MINISTÉRIO DO DESENVOLVIMENTO AGRÁRIO - MDA … · vazão total de aproximadamente ... e nos...
Transcript of MINISTÉRIO DO DESENVOLVIMENTO AGRÁRIO - MDA … · vazão total de aproximadamente ... e nos...
1
MINISTÉRIO DO DESENVOLVIMENTO AGRÁRIO - MDA
INSTITUTO NACIONAL DE COLONIZAÇÃO E REFORMA AGRÁRIA INCRA
SUPERINTENDÊNCIA REGIONAL DO RIO GRANDE DO SUL - SR 11 / RS
MEMORIAL DE CALCULO
UMBU – PIRATINI
2
1. Apresentação ................................................................................................................ 3
2. Referências Normativas ............................................................................................... 3
3. Terminologia ................................................................................................................. 4
4. Demanda Hidráulica ................................................................................................. 5
5. Fator de Consumo .................................................................................................... 5
6. Perda de Carga .......................................................................................................... 7
7. Disposição Geral da Rede de Abastecimento ............................................................ 7
8. Comportamento da Rede............................................................................................. 9
3
1. Apresentação
Este memorial tem por finalidade apresentar as bases fundamentadas para o
dimensionamento e escolhas utilizadas no projeto do sistema de abastecimento de água do
assentamento de Piratini, no Município de Umbu - RS.
2. Referências Normativas
A presente especificação técnica possui referências nas seguintes normas
2.1. Da ABNT:
NBR 5626 – Instalação predial de água fria.
NBR 12211 – Estudos de concepção de sistemas públicos de abastecimento de
água.
NBR 12212 – Projeto de poço para captação de água subterrânea.
NBR 12214 – Projeto de sistema de bombeamento de água para abastecimento
público.
NBR 12217 – Projeto de reservatório de distribuição de água para abastecimento
público.
NBR 12218 – Projeto de rede de distribuição de água para abastecimento
público.
NBR 12266 – Projeto e execução de valas para assentamento de tubulação de
água, esgoto ou drenagem urbana.
2.2. Da CORSAN/RS:
Regulamento dos Serviços de Água e de Esgoto (RSAE) - Resolução 1093 da
Agência Estadual de Regulação dos Serviços Públicos Delegados do Rio Grande
do Sul (AGERGS).
4
2.3. Do INCRA/RS:
Norma de Execução nº 54 – Dispõe sobre a implantação de obras de engenharia
componentes de infra-estrutura básica de projetos de assentamento.
2.4. Atualização:
Cada referência citada neste texto deve ser observada em sua edição em vigor, desde
que mantidos os mesmos objetivos da data de aprovação da presente Norma.
3. Terminologia
Para efeito deste memorial, são adotadas as seguintes definições:
REDE DE DISTRIBUIÇÃO - Parte do sistema de abastecimento formada de tubulações
e órgãos acessórios, destinada a colocar água potável à disposição dos consumidores, de
forma contínua, em quantidade e pressão recomendadas.
CONSUMO – Quantidade de água utilizada por uma unidade consumidora, expressa
em unidade de volume por unidade de tempo;
VAZÃO DE PROJETO – Vazão determinada para funcionamento da rede de
abastecimento na pior hipótese possível de trabalho, expressa em litros por segundo;
PRESSÃO ESTÁTICA – Pressão de trabalho da rede de abastecimento na hipótese de
consumo nulo, expresso em M.C.A (metro de coluna d’água);
PRESSÃO DINÂMICA – Pressão de trabalho da rede de abastecimento na hipótese de
consumo não nulo, expresso em M.C.A (metro de coluna d’água);
PERDA DE CARGA – Perda de pressão na rede de abastecimento devido ao atrito da
água com as tubulações e órgãos acessórios, expresso em m/km;
5
PROJETO EXECUTIVO - Conjunto dos elementos necessários e suficientes à
execução completa da obra, de acordo com as normas pertinentes da Associação Brasileira
de Normas Técnicas – ABNT.
4. Demanda Hidráulica
Será estabelecido um consumo por pessoa de 150l/dia (incluindo neste insumo perdas
de água, naturais nestes sistemas), projeção um pouco acima ao creditado a famílias em
zonas de características rurais.
Para fins de cálculo da demanda considerou-se a capacidade máxima do
Assentamento, considerando-se o número de lotes multiplicado por cinco. Portanto, a
população considerada é de 170 pessoas, com um consumo diário teórico total de 25,50 m³
de água.
A vazão média teórica total no final do plano de atuação será de aproximadamente
(25.500 / 24 x 60 x 60) 0,29514 L/s, muito baixo em comparação a outros sistemas de
abastecimento de água.
Será creditada uma taxa sazonal e diária de pico de consumo de 1.5, razoável para o
tipo de consumo existente, tendo, portanto, um consumo de pico total teórico de
aproximadamente (0,29514 x 1.5) 0,44271 L/s.
Como solicita a ABNT, será creditada uma taxa de erro de 1.2 ao cálculo de pico final,
concluindo que, teoricamente, a rede de abastecimento trabalhará no pior caso, com uma
vazão total de aproximadamente (0,44271 x 1.2) 0,53125 L/s.
A perda de carga com a vazão requerida pelo sistema é baixa ao utilizar tubulações de
médio diâmetro nos trechos principais.
5. Fator de Consumo
Existem diferenças nas taxas de consumo de uma unidade consumidora de acordo
com o horário, mostrando seu pico durante o dia e baixo consumo durante a noite.
6
Tendo em vista esta variação, será estabelecido um fator de consumo em relação a
média diária de acordo com o horário analizado:
1:00h = 50% consumo diário;
2:00h = 40% consumo diário;
3:00h = 40% consumo diário;
4:00h = 60% consumo diário;
5:00h = 65% consumo diário;
6:00h = 70% consumo diário;
7:00h = 80% consumo diário;
8:00h = 85% consumo diário;
9:00h = 90% consumo diário;
10:00h = 130% consumo diário;
11:00h = 150% consumo diário;
12:00h = 180% consumo diário;
13:00h = 160% consumo diário;
14:00h = 140% consumo diário;
15:00h = 150% consumo diário;
16:00h = 160% consumo diário;
17:00h = 180% consumo diário;
18:00h = 130% consumo diário;
19:00h = 100% consumo diário;
20:00h = 90% consumo diário;
21:00h = 75% consumo diário;
22:00h = 60% consumo diário;
7
23:00h = 55% consumo diário;
24:00h = 50% consumo diário.
6. Perda de Carga
Para os cálculos de perda de carga foram utilizadas as formulas de Hazen-Williams.
O projeto foi concebido para ser executado em PVC, devido as baixas vazões
apresentadas, e nos cálculos foi atribuído um coeficiente de rugosidade para estas
tubulações de 130, caracterizadas para tubos já desgastados.
7. Disposição Geral da Rede de Abastecimento
Trecho (ID) Início (Nó) Fim (Nó) Comprimento (m) Diâmetro (mm)
T1 U1 3 12 50
T2 U2 U1 696.1 75
8
T3 U3 U2 693.1 75
T4 U4 U3 511.3 75
T5A PV2 U4 206.9 75
T5B PV2 U5 48.6 75
T6 U5 U6 147.1 75
T7 U6 U7 618.4 75
T8 U8 PV2 1003.1 75
T9 U9 A7 454.1 75
T10 U10 U9 305.7 75
T11 U11 U10 32.1 75
T12 U12 U11 243.3 75
T13 U13 U12 38.8 75
T14 U14 U13 1513.9 75
T15 U15 U14 46.8 75
T16 U16 U15 1148.7 75
T17 U17 U16 268.1 75
T18 U18 A6 409.8 75
T19 U19 U18 116.1 75
T20 U20 U19 132.4 75
T21 U21 U20 45.1 75
T22 U22 U21 230.5 75
T23 U23 U22 388.6 75
T24 U23 PV6 384.1 75
T25 PV6 U24 119.5 75
T25B U24 U25 340.2 75
T26 U25 A3 779.2 75
T27 U26 U27 55.9 75
T28 U27 U28 421.5 75
T29 U28 U29 34.3 75
T30 U29 A4 435.6 75
T31 PV6 U31 1211.3 75
T32 U31 U32 64.5 75
T33 U32 A5 280.7 75
T34 U33 U34 272.1 75
T35 U34 16 20 50
T36 U2 2 12 50
T37 U3 1 20 50
T38 U4 5 20 50
T39 U5 13 20 50
T40 U6 15 155.2 50
T41 U7 14 20 50
T42 U8 4 22 50
T43 U9 12 12 50
T44 U10 11 12 50
T45 U11 10 12 50
T46 U12 7 12 50
T47 U13 6 22 50
T48 U14 8 12 50
T49 U15 9 12 50
T50 U16 22 17 50
9
T51 U17 23 12 50
T52 U18 24 12 50
T53 U19 21 12 50
T54 U20 20 17 50
T55 U21 34 17 50
T56 U22 25 12 50
T57 U23 26 17 50
T58 U24 27 17 50
T59 U25 28 17 50
T60 U26 29 17 50
T61 U27 30 17 50
T62 U28 31 17 50
T63 U29 32 17 50
T64 U30 33 12 50
T65 U31 19 17 50
T66 U32 18 17 50
T67 U33 17 17 50
T68 R1 U23 40 75
T69 A1 R1 468.1 50
T70 A2 R1 2498.9 50
1 P1 A1 - Bomba
2 P2 A2 - Bomba
3 A3 U26 75 Válvula
4 A4 U30 75 Válvula
5 A5 U33 75 Válvula
6 A6 U17 75 Válvula
7 A7 U8 75 Válvula
8. Comportamento da Rede
Resultado nos Nós às 0:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
10
1 0.03 238.51 114.51
2 0.03 238.50 132.50
3 0.03 238.50 157.50
4 0.03 238.57 103.57
5 0.03 238.51 110.51
6 0.03 243.18 64.18
7 0.03 243.17 63.17
8 0.03 243.43 98.43
9 0.03 243.43 103.43
10 0.03 243.14 50.14
11 0.03 243.14 50.14
12 0.03 243.11 55.11
13 0.03 238.52 122.52
14 0.03 238.52 106.52
15 0.03 238.52 125.52
16 0.03 243.03 78.03
17 0.03 243.03 53.03
18 0.03 247.06 37.06
19 0.03 247.06 32.06
20 0.03 246.85 30.85
21 0.03 246.80 43.80
22 0.03 243.68 85.68
23 0.03 243.75 87.75
24 0.03 246.77 53.77
25 0.03 246.95 19.95
26 0.03 247.12 12.12
27 0.03 247.07 25.07
28 0.03 247.06 24.06
29 0.03 243.26 49.26
30 0.03 243.26 54.26
31 0.03 243.26 75.26
32 0.03 243.26 78.26
33 0.03 239.23 103.23
34 0.03 246.86 27.86
U1 0.00 238.50 157.50
U2 0.00 238.50 132.50
U3 0.00 238.51 116.51
U4 0.00 238.51 110.51
U5 0.00 238.52 122.52
U6 0.00 238.52 125.52
U7 0.00 238.52 105.52
U8 0.00 238.57 101.57
U9 0.00 243.11 54.11
U10 0.00 243.14 49.14
U11 0.00 243.14 50.14
U12 0.00 243.17 62.17
U13 0.00 243.18 65.18
U14 0.00 243.43 98.43
U15 0.00 243.43 102.43
U16 0.00 243.68 86.68
11
U17 0.00 243.75 88.75
U18 0.00 246.77 52.77
U19 0.00 246.80 43.80
U20 0.00 246.85 31.85
U21 0.00 246.86 27.86
U22 0.00 246.96 19.96
U23 0.00 247.12 12.12
U24 0.00 247.07 24.07
U25 0.00 247.06 23.06
U26 0.00 243.26 48.26
U27 0.00 243.26 53.26
U28 0.00 243.26 76.26
U29 0.00 243.26 78.26
U30 0.00 239.23 104.23
U31 0.00 247.06 33.06
U32 0.00 247.06 36.06
U33 0.00 243.03 53.03
U34 0.00 243.03 79.03
PV2 0.00 238.52 121.52
PV6 0.00 247.08 25.08
A1 0.00 251.03 49.03
A2 0.00 262.80 160.80
A3 0.00 247.04 52.04
A4 0.00 243.25 108.25
A5 0.00 247.05 57.05
A6 0.00 246.66 91.66
A7 0.00 243.08 106.08
P1 -1.03 202.00 0.00
P2 -0.89 102.00 0.00
R1 0.97 247.16 11.16
Resultado nos Trechos às 0:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.03 0.01 0.01
12
T2 0.03 0.01 0.00
T3 0.06 0.01 0.01
T4 0.08 0.02 0.01
T5A 0.11 0.03 0.02
T5B 0.08 0.02 0.01
T6 0.06 0.01 0.01
T7 0.03 0.01 0.00
T8 0.19 0.04 0.05
T9 0.22 0.05 0.07
T10 0.25 0.06 0.08
T11 0.28 0.06 0.10
T12 0.31 0.07 0.12
T13 0.33 0.08 0.14
T14 0.36 0.08 0.16
T15 0.39 0.09 0.19
T16 0.42 0.09 0.21
T17 0.44 0.10 0.24
T18 0.47 0.11 0.27
T19 0.50 0.11 0.30
T20 0.53 0.12 0.33
T21 0.56 0.13 0.37
T22 0.58 0.13 0.40
T23 0.61 0.14 0.44
T24 0.31 0.07 0.12
T25 0.19 0.04 0.05
T25B 0.17 0.04 0.04
T26 0.14 0.03 0.03
T27 0.11 0.03 0.02
T28 0.08 0.02 0.01
T29 0.06 0.01 0.00
T30 0.03 0.01 0.00
T31 0.11 0.03 0.02
T32 0.08 0.02 0.01
T33 0.06 0.01 0.01
T34 0.03 0.01 0.00
T35 0.03 0.01 0.01
T36 0.03 0.01 0.01
T37 0.03 0.01 0.01
T38 0.03 0.01 0.01
T39 0.03 0.01 0.01
T40 0.03 0.01 0.01
T41 0.03 0.01 0.01
T42 0.03 0.01 0.01
T43 0.03 0.01 0.01
T44 0.03 0.01 0.01
T45 0.03 0.01 0.01
T46 0.03 0.01 0.01
T47 0.03 0.01 0.01
T48 0.03 0.01 0.01
T49 0.03 0.01 0.01
13
T50 0.03 0.01 0.01
T51 0.03 0.01 0.01
T52 0.03 0.01 0.01
T53 0.03 0.01 0.01
