

U17 0.00 241.10 86.10

U18 0.00 248.81 54.81

U19 0.00 248.89 45.89

U20 0.00 249.00 34.00

35

U21 0.00 249.04 30.04

U22 0.00 249.26 22.26

U23 0.00 249.67 14.67

U24 0.00 249.54 26.54

U25 0.00 249.51 25.51

U26 0.00 239.79 44.79

U27 0.00 239.79 49.79

U28 0.00 239.78 72.78

U29 0.00 239.78 74.78

U30 0.00 229.46 94.46

U31 0.00 249.50 35.50

U32 0.00 249.50 38.50

U33 0.00 239.19 49.19

U34 0.00 239.18 75.18

PV2 0.00 227.84 110.84

PV6 0.00 249.55 27.55

A1 0.00 253.19 51.19

A2 0.00 264.70 162.70

A3 0.00 249.46 54.46

A4 0.00 239.77 104.77

A5 0.00 249.50 59.50

A6 0.00 248.55 93.55

A7 0.00 239.51 102.51

P1 -0.96 202.00 0.00

P2 -0.86 102.00 0.00

R1 0.32 249.76 13.76

Resultado nos Trechos às 6:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.04 0.02 0.02

T2 0.04 0.01 0.00

T3 0.09 0.02 0.01

T4 0.13 0.03 0.03

36

T5A 0.18 0.04 0.04

T5B 0.13 0.03 0.03

T6 0.09 0.02 0.01

T7 0.04 0.01 0.00

T8 0.31 0.07 0.13

T9 0.36 0.08 0.16

T10 0.40 0.09 0.20

T11 0.44 0.10 0.24

T12 0.49 0.11 0.29

T13 0.53 0.12 0.34

T14 0.58 0.13 0.39

T15 0.62 0.14 0.45

T16 0.67 0.15 0.51

T17 0.71 0.16 0.58

T18 0.76 0.17 0.65

T19 0.80 0.18 0.72

T20 0.84 0.19 0.80

T21 0.89 0.20 0.87

T22 0.93 0.21 0.96

T23 0.98 0.22 1.04

T24 0.49 0.11 0.29

T25 0.31 0.07 0.13

T25B 0.27 0.06 0.09

T26 0.22 0.05 0.07

T27 0.18 0.04 0.04

T28 0.13 0.03 0.03

T29 0.09 0.02 0.01

T30 0.04 0.01 0.00

T31 0.18 0.04 0.04

T32 0.13 0.03 0.03

T33 0.09 0.02 0.01

T34 0.04 0.01 0.00

T35 0.04 0.02 0.02

T36 0.04 0.02 0.02

T37 0.04 0.02 0.03

T38 0.04 0.02 0.02

T39 0.04 0.02 0.03

T40 0.04 0.02 0.02

T41 0.04 0.02 0.02

T42 0.04 0.02 0.02

T43 0.04 0.02 0.02

T44 0.04 0.02 0.02

T45 0.04 0.02 0.02

T46 0.04 0.02 0.02

T47 0.04 0.02 0.02

T48 0.04 0.02 0.02

T49 0.04 0.02 0.02

T50 0.04 0.02 0.03

T51 0.04 0.02 0.02

T52 0.04 0.02 0.02

37

T53 0.04 0.02 0.02

T54 0.04 0.02 0.02

T55 0.04 0.02 0.03

T56 0.04 0.02 0.02

T57 0.04 0.02 0.02

T58 0.04 0.02 0.03

T59 0.04 0.02 0.03

T60 0.04 0.02 0.03

T61 0.04 0.02 0.02

T62 0.04 0.02 0.03

T63 0.04 0.02 0.02

T64 0.04 0.02 0.02

T65 0.04 0.02 0.02

T66 0.04 0.02 0.03

T67 0.04 0.02 0.02

T68 1.51 0.34 2.34

T69 0.96 0.49 7.32

T70 0.86 0.44 5.98

1 0.96 0.00 -51.19

2 0.86 0.00 -162.70

3 0.22 0.05 9.67

4 0.04 0.01 10.31

5 0.09 0.02 10.31

6 0.76 0.17 7.45

7 0.36 0.08 11.55

Resultado nos Nós às 7:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.05 225.17 101.17

2 0.05 225.17 119.17

3 0.05 225.16 144.16

4 0.05 225.34 90.34

38

5 0.05 225.19 97.19

6 0.05 238.63 59.63

7 0.05 238.61 58.61

8 0.05 239.30 94.30

9 0.05 239.32 99.32

10 0.05 238.54 45.54

11 0.05 238.53 45.53

12 0.05 238.46 50.46

13 0.05 225.20 109.20

14 0.05 225.19 93.19

15 0.05 225.19 112.19

16 0.05 237.98 72.98

17 0.05 237.99 47.99

18 0.05 249.63 39.63

19 0.05 249.63 34.63

20 0.05 249.07 33.07

21 0.05 248.95 45.95

22 0.05 239.98 81.98

23 0.05 240.15 84.15

24 0.05 248.86 55.86

25 0.05 249.36 22.36

26 0.05 249.82 14.82

27 0.05 249.67 27.67

28 0.05 249.64 26.64

29 0.05 238.67 44.67

30 0.05 238.66 49.66

31 0.05 238.65 70.65

32 0.05 238.65 73.65

33 0.05 227.01 91.01

34 0.05 249.11 30.11

U1 0.00 225.16 144.16

U2 0.00 225.17 119.17

U3 0.00 225.18 103.18

U4 0.00 225.19 97.19

U5 0.00 225.20 109.20

U6 0.00 225.20 112.20

U7 0.00 225.19 92.19

U8 0.00 225.34 88.34

U9 0.00 238.46 49.46

U10 0.00 238.53 44.53

U11 0.00 238.54 45.54

U12 0.00 238.61 57.61

U13 0.00 238.63 60.63

U14 0.00 239.30 94.30

U15 0.00 239.32 98.32

U16 0.00 239.98 82.98

U17 0.00 240.15 85.15

U18 0.00 248.86 54.86

U19 0.00 248.95 45.95

U20 0.00 249.07 34.07

39

U21 0.00 249.11 30.11

U22 0.00 249.36 22.36

U23 0.00 249.82 14.82

U24 0.00 249.67 26.67

U25 0.00 249.64 25.64

U26 0.00 238.67 43.67

U27 0.00 238.67 48.67

U28 0.00 238.65 71.65

U29 0.00 238.65 73.65

U30 0.00 227.01 92.01

U31 0.00 249.63 35.63

U32 0.00 249.63 38.63

U33 0.00 237.99 47.99

U34 0.00 237.98 73.98

PV2 0.00 225.20 108.20

PV6 0.00 249.69 27.69

A1 0.00 253.32 51.32

A2 0.00 264.81 162.81

A3 0.00 249.58 54.58

A4 0.00 238.65 103.65

A5 0.00 249.63 59.63

A6 0.00 248.56 93.56

A7 0.00 238.38 101.38

P1 -0.96 202.00 0.00

P2 -0.86 102.00 0.00

R1 0.22 249.92 13.92

Resultado nos Trechos às 7:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.05 0.02 0.03

T2 0.05 0.01 0.00

T3 0.09 0.02 0.01

T4 0.14 0.03 0.03

40

T5A 0.19 0.04 0.05

T5B 0.14 0.03 0.03

T6 0.09 0.02 0.01

T7 0.05 0.01 0.00

T8 0.33 0.07 0.14

T9 0.38 0.09 0.18

T10 0.42 0.10 0.22

T11 0.47 0.11 0.27

T12 0.52 0.12 0.32

T13 0.57 0.13 0.38

T14 0.61 0.14 0.44

T15 0.66 0.15 0.51

T16 0.71 0.16 0.57

T17 0.76 0.17 0.65

T18 0.80 0.18 0.72

T19 0.85 0.19 0.81

T20 0.90 0.20 0.89

T21 0.94 0.21 0.98

T22 0.99 0.22 1.07

T23 1.04 0.24 1.17

T24 0.52 0.12 0.32

T25 0.33 0.07 0.14

T25B 0.28 0.06 0.11

T26 0.24 0.05 0.08

T27 0.19 0.04 0.05

T28 0.14 0.03 0.03

T29 0.09 0.02 0.01

T30 0.05 0.01 0.00

T31 0.19 0.04 0.05

T32 0.14 0.03 0.03

T33 0.09 0.02 0.01

T34 0.05 0.01 0.00

T35 0.05 0.02 0.03

T36 0.05 0.02 0.03

T37 0.05 0.02 0.03

T38 0.05 0.02 0.03

T39 0.05 0.02 0.03

T40 0.05 0.02 0.03

T41 0.05 0.02 0.03

T42 0.05 0.02 0.03

T43 0.05 0.02 0.03

T44 0.05 0.02 0.03

T45 0.05 0.02 0.03

T46 0.05 0.02 0.03

T47 0.05 0.02 0.03

T48 0.05 0.02 0.03

T49 0.05 0.02 0.03

T50 0.05 0.02 0.03

T51 0.05 0.02 0.03

T52 0.05 0.02 0.03

41

T53 0.05 0.02 0.03

T54 0.05 0.02 0.03

T55 0.05 0.02 0.03

T56 0.05 0.02 0.03

T57 0.05 0.02 0.03

T58 0.05 0.02 0.03

T59 0.05 0.02 0.03

T60 0.05 0.02 0.03

T61 0.05 0.02 0.03

T62 0.05 0.02 0.03

T63 0.05 0.02 0.03

T64 0.05 0.02 0.03

T65 0.05 0.02 0.03

T66 0.05 0.02 0.03

T67 0.05 0.02 0.03

T68 1.61 0.36 2.61

T69 0.96 0.49 7.26

T70 0.86 0.44 5.96

1 0.96 0.00 -51.32

2 0.86 0.00 -162.81

3 0.24 0.05 10.91

4 0.05 0.01 11.64

5 0.09 0.02 11.64

6 0.80 0.18 8.41

7 0.38 0.09 13.04

Resultado nos Nós às 8:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.05 222.06 98.06

2 0.05 222.05 116.05

3 0.05 222.05 141.05

4 0.05 222.25 87.25

42

5 0.05 222.08 94.08

6 0.05 237.14 58.14

7 0.05 237.13 57.13

8 0.05 237.88 92.88

9 0.05 237.91 97.91

10 0.05 237.04 44.04

11 0.05 237.03 44.03

12 0.05 236.95 48.95

13 0.05 222.09 106.09

14 0.05 222.08 90.08

15 0.05 222.08 109.08

16 0.05 236.40 71.40

17 0.05 236.40 46.40

18 0.05 249.45 39.45

19 0.05 249.45 34.45

20 0.05 248.83 32.83

21 0.05 248.70 45.70

22 0.05 238.64 80.64

23 0.05 238.84 82.84

24 0.05 248.60 55.60

25 0.05 249.15 22.15

26 0.05 249.66 14.66

27 0.05 249.50 27.50

28 0.05 249.46 26.46

29 0.05 237.16 43.16

30 0.05 237.16 48.16

31 0.05 237.15 69.15

32 0.05 237.15 72.15

33 0.05 224.09 88.09

34 0.05 248.88 29.88

U1 0.00 222.05 141.05

U2 0.00 222.05 116.05

U3 0.00 222.06 100.06

U4 0.00 222.08 94.08

U5 0.00 222.09 106.09

U6 0.00 222.09 109.09

U7 0.00 222.09 89.09

U8 0.00 222.25 85.25

U9 0.00 236.95 47.95

U10 0.00 237.03 43.03

U11 0.00 237.04 44.04

U12 0.00 237.13 56.13

U13 0.00 237.14 59.14

U14 0.00 237.88 92.88

U15 0.00 237.91 96.91

U16 0.00 238.64 81.64

U17 0.00 238.84 83.84

U18 0.00 248.60 54.60

U19 0.00 248.70 45.70

U20 0.00 248.83 33.83

43

U21 0.00 248.88 29.88

U22 0.00 249.15 22.15

U23 0.00 249.66 14.66

U24 0.00 249.50 26.50

U25 0.00 249.46 25.46

U26 0.00 237.16 42.16

U27 0.00 237.16 47.16

U28 0.00 237.15 70.15

U29 0.00 237.15 72.15

U30 0.00 224.09 89.09

U31 0.00 249.45 35.45

U32 0.00 249.45 38.45

U33 0.00 236.40 46.40

U34 0.00 236.40 72.40

PV2 0.00 222.09 105.09

PV6 0.00 249.52 27.52

A1 0.00 253.20 51.20

A2 0.00 264.71 162.71

A3 0.00 249.40 54.40

A4 0.00 237.14 102.14

A5 0.00 249.45 59.45

A6 0.00 248.27 93.27

A7 0.00 236.86 99.86

P1 -0.96 202.00 0.00

P2 -0.86 102.00 0.00

R1 0.13 249.77 13.77

Resultado nos Trechos às 8:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.05 0.03 0.03

T2 0.05 0.01 0.00

T3 0.10 0.02 0.02

T4 0.15 0.03 0.03

44

T5A 0.20 0.05 0.06

T5B 0.15 0.03 0.03

T6 0.10 0.02 0.02

T7 0.05 0.01 0.00

T8 0.35 0.08 0.16

T9 0.40 0.09 0.20

T10 0.45 0.10 0.25

T11 0.50 0.11 0.30

T12 0.55 0.12 0.36

T13 0.60 0.14 0.42

T14 0.65 0.15 0.49

T15 0.70 0.16 0.56

T16 0.75 0.17 0.64

T17 0.80 0.18 0.72

T18 0.85 0.19 0.81

T19 0.90 0.20 0.90

T20 0.95 0.22 0.99

T21 1.00 0.23 1.09

T22 1.05 0.24 1.19

T23 1.10 0.25 1.30

T24 0.55 0.12 0.36

T25 0.35 0.08 0.16

T25B 0.30 0.07 0.12

T26 0.25 0.06 0.08

T27 0.20 0.05 0.06

T28 0.15 0.03 0.03

T29 0.10 0.02 0.02

T30 0.05 0.01 0.00

T31 0.20 0.05 0.06

T32 0.15 0.03 0.03

T33 0.10 0.02 0.02

T34 0.05 0.01 0.00

T35 0.05 0.03 0.03

T36 0.05 0.03 0.03

T37 0.05 0.03 0.03

T38 0.05 0.03 0.03

T39 0.05 0.03 0.03

T40 0.05 0.03 0.03

T41 0.05 0.03 0.03

T42 0.05 0.03 0.03

T43 0.05 0.03 0.03

T44 0.05 0.03 0.03

T45 0.05 0.03 0.03

T46 0.05 0.03 0.03

T47 0.05 0.03 0.03

T48 0.05 0.03 0.03

T49 0.05 0.03 0.03

T50 0.05 0.03 0.03

T51 0.05 0.03 0.03

T52 0.05 0.03 0.03

45

T53 0.05 0.03 0.03

T54 0.05 0.03 0.03

T55 0.05 0.03 0.03

T56 0.05 0.03 0.03

T57 0.05 0.03 0.03

T58 0.05 0.03 0.03

T59 0.05 0.03 0.03

T60 0.05 0.03 0.03

T61 0.05 0.03 0.03

T62 0.05 0.03 0.03

T63 0.05 0.03 0.03

T64 0.05 0.03 0.03

T65 0.05 0.03 0.03

T66 0.05 0.03 0.03

T67 0.05 0.03 0.03

T68 1.70 0.38 2.91

T69 0.96 0.49 7.32

T70 0.86 0.44 5.98

1 0.96 0.00 -51.20

2 0.86 0.00 -162.71

3 0.25 0.06 12.23

4 0.05 0.01 13.05

5 0.10 0.02 13.05

6 0.85 0.19 9.43

7 0.40 0.09 14.62

Resultado nos Nós às 9:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.07 192.43 68.43

2 0.07 192.41 86.41

3 0.07 192.40 111.40

4 0.07 192.79 57.79

46

5 0.07 192.46 64.46

6 0.07 223.84 44.84

7 0.07 223.81 43.81

8 0.07 225.30 80.30

9 0.07 225.36 85.36

10 0.07 223.63 30.63

11 0.07 223.61 30.61

12 0.07 223.46 35.46

13 0.07 192.48 76.48

14 0.07 192.47 60.47

15 0.07 192.47 79.47

16 0.07 221.96 56.96

17 0.07 221.96 31.96

18 0.07 249.20 39.20

19 0.07 249.20 34.20

20 0.07 247.97 31.97

21 0.07 247.71 44.71

22 0.07 226.80 68.80

23 0.07 227.19 71.19

24 0.07 247.51 54.51

25 0.07 248.61 21.61

26 0.07 249.61 14.61

27 0.07 249.30 27.30

28 0.07 249.22 26.22

29 0.07 223.57 29.57

30 0.07 223.56 34.56

31 0.07 223.53 55.53

32 0.07 223.53 58.53

33 0.07 196.30 60.30

34 0.07 248.07 29.07

U1 0.00 192.40 111.40

U2 0.00 192.41 86.41

U3 0.00 192.43 70.43

U4 0.00 192.46 64.46

U5 0.00 192.48 76.48

U6 0.00 192.48 79.48

U7 0.00 192.47 59.47

U8 0.00 192.79 55.79

U9 0.00 223.46 34.46

U10 0.00 223.61 29.61

U11 0.00 223.63 30.63

U12 0.00 223.81 42.81

U13 0.00 223.84 45.84

U14 0.00 225.30 80.30

U15 0.00 225.36 84.36

U16 0.00 226.81 69.81

U17 0.00 227.19 72.19

U18 0.00 247.51 53.51

U19 0.00 247.71 44.71

U20 0.00 247.97 32.97

47

U21 0.00 248.07 29.07

U22 0.00 248.61 21.61

U23 0.00 249.61 14.61

U24 0.00 249.30 26.30

U25 0.00 249.22 25.22

U26 0.00 223.57 28.57

U27 0.00 223.56 33.56

U28 0.00 223.54 56.54

U29 0.00 223.53 58.53

U30 0.00 196.30 61.30

U31 0.00 249.20 35.20

U32 0.00 249.20 38.20

U33 0.00 221.97 31.97

U34 0.00 221.96 57.96

PV2 0.00 192.48 75.48

PV6 0.00 249.34 27.34

A1 0.00 253.25 51.25

A2 0.00 264.75 162.75

A3 0.00 249.09 54.09

A4 0.00 223.53 88.53

A5 0.00 249.19 59.19

A6 0.00 246.86 91.86

A7 0.00 223.29 86.29

P1 -0.96 202.00 0.00

P2 -0.86 102.00 0.00

R1 -0.63 249.84 13.84

Resultado nos Trechos às 9:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.07 0.04 0.06

T2 0.07 0.02 0.01

T3 0.14 0.03 0.03

T4 0.22 0.05 0.06

48

T5A 0.29 0.07 0.11

T5B 0.22 0.05 0.06

T6 0.14 0.03 0.03

T7 0.07 0.02 0.01

T8 0.51 0.11 0.31

T9 0.58 0.13 0.39

T10 0.65 0.15 0.49

T11 0.72 0.16 0.60

T12 0.79 0.18 0.71

T13 0.87 0.20 0.83

T14 0.94 0.21 0.97

T15 1.01 0.23 1.11

T16 1.08 0.25 1.26

T17 1.16 0.26 1.42

T18 1.23 0.28 1.59

T19 1.30 0.29 1.77

T20 1.37 0.31 1.95

T21 1.44 0.33 2.15

T22 1.52 0.34 2.35

T23 1.59 0.36 2.56

T24 0.79 0.18 0.71

T25 0.51 0.11 0.31

T25B 0.43 0.10 0.23

T26 0.36 0.08 0.16

T27 0.29 0.07 0.11

T28 0.22 0.05 0.06

T29 0.14 0.03 0.03

T30 0.07 0.02 0.01

T31 0.29 0.07 0.11

T32 0.22 0.05 0.06

T33 0.14 0.03 0.03

T34 0.07 0.02 0.01

T35 0.07 0.04 0.06

T36 0.07 0.04 0.06

T37 0.07 0.04 0.06

T38 0.07 0.04 0.06

T39 0.07 0.04 0.06

T40 0.07 0.04 0.06

T41 0.07 0.04 0.06

T42 0.07 0.04 0.06

T43 0.07 0.04 0.06

T44 0.07 0.04 0.06

T45 0.07 0.04 0.06

T46 0.07 0.04 0.06

T47 0.07 0.04 0.06

T48 0.07 0.04 0.06

T49 0.07 0.04 0.06

T50 0.07 0.04 0.06

T51 0.07 0.04 0.06

T52 0.07 0.04 0.06

49

T53 0.07 0.04 0.06

T54 0.07 0.04 0.06

T55 0.07 0.04 0.06

T56 0.07 0.04 0.06

T57 0.07 0.04 0.06

T58 0.07 0.04 0.06

T59 0.07 0.04 0.06

T60 0.07 0.04 0.06

T61 0.07 0.04 0.06

T62 0.07 0.04 0.06

T63 0.07 0.04 0.06

T64 0.07 0.04 0.06

T65 0.07 0.04 0.06

T66 0.07 0.04 0.06

T67 0.07 0.04 0.06

T68 2.46 0.56 5.74

T69 0.96 0.49 7.29

T70 0.86 0.44 5.97

1 0.96 0.00 -51.25

2 0.86 0.00 -162.75

3 0.36 0.08 25.52

4 0.07 0.02 27.23

5 0.14 0.03 27.23

6 1.23 0.28 19.67

7 0.58 0.13 30.49

Resultado nos Nós às 10:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.08 173.28 49.28

2 0.08 173.26 67.26

3 0.08 173.25 92.25

4 0.08 173.76 38.76

50

5 0.08 173.33 45.33

6 0.08 215.08 36.08

7 0.08 215.04 35.04

8 0.08 216.99 71.99

9 0.08 217.06 77.06

10 0.08 214.81 21.81

11 0.08 214.79 21.79

12 0.08 214.59 26.59

13 0.08 173.35 57.35

14 0.08 173.34 41.34

15 0.08 173.34 60.34

16 0.08 212.42 47.42

17 0.08 212.42 22.42

18 0.08 248.68 38.68

19 0.08 248.69 33.69

20 0.08 247.09 31.09

21 0.08 246.75 43.75

22 0.08 218.94 60.94

23 0.08 219.44 63.44

24 0.08 246.48 53.48

25 0.08 247.92 20.92

26 0.08 249.22 14.22

27 0.08 248.81 26.81

28 0.08 248.71 25.71

29 0.08 214.56 20.56

30 0.08 214.55 25.55

31 0.08 214.52 46.52

32 0.08 214.52 49.52

33 0.08 178.26 42.26

34 0.08 247.21 28.21

U1 0.00 173.25 92.25

U2 0.00 173.26 67.26

U3 0.00 173.29 51.29

U4 0.00 173.33 45.33

U5 0.00 173.35 57.35

U6 0.00 173.35 60.35

U7 0.00 173.34 40.34

U8 0.00 173.76 36.76

U9 0.00 214.59 25.59

U10 0.00 214.79 20.79

U11 0.00 214.81 21.81

U12 0.00 215.04 34.04

U13 0.00 215.08 37.08

U14 0.00 216.99 71.99

U15 0.00 217.06 76.06

U16 0.00 218.95 61.95

U17 0.00 219.44 64.44

U18 0.00 246.48 52.48

U19 0.00 246.75 43.75

U20 0.00 247.09 32.09

51

U21 0.00 247.21 28.21

U22 0.00 247.92 20.92

U23 0.00 249.22 14.22

U24 0.00 248.82 25.82

U25 0.00 248.71 24.71

U26 0.00 214.56 19.56

U27 0.00 214.55 24.55

U28 0.00 214.52 47.52

U29 0.00 214.52 49.52

U30 0.00 178.27 43.27

U31 0.00 248.69 34.69

U32 0.00 248.69 37.69

U33 0.00 212.43 22.43

U34 0.00 212.42 48.42

PV2 0.00 173.36 56.36

PV6 0.00 248.86 26.86

A1 0.00 252.99 50.99

A2 0.00 264.52 162.52

A3 0.00 248.55 53.55

A4 0.00 214.51 79.51

A5 0.00 248.67 58.67

A6 0.00 245.63 90.63

A7 0.00 214.36 77.36

P1 -0.97 202.00 0.00

P2 -0.87 102.00 0.00

R1 -1.00 249.52 13.52

Resultado nos Trechos às 10:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.08 0.04 0.08

T2 0.08 0.02 0.01

T3 0.17 0.04 0.04

T4 0.25 0.06 0.08

52

T5A 0.33 0.08 0.14

T5B 0.25 0.06 0.08

T6 0.17 0.04 0.04

T7 0.08 0.02 0.01

T8 0.58 0.13 0.40

T9 0.67 0.15 0.51

T10 0.75 0.17 0.64

T11 0.83 0.19 0.78

T12 0.92 0.21 0.93

T13 1.00 0.23 1.09

T14 1.08 0.25 1.26

T15 1.17 0.26 1.45

T16 1.25 0.28 1.64

T17 1.33 0.30 1.85

T18 1.42 0.32 2.07

T19 1.50 0.34 2.31

T20 1.58 0.36 2.55

T21 1.67 0.38 2.80

T22 1.75 0.40 3.07

T23 1.83 0.41 3.34

T24 0.92 0.21 0.93

T25 0.58 0.13 0.40

T25B 0.50 0.11 0.30

T26 0.42 0.09 0.21

T27 0.33 0.08 0.14

T28 0.25 0.06 0.08

T29 0.17 0.04 0.04

T30 0.08 0.02 0.01

T31 0.33 0.08 0.14

T32 0.25 0.06 0.08

T33 0.17 0.04 0.04

T34 0.08 0.02 0.01

T35 0.08 0.04 0.08

T36 0.08 0.04 0.08

T37 0.08 0.04 0.08

T38 0.08 0.04 0.08

T39 0.08 0.04 0.08

T40 0.08 0.04 0.08

T41 0.08 0.04 0.08

T42 0.08 0.04 0.08

T43 0.08 0.04 0.08

T44 0.08 0.04 0.08

T45 0.08 0.04 0.08

T46 0.08 0.04 0.08

T47 0.08 0.04 0.08

T48 0.08 0.04 0.08

T49 0.08 0.04 0.08

T50 0.08 0.04 0.08

T51 0.08 0.04 0.08

T52 0.08 0.04 0.08

53

T53 0.08 0.04 0.08

T54 0.08 0.04 0.08

T55 0.08 0.04 0.08

T56 0.08 0.04 0.08

T57 0.08 0.04 0.08

T58 0.08 0.04 0.08

T59 0.08 0.04 0.08

T60 0.08 0.04 0.08

T61 0.08 0.04 0.08

T62 0.08 0.04 0.08

T63 0.08 0.04 0.08

T64 0.08 0.04 0.08

T65 0.08 0.04 0.08

T66 0.08 0.04 0.08

T67 0.08 0.04 0.08

T68 2.83 0.64 7.49

T69 0.97 0.49 7.41

T70 0.87 0.44 6.00

1 0.97 0.00 -50.99

2 0.87 0.00 -162.52

3 0.42 0.09 33.98

4 0.08 0.02 36.25

5 0.17 0.04 36.25

6 1.42 0.32 26.19

7 0.67 0.15 40.60

Resultado nos Nós às 11:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.10 139.60 15.60