T54 0.03 0.01 0.01
T55 0.03 0.01 0.01
T56 0.03 0.01 0.01
T57 0.03 0.01 0.01
T58 0.03 0.01 0.01
T59 0.03 0.01 0.01
T60 0.03 0.01 0.01
T61 0.03 0.01 0.01
T62 0.03 0.01 0.01
T63 0.03 0.01 0.01
T64 0.03 0.01 0.01
T65 0.03 0.01 0.01
T66 0.03 0.01 0.01
T67 0.03 0.01 0.01
T68 0.94 0.21 0.98
T69 1.03 0.52 8.26
T70 0.89 0.45 6.26
1 1.03 0.00 -49.03
2 0.89 0.00 -160.80
3 0.14 0.03 3.78
4 0.03 0.01 4.03
5 0.06 0.01 4.03
6 0.47 0.11 2.91
7 0.22 0.05 4.51
Resultado nos Nós às 1:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.02 242.09 118.09
14
2 0.02 242.09 136.09
3 0.02 242.09 161.09
4 0.02 242.13 107.13
5 0.02 242.10 114.10
6 0.02 245.08 66.08
7 0.02 245.08 65.08
8 0.02 245.25 100.25
9 0.02 245.25 105.25
10 0.02 245.06 52.06
11 0.02 245.06 52.06
12 0.02 245.04 57.04
13 0.02 242.10 126.10
14 0.02 242.10 110.10
15 0.02 242.10 129.10
16 0.02 245.01 80.01
17 0.02 245.01 55.01
18 0.02 247.59 37.59
19 0.02 247.59 32.59
20 0.02 247.45 31.45
21 0.02 247.42 44.42
22 0.02 245.42 87.42
23 0.02 245.46 89.46
24 0.02 247.40 54.40
25 0.02 247.52 20.52
26 0.02 247.63 12.63
27 0.02 247.60 25.60
28 0.02 247.59 24.59
29 0.02 245.16 51.16
30 0.02 245.16 56.16
31 0.02 245.15 77.15
32 0.02 245.15 80.15
33 0.02 242.58 106.58
34 0.02 247.46 28.46
U1 0.00 242.09 161.09
U2 0.00 242.09 136.09
U3 0.00 242.09 120.09
U4 0.00 242.10 114.10
U5 0.00 242.10 126.10
U6 0.00 242.10 129.10
U7 0.00 242.10 109.10
U8 0.00 242.13 105.13
U9 0.00 245.04 56.04
U10 0.00 245.06 51.06
U11 0.00 245.06 52.06
U12 0.00 245.08 64.08
U13 0.00 245.08 67.08
U14 0.00 245.25 100.25
U15 0.00 245.25 104.25
U16 0.00 245.42 88.42
U17 0.00 245.46 90.46
15
U18 0.00 247.40 53.40
U19 0.00 247.42 44.42
U20 0.00 247.45 32.45
U21 0.00 247.46 28.46
U22 0.00 247.52 20.52
U23 0.00 247.63 12.63
U24 0.00 247.60 24.60
U25 0.00 247.59 23.59
U26 0.00 245.16 50.16
U27 0.00 245.16 55.16
U28 0.00 245.15 78.15
U29 0.00 245.15 80.15
U30 0.00 242.58 107.58
U31 0.00 247.59 33.59
U32 0.00 247.59 36.59
U33 0.00 245.01 55.01
U34 0.00 245.01 81.01
PV2 0.00 242.10 125.10
PV6 0.00 247.60 25.60
A1 0.00 251.44 49.44
A2 0.00 263.16 161.16
A3 0.00 247.57 52.57
A4 0.00 245.15 110.15
A5 0.00 247.58 57.58
A6 0.00 247.32 92.32
A7 0.00 245.02 108.02
P1 -1.02 202.00 0.00
P2 -0.88 102.00 0.00
R1 1.14 247.66 11.66
Resultado nos Trechos às 1:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.02 0.01 0.01
16
T2 0.02 0.01 0.00
T3 0.04 0.01 0.00
T4 0.07 0.02 0.01
T5A 0.09 0.02 0.01
T5B 0.07 0.02 0.01
T6 0.04 0.01 0.00
T7 0.02 0.01 0.00
T8 0.16 0.04 0.03
T9 0.18 0.04 0.04
T10 0.20 0.05 0.06
T11 0.22 0.05 0.07
T12 0.24 0.06 0.08
T13 0.27 0.06 0.09
T14 0.29 0.07 0.11
T15 0.31 0.07 0.13
T16 0.33 0.08 0.14
T17 0.36 0.08 0.16
T18 0.38 0.09 0.18
T19 0.40 0.09 0.20
T20 0.42 0.10 0.22
T21 0.44 0.10 0.24
T22 0.47 0.11 0.27
T23 0.49 0.11 0.29
T24 0.24 0.06 0.08
T25 0.16 0.04 0.03
T25B 0.13 0.03 0.03
T26 0.11 0.03 0.02
T27 0.09 0.02 0.01
T28 0.07 0.02 0.01
T29 0.04 0.01 0.00
T30 0.02 0.01 0.00
T31 0.09 0.02 0.01
T32 0.07 0.02 0.01
T33 0.04 0.01 0.00
T34 0.02 0.01 0.00
T35 0.02 0.01 0.01
T36 0.02 0.01 0.01
T37 0.02 0.01 0.01
T38 0.02 0.01 0.01
T39 0.02 0.01 0.01
T40 0.02 0.01 0.01
T41 0.02 0.01 0.01
T42 0.02 0.01 0.01
T43 0.02 0.01 0.01
T44 0.02 0.01 0.01
T45 0.02 0.01 0.01
T46 0.02 0.01 0.01
T47 0.02 0.01 0.01
T48 0.02 0.01 0.01
T49 0.02 0.01 0.01
17
T50 0.02 0.01 0.01
T51 0.02 0.01 0.01
T52 0.02 0.01 0.01
T53 0.02 0.01 0.01
T54 0.02 0.01 0.01
T55 0.02 0.01 0.01
T56 0.02 0.01 0.01
T57 0.02 0.01 0.01
T58 0.02 0.01 0.01
T59 0.02 0.01 0.01
T60 0.02 0.01 0.01
T61 0.02 0.01 0.01
T62 0.02 0.01 0.01
T63 0.02 0.01 0.01
T64 0.02 0.01 0.01
T65 0.02 0.01 0.01
T66 0.02 0.01 0.01
T67 0.02 0.01 0.01
T68 0.76 0.17 0.65
T69 1.02 0.52 8.08
T70 0.88 0.45 6.20
1 1.02 0.00 -49.44
2 0.88 0.00 -161.16
3 0.11 0.03 2.42
4 0.02 0.01 2.58
5 0.04 0.01 2.58
6 0.38 0.09 1.86
7 0.18 0.04 2.89
Resultado nos Nós às 2:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.02 242.67 118.67
18
2 0.02 242.67 136.67
3 0.02 242.67 161.67
4 0.02 242.71 107.71
5 0.02 242.68 114.68
6 0.02 245.66 66.66
7 0.02 245.66 65.66
8 0.02 245.83 100.83
9 0.02 245.83 105.83
10 0.02 245.64 52.64
11 0.02 245.64 52.64
12 0.02 245.62 57.62
13 0.02 242.68 126.68
14 0.02 242.68 110.68
15 0.02 242.68 129.68
16 0.02 245.59 80.59
17 0.02 245.59 55.59
18 0.02 248.17 38.17
19 0.02 248.17 33.17
20 0.02 248.03 32.03
21 0.02 248.00 45.00
22 0.02 246.00 88.00
23 0.02 246.04 90.04
24 0.02 247.98 54.98
25 0.02 248.10 21.10
26 0.02 248.21 13.21
27 0.02 248.18 26.18
28 0.02 248.17 25.17
29 0.02 245.74 51.74
30 0.02 245.74 56.74
31 0.02 245.74 77.74
32 0.02 245.74 80.74
33 0.02 243.16 107.16
34 0.02 248.04 29.04
U1 0.00 242.67 161.67
U2 0.00 242.67 136.67
U3 0.00 242.67 120.67
U4 0.00 242.68 114.68
U5 0.00 242.68 126.68
U6 0.00 242.68 129.68
U7 0.00 242.68 109.68
U8 0.00 242.71 105.71
U9 0.00 245.62 56.62
U10 0.00 245.64 51.64
U11 0.00 245.64 52.64
U12 0.00 245.66 64.66
U13 0.00 245.66 67.66
U14 0.00 245.83 100.83
U15 0.00 245.83 104.83
U16 0.00 246.00 89.00
U17 0.00 246.04 91.04
19
U18 0.00 247.98 53.98
U19 0.00 248.00 45.00
U20 0.00 248.03 33.03
U21 0.00 248.04 29.04
U22 0.00 248.10 21.10
U23 0.00 248.21 13.21
U24 0.00 248.18 25.18
U25 0.00 248.17 24.17
U26 0.00 245.74 50.74
U27 0.00 245.74 55.74
U28 0.00 245.74 78.74
U29 0.00 245.74 80.74
U30 0.00 243.16 108.16
U31 0.00 248.17 34.17
U32 0.00 248.17 37.17
U33 0.00 245.59 55.59
U34 0.00 245.59 81.59
PV2 0.00 242.68 125.68
PV6 0.00 248.18 26.18
A1 0.00 251.92 49.92
A2 0.00 263.59 161.59
A3 0.00 248.16 53.16
A4 0.00 245.73 110.73
A5 0.00 248.17 58.17
A6 0.00 247.90 92.90
A7 0.00 245.60 108.60
P1 -1.00 202.00 0.00
P2 -0.88 102.00 0.00
R1 1.12 248.24 12.24
Resultado nos Trechos às 2:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.02 0.01 0.01
20
T2 0.02 0.01 0.00
T3 0.04 0.01 0.00
T4 0.07 0.02 0.01
T5A 0.09 0.02 0.01
T5B 0.07 0.02 0.01
T6 0.04 0.01 0.00
T7 0.02 0.01 0.00
T8 0.16 0.04 0.03
T9 0.18 0.04 0.04
T10 0.20 0.05 0.06
T11 0.22 0.05 0.07
T12 0.24 0.06 0.08
T13 0.27 0.06 0.09
T14 0.29 0.07 0.11
T15 0.31 0.07 0.13
T16 0.33 0.08 0.14
T17 0.36 0.08 0.16
T18 0.38 0.09 0.18
T19 0.40 0.09 0.20
T20 0.42 0.10 0.22
T21 0.44 0.10 0.24
T22 0.47 0.11 0.27
T23 0.49 0.11 0.29
T24 0.24 0.06 0.08
T25 0.16 0.04 0.03
T25B 0.13 0.03 0.03
T26 0.11 0.03 0.02
T27 0.09 0.02 0.01
T28 0.07 0.02 0.01
T29 0.04 0.01 0.00
T30 0.02 0.01 0.00
T31 0.09 0.02 0.01
T32 0.07 0.02 0.01
T33 0.04 0.01 0.00
T34 0.02 0.01 0.00
T35 0.02 0.01 0.01
T36 0.02 0.01 0.01
T37 0.02 0.01 0.01
T38 0.02 0.01 0.01
T39 0.02 0.01 0.01
T40 0.02 0.01 0.01
T41 0.02 0.01 0.01
T42 0.02 0.01 0.01
T43 0.02 0.01 0.01
T44 0.02 0.01 0.01
T45 0.02 0.01 0.01
T46 0.02 0.01 0.01
T47 0.02 0.01 0.01
T48 0.02 0.01 0.01
T49 0.02 0.01 0.01
21
T50 0.02 0.01 0.01
T51 0.02 0.01 0.01
T52 0.02 0.01 0.01
T53 0.02 0.01 0.01
T54 0.02 0.01 0.01
T55 0.02 0.01 0.01
T56 0.02 0.01 0.01
T57 0.02 0.01 0.01
T58 0.02 0.01 0.01
T59 0.02 0.01 0.01
T60 0.02 0.01 0.01
T61 0.02 0.01 0.01
T62 0.02 0.01 0.01
T63 0.02 0.01 0.01
T64 0.02 0.01 0.01
T65 0.02 0.01 0.01
T66 0.02 0.01 0.01
T67 0.02 0.01 0.01
T68 0.76 0.17 0.65
T69 1.00 0.51 7.87
T70 0.88 0.45 6.14
1 1.00 0.00 -49.92
2 0.88 0.00 -161.59
3 0.11 0.03 2.42
4 0.02 0.01 2.58
5 0.04 0.01 2.58
6 0.38 0.09 1.86
7 0.18 0.04 2.89
Resultado nos Nós às 3:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.03 236.39 112.39
22
2 0.03 236.39 130.39
3 0.03 236.39 155.39
4 0.03 236.48 101.48
5 0.03 236.40 108.40
6 0.03 243.11 64.11
7 0.03 243.10 63.10
8 0.03 243.46 98.46
9 0.03 243.47 103.47
10 0.03 243.06 50.06
11 0.03 243.06 50.06
12 0.03 243.02 55.02
13 0.03 236.41 120.41
14 0.03 236.40 104.40
15 0.03 236.40 123.40
16 0.03 242.86 77.86
17 0.03 242.86 52.86
18 0.03 248.66 38.66
19 0.03 248.66 33.66
20 0.03 248.37 32.37
21 0.03 248.30 45.30
22 0.03 243.82 85.82
23 0.03 243.91 87.91
24 0.03 248.26 55.26
25 0.03 248.52 21.52
26 0.03 248.76 13.76
27 0.03 248.68 26.68
28 0.03 248.66 25.66
29 0.03 243.20 49.20
30 0.03 243.19 54.19
31 0.03 243.19 75.19
32 0.03 243.19 78.19
33 0.03 237.39 101.39
34 0.03 248.39 29.39
U1 0.00 236.39 155.39
U2 0.00 236.39 130.39
U3 0.00 236.40 114.40
U4 0.00 236.40 108.40
U5 0.00 236.41 120.41
U6 0.00 236.41 123.41
U7 0.00 236.41 103.41
U8 0.00 236.48 99.48
U9 0.00 243.02 54.02
U10 0.00 243.06 49.06
U11 0.00 243.06 50.06
U12 0.00 243.10 62.10
U13 0.00 243.11 65.11
U14 0.00 243.46 98.46
U15 0.00 243.47 102.47
U16 0.00 243.82 86.82
U17 0.00 243.91 88.91
23
U18 0.00 248.26 54.26
U19 0.00 248.30 45.30
U20 0.00 248.37 33.37
U21 0.00 248.39 29.39
U22 0.00 248.52 21.52
U23 0.00 248.76 13.76
U24 0.00 248.68 25.68
U25 0.00 248.66 24.66
U26 0.00 243.20 48.20
U27 0.00 243.19 53.19
U28 0.00 243.19 76.19
U29 0.00 243.19 78.19
U30 0.00 237.39 102.39
U31 0.00 248.66 34.66
U32 0.00 248.66 37.66
U33 0.00 242.86 52.86
U34 0.00 242.86 78.86
PV2 0.00 236.41 119.41
PV6 0.00 248.69 26.69
A1 0.00 252.40 50.40
A2 0.00 264.01 162.01
A3 0.00 248.63 53.63
A4 0.00 243.19 108.19
A5 0.00 248.66 58.66
A6 0.00 248.10 93.10
A7 0.00 242.98 105.98
P1 -0.99 202.00 0.00
P2 -0.87 102.00 0.00
R1 0.73 248.81 12.81
Resultado nos Trechos às 3:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.03 0.02 0.02
24
T2 0.03 0.01 0.00
T3 0.07 0.02 0.01
T4 0.10 0.02 0.02
T5A 0.13 0.03 0.03
T5B 0.10 0.02 0.02
T6 0.07 0.02 0.01
T7 0.03 0.01 0.00
T8 0.23 0.05 0.07
T9 0.27 0.06 0.09
T10 0.30 0.07 0.12
T11 0.33 0.08 0.14
T12 0.37 0.08 0.17
T13 0.40 0.09 0.20
T14 0.43 0.10 0.23
T15 0.47 0.11 0.27
T16 0.50 0.11 0.30
T17 0.53 0.12 0.34
T18 0.57 0.13 0.38
T19 0.60 0.14 0.42
T20 0.63 0.14 0.47
T21 0.67 0.15 0.51
T22 0.70 0.16 0.56
T23 0.73 0.17 0.61
T24 0.37 0.08 0.17
T25 0.23 0.05 0.07
T25B 0.20 0.05 0.06
T26 0.17 0.04 0.04
T27 0.13 0.03 0.03
T28 0.10 0.02 0.02
T29 0.07 0.02 0.01
T30 0.03 0.01 0.00
T31 0.13 0.03 0.03
T32 0.10 0.02 0.02
T33 0.07 0.02 0.01
T34 0.03 0.01 0.00
T35 0.03 0.02 0.01
T36 0.03 0.02 0.02
T37 0.03 0.02 0.01
T38 0.03 0.02 0.01
T39 0.03 0.02 0.01
T40 0.03 0.02 0.01
T41 0.03 0.02 0.01
T42 0.03 0.02 0.01
T43 0.03 0.02 0.01
T44 0.03 0.02 0.01
T45 0.03 0.02 0.01
T46 0.03 0.02 0.01
T47 0.03 0.02 0.01
T48 0.03 0.02 0.01
T49 0.03 0.02 0.01
25
T50 0.03 0.02 0.01
T51 0.03 0.02 0.01
T52 0.03 0.02 0.01
T53 0.03 0.02 0.01
T54 0.03 0.02 0.01
T55 0.03 0.02 0.02
T56 0.03 0.02 0.01
T57 0.03 0.02 0.01
T58 0.03 0.02 0.01
T59 0.03 0.02 0.01
T60 0.03 0.02 0.01
T61 0.03 0.02 0.01
T62 0.03 0.02 0.01
T63 0.03 0.02 0.01
T64 0.03 0.02 0.01
T65 0.03 0.02 0.01
T66 0.03 0.02 0.01
T67 0.03 0.02 0.02
T68 1.13 0.26 1.37
T69 0.99 0.50 7.67
T70 0.87 0.44 6.08
1 0.99 0.00 -50.40
2 0.87 0.00 -162.01
3 0.17 0.04 5.44
4 0.03 0.01 5.80
5 0.07 0.02 5.80
6 0.57 0.13 4.19
7 0.27 0.06 6.50
Resultado nos Nós às 4:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.04 234.63 110.63
2 0.04 234.63 128.63
26
3 0.04 234.63 153.63
4 0.04 234.73 99.73
5 0.04 234.64 106.64
6 0.04 242.51 63.51
7 0.04 242.50 62.50
8 0.04 242.92 97.92
9 0.04 242.93 102.93
10 0.04 242.45 49.45
11 0.04 242.45 49.45
12 0.04 242.41 54.41
13 0.04 234.65 118.65
14 0.04 234.64 102.64
15 0.04 234.64 121.64
16 0.04 242.19 77.19
17 0.04 242.20 52.20
18 0.04 249.00 39.00
19 0.04 249.01 34.01
20 0.04 248.66 32.66
21 0.04 248.59 45.59