2 0.10 139.56 33.56

3 0.10 139.55 58.55

4 0.10 140.26 5.26

54

5 0.10 139.65 11.65

6 0.10 199.73 20.73

7 0.10 199.67 19.67

8 0.10 202.41 57.41

9 0.10 202.50 62.50

10 0.10 199.36 6.36

11 0.10 199.32 6.32

12 0.10 199.05 11.05

13 0.10 139.69 23.69

14 0.10 139.67 7.67

15 0.10 139.67 26.67

16 0.10 195.62 30.62

17 0.10 195.63 5.63

18 0.10 247.84 37.84

19 0.10 247.85 32.85

20 0.10 245.60 29.60

21 0.10 245.13 42.13

22 0.10 205.15 47.15

23 0.10 205.85 49.85

24 0.10 244.75 51.75

25 0.10 246.77 19.77

26 0.10 248.59 13.59

27 0.10 248.02 26.02

28 0.10 247.88 24.88

29 0.10 198.71 4.71

30 0.10 198.70 9.70

31 0.10 198.65 30.65

32 0.10 198.65 33.65

33 0.10 146.44 10.44

34 0.10 245.78 26.78

U1 0.00 139.55 58.55

U2 0.00 139.56 33.56

U3 0.00 139.60 17.60

U4 0.00 139.66 11.66

U5 0.00 139.69 23.69

U6 0.00 139.68 26.68

U7 0.00 139.68 6.68

U8 0.00 140.26 3.26

U9 0.00 199.05 10.05

U10 0.00 199.32 5.32

U11 0.00 199.36 6.36

U12 0.00 199.67 18.67

U13 0.00 199.73 21.73

U14 0.00 202.41 57.41

U15 0.00 202.51 61.51

U16 0.00 205.15 48.15

U17 0.00 205.85 50.85

U18 0.00 244.75 50.75

U19 0.00 245.13 42.13

U20 0.00 245.60 30.60

55

U21 0.00 245.78 26.78

U22 0.00 246.77 19.77

U23 0.00 248.59 13.59

U24 0.00 248.02 25.02

U25 0.00 247.88 23.88

U26 0.00 198.71 3.71

U27 0.00 198.70 8.70

U28 0.00 198.65 31.65

U29 0.00 198.65 33.65

U30 0.00 146.44 11.44

U31 0.00 247.85 33.85

U32 0.00 247.84 36.84

U33 0.00 195.63 5.63

U34 0.00 195.63 31.63

PV2 0.00 139.70 22.70

PV6 0.00 248.09 26.09

A1 0.00 252.56 50.56

A2 0.00 264.15 162.15

A3 0.00 247.65 52.65

A4 0.00 198.64 63.64

A5 0.00 247.83 57.83

A6 0.00 243.56 88.56

A7 0.00 198.72 61.72

P1 -0.98 202.00 0.00

P2 -0.87 102.00 0.00

R1 -1.55 249.01 13.01

Resultado nos Trechos às 11:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.10 0.05 0.11

T2 0.10 0.02 0.02

T3 0.20 0.05 0.06

T4 0.30 0.07 0.12

56

T5A 0.40 0.09 0.20

T5B 0.30 0.07 0.12

T6 0.20 0.05 0.06

T7 0.10 0.02 0.02

T8 0.70 0.16 0.56

T9 0.80 0.18 0.72

T10 0.90 0.20 0.90

T11 1.00 0.23 1.09

T12 1.10 0.25 1.30

T13 1.20 0.27 1.52

T14 1.30 0.29 1.77

T15 1.40 0.32 2.03

T16 1.50 0.34 2.31

T17 1.60 0.36 2.60

T18 1.70 0.38 2.91

T19 1.80 0.41 3.23

T20 1.90 0.43 3.57

T21 2.00 0.45 3.93

T22 2.10 0.48 4.30

T23 2.20 0.50 4.69

T24 1.10 0.25 1.30

T25 0.70 0.16 0.56

T25B 0.60 0.14 0.42

T26 0.50 0.11 0.30

T27 0.40 0.09 0.20

T28 0.30 0.07 0.12

T29 0.20 0.05 0.06

T30 0.10 0.02 0.02

T31 0.40 0.09 0.20

T32 0.30 0.07 0.12

T33 0.20 0.05 0.06

T34 0.10 0.02 0.02

T35 0.10 0.05 0.11

T36 0.10 0.05 0.11

T37 0.10 0.05 0.11

T38 0.10 0.05 0.11

T39 0.10 0.05 0.11

T40 0.10 0.05 0.11

T41 0.10 0.05 0.11

T42 0.10 0.05 0.11

T43 0.10 0.05 0.11

T44 0.10 0.05 0.11

T45 0.10 0.05 0.11

T46 0.10 0.05 0.11

T47 0.10 0.05 0.11

T48 0.10 0.05 0.11

T49 0.10 0.05 0.11

T50 0.10 0.05 0.11

T51 0.10 0.05 0.11

T52 0.10 0.05 0.11

57

T53 0.10 0.05 0.11

T54 0.10 0.05 0.11

T55 0.10 0.05 0.11

T56 0.10 0.05 0.11

T57 0.10 0.05 0.11

T58 0.10 0.05 0.11

T59 0.10 0.05 0.11

T60 0.10 0.05 0.11

T61 0.10 0.05 0.11

T62 0.10 0.05 0.11

T63 0.10 0.05 0.11

T64 0.10 0.05 0.11

T65 0.10 0.05 0.11

T66 0.10 0.05 0.11

T67 0.10 0.05 0.11

T68 3.40 0.77 10.49

T69 0.98 0.50 7.59

T70 0.87 0.44 6.06

1 0.98 0.00 -50.56

2 0.87 0.00 -162.15

3 0.50 0.11 48.93

4 0.10 0.02 52.20

5 0.20 0.05 52.20

6 1.70 0.38 37.71

7 0.80 0.18 58.46

Resultado nos Nós às 12:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.09 161.59 37.59

2 0.09 161.56 55.56

3 0.09 161.55 80.55

58

4 0.09 162.12 27.12

5 0.09 161.64 33.64

6 0.09 209.12 30.12

7 0.09 209.08 29.08

8 0.09 211.28 66.28

9 0.09 211.35 71.35

10 0.09 208.82 15.82

11 0.09 208.80 15.80

12 0.09 208.58 20.58

13 0.09 161.66 45.66

14 0.09 161.65 29.65

15 0.09 161.65 48.65

16 0.09 206.02 41.02

17 0.09 206.03 16.03

18 0.09 247.28 37.28

19 0.09 247.29 32.29

20 0.09 245.48 29.48

21 0.09 245.10 42.10

22 0.09 213.48 55.48

23 0.09 214.04 58.04

24 0.09 244.80 51.80

25 0.09 246.42 19.42

26 0.09 247.88 12.88

27 0.09 247.43 25.43

28 0.09 247.31 24.31

29 0.09 208.46 14.46

30 0.09 208.45 19.45

31 0.09 208.41 40.41

32 0.09 208.41 43.41

33 0.09 167.16 31.16

34 0.09 245.62 26.62

U1 0.00 161.55 80.55

U2 0.00 161.56 55.56

U3 0.00 161.59 39.59

U4 0.00 161.64 33.64

U5 0.00 161.67 45.67

U6 0.00 161.66 48.66

U7 0.00 161.65 28.65

U8 0.00 162.12 25.12

U9 0.00 208.58 19.58

U10 0.00 208.80 14.80

U11 0.00 208.83 15.83

U12 0.00 209.08 28.08

U13 0.00 209.13 31.13

U14 0.00 211.28 66.28

U15 0.00 211.36 70.36

U16 0.00 213.48 56.48

U17 0.00 214.04 59.04

U18 0.00 244.80 50.80

U19 0.00 245.10 42.10

59

U20 0.00 245.48 30.48

U21 0.00 245.62 26.62

U22 0.00 246.42 19.42

U23 0.00 247.88 12.88

U24 0.00 247.43 24.43

U25 0.00 247.31 23.31

U26 0.00 208.46 13.46

U27 0.00 208.45 18.45

U28 0.00 208.41 41.41

U29 0.00 208.41 43.41

U30 0.00 167.16 32.16

U31 0.00 247.29 33.29

U32 0.00 247.28 36.28

U33 0.00 206.03 16.03

U34 0.00 206.03 42.03

PV2 0.00 161.67 44.67

PV6 0.00 247.48 25.48

A1 0.00 251.91 49.91

A2 0.00 263.57 161.57

A3 0.00 247.13 52.13

A4 0.00 208.41 73.41

A5 0.00 247.27 57.27

A6 0.00 243.84 88.84

A7 0.00 208.31 71.31

P1 -1.00 202.00 0.00

P2 -0.88 102.00 0.00

R1 -1.14 248.22 12.22

Resultado nos Trechos às 12:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.09 0.05 0.09

T2 0.09 0.02 0.01

T3 0.18 0.04 0.04

60

T4 0.27 0.06 0.09

T5A 0.36 0.08 0.16

T5B 0.27 0.06 0.09

T6 0.18 0.04 0.04

T7 0.09 0.02 0.01

T8 0.62 0.14 0.45

T9 0.71 0.16 0.58

T10 0.80 0.18 0.72

T11 0.89 0.20 0.88

T12 0.98 0.22 1.04

T13 1.07 0.24 1.23

T14 1.16 0.26 1.42

T15 1.24 0.28 1.63

T16 1.33 0.30 1.85

T17 1.42 0.32 2.09

T18 1.51 0.34 2.34

T19 1.60 0.36 2.60

T20 1.69 0.38 2.87

T21 1.78 0.40 3.16

T22 1.87 0.42 3.46

T23 1.96 0.44 3.77

T24 0.98 0.22 1.04

T25 0.62 0.14 0.45

T25B 0.53 0.12 0.34

T26 0.44 0.10 0.24

T27 0.36 0.08 0.16

T28 0.27 0.06 0.09

T29 0.18 0.04 0.04

T30 0.09 0.02 0.01

T31 0.36 0.08 0.16

T32 0.27 0.06 0.09

T33 0.18 0.04 0.04

T34 0.09 0.02 0.01

T35 0.09 0.05 0.09

T36 0.09 0.05 0.09

T37 0.09 0.05 0.09

T38 0.09 0.05 0.09

T39 0.09 0.05 0.09

T40 0.09 0.05 0.09

T41 0.09 0.05 0.09

T42 0.09 0.05 0.09

T43 0.09 0.05 0.09

T44 0.09 0.05 0.09

T45 0.09 0.05 0.09

T46 0.09 0.05 0.09

T47 0.09 0.05 0.09

T48 0.09 0.05 0.09

T49 0.09 0.05 0.09

T50 0.09 0.05 0.09

T51 0.09 0.05 0.09

61

T52 0.09 0.05 0.09

T53 0.09 0.05 0.09

T54 0.09 0.05 0.09

T55 0.09 0.05 0.09

T56 0.09 0.05 0.09

T57 0.09 0.05 0.09

T58 0.09 0.05 0.09

T59 0.09 0.05 0.09

T60 0.09 0.05 0.09

T61 0.09 0.05 0.09

T62 0.09 0.05 0.09

T63 0.09 0.05 0.09

T64 0.09 0.05 0.09

T65 0.09 0.05 0.09

T66 0.09 0.05 0.09

T67 0.09 0.05 0.09

T68 3.02 0.68 8.44

T69 1.00 0.51 7.88

T70 0.88 0.45 6.14

1 1.00 0.00 -49.91

2 0.88 0.00 -161.57

3 0.44 0.10 38.66

4 0.09 0.02 41.24

5 0.18 0.04 41.24

6 1.51 0.34 29.80

7 0.71 0.16 46.19

Resultado nos Nós às 13:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.08 181.15 57.15

2 0.08 181.12 75.12

3 0.08 181.12 100.12

62

4 0.08 181.56 46.56

5 0.08 181.18 53.18

6 0.08 217.56 38.56

7 0.08 217.53 37.53

8 0.08 219.25 74.25

9 0.08 219.31 79.31

10 0.08 217.33 24.33

11 0.08 217.31 24.31

12 0.08 217.14 29.14

13 0.08 181.21 65.21

14 0.08 181.20 49.20

15 0.08 181.19 68.19

16 0.08 215.32 50.32

17 0.08 215.32 25.32

18 0.08 246.91 36.91

19 0.08 246.91 31.91

20 0.08 245.50 29.50

21 0.08 245.20 42.20

22 0.08 220.97 62.97

23 0.08 221.41 65.41

24 0.08 244.97 51.97

25 0.08 246.23 19.23

26 0.08 247.38 12.38

27 0.08 247.02 25.02

28 0.08 246.93 23.93

29 0.08 217.18 23.18

30 0.08 217.17 28.17

31 0.08 217.14 49.14

32 0.08 217.14 52.14

33 0.08 185.56 49.56

34 0.08 245.61 26.61

U1 0.00 181.12 100.12

U2 0.00 181.12 75.12

U3 0.00 181.15 59.15

U4 0.00 181.19 53.19

U5 0.00 181.21 65.21

U6 0.00 181.20 68.20

U7 0.00 181.20 48.20

U8 0.00 181.57 44.57

U9 0.00 217.14 28.14

U10 0.00 217.31 23.31

U11 0.00 217.33 24.33

U12 0.00 217.53 36.53

U13 0.00 217.57 39.57

U14 0.00 219.25 74.25

U15 0.00 219.31 78.31

U16 0.00 220.97 63.97

U17 0.00 221.41 66.41

U18 0.00 244.97 50.97

U19 0.00 245.20 42.20

63

U20 0.00 245.50 30.50

U21 0.00 245.61 26.61

U22 0.00 246.23 19.23

U23 0.00 247.38 12.38

U24 0.00 247.02 24.02

U25 0.00 246.93 22.93

U26 0.00 217.18 22.18

U27 0.00 217.17 27.17

U28 0.00 217.14 50.14

U29 0.00 217.14 52.14

U30 0.00 185.56 50.56

U31 0.00 246.91 32.91

U32 0.00 246.91 35.91

U33 0.00 215.32 25.32

U34 0.00 215.32 51.32

PV2 0.00 181.21 64.21

PV6 0.00 247.06 25.06

A1 0.00 251.43 49.43

A2 0.00 263.15 161.15

A3 0.00 246.78 51.78

A4 0.00 217.14 82.14

A5 0.00 246.90 56.90

A6 0.00 244.22 89.22

A7 0.00 216.93 79.93

P1 -1.02 202.00 0.00

P2 -0.88 102.00 0.00

R1 -0.75 247.64 11.64

Resultado nos Trechos às 13:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.08 0.04 0.07

T2 0.08 0.02 0.01

T3 0.16 0.04 0.03

64

T4 0.23 0.05 0.07

T5A 0.31 0.07 0.13

T5B 0.23 0.05 0.07

T6 0.16 0.04 0.03

T7 0.08 0.02 0.01

T8 0.54 0.12 0.35

T9 0.62 0.14 0.45

T10 0.70 0.16 0.56

T11 0.78 0.18 0.68

T12 0.86 0.19 0.81

T13 0.93 0.21 0.96

T14 1.01 0.23 1.11

T15 1.09 0.25 1.27

T16 1.17 0.26 1.45

T17 1.24 0.28 1.63

T18 1.32 0.30 1.82

T19 1.40 0.32 2.03

T20 1.48 0.33 2.24

T21 1.56 0.35 2.47

T22 1.63 0.37 2.70

T23 1.71 0.39 2.94

T24 0.86 0.19 0.81

T25 0.54 0.12 0.35

T25B 0.47 0.11 0.27

T26 0.39 0.09 0.19

T27 0.31 0.07 0.13

T28 0.23 0.05 0.07

T29 0.16 0.04 0.03

T30 0.08 0.02 0.01

T31 0.31 0.07 0.13

T32 0.23 0.05 0.07

T33 0.16 0.04 0.03

T34 0.08 0.02 0.01

T35 0.08 0.04 0.07

T36 0.08 0.04 0.07

T37 0.08 0.04 0.07

T38 0.08 0.04 0.07

T39 0.08 0.04 0.07

T40 0.08 0.04 0.07

T41 0.08 0.04 0.07

T42 0.08 0.04 0.07

T43 0.08 0.04 0.07

T44 0.08 0.04 0.07

T45 0.08 0.04 0.07

T46 0.08 0.04 0.07

T47 0.08 0.04 0.07

T48 0.08 0.04 0.07

T49 0.08 0.04 0.07

T50 0.08 0.04 0.07

T51 0.08 0.04 0.07

65

T52 0.08 0.04 0.07

T53 0.08 0.04 0.07

T54 0.08 0.04 0.07

T55 0.08 0.04 0.07

T56 0.08 0.04 0.07

T57 0.08 0.04 0.07

T58 0.08 0.04 0.07

T59 0.08 0.04 0.07

T60 0.08 0.04 0.07

T61 0.08 0.04 0.07

T62 0.08 0.04 0.07

T63 0.08 0.04 0.07

T64 0.08 0.04 0.07

T65 0.08 0.04 0.07

T66 0.08 0.04 0.07

T67 0.08 0.04 0.07

T68 2.64 0.60 6.59

T69 1.02 0.52 8.09

T70 0.88 0.45 6.21

1 1.02 0.00 -49.43

2 0.88 0.00 -161.15

3 0.39 0.09 29.60

4 0.08 0.02 31.58

5 0.16 0.04 31.58

6 1.32 0.30 22.81

7 0.62 0.14 35.37

Resultado nos Nós às 14:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.08 171.03 47.03

2 0.08 171.00 65.00

3 0.08 170.99 89.99

66

4 0.08 171.50 36.50

5 0.08 171.07 43.07

6 0.08 212.82 33.82

7 0.08 212.78 32.78

8 0.08 214.73 69.73

9 0.08 214.80 74.80

10 0.08 212.55 19.55

11 0.08 212.53 19.53

12 0.08 212.33 24.33

13 0.08 171.09 55.09

14 0.08 171.08 39.08

15 0.08 171.08 58.08

16 0.08 210.16 45.16

17 0.08 210.17 20.17

18 0.08 246.43 36.43

19 0.08 246.43 31.43

20 0.08 244.83 28.83

21 0.08 244.49 41.49

22 0.08 216.69 58.69

23 0.08 217.18 61.18

24 0.08 244.22 51.22

25 0.08 245.66 18.66

26 0.08 246.96 11.96

27 0.08 246.56 24.56

28 0.08 246.45 23.45

29 0.08 212.30 18.30

30 0.08 212.30 23.30

31 0.08 212.26 44.26

32 0.08 212.26 47.26

33 0.08 176.01 40.01

34 0.08 244.95 25.95

U1 0.00 170.99 89.99

U2 0.00 171.00 65.00

U3 0.00 171.03 49.03

U4 0.00 171.07 43.07

U5 0.00 171.10 55.10

U6 0.00 171.09 58.09

U7 0.00 171.08 38.08

U8 0.00 171.50 34.50

U9 0.00 212.33 23.33

U10 0.00 212.53 18.53

U11 0.00 212.55 19.55

U12 0.00 212.78 31.78

U13 0.00 212.82 34.82

U14 0.00 214.73 69.73

U15 0.00 214.80 73.80

U16 0.00 216.69 59.69

U17 0.00 217.18 62.18

U18 0.00 244.22 50.22

U19 0.00 244.49 41.49

67

U20 0.00 244.83 29.83

U21 0.00 244.95 25.95

U22 0.00 245.66 18.66

U23 0.00 246.96 11.96

U24 0.00 246.56 23.56

U25 0.00 246.45 22.45

U26 0.00 212.30 17.30

U27 0.00 212.30 22.30

U28 0.00 212.26 45.26

U29 0.00 212.26 47.26

U30 0.00 176.01 41.01

U31 0.00 246.43 32.43

U32 0.00 246.43 35.43

U33 0.00 210.17 20.17

U34 0.00 210.17 46.17

PV2 0.00 171.10 54.10

PV6 0.00 246.61 24.61

A1 0.00 251.11 49.11

A2 0.00 262.87 160.87

A3 0.00 246.29 51.29

A4 0.00 212.26 77.26

A5 0.00 246.42 56.42

A6 0.00 243.37 88.37

A7 0.00 212.10 75.10

P1 -1.03 202.00 0.00

P2 -0.88 102.00 0.00

R1 -0.92 247.26 11.26

Resultado nos Trechos às 14:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.08 0.04 0.08

T2 0.08 0.02 0.01

T3 0.17 0.04 0.04

68

T4 0.25 0.06 0.08

T5A 0.33 0.08 0.14

T5B 0.25 0.06 0.08

T6 0.17 0.04 0.04

T7 0.08 0.02 0.01

T8 0.58 0.13 0.40

T9 0.67 0.15 0.51

T10 0.75 0.17 0.64

T11 0.83 0.19 0.78

T12 0.92 0.21 0.93

T13 1.00 0.23 1.09

T14 1.08 0.25 1.26

T15 1.17 0.26 1.45

T16 1.25 0.28 1.64

T17 1.33 0.30 1.85

T18 1.42 0.32 2.07

T19 1.50 0.34 2.31

T20 1.58 0.36 2.55

T21 1.67 0.38 2.80

T22 1.75 0.40 3.07

T23 1.83 0.41 3.34

T24 0.92 0.21 0.93

T25 0.58 0.13 0.40

T25B 0.50 0.11 0.30

T26 0.42 0.09 0.21

T27 0.33 0.08 0.14

T28 0.25 0.06 0.08

T29 0.17 0.04 0.04

T30 0.08 0.02 0.01

T31 0.33 0.08 0.14

T32 0.25 0.06 0.08

T33 0.17 0.04 0.04

T34 0.08 0.02 0.01

T35 0.08 0.04 0.08

T36 0.08 0.04 0.08

T37 0.08 0.04 0.08

T38 0.08 0.04 0.08

T39 0.08 0.04 0.08

T40 0.08 0.04 0.08

T41 0.08 0.04 0.08

T42 0.08 0.04 0.08

T43 0.08 0.04 0.08

T44 0.08 0.04 0.08

T45 0.08 0.04 0.08

T46 0.08 0.04 0.08

T47 0.08 0.04 0.08

T48 0.08 0.04 0.08

T49 0.08 0.04 0.08

T50 0.08 0.04 0.08

T51 0.08 0.04 0.08

69

T52 0.08 0.04 0.08

T53 0.08 0.04 0.08

T54 0.08 0.04 0.08

T55 0.08 0.04 0.08

T56 0.08 0.04 0.08

T57 0.08 0.04 0.08

T58 0.08 0.04 0.08

T59 0.08 0.04 0.08

T60 0.08 0.04 0.08

T61 0.08 0.04 0.08

T62 0.08 0.04 0.08

T63 0.08 0.04 0.08

T64 0.08 0.04 0.08

T65 0.08 0.04 0.08

T66 0.08 0.04 0.08

T67 0.08 0.04 0.08

T68 2.83 0.64 7.49

T69 1.03 0.52 8.23

T70 0.88 0.45 6.25

1 1.03 0.00 -49.11

2 0.88 0.00 -160.87

3 0.42 0.09 33.98

4 0.08 0.02 36.25

5 0.17 0.04 36.25

6 1.42 0.32 26.19

7 0.67 0.15 40.60

Resultado nos Nós às 15:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.09 160.16 36.16

2 0.09 160.13 54.13

3 0.09 160.12 79.12

70

4 0.09 160.69 25.69

5 0.09 160.20 32.20

6 0.09 207.69 28.69

7 0.09 207.65 27.65

8 0.09 209.85 64.85

9 0.09 209.92 69.92

10 0.09 207.39 14.39

11 0.09 207.36 14.36

12 0.09 207.14 19.14

13 0.09 160.23 44.23

14 0.09 160.22 28.22

15 0.09 160.21 47.21

16 0.09 204.59 39.59

17 0.09 204.60 14.60

18 0.09 245.85 35.85

19 0.09 245.86 30.86

20 0.09 244.05 28.05

21 0.09 243.67 40.67

22 0.09 212.05 54.05

23 0.09 212.61 56.61

24 0.09 243.37 50.37

25 0.09 244.99 17.99

26 0.09 246.45 11.45

27 0.09 246.00 24.00

28 0.09 245.88 22.88

29 0.09 207.03 13.03

30 0.09 207.02 18.02

31 0.09 206.98 38.98

32 0.09 206.98 41.98

33 0.09 165.73 29.73

34 0.09 244.19 25.19

U1 0.00 160.12 79.12

U2 0.00 160.13 54.13

U3 0.00 160.16 38.16

U4 0.00 160.21 32.21

U5 0.00 160.23 44.23

U6 0.00 160.23 47.23

U7 0.00 160.22 27.22

U8 0.00 160.69 23.69

U9 0.00 207.15 18.15

U10 0.00 207.37 13.37

U11 0.00 207.39 14.39

U12 0.00 207.65 26.65

U13 0.00 207.70 29.70

U14 0.00 209.85 64.85

U15 0.00 209.92 68.92

U16 0.00 212.05 55.05

U17 0.00 212.61 57.61

U18 0.00 243.37 49.37

U19 0.00 243.67 40.67

71

U20 0.00 244.05 29.05

U21 0.00 244.19 25.19

U22 0.00 244.99 17.99

U23 0.00 246.45 11.45

U24 0.00 246.00 23.00

U25 0.00 245.88 21.88

U26 0.00 207.03 12.03

U27 0.00 207.02 17.02

U28 0.00 206.98 39.98

U29 0.00 206.98 41.98

U30 0.00 165.73 30.73

U31 0.00 245.86 31.86

U32 0.00 245.85 34.85

U33 0.00 204.60 14.60

U34 0.00 204.59 40.59

PV2 0.00 160.24 43.24

PV6 0.00 246.05 24.05

A1 0.00 250.72 48.72

A2 0.00 262.53 160.53

A3 0.00 245.69 50.69

A4 0.00 206.97 71.97

A5 0.00 245.84 55.84

A6 0.00 242.41 87.41

A7 0.00 206.88 69.88

P1 -1.04 202.00 0.00

P2 -0.89 102.00 0.00

R1 -1.10 246.79 10.79

Resultado nos Trechos às 15:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.09 0.05 0.09