22 0.04 243.33 85.33
23 0.04 243.44 87.44
24 0.04 248.54 55.54
25 0.04 248.84 21.84
26 0.04 249.12 14.12
27 0.04 249.03 27.03
28 0.04 249.01 26.01
29 0.04 242.59 48.59
30 0.04 242.59 53.59
31 0.04 242.58 74.58
32 0.04 242.58 77.58
33 0.04 235.78 99.78
34 0.04 248.69 29.69
U1 0.00 234.63 153.63
U2 0.00 234.63 128.63
U3 0.00 234.63 112.63
U4 0.00 234.64 106.64
U5 0.00 234.65 118.65
U6 0.00 234.65 121.65
U7 0.00 234.65 101.65
U8 0.00 234.73 97.73
U9 0.00 242.41 53.41
U10 0.00 242.45 48.45
U11 0.00 242.45 49.45
U12 0.00 242.50 61.50
U13 0.00 242.51 64.51
U14 0.00 242.92 97.92
U15 0.00 242.93 101.93
U16 0.00 243.33 86.33
U17 0.00 243.44 88.44
U18 0.00 248.54 54.54
27
U19 0.00 248.59 45.59
U20 0.00 248.66 33.66
U21 0.00 248.69 29.69
U22 0.00 248.84 21.84
U23 0.00 249.12 14.12
U24 0.00 249.03 26.03
U25 0.00 249.01 25.01
U26 0.00 242.59 47.59
U27 0.00 242.59 52.59
U28 0.00 242.58 75.58
U29 0.00 242.58 77.58
U30 0.00 235.78 100.78
U31 0.00 249.01 35.01
U32 0.00 249.00 38.00
U33 0.00 242.20 52.20
U34 0.00 242.20 78.20
PV2 0.00 234.65 117.65
PV6 0.00 249.04 27.04
A1 0.00 252.71 50.71
A2 0.00 264.28 162.28
A3 0.00 248.97 53.97
A4 0.00 242.58 107.58
A5 0.00 249.00 59.00
A6 0.00 248.36 93.36
A7 0.00 242.36 105.36
P1 -0.98 202.00 0.00
P2 -0.87 102.00 0.00
R1 0.62 249.18 13.18
Resultado nos Trechos às 4:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.04 0.02 0.02
T2 0.04 0.01 0.00
T3 0.07 0.02 0.01
28
T4 0.11 0.02 0.02
T5A 0.14 0.03 0.03
T5B 0.11 0.02 0.02
T6 0.07 0.02 0.01
T7 0.04 0.01 0.00
T8 0.25 0.06 0.09
T9 0.29 0.07 0.11
T10 0.32 0.07 0.14
T11 0.36 0.08 0.17
T12 0.40 0.09 0.20
T13 0.43 0.10 0.23
T14 0.47 0.11 0.27
T15 0.51 0.11 0.31
T16 0.54 0.12 0.35
T17 0.58 0.13 0.39
T18 0.61 0.14 0.44
T19 0.65 0.15 0.49
T20 0.69 0.16 0.54
T21 0.72 0.16 0.60
T22 0.76 0.17 0.65
T23 0.79 0.18 0.71
T24 0.40 0.09 0.20
T25 0.25 0.06 0.09
T25B 0.22 0.05 0.06
T26 0.18 0.04 0.05
T27 0.14 0.03 0.03
T28 0.11 0.02 0.02
T29 0.07 0.02 0.01
T30 0.04 0.01 0.00
T31 0.14 0.03 0.03
T32 0.11 0.02 0.02
T33 0.07 0.02 0.01
T34 0.04 0.01 0.00
T35 0.04 0.02 0.02
T36 0.04 0.02 0.02
T37 0.04 0.02 0.02
T38 0.04 0.02 0.02
T39 0.04 0.02 0.02
T40 0.04 0.02 0.02
T41 0.04 0.02 0.02
T42 0.04 0.02 0.02
T43 0.04 0.02 0.02
T44 0.04 0.02 0.02
T45 0.04 0.02 0.02
T46 0.04 0.02 0.02
T47 0.04 0.02 0.02
T48 0.04 0.02 0.02
T49 0.04 0.02 0.02
T50 0.04 0.02 0.02
T51 0.04 0.02 0.02
29
T52 0.04 0.02 0.02
T53 0.04 0.02 0.02
T54 0.04 0.02 0.02
T55 0.04 0.02 0.02
T56 0.04 0.02 0.02
T57 0.04 0.02 0.02
T58 0.04 0.02 0.02
T59 0.04 0.02 0.02
T60 0.04 0.02 0.02
T61 0.04 0.02 0.02
T62 0.04 0.02 0.02
T63 0.04 0.02 0.02
T64 0.04 0.02 0.02
T65 0.04 0.02 0.02
T66 0.04 0.02 0.02
T67 0.04 0.02 0.02
T68 1.23 0.28 1.59
T69 0.98 0.50 7.53
T70 0.87 0.44 6.04
1 0.98 0.00 -50.71
2 0.87 0.00 -162.28
3 0.18 0.04 6.38
4 0.04 0.01 6.81
5 0.07 0.02 6.81
6 0.61 0.14 4.92
7 0.29 0.07 7.62
Resultado nos Nós às 5:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.04 232.65 108.65
2 0.04 232.64 126.64
3 0.04 232.64 151.64
4 0.04 232.76 97.76
30
5 0.04 232.66 104.66
6 0.04 241.78 62.78
7 0.04 241.77 61.77
8 0.04 242.25 97.25
9 0.04 242.26 102.26
10 0.04 241.72 48.72
11 0.04 241.71 48.71
12 0.04 241.66 53.66
13 0.04 232.67 116.67
14 0.04 232.66 100.66
15 0.04 232.66 119.66
16 0.04 241.40 76.40
17 0.04 241.40 51.40
18 0.04 249.29 39.29
19 0.04 249.30 34.30
20 0.04 248.90 32.90
21 0.04 248.82 45.82
22 0.04 242.72 84.72
23 0.04 242.85 86.85
24 0.04 248.76 55.76
25 0.04 249.11 22.11
26 0.04 249.42 14.42
27 0.04 249.33 27.33
28 0.04 249.30 26.30
29 0.04 241.86 47.86
30 0.04 241.86 52.86
31 0.04 241.85 73.85
32 0.04 241.85 76.85
33 0.04 233.95 97.95
34 0.04 248.93 29.93
U1 0.00 232.64 151.64
U2 0.00 232.64 126.64
U3 0.00 232.65 110.65
U4 0.00 232.66 104.66
U5 0.00 232.67 116.67
U6 0.00 232.66 119.66
U7 0.00 232.66 99.66
U8 0.00 232.77 95.77
U9 0.00 241.66 52.66
U10 0.00 241.71 47.71
U11 0.00 241.72 48.72
U12 0.00 241.77 60.77
U13 0.00 241.78 63.78
U14 0.00 242.25 97.25
U15 0.00 242.26 101.26
U16 0.00 242.73 85.73
U17 0.00 242.85 87.85
U18 0.00 248.76 54.76
U19 0.00 248.82 45.82
U20 0.00 248.90 33.90
31
U21 0.00 248.94 29.94
U22 0.00 249.11 22.11
U23 0.00 249.42 14.42
U24 0.00 249.33 26.33
U25 0.00 249.30 25.30
U26 0.00 241.86 46.86
U27 0.00 241.86 51.86
U28 0.00 241.85 74.85
U29 0.00 241.85 76.85
U30 0.00 233.95 98.95
U31 0.00 249.30 35.30
U32 0.00 249.29 38.29
U33 0.00 241.40 51.40
U34 0.00 241.40 77.40
PV2 0.00 232.67 115.67
PV6 0.00 249.34 27.34
A1 0.00 252.97 50.97
A2 0.00 264.51 162.51
A3 0.00 249.26 54.26
A4 0.00 241.85 106.85
A5 0.00 249.29 59.29
A6 0.00 248.55 93.55
A7 0.00 241.61 104.61
P1 -0.97 202.00 0.00
P2 -0.87 102.00 0.00
R1 0.51 249.50 13.50
Resultado nos Trechos às 5:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.04 0.02 0.02
T2 0.04 0.01 0.00
T3 0.08 0.02 0.01
T4 0.12 0.03 0.02
32
T5A 0.16 0.04 0.03
T5B 0.12 0.03 0.02
T6 0.08 0.02 0.01
T7 0.04 0.01 0.00
T8 0.27 0.06 0.10
T9 0.31 0.07 0.13
T10 0.35 0.08 0.16
T11 0.39 0.09 0.19
T12 0.43 0.10 0.23
T13 0.47 0.11 0.27
T14 0.51 0.11 0.31
T15 0.54 0.12 0.35
T16 0.58 0.13 0.40
T17 0.62 0.14 0.45
T18 0.66 0.15 0.51
T19 0.70 0.16 0.56
T20 0.74 0.17 0.62
T21 0.78 0.18 0.68
T22 0.82 0.18 0.75
T23 0.86 0.19 0.81
T24 0.43 0.10 0.23
T25 0.27 0.06 0.10
T25B 0.23 0.05 0.07
T26 0.19 0.04 0.05
T27 0.16 0.04 0.03
T28 0.12 0.03 0.02
T29 0.08 0.02 0.01
T30 0.04 0.01 0.00
T31 0.16 0.04 0.03
T32 0.12 0.03 0.02
T33 0.08 0.02 0.01
T34 0.04 0.01 0.00
T35 0.04 0.02 0.02
T36 0.04 0.02 0.02
T37 0.04 0.02 0.02
T38 0.04 0.02 0.02
T39 0.04 0.02 0.02
T40 0.04 0.02 0.02
T41 0.04 0.02 0.02
T42 0.04 0.02 0.02
T43 0.04 0.02 0.02
T44 0.04 0.02 0.02
T45 0.04 0.02 0.02
T46 0.04 0.02 0.02
T47 0.04 0.02 0.02
T48 0.04 0.02 0.02
T49 0.04 0.02 0.02
T50 0.04 0.02 0.02
T51 0.04 0.02 0.02
T52 0.04 0.02 0.02
33
T53 0.04 0.02 0.02
T54 0.04 0.02 0.02
T55 0.04 0.02 0.02
T56 0.04 0.02 0.02
T57 0.04 0.02 0.02
T58 0.04 0.02 0.02
T59 0.04 0.02 0.02
T60 0.04 0.02 0.02
T61 0.04 0.02 0.02
T62 0.04 0.02 0.02
T63 0.04 0.02 0.02
T64 0.04 0.02 0.02
T65 0.04 0.02 0.02
T66 0.04 0.02 0.02
T67 0.04 0.02 0.02
T68 1.32 0.30 1.83
T69 0.97 0.49 7.42
T70 0.87 0.44 6.01
1 0.97 0.00 -50.97
2 0.87 0.00 -162.51
3 0.19 0.04 7.40
4 0.04 0.01 7.89
5 0.08 0.02 7.89
6 0.66 0.15 5.70
7 0.31 0.07 8.84
Resultado nos Nós às 6:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.04 227.81 103.81
2 0.04 227.80 121.80
3 0.04 227.80 146.80
4 0.04 227.96 92.96
34
5 0.04 227.83 99.83
6 0.04 239.73 60.73
7 0.04 239.72 59.72
8 0.04 240.33 95.33
9 0.04 240.35 100.35
10 0.04 239.65 46.65
11 0.04 239.64 46.64
12 0.04 239.58 51.58
13 0.04 227.83 111.83
14 0.04 227.83 95.83
15 0.04 227.83 114.83
16 0.04 239.18 74.18
17 0.04 239.18 49.18
18 0.04 249.50 39.50
19 0.04 249.50 34.50
20 0.04 249.00 33.00
21 0.04 248.89 45.89
22 0.04 240.94 82.94
23 0.04 241.10 85.10
24 0.04 248.81 55.81
25 0.04 249.26 22.26
26 0.04 249.67 14.67
27 0.04 249.54 27.54
28 0.04 249.51 26.51
29 0.04 239.79 45.79
30 0.04 239.79 50.79
31 0.04 239.78 71.78
32 0.04 239.77 74.77
33 0.04 229.46 93.46
34 0.04 249.04 30.04
U1 0.00 227.80 146.80
U2 0.00 227.80 121.80
U3 0.00 227.81 105.81
U4 0.00 227.83 99.83
U5 0.00 227.83 111.83
U6 0.00 227.83 114.83
U7 0.00 227.83 94.83
U8 0.00 227.96 90.96
U9 0.00 239.58 50.58
U10 0.00 239.64 45.64
U11 0.00 239.65 46.65
U12 0.00 239.72 58.72
U13 0.00 239.73 61.73
U14 0.00 240.33 95.33
U15 0.00 240.35 99.35
U16 0.00 240.94 83.94
U17 0.00 241.10 86.10
U18 0.00 248.81 54.81
U19 0.00 248.89 45.89
U20 0.00 249.00 34.00
35
U21 0.00 249.04 30.04
U22 0.00 249.26 22.26
U23 0.00 249.67 14.67
U24 0.00 249.54 26.54
U25 0.00 249.51 25.51
U26 0.00 239.79 44.79
U27 0.00 239.79 49.79
U28 0.00 239.78 72.78
U29 0.00 239.78 74.78
U30 0.00 229.46 94.46
U31 0.00 249.50 35.50
U32 0.00 249.50 38.50
U33 0.00 239.19 49.19
U34 0.00 239.18 75.18
PV2 0.00 227.84 110.84
PV6 0.00 249.55 27.55
A1 0.00 253.19 51.19
A2 0.00 264.70 162.70
A3 0.00 249.46 54.46
A4 0.00 239.77 104.77
A5 0.00 249.50 59.50
A6 0.00 248.55 93.55
A7 0.00 239.51 102.51
P1 -0.96 202.00 0.00
P2 -0.86 102.00 0.00
R1 0.32 249.76 13.76
Resultado nos Trechos às 6:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.04 0.02 0.02
T2 0.04 0.01 0.00
T3 0.09 0.02 0.01
T4 0.13 0.03 0.03
36
T5A 0.18 0.04 0.04
T5B 0.13 0.03 0.03
T6 0.09 0.02 0.01
T7 0.04 0.01 0.00
T8 0.31 0.07 0.13
T9 0.36 0.08 0.16
T10 0.40 0.09 0.20
T11 0.44 0.10 0.24
T12 0.49 0.11 0.29
T13 0.53 0.12 0.34
T14 0.58 0.13 0.39
T15 0.62 0.14 0.45
T16 0.67 0.15 0.51
T17 0.71 0.16 0.58
T18 0.76 0.17 0.65
T19 0.80 0.18 0.72
T20 0.84 0.19 0.80
T21 0.89 0.20 0.87
T22 0.93 0.21 0.96
T23 0.98 0.22 1.04
T24 0.49 0.11 0.29
T25 0.31 0.07 0.13
T25B 0.27 0.06 0.09
T26 0.22 0.05 0.07
T27 0.18 0.04 0.04
T28 0.13 0.03 0.03
T29 0.09 0.02 0.01
T30 0.04 0.01 0.00
T31 0.18 0.04 0.04
T32 0.13 0.03 0.03
T33 0.09 0.02 0.01
T34 0.04 0.01 0.00
T35 0.04 0.02 0.02
T36 0.04 0.02 0.02
T37 0.04 0.02 0.03
T38 0.04 0.02 0.02
T39 0.04 0.02 0.03
T40 0.04 0.02 0.02
T41 0.04 0.02 0.02
T42 0.04 0.02 0.02
T43 0.04 0.02 0.02
T44 0.04 0.02 0.02
T45 0.04 0.02 0.02
T46 0.04 0.02 0.02
T47 0.04 0.02 0.02
T48 0.04 0.02 0.02
T49 0.04 0.02 0.02
T50 0.04 0.02 0.03
T51 0.04 0.02 0.02
T52 0.04 0.02 0.02
37
T53 0.04 0.02 0.02
T54 0.04 0.02 0.02
T55 0.04 0.02 0.03
T56 0.04 0.02 0.02
T57 0.04 0.02 0.02
T58 0.04 0.02 0.03
T59 0.04 0.02 0.03
T60 0.04 0.02 0.03
T61 0.04 0.02 0.02
T62 0.04 0.02 0.03
T63 0.04 0.02 0.02
T64 0.04 0.02 0.02
T65 0.04 0.02 0.02
T66 0.04 0.02 0.03
T67 0.04 0.02 0.02
T68 1.51 0.34 2.34
T69 0.96 0.49 7.32
T70 0.86 0.44 5.98
1 0.96 0.00 -51.19
2 0.86 0.00 -162.70
3 0.22 0.05 9.67
4 0.04 0.01 10.31
5 0.09 0.02 10.31
6 0.76 0.17 7.45
7 0.36 0.08 11.55
Resultado nos Nós às 7:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.05 225.17 101.17
2 0.05 225.17 119.17
3 0.05 225.16 144.16
4 0.05 225.34 90.34
38
5 0.05 225.19 97.19
6 0.05 238.63 59.63
7 0.05 238.61 58.61
8 0.05 239.30 94.30
9 0.05 239.32 99.32
10 0.05 238.54 45.54
11 0.05 238.53 45.53
12 0.05 238.46 50.46
13 0.05 225.20 109.20
14 0.05 225.19 93.19
15 0.05 225.19 112.19
16 0.05 237.98 72.98
17 0.05 237.99 47.99
18 0.05 249.63 39.63
19 0.05 249.63 34.63
20 0.05 249.07 33.07
21 0.05 248.95 45.95
22 0.05 239.98 81.98
23 0.05 240.15 84.15
24 0.05 248.86 55.86
25 0.05 249.36 22.36
26 0.05 249.82 14.82
27 0.05 249.67 27.67
28 0.05 249.64 26.64
29 0.05 238.67 44.67
30 0.05 238.66 49.66
31 0.05 238.65 70.65
32 0.05 238.65 73.65
33 0.05 227.01 91.01
34 0.05 249.11 30.11
U1 0.00 225.16 144.16
U2 0.00 225.17 119.17
U3 0.00 225.18 103.18
U4 0.00 225.19 97.19
U5 0.00 225.20 109.20
U6 0.00 225.20 112.20
U7 0.00 225.19 92.19
U8 0.00 225.34 88.34
U9 0.00 238.46 49.46
U10 0.00 238.53 44.53
U11 0.00 238.54 45.54
U12 0.00 238.61 57.61
U13 0.00 238.63 60.63
U14 0.00 239.30 94.30
U15 0.00 239.32 98.32
U16 0.00 239.98 82.98
U17 0.00 240.15 85.15
U18 0.00 248.86 54.86
U19 0.00 248.95 45.95
U20 0.00 249.07 34.07
39
U21 0.00 249.11 30.11
U22 0.00 249.36 22.36
U23 0.00 249.82 14.82
U24 0.00 249.67 26.67
U25 0.00 249.64 25.64
U26 0.00 238.67 43.67
U27 0.00 238.67 48.67
U28 0.00 238.65 71.65
U29 0.00 238.65 73.65
U30 0.00 227.01 92.01
U31 0.00 249.63 35.63
U32 0.00 249.63 38.63