T2 0.09 0.02 0.01

T3 0.18 0.04 0.04

72

T4 0.27 0.06 0.09

T5A 0.36 0.08 0.16

T5B 0.27 0.06 0.09

T6 0.18 0.04 0.04

T7 0.09 0.02 0.01

T8 0.62 0.14 0.45

T9 0.71 0.16 0.58

T10 0.80 0.18 0.72

T11 0.89 0.20 0.87

T12 0.98 0.22 1.04

T13 1.07 0.24 1.23

T14 1.16 0.26 1.42

T15 1.24 0.28 1.63

T16 1.33 0.30 1.85

T17 1.42 0.32 2.09

T18 1.51 0.34 2.34

T19 1.60 0.36 2.60

T20 1.69 0.38 2.87

T21 1.78 0.40 3.16

T22 1.87 0.42 3.46

T23 1.96 0.44 3.77

T24 0.98 0.22 1.04

T25 0.62 0.14 0.45

T25B 0.53 0.12 0.34

T26 0.44 0.10 0.24

T27 0.36 0.08 0.16

T28 0.27 0.06 0.09

T29 0.18 0.04 0.04

T30 0.09 0.02 0.01

T31 0.36 0.08 0.16

T32 0.27 0.06 0.09

T33 0.18 0.04 0.04

T34 0.09 0.02 0.01

T35 0.09 0.05 0.09

T36 0.09 0.05 0.09

T37 0.09 0.05 0.09

T38 0.09 0.05 0.09

T39 0.09 0.05 0.09

T40 0.09 0.05 0.09

T41 0.09 0.05 0.09

T42 0.09 0.05 0.09

T43 0.09 0.05 0.09

T44 0.09 0.05 0.09

T45 0.09 0.05 0.09

T46 0.09 0.05 0.09

T47 0.09 0.05 0.09

T48 0.09 0.05 0.09

T49 0.09 0.05 0.09

T50 0.09 0.05 0.09

T51 0.09 0.05 0.09

73

T52 0.09 0.05 0.09

T53 0.09 0.05 0.09

T54 0.09 0.05 0.09

T55 0.09 0.05 0.09

T56 0.09 0.05 0.09

T57 0.09 0.05 0.09

T58 0.09 0.05 0.09

T59 0.09 0.05 0.09

T60 0.09 0.05 0.09

T61 0.09 0.05 0.09

T62 0.09 0.05 0.09

T63 0.09 0.05 0.09

T64 0.09 0.05 0.09

T65 0.09 0.05 0.09

T66 0.09 0.05 0.09

T67 0.09 0.05 0.09

T68 3.02 0.68 8.44

T69 1.04 0.53 8.40

T70 0.89 0.45 6.30

1 1.04 0.00 -48.72

2 0.89 0.00 -160.53

3 0.44 0.10 38.66

4 0.09 0.02 41.24

5 0.18 0.04 41.24

6 1.51 0.34 29.80

7 0.71 0.16 46.19

Resultado nos Nós às 16:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.10 136.82 12.82

2 0.10 136.78 30.78

3 0.10 136.77 55.77

74

4 0.10 137.48 2.48

5 0.10 136.88 8.88

6 0.10 196.95 17.95

7 0.10 196.89 16.89

8 0.10 199.63 54.63

9 0.10 199.73 59.73

10 0.10 196.58 3.58

11 0.10 196.54 3.54

12 0.10 196.27 8.27

13 0.10 136.91 20.91

14 0.10 136.90 4.90

15 0.10 136.89 23.89

16 0.10 192.85 27.85

17 0.10 192.85 2.85

18 0.10 245.06 35.06

19 0.10 245.07 30.07

20 0.10 242.82 26.82

21 0.10 242.35 39.35

22 0.10 202.37 44.37

23 0.10 203.07 47.07

24 0.10 241.97 48.97

25 0.10 243.99 16.99

26 0.10 245.81 10.81

27 0.10 245.24 23.24

28 0.10 245.10 22.10

29 0.10 195.93 1.93

30 0.10 195.92 6.92

31 0.10 195.87 27.87

32 0.10 195.87 30.87

33 0.10 143.67 7.67

34 0.10 243.00 24.00

U1 0.00 136.77 55.77

U2 0.00 136.78 30.78

U3 0.00 136.82 14.82

U4 0.00 136.88 8.88

U5 0.00 136.91 20.91

U6 0.00 136.91 23.91

U7 0.00 136.90 3.90

U8 0.00 137.48 0.48

U9 0.00 196.27 7.27

U10 0.00 196.55 2.55

U11 0.00 196.58 3.58

U12 0.00 196.90 15.90

U13 0.00 196.96 18.96

U14 0.00 199.63 54.63

U15 0.00 199.73 58.73

U16 0.00 202.38 45.38

U17 0.00 203.07 48.07

U18 0.00 241.98 47.98

U19 0.00 242.35 39.35

75

U20 0.00 242.82 27.82

U21 0.00 243.00 24.00

U22 0.00 243.99 16.99

U23 0.00 245.81 10.81

U24 0.00 245.25 22.25

U25 0.00 245.10 21.10

U26 0.00 195.93 0.93

U27 0.00 195.92 5.92

U28 0.00 195.87 28.87

U29 0.00 195.87 30.87

U30 0.00 143.67 8.67

U31 0.00 245.07 31.07

U32 0.00 245.06 34.06

U33 0.00 192.85 2.85

U34 0.00 192.85 28.85

PV2 0.00 136.92 19.92

PV6 0.00 245.31 23.31

A1 0.00 250.26 48.26

A2 0.00 262.12 160.12

A3 0.00 244.87 49.87

A4 0.00 195.86 60.86

A5 0.00 245.05 55.05

A6 0.00 240.78 85.78

A7 0.00 195.95 58.95

P1 -1.05 202.00 0.00

P2 -0.89 102.00 0.00

R1 -1.46 246.23 10.23

Resultado nos Trechos às 16:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.10 0.05 0.11

T2 0.10 0.02 0.02

T3 0.20 0.05 0.06

76

T4 0.30 0.07 0.12

T5A 0.40 0.09 0.20

T5B 0.30 0.07 0.12

T6 0.20 0.05 0.06

T7 0.10 0.02 0.02

T8 0.70 0.16 0.56

T9 0.80 0.18 0.72

T10 0.90 0.20 0.90

T11 1.00 0.23 1.09

T12 1.10 0.25 1.30

T13 1.20 0.27 1.52

T14 1.30 0.29 1.77

T15 1.40 0.32 2.03

T16 1.50 0.34 2.31

T17 1.60 0.36 2.60

T18 1.70 0.38 2.91

T19 1.80 0.41 3.23

T20 1.90 0.43 3.57

T21 2.00 0.45 3.93

T22 2.10 0.48 4.30

T23 2.20 0.50 4.69

T24 1.10 0.25 1.30

T25 0.70 0.16 0.56

T25B 0.60 0.14 0.42

T26 0.50 0.11 0.30

T27 0.40 0.09 0.20

T28 0.30 0.07 0.12

T29 0.20 0.05 0.05

T30 0.10 0.02 0.02

T31 0.40 0.09 0.20

T32 0.30 0.07 0.12

T33 0.20 0.05 0.06

T34 0.10 0.02 0.02

T35 0.10 0.05 0.11

T36 0.10 0.05 0.11

T37 0.10 0.05 0.11

T38 0.10 0.05 0.11

T39 0.10 0.05 0.11

T40 0.10 0.05 0.11

T41 0.10 0.05 0.11

T42 0.10 0.05 0.11

T43 0.10 0.05 0.11

T44 0.10 0.05 0.11

T45 0.10 0.05 0.11

T46 0.10 0.05 0.11

T47 0.10 0.05 0.11

T48 0.10 0.05 0.11

T49 0.10 0.05 0.11

T50 0.10 0.05 0.11

T51 0.10 0.05 0.11

77

T52 0.10 0.05 0.11

T53 0.10 0.05 0.11

T54 0.10 0.05 0.11

T55 0.10 0.05 0.11

T56 0.10 0.05 0.11

T57 0.10 0.05 0.11

T58 0.10 0.05 0.11

T59 0.10 0.05 0.11

T60 0.10 0.05 0.11

T61 0.10 0.05 0.11

T62 0.10 0.05 0.11

T63 0.10 0.05 0.11

T64 0.10 0.05 0.11

T65 0.10 0.05 0.11

T66 0.10 0.05 0.11

T67 0.10 0.05 0.11

T68 3.40 0.77 10.49

T69 1.05 0.54 8.60

T70 0.89 0.45 6.36

1 1.05 0.00 -48.26

2 0.89 0.00 -160.12

3 0.50 0.11 48.93

4 0.10 0.02 52.20

5 0.20 0.05 52.20

6 1.70 0.38 37.71

7 0.80 0.18 58.46

Resultado nos Nós às 17:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.07 188.08 64.08

2 0.07 188.06 82.06

78

3 0.07 188.05 107.05

4 0.07 188.44 53.44

5 0.07 188.11 60.11

6 0.07 219.49 40.49

7 0.07 219.46 39.46

8 0.07 220.95 75.95

9 0.07 221.01 81.01

10 0.07 219.28 26.28

11 0.07 219.27 26.27

12 0.07 219.12 31.12

13 0.07 188.13 72.13

14 0.07 188.12 56.12

15 0.07 188.12 75.12

16 0.07 217.61 52.61

17 0.07 217.62 27.62

18 0.07 244.85 34.85

19 0.07 244.85 29.85

20 0.07 243.62 27.62

21 0.07 243.37 40.37

22 0.07 222.46 64.46

23 0.07 222.84 66.84

24 0.07 243.16 50.16

25 0.07 244.26 17.26

26 0.07 245.26 10.26

27 0.07 244.95 22.95

28 0.07 244.87 21.87

29 0.07 219.22 25.22

30 0.07 219.21 30.21

31 0.07 219.19 51.19

32 0.07 219.18 54.18

33 0.07 191.95 55.95

34 0.07 243.72 24.72

U1 0.00 188.05 107.05

U2 0.00 188.06 82.06

U3 0.00 188.08 66.08

U4 0.00 188.11 60.11

U5 0.00 188.13 72.13

U6 0.00 188.13 75.13

U7 0.00 188.12 55.12

U8 0.00 188.44 51.44

U9 0.00 219.12 30.12

U10 0.00 219.27 25.27

U11 0.00 219.28 26.28

U12 0.00 219.46 38.46

U13 0.00 219.49 41.49

U14 0.00 220.96 75.96

U15 0.00 221.01 80.01

U16 0.00 222.46 65.46

U17 0.00 222.84 67.84

U18 0.00 243.16 49.16

79

U19 0.00 243.37 40.37

U20 0.00 243.63 28.63

U21 0.00 243.72 24.72

U22 0.00 244.26 17.26

U23 0.00 245.26 10.26

U24 0.00 244.95 21.95

U25 0.00 244.87 20.87

U26 0.00 219.22 24.22

U27 0.00 219.21 29.21

U28 0.00 219.19 52.19

U29 0.00 219.19 54.19

U30 0.00 191.96 56.96

U31 0.00 244.86 30.86

U32 0.00 244.85 33.85

U33 0.00 217.62 27.62

U34 0.00 217.61 53.61

PV2 0.00 188.14 71.14

PV6 0.00 244.99 22.99

A1 0.00 249.64 47.64

A2 0.00 261.58 159.58

A3 0.00 244.74 49.74

A4 0.00 219.18 84.18

A5 0.00 244.84 54.84

A6 0.00 242.51 87.51

A7 0.00 218.94 81.94

P1 -1.07 202.00 0.00

P2 -0.90 102.00 0.00

R1 -0.49 245.49 9.49

Resultado nos Trechos às 17:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.07 0.04 0.06

T2 0.07 0.02 0.01

80

T3 0.14 0.03 0.03

T4 0.22 0.05 0.06

T5A 0.29 0.07 0.11

T5B 0.22 0.05 0.06

T6 0.14 0.03 0.03

T7 0.07 0.02 0.01

T8 0.51 0.11 0.31

T9 0.58 0.13 0.39

T10 0.65 0.15 0.49

T11 0.72 0.16 0.60

T12 0.79 0.18 0.71

T13 0.87 0.20 0.83

T14 0.94 0.21 0.97

T15 1.01 0.23 1.11

T16 1.08 0.25 1.26

T17 1.16 0.26 1.42

T18 1.23 0.28 1.59

T19 1.30 0.29 1.77

T20 1.37 0.31 1.95

T21 1.44 0.33 2.15

T22 1.52 0.34 2.35

T23 1.59 0.36 2.56

T24 0.79 0.18 0.71

T25 0.51 0.11 0.31

T25B 0.43 0.10 0.23

T26 0.36 0.08 0.16

T27 0.29 0.07 0.11

T28 0.22 0.05 0.06

T29 0.14 0.03 0.03

T30 0.07 0.02 0.01

T31 0.29 0.07 0.11

T32 0.22 0.05 0.06

T33 0.14 0.03 0.03

T34 0.07 0.02 0.01

T35 0.07 0.04 0.06

T36 0.07 0.04 0.06

T37 0.07 0.04 0.06

T38 0.07 0.04 0.06

T39 0.07 0.04 0.06

T40 0.07 0.04 0.06

T41 0.07 0.04 0.06

T42 0.07 0.04 0.06

T43 0.07 0.04 0.06

T44 0.07 0.04 0.06

T45 0.07 0.04 0.06

T46 0.07 0.04 0.06

T47 0.07 0.04 0.06

T48 0.07 0.04 0.06

T49 0.07 0.04 0.06

T50 0.07 0.04 0.06

81

T51 0.07 0.04 0.06

T52 0.07 0.04 0.06

T53 0.07 0.04 0.06

T54 0.07 0.04 0.06

T55 0.07 0.04 0.06

T56 0.07 0.04 0.06

T57 0.07 0.04 0.06

T58 0.07 0.04 0.06

T59 0.07 0.04 0.06

T60 0.07 0.04 0.06

T61 0.07 0.04 0.06

T62 0.07 0.04 0.06

T63 0.07 0.04 0.06

T64 0.07 0.04 0.06

T65 0.07 0.04 0.06

T66 0.07 0.04 0.06

T67 0.07 0.04 0.06

T68 2.46 0.56 5.74

T69 1.07 0.54 8.86

T70 0.90 0.46 6.44

1 1.07 0.00 -47.64

2 0.90 0.00 -159.58

3 0.36 0.08 25.52

4 0.07 0.02 27.23

5 0.14 0.03 27.23

6 1.23 0.28 19.67

7 0.58 0.13 30.49

Resultado nos Nós às 18:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.06 211.10 87.10

82

2 0.06 211.09 105.09

3 0.06 211.08 130.08

4 0.06 211.32 76.32

5 0.06 211.12 83.12

6 0.06 229.71 50.71

7 0.06 229.69 49.69

8 0.06 230.61 85.61

9 0.06 230.64 90.64

10 0.06 229.58 36.58

11 0.06 229.57 36.57

12 0.06 229.48 41.48

13 0.06 211.13 95.13

14 0.06 211.13 79.13

15 0.06 211.13 98.13

16 0.06 228.73 63.73

17 0.06 228.73 38.73

18 0.06 244.85 34.85

19 0.06 244.85 29.85

20 0.06 244.09 28.09

21 0.06 243.93 40.93

22 0.06 231.53 73.53

23 0.06 231.77 75.77

24 0.06 243.81 50.81

25 0.06 244.49 17.49

26 0.06 245.10 10.10

27 0.06 244.91 22.91

28 0.06 244.86 21.86

29 0.06 229.68 35.68

30 0.06 229.68 40.68

31 0.06 229.66 61.66

32 0.06 229.66 64.66

33 0.06 213.55 77.55

34 0.06 244.15 25.15

U1 0.00 211.08 130.08

U2 0.00 211.09 105.09

U3 0.00 211.10 89.10

U4 0.00 211.12 83.12

U5 0.00 211.13 95.13

U6 0.00 211.13 98.13

U7 0.00 211.13 78.13

U8 0.00 211.33 74.33

U9 0.00 229.48 40.48

U10 0.00 229.57 35.57

U11 0.00 229.58 36.58

U12 0.00 229.69 48.69

U13 0.00 229.71 51.71

U14 0.00 230.61 85.61

U15 0.00 230.64 89.64

U16 0.00 231.53 74.53

U17 0.00 231.77 76.77

83

U18 0.00 243.81 49.81

U19 0.00 243.94 40.94

U20 0.00 244.09 29.09

U21 0.00 244.15 25.15

U22 0.00 244.49 17.49

U23 0.00 245.10 10.10

U24 0.00 244.91 21.91

U25 0.00 244.86 20.86

U26 0.00 229.68 34.68

U27 0.00 229.68 39.68

U28 0.00 229.66 62.66

U29 0.00 229.66 64.66

U30 0.00 213.55 78.55

U31 0.00 244.85 30.85

U32 0.00 244.85 33.85

U33 0.00 228.73 38.73

U34 0.00 228.73 64.73

PV2 0.00 211.14 94.14

PV6 0.00 244.93 22.93

A1 0.00 249.43 47.43

A2 0.00 261.40 159.40

A3 0.00 244.78 49.78

A4 0.00 229.66 94.66

A5 0.00 244.84 54.84

A6 0.00 243.41 88.41

A7 0.00 229.37 92.37

P1 -1.07 202.00 0.00

P2 -0.90 102.00 0.00

R1 0.09 245.24 9.24

Resultado nos Trechos às 18:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

84

T1 0.06 0.03 0.04

T2 0.06 0.01 0.01

T3 0.11 0.03 0.02

T4 0.17 0.04 0.04

T5A 0.22 0.05 0.07

T5B 0.17 0.04 0.04

T6 0.11 0.03 0.02

T7 0.06 0.01 0.01

T8 0.39 0.09 0.19

T9 0.44 0.10 0.24

T10 0.50 0.11 0.30

T11 0.56 0.13 0.37

T12 0.61 0.14 0.44

T13 0.67 0.15 0.51

T14 0.72 0.16 0.60

T15 0.78 0.18 0.68

T16 0.83 0.19 0.78

T17 0.89 0.20 0.87

T18 0.94 0.21 0.98

T19 1.00 0.23 1.09

T20 1.06 0.24 1.20

T21 1.11 0.25 1.32

T22 1.17 0.26 1.45

T23 1.22 0.28 1.58

T24 0.61 0.14 0.44

T25 0.39 0.09 0.19

T25B 0.33 0.08 0.14

T26 0.28 0.06 0.10

T27 0.22 0.05 0.07

T28 0.17 0.04 0.04

T29 0.11 0.03 0.02

T30 0.06 0.01 0.01

T31 0.22 0.05 0.07

T32 0.17 0.04 0.04

T33 0.11 0.03 0.02

T34 0.06 0.01 0.01

T35 0.06 0.03 0.04

T36 0.06 0.03 0.04

T37 0.06 0.03 0.04

T38 0.06 0.03 0.04

T39 0.06 0.03 0.04

T40 0.06 0.03 0.04

T41 0.06 0.03 0.04

T42 0.06 0.03 0.04

T43 0.06 0.03 0.04

T44 0.06 0.03 0.04

T45 0.06 0.03 0.04

T46 0.06 0.03 0.04

T47 0.06 0.03 0.04

T48 0.06 0.03 0.04

85

T49 0.06 0.03 0.04

T50 0.06 0.03 0.04

T51 0.06 0.03 0.04

T52 0.06 0.03 0.04

T53 0.06 0.03 0.04

T54 0.06 0.03 0.04

T55 0.06 0.03 0.04

T56 0.06 0.03 0.04

T57 0.06 0.03 0.04

T58 0.06 0.03 0.04

T59 0.06 0.03 0.04

T60 0.06 0.03 0.04

T61 0.06 0.03 0.04

T62 0.06 0.03 0.04

T63 0.06 0.03 0.04

T64 0.06 0.03 0.04

T65 0.06 0.03 0.04

T66 0.06 0.03 0.04

T67 0.06 0.03 0.04

T68 1.89 0.43 3.53

T69 1.07 0.55 8.95

T70 0.90 0.46 6.47

1 1.07 0.00 -47.43

2 0.90 0.00 -159.40

3 0.28 0.06 15.10

4 0.06 0.01 16.11

5 0.11 0.03 16.11

6 0.94 0.21 11.64

7 0.44 0.10 18.04

Resultado nos Nós às 19:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

86

1 0.05 217.57 93.57

2 0.05 217.56 111.56

3 0.05 217.56 136.56

4 0.05 217.76 82.76

5 0.05 217.59 89.59

6 0.05 232.65 53.65

7 0.05 232.64 52.64

8 0.05 233.40 88.40

9 0.05 233.42 93.42

10 0.05 232.55 39.55

11 0.05 232.54 39.54

12 0.05 232.47 44.47

13 0.05 217.60 101.60

14 0.05 217.60 85.60

15 0.05 217.59 104.59

16 0.05 231.91 66.91

17 0.05 231.91 41.91

18 0.05 244.96 34.96

19 0.05 244.96 29.96

20 0.05 244.34 28.34

21 0.05 244.21 41.21

22 0.05 234.16 76.16

23 0.05 234.35 78.35

24 0.05 244.11 51.11

25 0.05 244.67 17.67

26 0.05 245.17 10.17

27 0.05 245.01 23.01

28 0.05 244.97 21.97

29 0.05 232.67 38.67

30 0.05 232.67 43.67

31 0.05 232.66 64.66

32 0.05 232.66 67.66

33 0.05 219.61 83.61

34 0.05 244.39 25.39

U1 0.00 217.56 136.56

U2 0.00 217.56 111.56

U3 0.00 217.58 95.58

U4 0.00 217.59 89.59

U5 0.00 217.60 101.60

U6 0.00 217.60 104.60

U7 0.00 217.60 84.60

U8 0.00 217.76 80.76

U9 0.00 232.47 43.47

U10 0.00 232.54 38.54

U11 0.00 232.55 39.55

U12 0.00 232.64 51.64

U13 0.00 232.65 54.65

U14 0.00 233.40 88.40

U15 0.00 233.42 92.42

U16 0.00 234.16 77.16

87

U17 0.00 234.35 79.35

U18 0.00 244.11 50.11

U19 0.00 244.21 41.21

U20 0.00 244.34 29.34

U21 0.00 244.39 25.39

U22 0.00 244.67 17.67

U23 0.00 245.17 10.17

U24 0.00 245.01 22.01

U25 0.00 244.97 20.97

U26 0.00 232.67 37.67

U27 0.00 232.67 42.67

U28 0.00 232.66 65.66

U29 0.00 232.66 67.66

U30 0.00 219.61 84.61

U31 0.00 244.97 30.97

U32 0.00 244.96 33.96

U33 0.00 231.91 41.91

U34 0.00 231.91 67.91

PV2 0.00 217.60 100.60

PV6 0.00 245.03 23.03

A1 0.00 249.47 47.47

A2 0.00 261.43 159.43

A3 0.00 244.91 49.91

A4 0.00 232.66 97.66

A5 0.00 244.96 54.96

A6 0.00 243.78 88.78

A7 0.00 232.37 95.37

P1 -1.07 202.00 0.00

P2 -0.90 102.00 0.00

R1 0.27 245.29 9.29

Resultado nos Trechos às 19:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

88

T1 0.05 0.03 0.03

T2 0.05 0.01 0.00

T3 0.10 0.02 0.02

T4 0.15 0.03 0.03

T5A 0.20 0.05 0.06

T5B 0.15 0.03 0.03

T6 0.10 0.02 0.02

T7 0.05 0.01 0.00

T8 0.35 0.08 0.16

T9 0.40 0.09 0.20

T10 0.45 0.10 0.25

T11 0.50 0.11 0.30

T12 0.55 0.12 0.36

T13 0.60 0.14 0.42

T14 0.65 0.15 0.49

T15 0.70 0.16 0.56

T16 0.75 0.17 0.64

T17 0.80 0.18 0.72

T18 0.85 0.19 0.81

T19 0.90 0.20 0.90

T20 0.95 0.22 0.99

T21 1.00 0.23 1.09

T22 1.05 0.24 1.19

T23 1.10 0.25 1.30

T24 0.55 0.12 0.36

T25 0.35 0.08 0.16

T25B 0.30 0.07 0.12

T26 0.25 0.06 0.08

T27 0.20 0.05 0.06

T28 0.15 0.03 0.03

T29 0.10 0.02 0.02

T30 0.05 0.01 0.00

T31 0.20 0.05 0.06

T32 0.15 0.03 0.03

T33 0.10 0.02 0.02

T34 0.05 0.01 0.00

T35 0.05 0.03 0.03

T36 0.05 0.03 0.03

T37 0.05 0.03 0.03

T38 0.05 0.03 0.03

T39 0.05 0.03 0.03

T40 0.05 0.03 0.03

T41 0.05 0.03 0.03

T42 0.05 0.03 0.03

T43 0.05 0.03 0.03

T44 0.05 0.03 0.03

T45 0.05 0.03 0.03

T46 0.05 0.03 0.03

T47 0.05 0.03 0.03

T48 0.05 0.03 0.03

89

T49 0.05 0.03 0.03

T50 0.05 0.03 0.03

T51 0.05 0.03 0.03

T52 0.05 0.03 0.03

T53 0.05 0.03 0.03

T54 0.05 0.03 0.03

T55 0.05 0.03 0.03

T56 0.05 0.03 0.03

T57 0.05 0.03 0.03

T58 0.05 0.03 0.03

T59 0.05 0.03 0.03

T60 0.05 0.03 0.03

T61 0.05 0.03 0.03

T62 0.05 0.03 0.03

T63 0.05 0.03 0.03

T64 0.05 0.03 0.03

T65 0.05 0.03 0.03

T66 0.05 0.03 0.03

T67 0.05 0.03 0.03

T68 1.70 0.38 2.91

T69 1.07 0.55 8.94

T70 0.90 0.46 6.46

1 1.07 0.00 -47.47

2 0.90 0.00 -159.43

3 0.25 0.06 12.23

4 0.05 0.01 13.05

5 0.10 0.02 13.05

6 0.85 0.19 9.43

7 0.40 0.09 14.62

Resultado nos Nós às 20:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

90

1 0.04 226.11 102.11

2 0.04 226.10 120.10

3 0.04 226.10 145.10

4 0.04 226.24 91.24

5 0.04 226.12 98.12

6 0.04 236.59 57.59

7 0.04 236.58 56.58

8 0.04 237.12 92.12

9 0.04 237.14 97.14

10 0.04 236.52 43.52

11 0.04 236.51 43.51

12 0.04 236.46 48.46

13 0.04 226.13 110.13

14 0.04 226.13 94.13

15 0.04 226.13 113.13

16 0.04 236.13 71.13

17 0.04 236.13 46.13

18 0.04 245.19 35.19

19 0.04 245.20 30.20

20 0.04 244.75 28.75

21 0.04 244.66 41.66

22 0.04 237.66 79.66

23 0.04 237.80 81.80

24 0.04 244.58 51.58

25 0.04 244.98 17.98

26 0.04 245.34 10.34

27 0.04 245.23 23.23

28 0.04 245.20 22.20

29 0.04 236.66 42.66

30 0.04 236.66 47.66

31 0.04 236.65 68.65

32 0.04 236.65 71.65

33 0.04 227.58 91.58

34 0.04 244.79 25.79

U1 0.00 226.10 145.10

U2 0.00 226.11 120.11

U3 0.00 226.11 104.11

U4 0.00 226.12 98.12

U5 0.00 226.13 110.13

U6 0.00 226.13 113.13

U7 0.00 226.13 93.13

U8 0.00 226.24 89.24

U9 0.00 236.46 47.46

U10 0.00 236.51 42.51

U11 0.00 236.52 43.52

U12 0.00 236.58 55.58

U13 0.00 236.59 58.59

U14 0.00 237.12 92.12

U15 0.00 237.14 96.14

U16 0.00 237.66 80.66

91

U17 0.00 237.80 82.80

U18 0.00 244.58 50.58

U19 0.00 244.66 41.66

U20 0.00 244.75 29.75

U21 0.00 244.79 25.79

U22 0.00 244.98 17.98

U23 0.00 245.34 10.34

U24 0.00 245.23 22.23

U25 0.00 245.20 21.20

U26 0.00 236.66 41.66

U27 0.00 236.66 46.66

U28 0.00 236.65 69.65

U29 0.00 236.65 71.65

U30 0.00 227.58 92.58

U31 0.00 245.20 31.20

U32 0.00 245.20 34.20

U33 0.00 236.13 46.13

U34 0.00 236.13 72.13

PV2 0.00 226.13 109.13

PV6 0.00 245.24 23.24

A1 0.00 249.59 47.59

A2 0.00 261.53 159.53

A3 0.00 245.16 50.16

A4 0.00 236.65 101.65

A5 0.00 245.19 55.19

A6 0.00 244.35 89.35

A7 0.00 236.39 99.39

P1 -1.07 202.00 0.00

P2 -0.90 102.00 0.00

R1 0.55 245.43 9.43

Resultado nos Trechos às 20:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