U33 0.00 237.99 47.99
U34 0.00 237.98 73.98
PV2 0.00 225.20 108.20
PV6 0.00 249.69 27.69
A1 0.00 253.32 51.32
A2 0.00 264.81 162.81
A3 0.00 249.58 54.58
A4 0.00 238.65 103.65
A5 0.00 249.63 59.63
A6 0.00 248.56 93.56
A7 0.00 238.38 101.38
P1 -0.96 202.00 0.00
P2 -0.86 102.00 0.00
R1 0.22 249.92 13.92
Resultado nos Trechos às 7:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.05 0.02 0.03
T2 0.05 0.01 0.00
T3 0.09 0.02 0.01
T4 0.14 0.03 0.03
40
T5A 0.19 0.04 0.05
T5B 0.14 0.03 0.03
T6 0.09 0.02 0.01
T7 0.05 0.01 0.00
T8 0.33 0.07 0.14
T9 0.38 0.09 0.18
T10 0.42 0.10 0.22
T11 0.47 0.11 0.27
T12 0.52 0.12 0.32
T13 0.57 0.13 0.38
T14 0.61 0.14 0.44
T15 0.66 0.15 0.51
T16 0.71 0.16 0.57
T17 0.76 0.17 0.65
T18 0.80 0.18 0.72
T19 0.85 0.19 0.81
T20 0.90 0.20 0.89
T21 0.94 0.21 0.98
T22 0.99 0.22 1.07
T23 1.04 0.24 1.17
T24 0.52 0.12 0.32
T25 0.33 0.07 0.14
T25B 0.28 0.06 0.11
T26 0.24 0.05 0.08
T27 0.19 0.04 0.05
T28 0.14 0.03 0.03
T29 0.09 0.02 0.01
T30 0.05 0.01 0.00
T31 0.19 0.04 0.05
T32 0.14 0.03 0.03
T33 0.09 0.02 0.01
T34 0.05 0.01 0.00
T35 0.05 0.02 0.03
T36 0.05 0.02 0.03
T37 0.05 0.02 0.03
T38 0.05 0.02 0.03
T39 0.05 0.02 0.03
T40 0.05 0.02 0.03
T41 0.05 0.02 0.03
T42 0.05 0.02 0.03
T43 0.05 0.02 0.03
T44 0.05 0.02 0.03
T45 0.05 0.02 0.03
T46 0.05 0.02 0.03
T47 0.05 0.02 0.03
T48 0.05 0.02 0.03
T49 0.05 0.02 0.03
T50 0.05 0.02 0.03
T51 0.05 0.02 0.03
T52 0.05 0.02 0.03
41
T53 0.05 0.02 0.03
T54 0.05 0.02 0.03
T55 0.05 0.02 0.03
T56 0.05 0.02 0.03
T57 0.05 0.02 0.03
T58 0.05 0.02 0.03
T59 0.05 0.02 0.03
T60 0.05 0.02 0.03
T61 0.05 0.02 0.03
T62 0.05 0.02 0.03
T63 0.05 0.02 0.03
T64 0.05 0.02 0.03
T65 0.05 0.02 0.03
T66 0.05 0.02 0.03
T67 0.05 0.02 0.03
T68 1.61 0.36 2.61
T69 0.96 0.49 7.26
T70 0.86 0.44 5.96
1 0.96 0.00 -51.32
2 0.86 0.00 -162.81
3 0.24 0.05 10.91
4 0.05 0.01 11.64
5 0.09 0.02 11.64
6 0.80 0.18 8.41
7 0.38 0.09 13.04
Resultado nos Nós às 8:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.05 222.06 98.06
2 0.05 222.05 116.05
3 0.05 222.05 141.05
4 0.05 222.25 87.25
42
5 0.05 222.08 94.08
6 0.05 237.14 58.14
7 0.05 237.13 57.13
8 0.05 237.88 92.88
9 0.05 237.91 97.91
10 0.05 237.04 44.04
11 0.05 237.03 44.03
12 0.05 236.95 48.95
13 0.05 222.09 106.09
14 0.05 222.08 90.08
15 0.05 222.08 109.08
16 0.05 236.40 71.40
17 0.05 236.40 46.40
18 0.05 249.45 39.45
19 0.05 249.45 34.45
20 0.05 248.83 32.83
21 0.05 248.70 45.70
22 0.05 238.64 80.64
23 0.05 238.84 82.84
24 0.05 248.60 55.60
25 0.05 249.15 22.15
26 0.05 249.66 14.66
27 0.05 249.50 27.50
28 0.05 249.46 26.46
29 0.05 237.16 43.16
30 0.05 237.16 48.16
31 0.05 237.15 69.15
32 0.05 237.15 72.15
33 0.05 224.09 88.09
34 0.05 248.88 29.88
U1 0.00 222.05 141.05
U2 0.00 222.05 116.05
U3 0.00 222.06 100.06
U4 0.00 222.08 94.08
U5 0.00 222.09 106.09
U6 0.00 222.09 109.09
U7 0.00 222.09 89.09
U8 0.00 222.25 85.25
U9 0.00 236.95 47.95
U10 0.00 237.03 43.03
U11 0.00 237.04 44.04
U12 0.00 237.13 56.13
U13 0.00 237.14 59.14
U14 0.00 237.88 92.88
U15 0.00 237.91 96.91
U16 0.00 238.64 81.64
U17 0.00 238.84 83.84
U18 0.00 248.60 54.60
U19 0.00 248.70 45.70
U20 0.00 248.83 33.83
43
U21 0.00 248.88 29.88
U22 0.00 249.15 22.15
U23 0.00 249.66 14.66
U24 0.00 249.50 26.50
U25 0.00 249.46 25.46
U26 0.00 237.16 42.16
U27 0.00 237.16 47.16
U28 0.00 237.15 70.15
U29 0.00 237.15 72.15
U30 0.00 224.09 89.09
U31 0.00 249.45 35.45
U32 0.00 249.45 38.45
U33 0.00 236.40 46.40
U34 0.00 236.40 72.40
PV2 0.00 222.09 105.09
PV6 0.00 249.52 27.52
A1 0.00 253.20 51.20
A2 0.00 264.71 162.71
A3 0.00 249.40 54.40
A4 0.00 237.14 102.14
A5 0.00 249.45 59.45
A6 0.00 248.27 93.27
A7 0.00 236.86 99.86
P1 -0.96 202.00 0.00
P2 -0.86 102.00 0.00
R1 0.13 249.77 13.77
Resultado nos Trechos às 8:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.05 0.03 0.03
T2 0.05 0.01 0.00
T3 0.10 0.02 0.02
T4 0.15 0.03 0.03
44
T5A 0.20 0.05 0.06
T5B 0.15 0.03 0.03
T6 0.10 0.02 0.02
T7 0.05 0.01 0.00
T8 0.35 0.08 0.16
T9 0.40 0.09 0.20
T10 0.45 0.10 0.25
T11 0.50 0.11 0.30
T12 0.55 0.12 0.36
T13 0.60 0.14 0.42
T14 0.65 0.15 0.49
T15 0.70 0.16 0.56
T16 0.75 0.17 0.64
T17 0.80 0.18 0.72
T18 0.85 0.19 0.81
T19 0.90 0.20 0.90
T20 0.95 0.22 0.99
T21 1.00 0.23 1.09
T22 1.05 0.24 1.19
T23 1.10 0.25 1.30
T24 0.55 0.12 0.36
T25 0.35 0.08 0.16
T25B 0.30 0.07 0.12
T26 0.25 0.06 0.08
T27 0.20 0.05 0.06
T28 0.15 0.03 0.03
T29 0.10 0.02 0.02
T30 0.05 0.01 0.00
T31 0.20 0.05 0.06
T32 0.15 0.03 0.03
T33 0.10 0.02 0.02
T34 0.05 0.01 0.00
T35 0.05 0.03 0.03
T36 0.05 0.03 0.03
T37 0.05 0.03 0.03
T38 0.05 0.03 0.03
T39 0.05 0.03 0.03
T40 0.05 0.03 0.03
T41 0.05 0.03 0.03
T42 0.05 0.03 0.03
T43 0.05 0.03 0.03
T44 0.05 0.03 0.03
T45 0.05 0.03 0.03
T46 0.05 0.03 0.03
T47 0.05 0.03 0.03
T48 0.05 0.03 0.03
T49 0.05 0.03 0.03
T50 0.05 0.03 0.03
T51 0.05 0.03 0.03
T52 0.05 0.03 0.03
45
T53 0.05 0.03 0.03
T54 0.05 0.03 0.03
T55 0.05 0.03 0.03
T56 0.05 0.03 0.03
T57 0.05 0.03 0.03
T58 0.05 0.03 0.03
T59 0.05 0.03 0.03
T60 0.05 0.03 0.03
T61 0.05 0.03 0.03
T62 0.05 0.03 0.03
T63 0.05 0.03 0.03
T64 0.05 0.03 0.03
T65 0.05 0.03 0.03
T66 0.05 0.03 0.03
T67 0.05 0.03 0.03
T68 1.70 0.38 2.91
T69 0.96 0.49 7.32
T70 0.86 0.44 5.98
1 0.96 0.00 -51.20
2 0.86 0.00 -162.71
3 0.25 0.06 12.23
4 0.05 0.01 13.05
5 0.10 0.02 13.05
6 0.85 0.19 9.43
7 0.40 0.09 14.62
Resultado nos Nós às 9:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.07 192.43 68.43
2 0.07 192.41 86.41
3 0.07 192.40 111.40
4 0.07 192.79 57.79
46
5 0.07 192.46 64.46
6 0.07 223.84 44.84
7 0.07 223.81 43.81
8 0.07 225.30 80.30
9 0.07 225.36 85.36
10 0.07 223.63 30.63
11 0.07 223.61 30.61
12 0.07 223.46 35.46
13 0.07 192.48 76.48
14 0.07 192.47 60.47
15 0.07 192.47 79.47
16 0.07 221.96 56.96
17 0.07 221.96 31.96
18 0.07 249.20 39.20
19 0.07 249.20 34.20
20 0.07 247.97 31.97
21 0.07 247.71 44.71
22 0.07 226.80 68.80
23 0.07 227.19 71.19
24 0.07 247.51 54.51
25 0.07 248.61 21.61
26 0.07 249.61 14.61
27 0.07 249.30 27.30
28 0.07 249.22 26.22
29 0.07 223.57 29.57
30 0.07 223.56 34.56
31 0.07 223.53 55.53
32 0.07 223.53 58.53
33 0.07 196.30 60.30
34 0.07 248.07 29.07
U1 0.00 192.40 111.40
U2 0.00 192.41 86.41
U3 0.00 192.43 70.43
U4 0.00 192.46 64.46
U5 0.00 192.48 76.48
U6 0.00 192.48 79.48
U7 0.00 192.47 59.47
U8 0.00 192.79 55.79
U9 0.00 223.46 34.46
U10 0.00 223.61 29.61
U11 0.00 223.63 30.63
U12 0.00 223.81 42.81
U13 0.00 223.84 45.84
U14 0.00 225.30 80.30
U15 0.00 225.36 84.36
U16 0.00 226.81 69.81
U17 0.00 227.19 72.19
U18 0.00 247.51 53.51
U19 0.00 247.71 44.71
U20 0.00 247.97 32.97
47
U21 0.00 248.07 29.07
U22 0.00 248.61 21.61
U23 0.00 249.61 14.61
U24 0.00 249.30 26.30
U25 0.00 249.22 25.22
U26 0.00 223.57 28.57
U27 0.00 223.56 33.56
U28 0.00 223.54 56.54
U29 0.00 223.53 58.53
U30 0.00 196.30 61.30
U31 0.00 249.20 35.20
U32 0.00 249.20 38.20
U33 0.00 221.97 31.97
U34 0.00 221.96 57.96
PV2 0.00 192.48 75.48
PV6 0.00 249.34 27.34
A1 0.00 253.25 51.25
A2 0.00 264.75 162.75
A3 0.00 249.09 54.09
A4 0.00 223.53 88.53
A5 0.00 249.19 59.19
A6 0.00 246.86 91.86
A7 0.00 223.29 86.29
P1 -0.96 202.00 0.00
P2 -0.86 102.00 0.00
R1 -0.63 249.84 13.84
Resultado nos Trechos às 9:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.07 0.04 0.06
T2 0.07 0.02 0.01
T3 0.14 0.03 0.03
T4 0.22 0.05 0.06
48
T5A 0.29 0.07 0.11
T5B 0.22 0.05 0.06
T6 0.14 0.03 0.03
T7 0.07 0.02 0.01
T8 0.51 0.11 0.31
T9 0.58 0.13 0.39
T10 0.65 0.15 0.49
T11 0.72 0.16 0.60
T12 0.79 0.18 0.71
T13 0.87 0.20 0.83
T14 0.94 0.21 0.97
T15 1.01 0.23 1.11
T16 1.08 0.25 1.26
T17 1.16 0.26 1.42
T18 1.23 0.28 1.59
T19 1.30 0.29 1.77
T20 1.37 0.31 1.95
T21 1.44 0.33 2.15
T22 1.52 0.34 2.35
T23 1.59 0.36 2.56
T24 0.79 0.18 0.71
T25 0.51 0.11 0.31
T25B 0.43 0.10 0.23
T26 0.36 0.08 0.16
T27 0.29 0.07 0.11
T28 0.22 0.05 0.06
T29 0.14 0.03 0.03
T30 0.07 0.02 0.01
T31 0.29 0.07 0.11
T32 0.22 0.05 0.06
T33 0.14 0.03 0.03
T34 0.07 0.02 0.01
T35 0.07 0.04 0.06
T36 0.07 0.04 0.06
T37 0.07 0.04 0.06
T38 0.07 0.04 0.06
T39 0.07 0.04 0.06
T40 0.07 0.04 0.06
T41 0.07 0.04 0.06
T42 0.07 0.04 0.06
T43 0.07 0.04 0.06
T44 0.07 0.04 0.06
T45 0.07 0.04 0.06
T46 0.07 0.04 0.06
T47 0.07 0.04 0.06
T48 0.07 0.04 0.06
T49 0.07 0.04 0.06
T50 0.07 0.04 0.06
T51 0.07 0.04 0.06
T52 0.07 0.04 0.06
49
T53 0.07 0.04 0.06
T54 0.07 0.04 0.06
T55 0.07 0.04 0.06
T56 0.07 0.04 0.06
T57 0.07 0.04 0.06
T58 0.07 0.04 0.06
T59 0.07 0.04 0.06
T60 0.07 0.04 0.06
T61 0.07 0.04 0.06
T62 0.07 0.04 0.06
T63 0.07 0.04 0.06
T64 0.07 0.04 0.06
T65 0.07 0.04 0.06
T66 0.07 0.04 0.06
T67 0.07 0.04 0.06
T68 2.46 0.56 5.74
T69 0.96 0.49 7.29
T70 0.86 0.44 5.97
1 0.96 0.00 -51.25
2 0.86 0.00 -162.75
3 0.36 0.08 25.52
4 0.07 0.02 27.23
5 0.14 0.03 27.23
6 1.23 0.28 19.67
7 0.58 0.13 30.49
Resultado nos Nós às 10:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.08 173.28 49.28
2 0.08 173.26 67.26
3 0.08 173.25 92.25
4 0.08 173.76 38.76
50
5 0.08 173.33 45.33
6 0.08 215.08 36.08
7 0.08 215.04 35.04
8 0.08 216.99 71.99
9 0.08 217.06 77.06
10 0.08 214.81 21.81
11 0.08 214.79 21.79
12 0.08 214.59 26.59
13 0.08 173.35 57.35
14 0.08 173.34 41.34
15 0.08 173.34 60.34
16 0.08 212.42 47.42
17 0.08 212.42 22.42
18 0.08 248.68 38.68
19 0.08 248.69 33.69
20 0.08 247.09 31.09
21 0.08 246.75 43.75
22 0.08 218.94 60.94
23 0.08 219.44 63.44
24 0.08 246.48 53.48
25 0.08 247.92 20.92
26 0.08 249.22 14.22
27 0.08 248.81 26.81
28 0.08 248.71 25.71
29 0.08 214.56 20.56
30 0.08 214.55 25.55
31 0.08 214.52 46.52
32 0.08 214.52 49.52
33 0.08 178.26 42.26
34 0.08 247.21 28.21
U1 0.00 173.25 92.25
U2 0.00 173.26 67.26
U3 0.00 173.29 51.29
U4 0.00 173.33 45.33
U5 0.00 173.35 57.35
U6 0.00 173.35 60.35
U7 0.00 173.34 40.34
U8 0.00 173.76 36.76
U9 0.00 214.59 25.59
U10 0.00 214.79 20.79
U11 0.00 214.81 21.81
U12 0.00 215.04 34.04
U13 0.00 215.08 37.08
U14 0.00 216.99 71.99
U15 0.00 217.06 76.06
U16 0.00 218.95 61.95
U17 0.00 219.44 64.44
U18 0.00 246.48 52.48
U19 0.00 246.75 43.75
U20 0.00 247.09 32.09
51
U21 0.00 247.21 28.21
U22 0.00 247.92 20.92
U23 0.00 249.22 14.22
U24 0.00 248.82 25.82
U25 0.00 248.71 24.71
U26 0.00 214.56 19.56
U27 0.00 214.55 24.55
U28 0.00 214.52 47.52
U29 0.00 214.52 49.52
U30 0.00 178.27 43.27
U31 0.00 248.69 34.69
U32 0.00 248.69 37.69
U33 0.00 212.43 22.43
U34 0.00 212.42 48.42
PV2 0.00 173.36 56.36
PV6 0.00 248.86 26.86
A1 0.00 252.99 50.99
A2 0.00 264.52 162.52
A3 0.00 248.55 53.55
A4 0.00 214.51 79.51
A5 0.00 248.67 58.67
A6 0.00 245.63 90.63
A7 0.00 214.36 77.36
P1 -0.97 202.00 0.00
P2 -0.87 102.00 0.00
R1 -1.00 249.52 13.52
Resultado nos Trechos às 10:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.08 0.04 0.08
T2 0.08 0.02 0.01
T3 0.17 0.04 0.04
T4 0.25 0.06 0.08
52
T5A 0.33 0.08 0.14
T5B 0.25 0.06 0.08
T6 0.17 0.04 0.04
T7 0.08 0.02 0.01
T8 0.58 0.13 0.40
T9 0.67 0.15 0.51
T10 0.75 0.17 0.64
T11 0.83 0.19 0.78
T12 0.92 0.21 0.93
T13 1.00 0.23 1.09
T14 1.08 0.25 1.26
T15 1.17 0.26 1.45
T16 1.25 0.28 1.64
T17 1.33 0.30 1.85
T18 1.42 0.32 2.07
T19 1.50 0.34 2.31
T20 1.58 0.36 2.55
T21 1.67 0.38 2.80
T22 1.75 0.40 3.07
T23 1.83 0.41 3.34
T24 0.92 0.21 0.93
T25 0.58 0.13 0.40
T25B 0.50 0.11 0.30
T26 0.42 0.09 0.21
T27 0.33 0.08 0.14
T28 0.25 0.06 0.08
T29 0.17 0.04 0.04
T30 0.08 0.02 0.01
T31 0.33 0.08 0.14
T32 0.25 0.06 0.08
T33 0.17 0.04 0.04
T34 0.08 0.02 0.01
T35 0.08 0.04 0.08
T36 0.08 0.04 0.08
T37 0.08 0.04 0.08
T38 0.08 0.04 0.08
T39 0.08 0.04 0.08
T40 0.08 0.04 0.08
T41 0.08 0.04 0.08
T42 0.08 0.04 0.08
T43 0.08 0.04 0.08
T44 0.08 0.04 0.08
T45 0.08 0.04 0.08
T46 0.08 0.04 0.08
T47 0.08 0.04 0.08
T48 0.08 0.04 0.08
T49 0.08 0.04 0.08
T50 0.08 0.04 0.08
T51 0.08 0.04 0.08
T52 0.08 0.04 0.08
53
T53 0.08 0.04 0.08
T54 0.08 0.04 0.08
T55 0.08 0.04 0.08
T56 0.08 0.04 0.08
T57 0.08 0.04 0.08
T58 0.08 0.04 0.08
T59 0.08 0.04 0.08
T60 0.08 0.04 0.08
T61 0.08 0.04 0.08
T62 0.08 0.04 0.08
T63 0.08 0.04 0.08
T64 0.08 0.04 0.08
T65 0.08 0.04 0.08
T66 0.08 0.04 0.08
T67 0.08 0.04 0.08
T68 2.83 0.64 7.49
T69 0.97 0.49 7.41
T70 0.87 0.44 6.00
1 0.97 0.00 -50.99
2 0.87 0.00 -162.52
3 0.42 0.09 33.98
4 0.08 0.02 36.25
5 0.17 0.04 36.25
6 1.42 0.32 26.19
7 0.67 0.15 40.60
Resultado nos Nós às 11:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.10 139.60 15.60
2 0.10 139.56 33.56
3 0.10 139.55 58.55
4 0.10 140.26 5.26
54
5 0.10 139.65 11.65
6 0.10 199.73 20.73
7 0.10 199.67 19.67
8 0.10 202.41 57.41
9 0.10 202.50 62.50
10 0.10 199.36 6.36
11 0.10 199.32 6.32
12 0.10 199.05 11.05
13 0.10 139.69 23.69
14 0.10 139.67 7.67
15 0.10 139.67 26.67
16 0.10 195.62 30.62
17 0.10 195.63 5.63
18 0.10 247.84 37.84
19 0.10 247.85 32.85
20 0.10 245.60 29.60
21 0.10 245.13 42.13
22 0.10 205.15 47.15
23 0.10 205.85 49.85
24 0.10 244.75 51.75
25 0.10 246.77 19.77
26 0.10 248.59 13.59
27 0.10 248.02 26.02
28 0.10 247.88 24.88
29 0.10 198.71 4.71
30 0.10 198.70 9.70
31 0.10 198.65 30.65
32 0.10 198.65 33.65
33 0.10 146.44 10.44
34 0.10 245.78 26.78
U1 0.00 139.55 58.55
U2 0.00 139.56 33.56
U3 0.00 139.60 17.60
U4 0.00 139.66 11.66
U5 0.00 139.69 23.69
U6 0.00 139.68 26.68
U7 0.00 139.68 6.68
U8 0.00 140.26 3.26
U9 0.00 199.05 10.05
U10 0.00 199.32 5.32
U11 0.00 199.36 6.36
U12 0.00 199.67 18.67
U13 0.00 199.73 21.73
U14 0.00 202.41 57.41
U15 0.00 202.51 61.51
U16 0.00 205.15 48.15
U17 0.00 205.85 50.85
U18 0.00 244.75 50.75
U19 0.00 245.13 42.13
U20 0.00 245.60 30.60
55
U21 0.00 245.78 26.78
U22 0.00 246.77 19.77
U23 0.00 248.59 13.59
U24 0.00 248.02 25.02
U25 0.00 247.88 23.88
U26 0.00 198.71 3.71
U27 0.00 198.70 8.70
U28 0.00 198.65 31.65
U29 0.00 198.65 33.65
U30 0.00 146.44 11.44
U31 0.00 247.85 33.85
U32 0.00 247.84 36.84
U33 0.00 195.63 5.63
U34 0.00 195.63 31.63
PV2 0.00 139.70 22.70
PV6 0.00 248.09 26.09
A1 0.00 252.56 50.56
A2 0.00 264.15 162.15
A3 0.00 247.65 52.65
A4 0.00 198.64 63.64
A5 0.00 247.83 57.83
A6 0.00 243.56 88.56
A7 0.00 198.72 61.72
P1 -0.98 202.00 0.00
P2 -0.87 102.00 0.00
R1 -1.55 249.01 13.01
Resultado nos Trechos às 11:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.10 0.05 0.11
T2 0.10 0.02 0.02
T3 0.20 0.05 0.06
T4 0.30 0.07 0.12
56
T5A 0.40 0.09 0.20
T5B 0.30 0.07 0.12
T6 0.20 0.05 0.06
T7 0.10 0.02 0.02
T8 0.70 0.16 0.56
T9 0.80 0.18 0.72
T10 0.90 0.20 0.90
T11 1.00 0.23 1.09
T12 1.10 0.25 1.30
T13 1.20 0.27 1.52
T14 1.30 0.29 1.77
T15 1.40 0.32 2.03
T16 1.50 0.34 2.31
T17 1.60 0.36 2.60
T18 1.70 0.38 2.91
T19 1.80 0.41 3.23
T20 1.90 0.43 3.57
T21 2.00 0.45 3.93
T22 2.10 0.48 4.30
T23 2.20 0.50 4.69
T24 1.10 0.25 1.30
T25 0.70 0.16 0.56
T25B 0.60 0.14 0.42
T26 0.50 0.11 0.30
T27 0.40 0.09 0.20
T28 0.30 0.07 0.12
T29 0.20 0.05 0.06
T30 0.10 0.02 0.02
T31 0.40 0.09 0.20
T32 0.30 0.07 0.12
T33 0.20 0.05 0.06
T34 0.10 0.02 0.02
T35 0.10 0.05 0.11
T36 0.10 0.05 0.11
T37 0.10 0.05 0.11
T38 0.10 0.05 0.11
T39 0.10 0.05 0.11
T40 0.10 0.05 0.11
T41 0.10 0.05 0.11
T42 0.10 0.05 0.11
T43 0.10 0.05 0.11
T44 0.10 0.05 0.11
T45 0.10 0.05 0.11
T46 0.10 0.05 0.11
T47 0.10 0.05 0.11
T48 0.10 0.05 0.11
T49 0.10 0.05 0.11
T50 0.10 0.05 0.11
T51 0.10 0.05 0.11
T52 0.10 0.05 0.11
57
T53 0.10 0.05 0.11
T54 0.10 0.05 0.11
T55 0.10 0.05 0.11
T56 0.10 0.05 0.11
T57 0.10 0.05 0.11
T58 0.10 0.05 0.11
T59 0.10 0.05 0.11
T60 0.10 0.05 0.11
T61 0.10 0.05 0.11
T62 0.10 0.05 0.11
T63 0.10 0.05 0.11
T64 0.10 0.05 0.11
T65 0.10 0.05 0.11
T66 0.10 0.05 0.11
T67 0.10 0.05 0.11
T68 3.40 0.77 10.49
T69 0.98 0.50 7.59
T70 0.87 0.44 6.06
1 0.98 0.00 -50.56
2 0.87 0.00 -162.15
3 0.50 0.11 48.93
4 0.10 0.02 52.20
5 0.20 0.05 52.20
6 1.70 0.38 37.71
7 0.80 0.18 58.46
Resultado nos Nós às 12:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.09 161.59 37.59
2 0.09 161.56 55.56
3 0.09 161.55 80.55
58
4 0.09 162.12 27.12
5 0.09 161.64 33.64
6 0.09 209.12 30.12
7 0.09 209.08 29.08
8 0.09 211.28 66.28
9 0.09 211.35 71.35
10 0.09 208.82 15.82
11 0.09 208.80 15.80
12 0.09 208.58 20.58
13 0.09 161.66 45.66
14 0.09 161.65 29.65
15 0.09 161.65 48.65
16 0.09 206.02 41.02
17 0.09 206.03 16.03
18 0.09 247.28 37.28
19 0.09 247.29 32.29
20 0.09 245.48 29.48
21 0.09 245.10 42.10
22 0.09 213.48 55.48
23 0.09 214.04 58.04
24 0.09 244.80 51.80
25 0.09 246.42 19.42
26 0.09 247.88 12.88
27 0.09 247.43 25.43
28 0.09 247.31 24.31
29 0.09 208.46 14.46
30 0.09 208.45 19.45
31 0.09 208.41 40.41
32 0.09 208.41 43.41
33 0.09 167.16 31.16
34 0.09 245.62 26.62
U1 0.00 161.55 80.55
U2 0.00 161.56 55.56
U3 0.00 161.59 39.59
U4 0.00 161.64 33.64
U5 0.00 161.67 45.67
U6 0.00 161.66 48.66
U7 0.00 161.65 28.65
U8 0.00 162.12 25.12
U9 0.00 208.58 19.58
U10 0.00 208.80 14.80
U11 0.00 208.83 15.83
U12 0.00 209.08 28.08
U13 0.00 209.13 31.13
U14 0.00 211.28 66.28
U15 0.00 211.36 70.36
U16 0.00 213.48 56.48
U17 0.00 214.04 59.04
U18 0.00 244.80 50.80
U19 0.00 245.10 42.10
59
U20 0.00 245.48 30.48
U21 0.00 245.62 26.62
U22 0.00 246.42 19.42
U23 0.00 247.88 12.88
U24 0.00 247.43 24.43
U25 0.00 247.31 23.31
U26 0.00 208.46 13.46
U27 0.00 208.45 18.45
U28 0.00 208.41 41.41
U29 0.00 208.41 43.41
U30 0.00 167.16 32.16
U31 0.00 247.29 33.29
U32 0.00 247.28 36.28
U33 0.00 206.03 16.03
U34 0.00 206.03 42.03
PV2 0.00 161.67 44.67
PV6 0.00 247.48 25.48
A1 0.00 251.91 49.91
A2 0.00 263.57 161.57
A3 0.00 247.13 52.13
A4 0.00 208.41 73.41
A5 0.00 247.27 57.27
A6 0.00 243.84 88.84
A7 0.00 208.31 71.31
P1 -1.00 202.00 0.00
P2 -0.88 102.00 0.00
R1 -1.14 248.22 12.22
Resultado nos Trechos às 12:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.09 0.05 0.09
T2 0.09 0.02 0.01
T3 0.18 0.04 0.04
60
T4 0.27 0.06 0.09
T5A 0.36 0.08 0.16
T5B 0.27 0.06 0.09
T6 0.18 0.04 0.04
T7 0.09 0.02 0.01
T8 0.62 0.14 0.45
T9 0.71 0.16 0.58
T10 0.80 0.18 0.72
T11 0.89 0.20 0.88
T12 0.98 0.22 1.04
T13 1.07 0.24 1.23
T14 1.16 0.26 1.42
T15 1.24 0.28 1.63
T16 1.33 0.30 1.85
T17 1.42 0.32 2.09
T18 1.51 0.34 2.34
T19 1.60 0.36 2.60
T20 1.69 0.38 2.87
T21 1.78 0.40 3.16
T22 1.87 0.42 3.46
T23 1.96 0.44 3.77
T24 0.98 0.22 1.04
T25 0.62 0.14 0.45
T25B 0.53 0.12 0.34
T26 0.44 0.10 0.24
T27 0.36 0.08 0.16
T28 0.27 0.06 0.09
T29 0.18 0.04 0.04
T30 0.09 0.02 0.01
T31 0.36 0.08 0.16
T32 0.27 0.06 0.09
T33 0.18 0.04 0.04
T34 0.09 0.02 0.01
T35 0.09 0.05 0.09
T36 0.09 0.05 0.09
T37 0.09 0.05 0.09
T38 0.09 0.05 0.09
T39 0.09 0.05 0.09
T40 0.09 0.05 0.09
T41 0.09 0.05 0.09
T42 0.09 0.05 0.09
T43 0.09 0.05 0.09
T44 0.09 0.05 0.09
T45 0.09 0.05 0.09
T46 0.09 0.05 0.09
T47 0.09 0.05 0.09
T48 0.09 0.05 0.09
T49 0.09 0.05 0.09
T50 0.09 0.05 0.09
T51 0.09 0.05 0.09
61
T52 0.09 0.05 0.09
T53 0.09 0.05 0.09
T54 0.09 0.05 0.09
T55 0.09 0.05 0.09
T56 0.09 0.05 0.09
T57 0.09 0.05 0.09
T58 0.09 0.05 0.09
T59 0.09 0.05 0.09
T60 0.09 0.05 0.09
T61 0.09 0.05 0.09
T62 0.09 0.05 0.09
T63 0.09 0.05 0.09
T64 0.09 0.05 0.09
T65 0.09 0.05 0.09
T66 0.09 0.05 0.09
T67 0.09 0.05 0.09
T68 3.02 0.68 8.44
T69 1.00 0.51 7.88
T70 0.88 0.45 6.14
1 1.00 0.00 -49.91
2 0.88 0.00 -161.57
3 0.44 0.10 38.66
4 0.09 0.02 41.24
5 0.18 0.04 41.24
6 1.51 0.34 29.80
7 0.71 0.16 46.19
Resultado nos Nós às 13:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.08 181.15 57.15
2 0.08 181.12 75.12
3 0.08 181.12 100.12
62
4 0.08 181.56 46.56
5 0.08 181.18 53.18
6 0.08 217.56 38.56
7 0.08 217.53 37.53
8 0.08 219.25 74.25
9 0.08 219.31 79.31
10 0.08 217.33 24.33
11 0.08 217.31 24.31
12 0.08 217.14 29.14
13 0.08 181.21 65.21
14 0.08 181.20 49.20
15 0.08 181.19 68.19
16 0.08 215.32 50.32
17 0.08 215.32 25.32
18 0.08 246.91 36.91
19 0.08 246.91 31.91
20 0.08 245.50 29.50
21 0.08 245.20 42.20
22 0.08 220.97 62.97
23 0.08 221.41 65.41
24 0.08 244.97 51.97
25 0.08 246.23 19.23
26 0.08 247.38 12.38
27 0.08 247.02 25.02
28 0.08 246.93 23.93
29 0.08 217.18 23.18
30 0.08 217.17 28.17
31 0.08 217.14 49.14
32 0.08 217.14 52.14
33 0.08 185.56 49.56
34 0.08 245.61 26.61
U1 0.00 181.12 100.12
U2 0.00 181.12 75.12
U3 0.00 181.15 59.15
U4 0.00 181.19 53.19
U5 0.00 181.21 65.21
U6 0.00 181.20 68.20
U7 0.00 181.20 48.20
U8 0.00 181.57 44.57
U9 0.00 217.14 28.14
U10 0.00 217.31 23.31
U11 0.00 217.33 24.33
U12 0.00 217.53 36.53
U13 0.00 217.57 39.57
U14 0.00 219.25 74.25
U15 0.00 219.31 78.31
U16 0.00 220.97 63.97
U17 0.00 221.41 66.41
U18 0.00 244.97 50.97
U19 0.00 245.20 42.20
63
U20 0.00 245.50 30.50
U21 0.00 245.61 26.61
U22 0.00 246.23 19.23
U23 0.00 247.38 12.38
U24 0.00 247.02 24.02
U25 0.00 246.93 22.93
U26 0.00 217.18 22.18
U27 0.00 217.17 27.17
U28 0.00 217.14 50.14
U29 0.00 217.14 52.14
U30 0.00 185.56 50.56
U31 0.00 246.91 32.91
U32 0.00 246.91 35.91
U33 0.00 215.32 25.32
U34 0.00 215.32 51.32
PV2 0.00 181.21 64.21
PV6 0.00 247.06 25.06
A1 0.00 251.43 49.43
A2 0.00 263.15 161.15
A3 0.00 246.78 51.78
A4 0.00 217.14 82.14
A5 0.00 246.90 56.90
A6 0.00 244.22 89.22
A7 0.00 216.93 79.93
P1 -1.02 202.00 0.00
P2 -0.88 102.00 0.00
R1 -0.75 247.64 11.64
Resultado nos Trechos às 13:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.08 0.04 0.07
T2 0.08 0.02 0.01
T3 0.16 0.04 0.03
64
T4 0.23 0.05 0.07
T5A 0.31 0.07 0.13
T5B 0.23 0.05 0.07
T6 0.16 0.04 0.03
T7 0.08 0.02 0.01
T8 0.54 0.12 0.35
T9 0.62 0.14 0.45
T10 0.70 0.16 0.56
T11 0.78 0.18 0.68
T12 0.86 0.19 0.81
T13 0.93 0.21 0.96
T14 1.01 0.23 1.11
T15 1.09 0.25 1.27
T16 1.17 0.26 1.45
T17 1.24 0.28 1.63
T18 1.32 0.30 1.82
T19 1.40 0.32 2.03
T20 1.48 0.33 2.24
T21 1.56 0.35 2.47
T22 1.63 0.37 2.70
T23 1.71 0.39 2.94
T24 0.86 0.19 0.81
T25 0.54 0.12 0.35
T25B 0.47 0.11 0.27
T26 0.39 0.09 0.19
T27 0.31 0.07 0.13
T28 0.23 0.05 0.07
T29 0.16 0.04 0.03
T30 0.08 0.02 0.01
T31 0.31 0.07 0.13
T32 0.23 0.05 0.07
T33 0.16 0.04 0.03
T34 0.08 0.02 0.01
T35 0.08 0.04 0.07
T36 0.08 0.04 0.07
T37 0.08 0.04 0.07
T38 0.08 0.04 0.07
T39 0.08 0.04 0.07
T40 0.08 0.04 0.07
T41 0.08 0.04 0.07
T42 0.08 0.04 0.07
T43 0.08 0.04 0.07
T44 0.08 0.04 0.07
T45 0.08 0.04 0.07
T46 0.08 0.04 0.07
T47 0.08 0.04 0.07
T48 0.08 0.04 0.07
T49 0.08 0.04 0.07
T50 0.08 0.04 0.07
T51 0.08 0.04 0.07
65
T52 0.08 0.04 0.07
T53 0.08 0.04 0.07
T54 0.08 0.04 0.07
T55 0.08 0.04 0.07
T56 0.08 0.04 0.07
T57 0.08 0.04 0.07
T58 0.08 0.04 0.07
T59 0.08 0.04 0.07
T60 0.08 0.04 0.07
T61 0.08 0.04 0.07
T62 0.08 0.04 0.07
T63 0.08 0.04 0.07
T64 0.08 0.04 0.07
T65 0.08 0.04 0.07
T66 0.08 0.04 0.07
T67 0.08 0.04 0.07
T68 2.64 0.60 6.59
T69 1.02 0.52 8.09
T70 0.88 0.45 6.21
1 1.02 0.00 -49.43
2 0.88 0.00 -161.15
3 0.39 0.09 29.60
4 0.08 0.02 31.58
5 0.16 0.04 31.58
6 1.32 0.30 22.81
7 0.62 0.14 35.37
Resultado nos Nós às 14:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.08 171.03 47.03
2 0.08 171.00 65.00