92

T1 0.04 0.02 0.02

T2 0.04 0.01 0.00

T3 0.08 0.02 0.01

T4 0.12 0.03 0.02

T5A 0.17 0.04 0.04

T5B 0.12 0.03 0.02

T6 0.08 0.02 0.01

T7 0.04 0.01 0.00

T8 0.29 0.07 0.11

T9 0.33 0.08 0.14

T10 0.37 0.08 0.18

T11 0.42 0.09 0.21

T12 0.46 0.10 0.26

T13 0.50 0.11 0.30

T14 0.54 0.12 0.35

T15 0.58 0.13 0.40

T16 0.62 0.14 0.46

T17 0.67 0.15 0.51

T18 0.71 0.16 0.57

T19 0.75 0.17 0.64

T20 0.79 0.18 0.71

T21 0.83 0.19 0.78

T22 0.87 0.20 0.85

T23 0.92 0.21 0.93

T24 0.46 0.10 0.26

T25 0.29 0.07 0.11

T25B 0.25 0.06 0.08

T26 0.21 0.05 0.06

T27 0.17 0.04 0.04

T28 0.12 0.03 0.02

T29 0.08 0.02 0.01

T30 0.04 0.01 0.00

T31 0.17 0.04 0.04

T32 0.12 0.03 0.02

T33 0.08 0.02 0.01

T34 0.04 0.01 0.00

T35 0.04 0.02 0.02

T36 0.04 0.02 0.02

T37 0.04 0.02 0.02

T38 0.04 0.02 0.02

T39 0.04 0.02 0.02

T40 0.04 0.02 0.02

T41 0.04 0.02 0.02

T42 0.04 0.02 0.02

T43 0.04 0.02 0.02

T44 0.04 0.02 0.02

T45 0.04 0.02 0.02

T46 0.04 0.02 0.02

T47 0.04 0.02 0.02

T48 0.04 0.02 0.02

93

T49 0.04 0.02 0.02

T50 0.04 0.02 0.02

T51 0.04 0.02 0.02

T52 0.04 0.02 0.02

T53 0.04 0.02 0.02

T54 0.04 0.02 0.02

T55 0.04 0.02 0.02

T56 0.04 0.02 0.02

T57 0.04 0.02 0.02

T58 0.04 0.02 0.02

T59 0.04 0.02 0.02

T60 0.04 0.02 0.02

T61 0.04 0.02 0.02

T62 0.04 0.02 0.02

T63 0.04 0.02 0.02

T64 0.04 0.02 0.02

T65 0.04 0.02 0.02

T66 0.04 0.02 0.02

T67 0.04 0.02 0.02

T68 1.42 0.32 2.07

T69 1.07 0.54 8.89

T70 0.90 0.46 6.45

1 1.07 0.00 -47.59

2 0.90 0.00 -159.53

3 0.21 0.05 8.50

4 0.04 0.01 9.06

5 0.08 0.02 9.06

6 0.71 0.16 6.55

7 0.33 0.08 10.15

Resultado nos Nós às 21:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

94

1 0.03 233.29 109.29

2 0.03 233.29 127.29

3 0.03 233.28 152.28

4 0.03 233.38 98.38

5 0.03 233.30 105.30

6 0.03 240.01 61.01

7 0.03 240.00 60.00

8 0.03 240.36 95.36

9 0.03 240.37 100.37

10 0.03 239.96 46.96

11 0.03 239.95 46.95

12 0.03 239.92 51.92

13 0.03 233.30 117.30

14 0.03 233.30 101.30

15 0.03 233.30 120.30

16 0.03 239.75 74.75

17 0.03 239.75 49.75

18 0.03 245.55 35.55

19 0.03 245.56 30.56

20 0.03 245.26 29.26

21 0.03 245.20 42.20

22 0.03 240.71 82.71

23 0.03 240.80 84.80

24 0.03 245.15 52.15

25 0.03 245.41 18.41

26 0.03 245.65 10.65

27 0.03 245.58 23.58

28 0.03 245.56 22.56

29 0.03 240.09 46.09

30 0.03 240.09 51.09

31 0.03 240.08 72.08

32 0.03 240.08 75.08

33 0.03 234.28 98.28

34 0.03 245.28 26.28

U1 0.00 233.28 152.28

U2 0.00 233.29 127.29

U3 0.00 233.29 111.29

U4 0.00 233.30 105.30

U5 0.00 233.30 117.30

U6 0.00 233.30 120.30

U7 0.00 233.30 100.30

U8 0.00 233.38 96.38

U9 0.00 239.92 50.92

U10 0.00 239.95 45.95

U11 0.00 239.96 46.96

U12 0.00 240.00 59.00

U13 0.00 240.01 62.01

U14 0.00 240.36 95.36

U15 0.00 240.37 99.37

U16 0.00 240.71 83.71

95

U17 0.00 240.81 85.81

U18 0.00 245.15 51.15

U19 0.00 245.20 42.20

U20 0.00 245.26 30.26

U21 0.00 245.29 26.29

U22 0.00 245.41 18.41

U23 0.00 245.65 10.65

U24 0.00 245.58 22.58

U25 0.00 245.56 21.56

U26 0.00 240.09 45.09

U27 0.00 240.09 50.09

U28 0.00 240.08 73.08

U29 0.00 240.08 75.08

U30 0.00 234.28 99.28

U31 0.00 245.56 31.56

U32 0.00 245.55 34.55

U33 0.00 239.75 49.75

U34 0.00 239.75 75.75

PV2 0.00 233.30 116.30

PV6 0.00 245.59 23.59

A1 0.00 249.82 47.82

A2 0.00 261.74 159.74

A3 0.00 245.53 50.53

A4 0.00 240.08 105.08

A5 0.00 245.55 55.55

A6 0.00 245.00 90.00

A7 0.00 239.87 102.87

P1 -1.06 202.00 0.00

P2 -0.90 102.00 0.00

R1 0.83 245.71 9.71

Resultado nos Trechos às 21:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