3 0.08 170.99 89.99
66
4 0.08 171.50 36.50
5 0.08 171.07 43.07
6 0.08 212.82 33.82
7 0.08 212.78 32.78
8 0.08 214.73 69.73
9 0.08 214.80 74.80
10 0.08 212.55 19.55
11 0.08 212.53 19.53
12 0.08 212.33 24.33
13 0.08 171.09 55.09
14 0.08 171.08 39.08
15 0.08 171.08 58.08
16 0.08 210.16 45.16
17 0.08 210.17 20.17
18 0.08 246.43 36.43
19 0.08 246.43 31.43
20 0.08 244.83 28.83
21 0.08 244.49 41.49
22 0.08 216.69 58.69
23 0.08 217.18 61.18
24 0.08 244.22 51.22
25 0.08 245.66 18.66
26 0.08 246.96 11.96
27 0.08 246.56 24.56
28 0.08 246.45 23.45
29 0.08 212.30 18.30
30 0.08 212.30 23.30
31 0.08 212.26 44.26
32 0.08 212.26 47.26
33 0.08 176.01 40.01
34 0.08 244.95 25.95
U1 0.00 170.99 89.99
U2 0.00 171.00 65.00
U3 0.00 171.03 49.03
U4 0.00 171.07 43.07
U5 0.00 171.10 55.10
U6 0.00 171.09 58.09
U7 0.00 171.08 38.08
U8 0.00 171.50 34.50
U9 0.00 212.33 23.33
U10 0.00 212.53 18.53
U11 0.00 212.55 19.55
U12 0.00 212.78 31.78
U13 0.00 212.82 34.82
U14 0.00 214.73 69.73
U15 0.00 214.80 73.80
U16 0.00 216.69 59.69
U17 0.00 217.18 62.18
U18 0.00 244.22 50.22
U19 0.00 244.49 41.49
67
U20 0.00 244.83 29.83
U21 0.00 244.95 25.95
U22 0.00 245.66 18.66
U23 0.00 246.96 11.96
U24 0.00 246.56 23.56
U25 0.00 246.45 22.45
U26 0.00 212.30 17.30
U27 0.00 212.30 22.30
U28 0.00 212.26 45.26
U29 0.00 212.26 47.26
U30 0.00 176.01 41.01
U31 0.00 246.43 32.43
U32 0.00 246.43 35.43
U33 0.00 210.17 20.17
U34 0.00 210.17 46.17
PV2 0.00 171.10 54.10
PV6 0.00 246.61 24.61
A1 0.00 251.11 49.11
A2 0.00 262.87 160.87
A3 0.00 246.29 51.29
A4 0.00 212.26 77.26
A5 0.00 246.42 56.42
A6 0.00 243.37 88.37
A7 0.00 212.10 75.10
P1 -1.03 202.00 0.00
P2 -0.88 102.00 0.00
R1 -0.92 247.26 11.26
Resultado nos Trechos às 14:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.08 0.04 0.08
T2 0.08 0.02 0.01
T3 0.17 0.04 0.04
68
T4 0.25 0.06 0.08
T5A 0.33 0.08 0.14
T5B 0.25 0.06 0.08
T6 0.17 0.04 0.04
T7 0.08 0.02 0.01
T8 0.58 0.13 0.40
T9 0.67 0.15 0.51
T10 0.75 0.17 0.64
T11 0.83 0.19 0.78
T12 0.92 0.21 0.93
T13 1.00 0.23 1.09
T14 1.08 0.25 1.26
T15 1.17 0.26 1.45
T16 1.25 0.28 1.64
T17 1.33 0.30 1.85
T18 1.42 0.32 2.07
T19 1.50 0.34 2.31
T20 1.58 0.36 2.55
T21 1.67 0.38 2.80
T22 1.75 0.40 3.07
T23 1.83 0.41 3.34
T24 0.92 0.21 0.93
T25 0.58 0.13 0.40
T25B 0.50 0.11 0.30
T26 0.42 0.09 0.21
T27 0.33 0.08 0.14
T28 0.25 0.06 0.08
T29 0.17 0.04 0.04
T30 0.08 0.02 0.01
T31 0.33 0.08 0.14
T32 0.25 0.06 0.08
T33 0.17 0.04 0.04
T34 0.08 0.02 0.01
T35 0.08 0.04 0.08
T36 0.08 0.04 0.08
T37 0.08 0.04 0.08
T38 0.08 0.04 0.08
T39 0.08 0.04 0.08
T40 0.08 0.04 0.08
T41 0.08 0.04 0.08
T42 0.08 0.04 0.08
T43 0.08 0.04 0.08
T44 0.08 0.04 0.08
T45 0.08 0.04 0.08
T46 0.08 0.04 0.08
T47 0.08 0.04 0.08
T48 0.08 0.04 0.08
T49 0.08 0.04 0.08
T50 0.08 0.04 0.08
T51 0.08 0.04 0.08
69
T52 0.08 0.04 0.08
T53 0.08 0.04 0.08
T54 0.08 0.04 0.08
T55 0.08 0.04 0.08
T56 0.08 0.04 0.08
T57 0.08 0.04 0.08
T58 0.08 0.04 0.08
T59 0.08 0.04 0.08
T60 0.08 0.04 0.08
T61 0.08 0.04 0.08
T62 0.08 0.04 0.08
T63 0.08 0.04 0.08
T64 0.08 0.04 0.08
T65 0.08 0.04 0.08
T66 0.08 0.04 0.08
T67 0.08 0.04 0.08
T68 2.83 0.64 7.49
T69 1.03 0.52 8.23
T70 0.88 0.45 6.25
1 1.03 0.00 -49.11
2 0.88 0.00 -160.87
3 0.42 0.09 33.98
4 0.08 0.02 36.25
5 0.17 0.04 36.25
6 1.42 0.32 26.19
7 0.67 0.15 40.60
Resultado nos Nós às 15:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.09 160.16 36.16
2 0.09 160.13 54.13
3 0.09 160.12 79.12
70
4 0.09 160.69 25.69
5 0.09 160.20 32.20
6 0.09 207.69 28.69
7 0.09 207.65 27.65
8 0.09 209.85 64.85
9 0.09 209.92 69.92
10 0.09 207.39 14.39
11 0.09 207.36 14.36
12 0.09 207.14 19.14
13 0.09 160.23 44.23
14 0.09 160.22 28.22
15 0.09 160.21 47.21
16 0.09 204.59 39.59
17 0.09 204.60 14.60
18 0.09 245.85 35.85
19 0.09 245.86 30.86
20 0.09 244.05 28.05
21 0.09 243.67 40.67
22 0.09 212.05 54.05
23 0.09 212.61 56.61
24 0.09 243.37 50.37
25 0.09 244.99 17.99
26 0.09 246.45 11.45
27 0.09 246.00 24.00
28 0.09 245.88 22.88
29 0.09 207.03 13.03
30 0.09 207.02 18.02
31 0.09 206.98 38.98
32 0.09 206.98 41.98
33 0.09 165.73 29.73
34 0.09 244.19 25.19
U1 0.00 160.12 79.12
U2 0.00 160.13 54.13
U3 0.00 160.16 38.16
U4 0.00 160.21 32.21
U5 0.00 160.23 44.23
U6 0.00 160.23 47.23
U7 0.00 160.22 27.22
U8 0.00 160.69 23.69
U9 0.00 207.15 18.15
U10 0.00 207.37 13.37
U11 0.00 207.39 14.39
U12 0.00 207.65 26.65
U13 0.00 207.70 29.70
U14 0.00 209.85 64.85
U15 0.00 209.92 68.92
U16 0.00 212.05 55.05
U17 0.00 212.61 57.61
U18 0.00 243.37 49.37
U19 0.00 243.67 40.67
71
U20 0.00 244.05 29.05
U21 0.00 244.19 25.19
U22 0.00 244.99 17.99
U23 0.00 246.45 11.45
U24 0.00 246.00 23.00
U25 0.00 245.88 21.88
U26 0.00 207.03 12.03
U27 0.00 207.02 17.02
U28 0.00 206.98 39.98
U29 0.00 206.98 41.98
U30 0.00 165.73 30.73
U31 0.00 245.86 31.86
U32 0.00 245.85 34.85
U33 0.00 204.60 14.60
U34 0.00 204.59 40.59
PV2 0.00 160.24 43.24
PV6 0.00 246.05 24.05
A1 0.00 250.72 48.72
A2 0.00 262.53 160.53
A3 0.00 245.69 50.69
A4 0.00 206.97 71.97
A5 0.00 245.84 55.84
A6 0.00 242.41 87.41
A7 0.00 206.88 69.88
P1 -1.04 202.00 0.00
P2 -0.89 102.00 0.00
R1 -1.10 246.79 10.79
Resultado nos Trechos às 15:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.09 0.05 0.09
T2 0.09 0.02 0.01
T3 0.18 0.04 0.04
72
T4 0.27 0.06 0.09
T5A 0.36 0.08 0.16
T5B 0.27 0.06 0.09
T6 0.18 0.04 0.04
T7 0.09 0.02 0.01
T8 0.62 0.14 0.45
T9 0.71 0.16 0.58
T10 0.80 0.18 0.72
T11 0.89 0.20 0.87
T12 0.98 0.22 1.04
T13 1.07 0.24 1.23
T14 1.16 0.26 1.42
T15 1.24 0.28 1.63
T16 1.33 0.30 1.85
T17 1.42 0.32 2.09
T18 1.51 0.34 2.34
T19 1.60 0.36 2.60
T20 1.69 0.38 2.87
T21 1.78 0.40 3.16
T22 1.87 0.42 3.46
T23 1.96 0.44 3.77
T24 0.98 0.22 1.04
T25 0.62 0.14 0.45
T25B 0.53 0.12 0.34
T26 0.44 0.10 0.24
T27 0.36 0.08 0.16
T28 0.27 0.06 0.09
T29 0.18 0.04 0.04
T30 0.09 0.02 0.01
T31 0.36 0.08 0.16
T32 0.27 0.06 0.09
T33 0.18 0.04 0.04
T34 0.09 0.02 0.01
T35 0.09 0.05 0.09
T36 0.09 0.05 0.09
T37 0.09 0.05 0.09
T38 0.09 0.05 0.09
T39 0.09 0.05 0.09
T40 0.09 0.05 0.09
T41 0.09 0.05 0.09
T42 0.09 0.05 0.09
T43 0.09 0.05 0.09
T44 0.09 0.05 0.09
T45 0.09 0.05 0.09
T46 0.09 0.05 0.09
T47 0.09 0.05 0.09
T48 0.09 0.05 0.09
T49 0.09 0.05 0.09
T50 0.09 0.05 0.09
T51 0.09 0.05 0.09
73
T52 0.09 0.05 0.09
T53 0.09 0.05 0.09
T54 0.09 0.05 0.09
T55 0.09 0.05 0.09
T56 0.09 0.05 0.09
T57 0.09 0.05 0.09
T58 0.09 0.05 0.09
T59 0.09 0.05 0.09
T60 0.09 0.05 0.09
T61 0.09 0.05 0.09
T62 0.09 0.05 0.09
T63 0.09 0.05 0.09
T64 0.09 0.05 0.09
T65 0.09 0.05 0.09
T66 0.09 0.05 0.09
T67 0.09 0.05 0.09
T68 3.02 0.68 8.44
T69 1.04 0.53 8.40
T70 0.89 0.45 6.30
1 1.04 0.00 -48.72
2 0.89 0.00 -160.53
3 0.44 0.10 38.66
4 0.09 0.02 41.24
5 0.18 0.04 41.24
6 1.51 0.34 29.80
7 0.71 0.16 46.19
Resultado nos Nós às 16:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.10 136.82 12.82
2 0.10 136.78 30.78
3 0.10 136.77 55.77
74
4 0.10 137.48 2.48
5 0.10 136.88 8.88
6 0.10 196.95 17.95
7 0.10 196.89 16.89
8 0.10 199.63 54.63
9 0.10 199.73 59.73
10 0.10 196.58 3.58
11 0.10 196.54 3.54
12 0.10 196.27 8.27
13 0.10 136.91 20.91
14 0.10 136.90 4.90
15 0.10 136.89 23.89
16 0.10 192.85 27.85
17 0.10 192.85 2.85
18 0.10 245.06 35.06
19 0.10 245.07 30.07
20 0.10 242.82 26.82
21 0.10 242.35 39.35
22 0.10 202.37 44.37
23 0.10 203.07 47.07
24 0.10 241.97 48.97
25 0.10 243.99 16.99
26 0.10 245.81 10.81
27 0.10 245.24 23.24
28 0.10 245.10 22.10
29 0.10 195.93 1.93
30 0.10 195.92 6.92
31 0.10 195.87 27.87
32 0.10 195.87 30.87
33 0.10 143.67 7.67
34 0.10 243.00 24.00
U1 0.00 136.77 55.77
U2 0.00 136.78 30.78
U3 0.00 136.82 14.82
U4 0.00 136.88 8.88
U5 0.00 136.91 20.91
U6 0.00 136.91 23.91
U7 0.00 136.90 3.90
U8 0.00 137.48 0.48
U9 0.00 196.27 7.27
U10 0.00 196.55 2.55
U11 0.00 196.58 3.58
U12 0.00 196.90 15.90
U13 0.00 196.96 18.96
U14 0.00 199.63 54.63
U15 0.00 199.73 58.73
U16 0.00 202.38 45.38
U17 0.00 203.07 48.07
U18 0.00 241.98 47.98
U19 0.00 242.35 39.35
75
U20 0.00 242.82 27.82
U21 0.00 243.00 24.00
U22 0.00 243.99 16.99
U23 0.00 245.81 10.81
U24 0.00 245.25 22.25
U25 0.00 245.10 21.10
U26 0.00 195.93 0.93
U27 0.00 195.92 5.92
U28 0.00 195.87 28.87
U29 0.00 195.87 30.87
U30 0.00 143.67 8.67
U31 0.00 245.07 31.07
U32 0.00 245.06 34.06
U33 0.00 192.85 2.85
U34 0.00 192.85 28.85
PV2 0.00 136.92 19.92
PV6 0.00 245.31 23.31
A1 0.00 250.26 48.26
A2 0.00 262.12 160.12
A3 0.00 244.87 49.87
A4 0.00 195.86 60.86
A5 0.00 245.05 55.05
A6 0.00 240.78 85.78
A7 0.00 195.95 58.95
P1 -1.05 202.00 0.00
P2 -0.89 102.00 0.00
R1 -1.46 246.23 10.23
Resultado nos Trechos às 16:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.10 0.05 0.11
T2 0.10 0.02 0.02
T3 0.20 0.05 0.06
76
T4 0.30 0.07 0.12
T5A 0.40 0.09 0.20
T5B 0.30 0.07 0.12
T6 0.20 0.05 0.06
T7 0.10 0.02 0.02
T8 0.70 0.16 0.56
T9 0.80 0.18 0.72
T10 0.90 0.20 0.90
T11 1.00 0.23 1.09
T12 1.10 0.25 1.30
T13 1.20 0.27 1.52
T14 1.30 0.29 1.77
T15 1.40 0.32 2.03
T16 1.50 0.34 2.31
T17 1.60 0.36 2.60
T18 1.70 0.38 2.91
T19 1.80 0.41 3.23
T20 1.90 0.43 3.57
T21 2.00 0.45 3.93
T22 2.10 0.48 4.30
T23 2.20 0.50 4.69
T24 1.10 0.25 1.30
T25 0.70 0.16 0.56
T25B 0.60 0.14 0.42
T26 0.50 0.11 0.30
T27 0.40 0.09 0.20
T28 0.30 0.07 0.12
T29 0.20 0.05 0.05
T30 0.10 0.02 0.02
T31 0.40 0.09 0.20
T32 0.30 0.07 0.12
T33 0.20 0.05 0.06
T34 0.10 0.02 0.02
T35 0.10 0.05 0.11
T36 0.10 0.05 0.11
T37 0.10 0.05 0.11
T38 0.10 0.05 0.11
T39 0.10 0.05 0.11
T40 0.10 0.05 0.11
T41 0.10 0.05 0.11
T42 0.10 0.05 0.11
T43 0.10 0.05 0.11
T44 0.10 0.05 0.11
T45 0.10 0.05 0.11
T46 0.10 0.05 0.11
T47 0.10 0.05 0.11
T48 0.10 0.05 0.11
T49 0.10 0.05 0.11
T50 0.10 0.05 0.11
T51 0.10 0.05 0.11
77
T52 0.10 0.05 0.11
T53 0.10 0.05 0.11
T54 0.10 0.05 0.11
T55 0.10 0.05 0.11
T56 0.10 0.05 0.11
T57 0.10 0.05 0.11
T58 0.10 0.05 0.11
T59 0.10 0.05 0.11
T60 0.10 0.05 0.11
T61 0.10 0.05 0.11
T62 0.10 0.05 0.11
T63 0.10 0.05 0.11
T64 0.10 0.05 0.11
T65 0.10 0.05 0.11
T66 0.10 0.05 0.11
T67 0.10 0.05 0.11
T68 3.40 0.77 10.49
T69 1.05 0.54 8.60
T70 0.89 0.45 6.36
1 1.05 0.00 -48.26
2 0.89 0.00 -160.12
3 0.50 0.11 48.93
4 0.10 0.02 52.20
5 0.20 0.05 52.20
6 1.70 0.38 37.71
7 0.80 0.18 58.46
Resultado nos Nós às 17:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.07 188.08 64.08
2 0.07 188.06 82.06
78
3 0.07 188.05 107.05
4 0.07 188.44 53.44
5 0.07 188.11 60.11
6 0.07 219.49 40.49
7 0.07 219.46 39.46
8 0.07 220.95 75.95
9 0.07 221.01 81.01
10 0.07 219.28 26.28
11 0.07 219.27 26.27
12 0.07 219.12 31.12
13 0.07 188.13 72.13
14 0.07 188.12 56.12
15 0.07 188.12 75.12
16 0.07 217.61 52.61
17 0.07 217.62 27.62
18 0.07 244.85 34.85
19 0.07 244.85 29.85
20 0.07 243.62 27.62
21 0.07 243.37 40.37
22 0.07 222.46 64.46
23 0.07 222.84 66.84
24 0.07 243.16 50.16
25 0.07 244.26 17.26
26 0.07 245.26 10.26
27 0.07 244.95 22.95
28 0.07 244.87 21.87
29 0.07 219.22 25.22
30 0.07 219.21 30.21
31 0.07 219.19 51.19
32 0.07 219.18 54.18
33 0.07 191.95 55.95
34 0.07 243.72 24.72
U1 0.00 188.05 107.05
U2 0.00 188.06 82.06
U3 0.00 188.08 66.08
U4 0.00 188.11 60.11
U5 0.00 188.13 72.13
U6 0.00 188.13 75.13
U7 0.00 188.12 55.12
U8 0.00 188.44 51.44
U9 0.00 219.12 30.12
U10 0.00 219.27 25.27
U11 0.00 219.28 26.28
U12 0.00 219.46 38.46
U13 0.00 219.49 41.49
U14 0.00 220.96 75.96
U15 0.00 221.01 80.01
U16 0.00 222.46 65.46
U17 0.00 222.84 67.84
U18 0.00 243.16 49.16
79
U19 0.00 243.37 40.37
U20 0.00 243.63 28.63
U21 0.00 243.72 24.72
U22 0.00 244.26 17.26
U23 0.00 245.26 10.26
U24 0.00 244.95 21.95
U25 0.00 244.87 20.87
U26 0.00 219.22 24.22
U27 0.00 219.21 29.21
U28 0.00 219.19 52.19
U29 0.00 219.19 54.19
U30 0.00 191.96 56.96
U31 0.00 244.86 30.86
U32 0.00 244.85 33.85
U33 0.00 217.62 27.62
U34 0.00 217.61 53.61
PV2 0.00 188.14 71.14
PV6 0.00 244.99 22.99
A1 0.00 249.64 47.64
A2 0.00 261.58 159.58
A3 0.00 244.74 49.74
A4 0.00 219.18 84.18
A5 0.00 244.84 54.84
A6 0.00 242.51 87.51
A7 0.00 218.94 81.94
P1 -1.07 202.00 0.00
P2 -0.90 102.00 0.00
R1 -0.49 245.49 9.49
Resultado nos Trechos às 17:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.07 0.04 0.06
T2 0.07 0.02 0.01
80
T3 0.14 0.03 0.03
T4 0.22 0.05 0.06
T5A 0.29 0.07 0.11
T5B 0.22 0.05 0.06
T6 0.14 0.03 0.03
T7 0.07 0.02 0.01
T8 0.51 0.11 0.31
T9 0.58 0.13 0.39
T10 0.65 0.15 0.49
T11 0.72 0.16 0.60
T12 0.79 0.18 0.71
T13 0.87 0.20 0.83
T14 0.94 0.21 0.97
T15 1.01 0.23 1.11
T16 1.08 0.25 1.26
T17 1.16 0.26 1.42
T18 1.23 0.28 1.59
T19 1.30 0.29 1.77
T20 1.37 0.31 1.95
T21 1.44 0.33 2.15
T22 1.52 0.34 2.35
T23 1.59 0.36 2.56
T24 0.79 0.18 0.71
T25 0.51 0.11 0.31
T25B 0.43 0.10 0.23
T26 0.36 0.08 0.16
T27 0.29 0.07 0.11
T28 0.22 0.05 0.06
T29 0.14 0.03 0.03
T30 0.07 0.02 0.01
T31 0.29 0.07 0.11
T32 0.22 0.05 0.06
T33 0.14 0.03 0.03
T34 0.07 0.02 0.01
T35 0.07 0.04 0.06
T36 0.07 0.04 0.06
T37 0.07 0.04 0.06
T38 0.07 0.04 0.06
T39 0.07 0.04 0.06
T40 0.07 0.04 0.06
T41 0.07 0.04 0.06
T42 0.07 0.04 0.06
T43 0.07 0.04 0.06
T44 0.07 0.04 0.06
T45 0.07 0.04 0.06
T46 0.07 0.04 0.06
T47 0.07 0.04 0.06
T48 0.07 0.04 0.06
T49 0.07 0.04 0.06
T50 0.07 0.04 0.06
81
T51 0.07 0.04 0.06
T52 0.07 0.04 0.06
T53 0.07 0.04 0.06
T54 0.07 0.04 0.06
T55 0.07 0.04 0.06
T56 0.07 0.04 0.06
T57 0.07 0.04 0.06
T58 0.07 0.04 0.06
T59 0.07 0.04 0.06
T60 0.07 0.04 0.06
T61 0.07 0.04 0.06
T62 0.07 0.04 0.06
T63 0.07 0.04 0.06
T64 0.07 0.04 0.06
T65 0.07 0.04 0.06
T66 0.07 0.04 0.06
T67 0.07 0.04 0.06
T68 2.46 0.56 5.74
T69 1.07 0.54 8.86
T70 0.90 0.46 6.44
1 1.07 0.00 -47.64
2 0.90 0.00 -159.58
3 0.36 0.08 25.52
4 0.07 0.02 27.23
5 0.14 0.03 27.23
6 1.23 0.28 19.67
7 0.58 0.13 30.49
Resultado nos Nós às 18:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.06 211.10 87.10
82
2 0.06 211.09 105.09
3 0.06 211.08 130.08
4 0.06 211.32 76.32
5 0.06 211.12 83.12
6 0.06 229.71 50.71
7 0.06 229.69 49.69
8 0.06 230.61 85.61
9 0.06 230.64 90.64
10 0.06 229.58 36.58
11 0.06 229.57 36.57
12 0.06 229.48 41.48
13 0.06 211.13 95.13
14 0.06 211.13 79.13
15 0.06 211.13 98.13
16 0.06 228.73 63.73
17 0.06 228.73 38.73
18 0.06 244.85 34.85
19 0.06 244.85 29.85
20 0.06 244.09 28.09
21 0.06 243.93 40.93
22 0.06 231.53 73.53
23 0.06 231.77 75.77
24 0.06 243.81 50.81
25 0.06 244.49 17.49
26 0.06 245.10 10.10
27 0.06 244.91 22.91
28 0.06 244.86 21.86
29 0.06 229.68 35.68
30 0.06 229.68 40.68
31 0.06 229.66 61.66
32 0.06 229.66 64.66
33 0.06 213.55 77.55
34 0.06 244.15 25.15
U1 0.00 211.08 130.08
U2 0.00 211.09 105.09
U3 0.00 211.10 89.10
U4 0.00 211.12 83.12
U5 0.00 211.13 95.13
U6 0.00 211.13 98.13
U7 0.00 211.13 78.13
U8 0.00 211.33 74.33
U9 0.00 229.48 40.48
U10 0.00 229.57 35.57
U11 0.00 229.58 36.58
U12 0.00 229.69 48.69
U13 0.00 229.71 51.71
U14 0.00 230.61 85.61
U15 0.00 230.64 89.64
U16 0.00 231.53 74.53
U17 0.00 231.77 76.77
83
U18 0.00 243.81 49.81
U19 0.00 243.94 40.94
U20 0.00 244.09 29.09
U21 0.00 244.15 25.15
U22 0.00 244.49 17.49
U23 0.00 245.10 10.10
U24 0.00 244.91 21.91
U25 0.00 244.86 20.86
U26 0.00 229.68 34.68
U27 0.00 229.68 39.68
U28 0.00 229.66 62.66
U29 0.00 229.66 64.66
U30 0.00 213.55 78.55
U31 0.00 244.85 30.85
U32 0.00 244.85 33.85
U33 0.00 228.73 38.73
U34 0.00 228.73 64.73
PV2 0.00 211.14 94.14
PV6 0.00 244.93 22.93
A1 0.00 249.43 47.43
A2 0.00 261.40 159.40
A3 0.00 244.78 49.78
A4 0.00 229.66 94.66
A5 0.00 244.84 54.84
A6 0.00 243.41 88.41
A7 0.00 229.37 92.37
P1 -1.07 202.00 0.00
P2 -0.90 102.00 0.00
R1 0.09 245.24 9.24
Resultado nos Trechos às 18:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
84
T1 0.06 0.03 0.04
T2 0.06 0.01 0.01
T3 0.11 0.03 0.02
T4 0.17 0.04 0.04
T5A 0.22 0.05 0.07
T5B 0.17 0.04 0.04
T6 0.11 0.03 0.02
T7 0.06 0.01 0.01
T8 0.39 0.09 0.19
T9 0.44 0.10 0.24
T10 0.50 0.11 0.30
T11 0.56 0.13 0.37
T12 0.61 0.14 0.44
T13 0.67 0.15 0.51
T14 0.72 0.16 0.60
T15 0.78 0.18 0.68
T16 0.83 0.19 0.78
T17 0.89 0.20 0.87
T18 0.94 0.21 0.98
T19 1.00 0.23 1.09
T20 1.06 0.24 1.20
T21 1.11 0.25 1.32
T22 1.17 0.26 1.45
T23 1.22 0.28 1.58
T24 0.61 0.14 0.44
T25 0.39 0.09 0.19
T25B 0.33 0.08 0.14
T26 0.28 0.06 0.10
T27 0.22 0.05 0.07
T28 0.17 0.04 0.04
T29 0.11 0.03 0.02
T30 0.06 0.01 0.01
T31 0.22 0.05 0.07
T32 0.17 0.04 0.04
T33 0.11 0.03 0.02
T34 0.06 0.01 0.01
T35 0.06 0.03 0.04
T36 0.06 0.03 0.04
T37 0.06 0.03 0.04
T38 0.06 0.03 0.04
T39 0.06 0.03 0.04
T40 0.06 0.03 0.04
T41 0.06 0.03 0.04
T42 0.06 0.03 0.04
T43 0.06 0.03 0.04
T44 0.06 0.03 0.04
T45 0.06 0.03 0.04
T46 0.06 0.03 0.04
T47 0.06 0.03 0.04
T48 0.06 0.03 0.04
85
T49 0.06 0.03 0.04
T50 0.06 0.03 0.04
T51 0.06 0.03 0.04
T52 0.06 0.03 0.04
T53 0.06 0.03 0.04
T54 0.06 0.03 0.04
T55 0.06 0.03 0.04
T56 0.06 0.03 0.04
T57 0.06 0.03 0.04
T58 0.06 0.03 0.04
T59 0.06 0.03 0.04
T60 0.06 0.03 0.04
T61 0.06 0.03 0.04
T62 0.06 0.03 0.04
T63 0.06 0.03 0.04
T64 0.06 0.03 0.04
T65 0.06 0.03 0.04
T66 0.06 0.03 0.04
T67 0.06 0.03 0.04
T68 1.89 0.43 3.53
T69 1.07 0.55 8.95
T70 0.90 0.46 6.47
1 1.07 0.00 -47.43
2 0.90 0.00 -159.40
3 0.28 0.06 15.10
4 0.06 0.01 16.11
5 0.11 0.03 16.11
6 0.94 0.21 11.64
7 0.44 0.10 18.04
Resultado nos Nós às 19:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
86
1 0.05 217.57 93.57
2 0.05 217.56 111.56
3 0.05 217.56 136.56
4 0.05 217.76 82.76
5 0.05 217.59 89.59
6 0.05 232.65 53.65
7 0.05 232.64 52.64
8 0.05 233.40 88.40
9 0.05 233.42 93.42
10 0.05 232.55 39.55
11 0.05 232.54 39.54
12 0.05 232.47 44.47
13 0.05 217.60 101.60
14 0.05 217.60 85.60
15 0.05 217.59 104.59
16 0.05 231.91 66.91
17 0.05 231.91 41.91
18 0.05 244.96 34.96
19 0.05 244.96 29.96
20 0.05 244.34 28.34
21 0.05 244.21 41.21
22 0.05 234.16 76.16
23 0.05 234.35 78.35
24 0.05 244.11 51.11
25 0.05 244.67 17.67
26 0.05 245.17 10.17
27 0.05 245.01 23.01
28 0.05 244.97 21.97
29 0.05 232.67 38.67
30 0.05 232.67 43.67
31 0.05 232.66 64.66
32 0.05 232.66 67.66
33 0.05 219.61 83.61
34 0.05 244.39 25.39
U1 0.00 217.56 136.56
U2 0.00 217.56 111.56
U3 0.00 217.58 95.58
U4 0.00 217.59 89.59
U5 0.00 217.60 101.60
U6 0.00 217.60 104.60
U7 0.00 217.60 84.60
U8 0.00 217.76 80.76
U9 0.00 232.47 43.47
U10 0.00 232.54 38.54
U11 0.00 232.55 39.55
U12 0.00 232.64 51.64
U13 0.00 232.65 54.65
U14 0.00 233.40 88.40
U15 0.00 233.42 92.42
U16 0.00 234.16 77.16
87
U17 0.00 234.35 79.35
U18 0.00 244.11 50.11
U19 0.00 244.21 41.21
U20 0.00 244.34 29.34
U21 0.00 244.39 25.39
U22 0.00 244.67 17.67
U23 0.00 245.17 10.17
U24 0.00 245.01 22.01
U25 0.00 244.97 20.97
U26 0.00 232.67 37.67
U27 0.00 232.67 42.67
U28 0.00 232.66 65.66
U29 0.00 232.66 67.66
U30 0.00 219.61 84.61
U31 0.00 244.97 30.97
U32 0.00 244.96 33.96
U33 0.00 231.91 41.91
U34 0.00 231.91 67.91
PV2 0.00 217.60 100.60
PV6 0.00 245.03 23.03
A1 0.00 249.47 47.47
A2 0.00 261.43 159.43
A3 0.00 244.91 49.91
A4 0.00 232.66 97.66
A5 0.00 244.96 54.96
A6 0.00 243.78 88.78
A7 0.00 232.37 95.37
P1 -1.07 202.00 0.00
P2 -0.90 102.00 0.00
R1 0.27 245.29 9.29
Resultado nos Trechos às 19:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
88
T1 0.05 0.03 0.03
T2 0.05 0.01 0.00
T3 0.10 0.02 0.02
T4 0.15 0.03 0.03
T5A 0.20 0.05 0.06
T5B 0.15 0.03 0.03
T6 0.10 0.02 0.02
T7 0.05 0.01 0.00
T8 0.35 0.08 0.16
T9 0.40 0.09 0.20
T10 0.45 0.10 0.25
T11 0.50 0.11 0.30
T12 0.55 0.12 0.36
T13 0.60 0.14 0.42
T14 0.65 0.15 0.49
T15 0.70 0.16 0.56
T16 0.75 0.17 0.64
T17 0.80 0.18 0.72
T18 0.85 0.19 0.81
T19 0.90 0.20 0.90
T20 0.95 0.22 0.99
T21 1.00 0.23 1.09
T22 1.05 0.24 1.19
T23 1.10 0.25 1.30
T24 0.55 0.12 0.36
T25 0.35 0.08 0.16
T25B 0.30 0.07 0.12
T26 0.25 0.06 0.08
T27 0.20 0.05 0.06
T28 0.15 0.03 0.03
T29 0.10 0.02 0.02
T30 0.05 0.01 0.00
T31 0.20 0.05 0.06
T32 0.15 0.03 0.03
T33 0.10 0.02 0.02
T34 0.05 0.01 0.00
T35 0.05 0.03 0.03
T36 0.05 0.03 0.03
T37 0.05 0.03 0.03
T38 0.05 0.03 0.03
T39 0.05 0.03 0.03
T40 0.05 0.03 0.03
T41 0.05 0.03 0.03
T42 0.05 0.03 0.03
T43 0.05 0.03 0.03
T44 0.05 0.03 0.03
T45 0.05 0.03 0.03
T46 0.05 0.03 0.03
T47 0.05 0.03 0.03
T48 0.05 0.03 0.03
89
T49 0.05 0.03 0.03
T50 0.05 0.03 0.03
T51 0.05 0.03 0.03
T52 0.05 0.03 0.03
T53 0.05 0.03 0.03
T54 0.05 0.03 0.03
T55 0.05 0.03 0.03
T56 0.05 0.03 0.03
T57 0.05 0.03 0.03
T58 0.05 0.03 0.03
T59 0.05 0.03 0.03
T60 0.05 0.03 0.03
T61 0.05 0.03 0.03
T62 0.05 0.03 0.03
T63 0.05 0.03 0.03
T64 0.05 0.03 0.03
T65 0.05 0.03 0.03
T66 0.05 0.03 0.03
T67 0.05 0.03 0.03
T68 1.70 0.38 2.91
T69 1.07 0.55 8.94
T70 0.90 0.46 6.46
1 1.07 0.00 -47.47
2 0.90 0.00 -159.43
3 0.25 0.06 12.23
4 0.05 0.01 13.05
5 0.10 0.02 13.05
6 0.85 0.19 9.43
7 0.40 0.09 14.62
Resultado nos Nós às 20:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
90
1 0.04 226.11 102.11
2 0.04 226.10 120.10
3 0.04 226.10 145.10
4 0.04 226.24 91.24
5 0.04 226.12 98.12
6 0.04 236.59 57.59
7 0.04 236.58 56.58
8 0.04 237.12 92.12
9 0.04 237.14 97.14
10 0.04 236.52 43.52
11 0.04 236.51 43.51
12 0.04 236.46 48.46
13 0.04 226.13 110.13
14 0.04 226.13 94.13
15 0.04 226.13 113.13
16 0.04 236.13 71.13
17 0.04 236.13 46.13
18 0.04 245.19 35.19
19 0.04 245.20 30.20
20 0.04 244.75 28.75
21 0.04 244.66 41.66
22 0.04 237.66 79.66
23 0.04 237.80 81.80
24 0.04 244.58 51.58
25 0.04 244.98 17.98
26 0.04 245.34 10.34
27 0.04 245.23 23.23
28 0.04 245.20 22.20
29 0.04 236.66 42.66
30 0.04 236.66 47.66
31 0.04 236.65 68.65
32 0.04 236.65 71.65
33 0.04 227.58 91.58
34 0.04 244.79 25.79
U1 0.00 226.10 145.10
U2 0.00 226.11 120.11
U3 0.00 226.11 104.11
U4 0.00 226.12 98.12
U5 0.00 226.13 110.13
U6 0.00 226.13 113.13
U7 0.00 226.13 93.13
U8 0.00 226.24 89.24
U9 0.00 236.46 47.46
U10 0.00 236.51 42.51
U11 0.00 236.52 43.52
U12 0.00 236.58 55.58
U13 0.00 236.59 58.59
U14 0.00 237.12 92.12
U15 0.00 237.14 96.14
U16 0.00 237.66 80.66
91
U17 0.00 237.80 82.80
U18 0.00 244.58 50.58
U19 0.00 244.66 41.66
U20 0.00 244.75 29.75
U21 0.00 244.79 25.79
U22 0.00 244.98 17.98
U23 0.00 245.34 10.34
U24 0.00 245.23 22.23
U25 0.00 245.20 21.20
U26 0.00 236.66 41.66
U27 0.00 236.66 46.66
U28 0.00 236.65 69.65
U29 0.00 236.65 71.65
U30 0.00 227.58 92.58
U31 0.00 245.20 31.20
U32 0.00 245.20 34.20
U33 0.00 236.13 46.13
U34 0.00 236.13 72.13
PV2 0.00 226.13 109.13
PV6 0.00 245.24 23.24
A1 0.00 249.59 47.59
A2 0.00 261.53 159.53
A3 0.00 245.16 50.16
A4 0.00 236.65 101.65
A5 0.00 245.19 55.19
A6 0.00 244.35 89.35
A7 0.00 236.39 99.39
P1 -1.07 202.00 0.00
P2 -0.90 102.00 0.00
R1 0.55 245.43 9.43
Resultado nos Trechos às 20:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
92
T1 0.04 0.02 0.02
T2 0.04 0.01 0.00
T3 0.08 0.02 0.01
T4 0.12 0.03 0.02
T5A 0.17 0.04 0.04
T5B 0.12 0.03 0.02
T6 0.08 0.02 0.01
T7 0.04 0.01 0.00
T8 0.29 0.07 0.11
T9 0.33 0.08 0.14
T10 0.37 0.08 0.18
T11 0.42 0.09 0.21
T12 0.46 0.10 0.26