96

T1 0.03 0.02 0.01

T2 0.03 0.01 0.00

T3 0.07 0.02 0.01

T4 0.10 0.02 0.02

T5A 0.13 0.03 0.03

T5B 0.10 0.02 0.02

T6 0.07 0.02 0.01

T7 0.03 0.01 0.00

T8 0.23 0.05 0.07

T9 0.27 0.06 0.09

T10 0.30 0.07 0.12

T11 0.33 0.08 0.14

T12 0.37 0.08 0.17

T13 0.40 0.09 0.20

T14 0.43 0.10 0.23

T15 0.47 0.11 0.27

T16 0.50 0.11 0.30

T17 0.53 0.12 0.34

T18 0.57 0.13 0.38

T19 0.60 0.14 0.42

T20 0.63 0.14 0.47

T21 0.67 0.15 0.51

T22 0.70 0.16 0.56

T23 0.73 0.17 0.61

T24 0.37 0.08 0.17

T25 0.23 0.05 0.07

T25B 0.20 0.05 0.06

T26 0.17 0.04 0.04

T27 0.13 0.03 0.03

T28 0.10 0.02 0.02

T29 0.07 0.02 0.01

T30 0.03 0.01 0.00

T31 0.13 0.03 0.03

T32 0.10 0.02 0.02

T33 0.07 0.02 0.01

T34 0.03 0.01 0.00

T35 0.03 0.02 0.01

T36 0.03 0.02 0.02

T37 0.03 0.02 0.01

T38 0.03 0.02 0.01

T39 0.03 0.02 0.01

T40 0.03 0.02 0.01

T41 0.03 0.02 0.01

T42 0.03 0.02 0.01

T43 0.03 0.02 0.01

T44 0.03 0.02 0.01

T45 0.03 0.02 0.01

T46 0.03 0.02 0.02

T47 0.03 0.02 0.01

T48 0.03 0.02 0.01

97

T49 0.03 0.02 0.01

T50 0.03 0.02 0.01

T51 0.03 0.02 0.01

T52 0.03 0.02 0.01

T53 0.03 0.02 0.01

T54 0.03 0.02 0.01

T55 0.03 0.02 0.01

T56 0.03 0.02 0.02

T57 0.03 0.02 0.01

T58 0.03 0.02 0.01

T59 0.03 0.02 0.01

T60 0.03 0.02 0.01

T61 0.03 0.02 0.01

T62 0.03 0.02 0.01

T63 0.03 0.02 0.01

T64 0.03 0.02 0.02

T65 0.03 0.02 0.01

T66 0.03 0.02 0.01

T67 0.03 0.02 0.01

T68 1.13 0.26 1.37

T69 1.06 0.54 8.79

T70 0.90 0.46 6.42

1 1.06 0.00 -47.82

2 0.90 0.00 -159.74

3 0.17 0.04 5.44

4 0.03 0.01 5.80

5 0.07 0.02 5.80

6 0.57 0.13 4.19

7 0.27 0.06 6.50

Resultado nos Nós às 22:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

98

1 0.03 235.68 111.68

2 0.03 235.67 129.67

3 0.03 235.67 154.67

4 0.03 235.75 100.75

5 0.03 235.68 107.68

6 0.03 241.32 62.32

7 0.03 241.31 61.31

8 0.03 241.62 96.62

9 0.03 241.63 101.63

10 0.03 241.28 48.28

11 0.03 241.28 48.28

12 0.03 241.24 53.24

13 0.03 235.69 119.69

14 0.03 235.68 103.68

15 0.03 235.68 122.68

16 0.03 241.12 76.12

17 0.03 241.12 51.12

18 0.03 246.00 36.00

19 0.03 246.00 31.00

20 0.03 245.75 29.75

21 0.03 245.70 42.70

22 0.03 241.92 83.92

23 0.03 242.00 86.00

24 0.03 245.66 52.66

25 0.03 245.88 18.88

26 0.03 246.08 11.08

27 0.03 246.02 24.02

28 0.03 246.00 23.00

29 0.03 241.41 47.41

30 0.03 241.41 52.41

31 0.03 241.40 73.40

32 0.03 241.40 76.40

33 0.03 236.53 100.53

34 0.03 245.77 26.77

U1 0.00 235.67 154.67

U2 0.00 235.67 129.67

U3 0.00 235.68 113.68

U4 0.00 235.68 107.68

U5 0.00 235.69 119.69

U6 0.00 235.69 122.69

U7 0.00 235.69 102.69

U8 0.00 235.75 98.75

U9 0.00 241.24 52.24

U10 0.00 241.28 47.28

U11 0.00 241.28 48.28

U12 0.00 241.31 60.31

U13 0.00 241.32 63.32

U14 0.00 241.62 96.62

U15 0.00 241.63 100.63

U16 0.00 241.92 84.92

99

U17 0.00 242.00 87.00

U18 0.00 245.66 51.66

U19 0.00 245.70 42.70

U20 0.00 245.75 30.75

U21 0.00 245.77 26.77

U22 0.00 245.88 18.88

U23 0.00 246.08 11.08

U24 0.00 246.02 23.02

U25 0.00 246.00 22.00

U26 0.00 241.41 46.41

U27 0.00 241.41 51.41

U28 0.00 241.40 74.40

U29 0.00 241.40 76.40

U30 0.00 236.53 101.53

U31 0.00 246.00 32.00

U32 0.00 246.00 35.00

U33 0.00 241.12 51.12

U34 0.00 241.12 77.12

PV2 0.00 235.69 118.69

PV6 0.00 246.03 24.03

A1 0.00 250.17 48.17

A2 0.00 262.05 160.05

A3 0.00 245.98 50.98

A4 0.00 241.40 106.40

A5 0.00 246.00 56.00

A6 0.00 245.52 90.52

A7 0.00 241.21 104.21

P1 -1.05 202.00 0.00

P2 -0.89 102.00 0.00

R1 0.91 246.13 10.13

Resultado nos Trechos às 22:00 Horas

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

100

T1 0.03 0.02 0.01

T2 0.03 0.01 0.00

T3 0.06 0.01 0.01

T4 0.09 0.02 0.01

T5A 0.12 0.03 0.02

T5B 0.09 0.02 0.01

T6 0.06 0.01 0.01

T7 0.03 0.01 0.00

T8 0.21 0.05 0.06

T9 0.24 0.06 0.08

T10 0.27 0.06 0.10

T11 0.31 0.07 0.12

T12 0.34 0.08 0.14

T13 0.37 0.08 0.17

T14 0.40 0.09 0.20

T15 0.43 0.10 0.23

T16 0.46 0.10 0.26

T17 0.49 0.11 0.29

T18 0.52 0.12 0.32

T19 0.55 0.12 0.36

T20 0.58 0.13 0.40

T21 0.61 0.14 0.44

T22 0.64 0.15 0.48

T23 0.67 0.15 0.52

T24 0.34 0.08 0.14

T25 0.21 0.05 0.06

T25B 0.18 0.04 0.05

T26 0.15 0.03 0.03

T27 0.12 0.03 0.02

T28 0.09 0.02 0.01

T29 0.06 0.01 0.01

T30 0.03 0.01 0.00

T31 0.12 0.03 0.02

T32 0.09 0.02 0.01

T33 0.06 0.01 0.01

T34 0.03 0.01 0.00

T35 0.03 0.02 0.01

T36 0.03 0.02 0.01

T37 0.03 0.02 0.01

T38 0.03 0.02 0.01

T39 0.03 0.02 0.01

T40 0.03 0.02 0.01

T41 0.03 0.02 0.01

T42 0.03 0.02 0.01

T43 0.03 0.02 0.01

T44 0.03 0.02 0.01

T45 0.03 0.02 0.01

T46 0.03 0.02 0.01

T47 0.03 0.02 0.01

T48 0.03 0.02 0.01

101

T49 0.03 0.02 0.01

T50 0.03 0.02 0.01

T51 0.03 0.02 0.01

T52 0.03 0.02 0.01

T53 0.03 0.02 0.01

T54 0.03 0.02 0.01

T55 0.03 0.02 0.01

T56 0.03 0.02 0.01

T57 0.03 0.02 0.01

T58 0.03 0.02 0.01

T59 0.03 0.02 0.01

T60 0.03 0.02 0.01

T61 0.03 0.02 0.01

T62 0.03 0.02 0.01

T63 0.03 0.02 0.01

T64 0.03 0.02 0.01

T65 0.03 0.02 0.01

T66 0.03 0.02 0.01

T67 0.03 0.02 0.01

T68 1.04 0.24 1.17

T69 1.05 0.54 8.63

T70 0.89 0.46 6.37

1 1.05 0.00 -48.17

2 0.89 0.00 -160.05

3 0.15 0.03 4.57

4 0.03 0.01 4.87

5 0.06 0.01 4.87

6 0.52 0.12 3.52

7 0.24 0.06 5.46

Resultado nos Nós às 23:00 Horas

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

102

1 0.03 237.94 113.94

2 0.03 237.93 131.93

3 0.03 237.93 156.93

4 0.03 238.00 103.00

5 0.03 237.94 109.94

6 0.03 242.60 63.60

7 0.03 242.60 62.60

8 0.03 242.85 97.85

9 0.03 242.86 102.86

10 0.03 242.57 49.57

11 0.03 242.56 49.56

12 0.03 242.54 54.54

13 0.03 237.94 121.94

14 0.03 237.94 105.94

15 0.03 237.94 124.94

16 0.03 242.45 77.45

17 0.03 242.45 52.45

18 0.03 246.48 36.48

19 0.03 246.48 31.48

20 0.03 246.27 30.27

21 0.03 246.23 43.23

22 0.03 243.11 85.11

23 0.03 243.17 87.17

24 0.03 246.19 53.19

25 0.03 246.38 19.38

26 0.03 246.55 11.55

27 0.03 246.50 24.50

28 0.03 246.49 23.49

29 0.03 242.69 48.69

30 0.03 242.69 53.69

31 0.03 242.68 74.68

32 0.03 242.68 77.68

33 0.03 238.65 102.65

34 0.03 246.29 27.29

U1 0.00 237.93 156.93

U2 0.00 237.93 131.93

U3 0.00 237.94 115.94

U4 0.00 237.94 109.94

U5 0.00 237.94 121.94

U6 0.00 237.94 124.94

U7 0.00 237.94 104.94

U8 0.00 238.00 101.00

U9 0.00 242.54 53.54

U10 0.00 242.56 48.56

U11 0.00 242.57 49.57

U12 0.00 242.60 61.60

U13 0.00 242.60 64.60

U14 0.00 242.85 97.85

U15 0.00 242.86 101.86

U16 0.00 243.11 86.11

103

U17 0.00 243.17 88.17

U18 0.00 246.19 52.19

U19 0.00 246.23 43.23

U20 0.00 246.27 31.27

U21 0.00 246.29 27.29

U22 0.00 246.38 19.38

U23 0.00 246.55 11.55

U24 0.00 246.50 23.50

U25 0.00 246.49 22.49

U26 0.00 242.69 47.69

U27 0.00 242.69 52.69

U28 0.00 242.68 75.68

U29 0.00 242.68 77.68

U30 0.00 238.65 103.65

U31 0.00 246.48 32.48

U32 0.00 246.48 35.48

U33 0.00 242.45 52.45

U34 0.00 242.45 78.45

PV2 0.00 237.95 120.95

PV6 0.00 246.51 24.51

A1 0.00 250.56 48.56

A2 0.00 262.38 160.38

A3 0.00 246.46 51.46

A4 0.00 242.68 107.68

A5 0.00 246.48 56.48

A6 0.00 246.08 91.08

A7 0.00 242.51 105.51

P1 -1.04 202.00 0.00

P2 -0.89 102.00 0.00

R1 0.99 246.59 10.59

Resultado nos Trechos às 23:00 Horas

104

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.03 0.01 0.01

T2 0.03 0.01 0.00

T3 0.06 0.01 0.01

T4 0.08 0.02 0.01

T5A 0.11 0.03 0.02

T5B 0.08 0.02 0.01

T6 0.06 0.01 0.01

T7 0.03 0.01 0.00

T8 0.19 0.04 0.05

T9 0.22 0.05 0.07

T10 0.25 0.06 0.08

T11 0.28 0.06 0.10

T12 0.31 0.07 0.12

T13 0.33 0.08 0.14

T14 0.36 0.08 0.16

T15 0.39 0.09 0.19

T16 0.42 0.09 0.21

T17 0.44 0.10 0.24

T18 0.47 0.11 0.27

T19 0.50 0.11 0.30

T20 0.53 0.12 0.33

T21 0.56 0.13 0.37

T22 0.58 0.13 0.40

T23 0.61 0.14 0.44

T24 0.31 0.07 0.12

T25 0.19 0.04 0.05

T25B 0.17 0.04 0.04

T26 0.14 0.03 0.03

T27 0.11 0.03 0.02

T28 0.08 0.02 0.01

T29 0.06 0.01 0.01

T30 0.03 0.01 0.00

T31 0.11 0.03 0.02

T32 0.08 0.02 0.01

T33 0.06 0.01 0.01

T34 0.03 0.01 0.00

T35 0.03 0.01 0.01

T36 0.03 0.01 0.01

T37 0.03 0.01 0.01

T38 0.03 0.01 0.01

T39 0.03 0.01 0.01

T40 0.03 0.01 0.01

T41 0.03 0.01 0.01

T42 0.03 0.01 0.01

T43 0.03 0.01 0.01

T44 0.03 0.01 0.01

T45 0.03 0.01 0.01

T46 0.03 0.01 0.01

T47 0.03 0.01 0.01

105

T48 0.03 0.01 0.01

T49 0.03 0.01 0.01

T50 0.03 0.01 0.01

T51 0.03 0.01 0.01

T52 0.03 0.01 0.01

T53 0.03 0.01 0.01

T54 0.03 0.01 0.01

T55 0.03 0.01 0.01

T56 0.03 0.01 0.01

T57 0.03 0.01 0.01

T58 0.03 0.01 0.01

T59 0.03 0.01 0.01

T60 0.03 0.01 0.01

T61 0.03 0.01 0.01

T62 0.03 0.01 0.01

T63 0.03 0.01 0.01

T64 0.03 0.01 0.01

T65 0.03 0.01 0.01

T66 0.03 0.01 0.01

T67 0.03 0.01 0.01

T68 0.94 0.21 0.98

T69 1.04 0.53 8.47

T70 0.89 0.45 6.32

1 1.04 0.00 -48.56

2 0.89 0.00 -160.38

3 0.14 0.03 3.78

4 0.03 0.01 4.03

5 0.06 0.01 4.03

6 0.47 0.11 2.91

7 0.22 0.05 4.51

Resultado nos Nós às 24:00 Horas

106

Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)

1 0.03 238.44 114.44

2 0.03 238.44 132.44

3 0.03 238.43 157.43

4 0.03 238.50 103.50

5 0.03 238.44 110.44

6 0.03 243.11 64.11

7 0.03 243.10 63.10

8 0.03 243.36 98.36

9 0.03 243.36 103.36

10 0.03 243.07 50.07

11 0.03 243.07 50.07

12 0.03 243.04 55.04

13 0.03 238.45 122.45

14 0.03 238.45 106.45

15 0.03 238.45 125.45

16 0.03 242.96 77.96

17 0.03 242.96 52.96

18 0.03 246.99 36.99

19 0.03 246.99 31.99

20 0.03 246.78 30.78

21 0.03 246.73 43.73

22 0.03 243.61 85.61

23 0.03 243.68 87.68

24 0.03 246.70 53.70

25 0.03 246.89 19.89

26 0.03 247.06 12.06

27 0.03 247.00 25.00

28 0.03 246.99 23.99

29 0.03 243.19 49.19

30 0.03 243.19 54.19

31 0.03 243.19 75.19

32 0.03 243.19 78.19

33 0.03 239.16 103.16

34 0.03 246.79 27.79

U1 0.00 238.43 157.43

U2 0.00 238.44 132.44

U3 0.00 238.44 116.44

U4 0.00 238.44 110.44

U5 0.00 238.45 122.45

U6 0.00 238.45 125.45

U7 0.00 238.45 105.45

U8 0.00 238.50 101.50

U9 0.00 243.04 54.04

U10 0.00 243.07 49.07

U11 0.00 243.07 50.07

U12 0.00 243.10 62.10

U13 0.00 243.11 65.11

U14 0.00 243.36 98.36

107

U15 0.00 243.36 102.36

U16 0.00 243.61 86.61

U17 0.00 243.68 88.68

U18 0.00 246.70 52.70

U19 0.00 246.73 43.73

U20 0.00 246.78 31.78

U21 0.00 246.79 27.79

U22 0.00 246.89 19.89

U23 0.00 247.06 12.06

U24 0.00 247.00 24.00

U25 0.00 246.99 22.99

U26 0.00 243.19 48.19

U27 0.00 243.19 53.19

U28 0.00 243.19 76.19

U29 0.00 243.19 78.19

U30 0.00 239.16 104.16

U31 0.00 246.99 32.99

U32 0.00 246.99 35.99

U33 0.00 242.96 52.96

U34 0.00 242.96 78.96

PV2 0.00 238.45 121.45

PV6 0.00 247.01 25.01

A1 0.00 250.97 48.97

A2 0.00 262.75 160.75

A3 0.00 246.97 51.97

A4 0.00 243.19 108.19

A5 0.00 246.98 56.98

A6 0.00 246.59 91.59

A7 0.00 243.01 106.01

P1 -1.03 202.00 0.00

P2 -0.89 102.00 0.00

R1 0.97 247.09 11.09

Resultado nos Trechos às 24:00 Horas

108

Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)

T1 0.03 0.01 0.01

T2 0.03 0.01 0.00

T3 0.06 0.01 0.01

T4 0.08 0.02 0.01

T5A 0.11 0.03 0.02

T5B 0.08 0.02 0.01

T6 0.06 0.01 0.01

T7 0.03 0.01 0.00

T8 0.19 0.04 0.05

T9 0.22 0.05 0.07

T10 0.25 0.06 0.08

T11 0.28 0.06 0.10

T12 0.31 0.07 0.12

T13 0.33 0.08 0.14

T14 0.36 0.08 0.16

T15 0.39 0.09 0.19

T16 0.42 0.09 0.21

T17 0.44 0.10 0.24

T18 0.47 0.11 0.27

T19 0.50 0.11 0.30

T20 0.53 0.12 0.33

T21 0.56 0.13 0.37

T22 0.58 0.13 0.40

T23 0.61 0.14 0.44

T24 0.31 0.07 0.12

T25 0.19 0.04 0.05

T25B 0.17 0.04 0.04

T26 0.14 0.03 0.03

T27 0.11 0.03 0.02

T28 0.08 0.02 0.01

T29 0.06 0.01 0.01

T30 0.03 0.01 0.00

T31 0.11 0.03 0.02

T32 0.08 0.02 0.01

T33 0.06 0.01 0.01

T34 0.03 0.01 0.00

T35 0.03 0.01 0.01

T36 0.03 0.01 0.01

T37 0.03 0.01 0.01

T38 0.03 0.01 0.01

T39 0.03 0.01 0.01

T40 0.03 0.01 0.01

T41 0.03 0.01 0.01

T42 0.03 0.01 0.01

T43 0.03 0.01 0.01

T44 0.03 0.01 0.01

T45 0.03 0.01 0.01

T46 0.03 0.01 0.01

109

T47 0.03 0.01 0.01

T48 0.03 0.01 0.01

T49 0.03 0.01 0.01

T50 0.03 0.01 0.01

T51 0.03 0.01 0.01

T52 0.03 0.01 0.01

T53 0.03 0.01 0.01

T54 0.03 0.01 0.01

T55 0.03 0.01 0.01

T56 0.03 0.01 0.01

T57 0.03 0.01 0.01

T58 0.03 0.01 0.01

T59 0.03 0.01 0.01

T60 0.03 0.01 0.01

T61 0.03 0.01 0.01

T62 0.03 0.01 0.01

T63 0.03 0.01 0.01

T64 0.03 0.01 0.01

T65 0.03 0.01 0.01

T66 0.03 0.01 0.01

T67 0.03 0.01 0.01

T68 0.94 0.21 0.98

T69 1.03 0.52 8.29

T70 0.89 0.45 6.27

1 1.03 0.00 -48.97

2 0.89 0.00 -160.75

3 0.14 0.03 3.78

4 0.03 0.01 4.03

5 0.06 0.01 4.03

6 0.47 0.11 2.91

7 0.22 0.05 4.51

__________________________________________________

BRAZ CAMPOS

Engº Civil – CREA 7044/D-GO

RESPONSÁVEL TÉCNICO