T13 0.50 0.11 0.30
T14 0.54 0.12 0.35
T15 0.58 0.13 0.40
T16 0.62 0.14 0.46
T17 0.67 0.15 0.51
T18 0.71 0.16 0.57
T19 0.75 0.17 0.64
T20 0.79 0.18 0.71
T21 0.83 0.19 0.78
T22 0.87 0.20 0.85
T23 0.92 0.21 0.93
T24 0.46 0.10 0.26
T25 0.29 0.07 0.11
T25B 0.25 0.06 0.08
T26 0.21 0.05 0.06
T27 0.17 0.04 0.04
T28 0.12 0.03 0.02
T29 0.08 0.02 0.01
T30 0.04 0.01 0.00
T31 0.17 0.04 0.04
T32 0.12 0.03 0.02
T33 0.08 0.02 0.01
T34 0.04 0.01 0.00
T35 0.04 0.02 0.02
T36 0.04 0.02 0.02
T37 0.04 0.02 0.02
T38 0.04 0.02 0.02
T39 0.04 0.02 0.02
T40 0.04 0.02 0.02
T41 0.04 0.02 0.02
T42 0.04 0.02 0.02
T43 0.04 0.02 0.02
T44 0.04 0.02 0.02
T45 0.04 0.02 0.02
T46 0.04 0.02 0.02
T47 0.04 0.02 0.02
T48 0.04 0.02 0.02
93
T49 0.04 0.02 0.02
T50 0.04 0.02 0.02
T51 0.04 0.02 0.02
T52 0.04 0.02 0.02
T53 0.04 0.02 0.02
T54 0.04 0.02 0.02
T55 0.04 0.02 0.02
T56 0.04 0.02 0.02
T57 0.04 0.02 0.02
T58 0.04 0.02 0.02
T59 0.04 0.02 0.02
T60 0.04 0.02 0.02
T61 0.04 0.02 0.02
T62 0.04 0.02 0.02
T63 0.04 0.02 0.02
T64 0.04 0.02 0.02
T65 0.04 0.02 0.02
T66 0.04 0.02 0.02
T67 0.04 0.02 0.02
T68 1.42 0.32 2.07
T69 1.07 0.54 8.89
T70 0.90 0.46 6.45
1 1.07 0.00 -47.59
2 0.90 0.00 -159.53
3 0.21 0.05 8.50
4 0.04 0.01 9.06
5 0.08 0.02 9.06
6 0.71 0.16 6.55
7 0.33 0.08 10.15
Resultado nos Nós às 21:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
94
1 0.03 233.29 109.29
2 0.03 233.29 127.29
3 0.03 233.28 152.28
4 0.03 233.38 98.38
5 0.03 233.30 105.30
6 0.03 240.01 61.01
7 0.03 240.00 60.00
8 0.03 240.36 95.36
9 0.03 240.37 100.37
10 0.03 239.96 46.96
11 0.03 239.95 46.95
12 0.03 239.92 51.92
13 0.03 233.30 117.30
14 0.03 233.30 101.30
15 0.03 233.30 120.30
16 0.03 239.75 74.75
17 0.03 239.75 49.75
18 0.03 245.55 35.55
19 0.03 245.56 30.56
20 0.03 245.26 29.26
21 0.03 245.20 42.20
22 0.03 240.71 82.71
23 0.03 240.80 84.80
24 0.03 245.15 52.15
25 0.03 245.41 18.41
26 0.03 245.65 10.65
27 0.03 245.58 23.58
28 0.03 245.56 22.56
29 0.03 240.09 46.09
30 0.03 240.09 51.09
31 0.03 240.08 72.08
32 0.03 240.08 75.08
33 0.03 234.28 98.28
34 0.03 245.28 26.28
U1 0.00 233.28 152.28
U2 0.00 233.29 127.29
U3 0.00 233.29 111.29
U4 0.00 233.30 105.30
U5 0.00 233.30 117.30
U6 0.00 233.30 120.30
U7 0.00 233.30 100.30
U8 0.00 233.38 96.38
U9 0.00 239.92 50.92
U10 0.00 239.95 45.95
U11 0.00 239.96 46.96
U12 0.00 240.00 59.00
U13 0.00 240.01 62.01
U14 0.00 240.36 95.36
U15 0.00 240.37 99.37
U16 0.00 240.71 83.71
95
U17 0.00 240.81 85.81
U18 0.00 245.15 51.15
U19 0.00 245.20 42.20
U20 0.00 245.26 30.26
U21 0.00 245.29 26.29
U22 0.00 245.41 18.41
U23 0.00 245.65 10.65
U24 0.00 245.58 22.58
U25 0.00 245.56 21.56
U26 0.00 240.09 45.09
U27 0.00 240.09 50.09
U28 0.00 240.08 73.08
U29 0.00 240.08 75.08
U30 0.00 234.28 99.28
U31 0.00 245.56 31.56
U32 0.00 245.55 34.55
U33 0.00 239.75 49.75
U34 0.00 239.75 75.75
PV2 0.00 233.30 116.30
PV6 0.00 245.59 23.59
A1 0.00 249.82 47.82
A2 0.00 261.74 159.74
A3 0.00 245.53 50.53
A4 0.00 240.08 105.08
A5 0.00 245.55 55.55
A6 0.00 245.00 90.00
A7 0.00 239.87 102.87
P1 -1.06 202.00 0.00
P2 -0.90 102.00 0.00
R1 0.83 245.71 9.71
Resultado nos Trechos às 21:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
96
T1 0.03 0.02 0.01
T2 0.03 0.01 0.00
T3 0.07 0.02 0.01
T4 0.10 0.02 0.02
T5A 0.13 0.03 0.03
T5B 0.10 0.02 0.02
T6 0.07 0.02 0.01
T7 0.03 0.01 0.00
T8 0.23 0.05 0.07
T9 0.27 0.06 0.09
T10 0.30 0.07 0.12
T11 0.33 0.08 0.14
T12 0.37 0.08 0.17
T13 0.40 0.09 0.20
T14 0.43 0.10 0.23
T15 0.47 0.11 0.27
T16 0.50 0.11 0.30
T17 0.53 0.12 0.34
T18 0.57 0.13 0.38
T19 0.60 0.14 0.42
T20 0.63 0.14 0.47
T21 0.67 0.15 0.51
T22 0.70 0.16 0.56
T23 0.73 0.17 0.61
T24 0.37 0.08 0.17
T25 0.23 0.05 0.07
T25B 0.20 0.05 0.06
T26 0.17 0.04 0.04
T27 0.13 0.03 0.03
T28 0.10 0.02 0.02
T29 0.07 0.02 0.01
T30 0.03 0.01 0.00
T31 0.13 0.03 0.03
T32 0.10 0.02 0.02
T33 0.07 0.02 0.01
T34 0.03 0.01 0.00
T35 0.03 0.02 0.01
T36 0.03 0.02 0.02
T37 0.03 0.02 0.01
T38 0.03 0.02 0.01
T39 0.03 0.02 0.01
T40 0.03 0.02 0.01
T41 0.03 0.02 0.01
T42 0.03 0.02 0.01
T43 0.03 0.02 0.01
T44 0.03 0.02 0.01
T45 0.03 0.02 0.01
T46 0.03 0.02 0.02
T47 0.03 0.02 0.01
T48 0.03 0.02 0.01
97
T49 0.03 0.02 0.01
T50 0.03 0.02 0.01
T51 0.03 0.02 0.01
T52 0.03 0.02 0.01
T53 0.03 0.02 0.01
T54 0.03 0.02 0.01
T55 0.03 0.02 0.01
T56 0.03 0.02 0.02
T57 0.03 0.02 0.01
T58 0.03 0.02 0.01
T59 0.03 0.02 0.01
T60 0.03 0.02 0.01
T61 0.03 0.02 0.01
T62 0.03 0.02 0.01
T63 0.03 0.02 0.01
T64 0.03 0.02 0.02
T65 0.03 0.02 0.01
T66 0.03 0.02 0.01
T67 0.03 0.02 0.01
T68 1.13 0.26 1.37
T69 1.06 0.54 8.79
T70 0.90 0.46 6.42
1 1.06 0.00 -47.82
2 0.90 0.00 -159.74
3 0.17 0.04 5.44
4 0.03 0.01 5.80
5 0.07 0.02 5.80
6 0.57 0.13 4.19
7 0.27 0.06 6.50
Resultado nos Nós às 22:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
98
1 0.03 235.68 111.68
2 0.03 235.67 129.67
3 0.03 235.67 154.67
4 0.03 235.75 100.75
5 0.03 235.68 107.68
6 0.03 241.32 62.32
7 0.03 241.31 61.31
8 0.03 241.62 96.62
9 0.03 241.63 101.63
10 0.03 241.28 48.28
11 0.03 241.28 48.28
12 0.03 241.24 53.24
13 0.03 235.69 119.69
14 0.03 235.68 103.68
15 0.03 235.68 122.68
16 0.03 241.12 76.12
17 0.03 241.12 51.12
18 0.03 246.00 36.00
19 0.03 246.00 31.00
20 0.03 245.75 29.75
21 0.03 245.70 42.70
22 0.03 241.92 83.92
23 0.03 242.00 86.00
24 0.03 245.66 52.66
25 0.03 245.88 18.88
26 0.03 246.08 11.08
27 0.03 246.02 24.02
28 0.03 246.00 23.00
29 0.03 241.41 47.41
30 0.03 241.41 52.41
31 0.03 241.40 73.40
32 0.03 241.40 76.40
33 0.03 236.53 100.53
34 0.03 245.77 26.77
U1 0.00 235.67 154.67
U2 0.00 235.67 129.67
U3 0.00 235.68 113.68
U4 0.00 235.68 107.68
U5 0.00 235.69 119.69
U6 0.00 235.69 122.69
U7 0.00 235.69 102.69
U8 0.00 235.75 98.75
U9 0.00 241.24 52.24
U10 0.00 241.28 47.28
U11 0.00 241.28 48.28
U12 0.00 241.31 60.31
U13 0.00 241.32 63.32
U14 0.00 241.62 96.62
U15 0.00 241.63 100.63
U16 0.00 241.92 84.92
99
U17 0.00 242.00 87.00
U18 0.00 245.66 51.66
U19 0.00 245.70 42.70
U20 0.00 245.75 30.75
U21 0.00 245.77 26.77
U22 0.00 245.88 18.88
U23 0.00 246.08 11.08
U24 0.00 246.02 23.02
U25 0.00 246.00 22.00
U26 0.00 241.41 46.41
U27 0.00 241.41 51.41
U28 0.00 241.40 74.40
U29 0.00 241.40 76.40
U30 0.00 236.53 101.53
U31 0.00 246.00 32.00
U32 0.00 246.00 35.00
U33 0.00 241.12 51.12
U34 0.00 241.12 77.12
PV2 0.00 235.69 118.69
PV6 0.00 246.03 24.03
A1 0.00 250.17 48.17
A2 0.00 262.05 160.05
A3 0.00 245.98 50.98
A4 0.00 241.40 106.40
A5 0.00 246.00 56.00
A6 0.00 245.52 90.52
A7 0.00 241.21 104.21
P1 -1.05 202.00 0.00
P2 -0.89 102.00 0.00
R1 0.91 246.13 10.13
Resultado nos Trechos às 22:00 Horas
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
100
T1 0.03 0.02 0.01
T2 0.03 0.01 0.00
T3 0.06 0.01 0.01
T4 0.09 0.02 0.01
T5A 0.12 0.03 0.02
T5B 0.09 0.02 0.01
T6 0.06 0.01 0.01
T7 0.03 0.01 0.00
T8 0.21 0.05 0.06
T9 0.24 0.06 0.08
T10 0.27 0.06 0.10
T11 0.31 0.07 0.12
T12 0.34 0.08 0.14
T13 0.37 0.08 0.17
T14 0.40 0.09 0.20
T15 0.43 0.10 0.23
T16 0.46 0.10 0.26
T17 0.49 0.11 0.29
T18 0.52 0.12 0.32
T19 0.55 0.12 0.36
T20 0.58 0.13 0.40
T21 0.61 0.14 0.44
T22 0.64 0.15 0.48
T23 0.67 0.15 0.52
T24 0.34 0.08 0.14
T25 0.21 0.05 0.06
T25B 0.18 0.04 0.05
T26 0.15 0.03 0.03
T27 0.12 0.03 0.02
T28 0.09 0.02 0.01
T29 0.06 0.01 0.01
T30 0.03 0.01 0.00
T31 0.12 0.03 0.02
T32 0.09 0.02 0.01
T33 0.06 0.01 0.01
T34 0.03 0.01 0.00
T35 0.03 0.02 0.01
T36 0.03 0.02 0.01
T37 0.03 0.02 0.01
T38 0.03 0.02 0.01
T39 0.03 0.02 0.01
T40 0.03 0.02 0.01
T41 0.03 0.02 0.01
T42 0.03 0.02 0.01
T43 0.03 0.02 0.01
T44 0.03 0.02 0.01
T45 0.03 0.02 0.01
T46 0.03 0.02 0.01
T47 0.03 0.02 0.01
T48 0.03 0.02 0.01
101
T49 0.03 0.02 0.01
T50 0.03 0.02 0.01
T51 0.03 0.02 0.01
T52 0.03 0.02 0.01
T53 0.03 0.02 0.01
T54 0.03 0.02 0.01
T55 0.03 0.02 0.01
T56 0.03 0.02 0.01
T57 0.03 0.02 0.01
T58 0.03 0.02 0.01
T59 0.03 0.02 0.01
T60 0.03 0.02 0.01
T61 0.03 0.02 0.01
T62 0.03 0.02 0.01
T63 0.03 0.02 0.01
T64 0.03 0.02 0.01
T65 0.03 0.02 0.01
T66 0.03 0.02 0.01
T67 0.03 0.02 0.01
T68 1.04 0.24 1.17
T69 1.05 0.54 8.63
T70 0.89 0.46 6.37
1 1.05 0.00 -48.17
2 0.89 0.00 -160.05
3 0.15 0.03 4.57
4 0.03 0.01 4.87
5 0.06 0.01 4.87
6 0.52 0.12 3.52
7 0.24 0.06 5.46
Resultado nos Nós às 23:00 Horas
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
102
1 0.03 237.94 113.94
2 0.03 237.93 131.93
3 0.03 237.93 156.93
4 0.03 238.00 103.00
5 0.03 237.94 109.94
6 0.03 242.60 63.60
7 0.03 242.60 62.60
8 0.03 242.85 97.85
9 0.03 242.86 102.86
10 0.03 242.57 49.57
11 0.03 242.56 49.56
12 0.03 242.54 54.54
13 0.03 237.94 121.94
14 0.03 237.94 105.94
15 0.03 237.94 124.94
16 0.03 242.45 77.45
17 0.03 242.45 52.45
18 0.03 246.48 36.48
19 0.03 246.48 31.48
20 0.03 246.27 30.27
21 0.03 246.23 43.23
22 0.03 243.11 85.11
23 0.03 243.17 87.17
24 0.03 246.19 53.19
25 0.03 246.38 19.38
26 0.03 246.55 11.55
27 0.03 246.50 24.50
28 0.03 246.49 23.49
29 0.03 242.69 48.69
30 0.03 242.69 53.69
31 0.03 242.68 74.68
32 0.03 242.68 77.68
33 0.03 238.65 102.65
34 0.03 246.29 27.29
U1 0.00 237.93 156.93
U2 0.00 237.93 131.93
U3 0.00 237.94 115.94
U4 0.00 237.94 109.94
U5 0.00 237.94 121.94
U6 0.00 237.94 124.94
U7 0.00 237.94 104.94
U8 0.00 238.00 101.00
U9 0.00 242.54 53.54
U10 0.00 242.56 48.56
U11 0.00 242.57 49.57
U12 0.00 242.60 61.60
U13 0.00 242.60 64.60
U14 0.00 242.85 97.85
U15 0.00 242.86 101.86
U16 0.00 243.11 86.11
103
U17 0.00 243.17 88.17
U18 0.00 246.19 52.19
U19 0.00 246.23 43.23
U20 0.00 246.27 31.27
U21 0.00 246.29 27.29
U22 0.00 246.38 19.38
U23 0.00 246.55 11.55
U24 0.00 246.50 23.50
U25 0.00 246.49 22.49
U26 0.00 242.69 47.69
U27 0.00 242.69 52.69
U28 0.00 242.68 75.68
U29 0.00 242.68 77.68
U30 0.00 238.65 103.65
U31 0.00 246.48 32.48
U32 0.00 246.48 35.48
U33 0.00 242.45 52.45
U34 0.00 242.45 78.45
PV2 0.00 237.95 120.95
PV6 0.00 246.51 24.51
A1 0.00 250.56 48.56
A2 0.00 262.38 160.38
A3 0.00 246.46 51.46
A4 0.00 242.68 107.68
A5 0.00 246.48 56.48
A6 0.00 246.08 91.08
A7 0.00 242.51 105.51
P1 -1.04 202.00 0.00
P2 -0.89 102.00 0.00
R1 0.99 246.59 10.59
Resultado nos Trechos às 23:00 Horas
104
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.03 0.01 0.01
T2 0.03 0.01 0.00
T3 0.06 0.01 0.01
T4 0.08 0.02 0.01
T5A 0.11 0.03 0.02
T5B 0.08 0.02 0.01
T6 0.06 0.01 0.01
T7 0.03 0.01 0.00
T8 0.19 0.04 0.05
T9 0.22 0.05 0.07
T10 0.25 0.06 0.08
T11 0.28 0.06 0.10
T12 0.31 0.07 0.12
T13 0.33 0.08 0.14
T14 0.36 0.08 0.16
T15 0.39 0.09 0.19
T16 0.42 0.09 0.21
T17 0.44 0.10 0.24
T18 0.47 0.11 0.27
T19 0.50 0.11 0.30
T20 0.53 0.12 0.33
T21 0.56 0.13 0.37
T22 0.58 0.13 0.40
T23 0.61 0.14 0.44
T24 0.31 0.07 0.12
T25 0.19 0.04 0.05
T25B 0.17 0.04 0.04
T26 0.14 0.03 0.03
T27 0.11 0.03 0.02
T28 0.08 0.02 0.01
T29 0.06 0.01 0.01
T30 0.03 0.01 0.00
T31 0.11 0.03 0.02
T32 0.08 0.02 0.01
T33 0.06 0.01 0.01
T34 0.03 0.01 0.00
T35 0.03 0.01 0.01
T36 0.03 0.01 0.01
T37 0.03 0.01 0.01
T38 0.03 0.01 0.01
T39 0.03 0.01 0.01
T40 0.03 0.01 0.01
T41 0.03 0.01 0.01
T42 0.03 0.01 0.01
T43 0.03 0.01 0.01
T44 0.03 0.01 0.01
T45 0.03 0.01 0.01
T46 0.03 0.01 0.01
T47 0.03 0.01 0.01
105
T48 0.03 0.01 0.01
T49 0.03 0.01 0.01
T50 0.03 0.01 0.01
T51 0.03 0.01 0.01
T52 0.03 0.01 0.01
T53 0.03 0.01 0.01
T54 0.03 0.01 0.01
T55 0.03 0.01 0.01
T56 0.03 0.01 0.01
T57 0.03 0.01 0.01
T58 0.03 0.01 0.01
T59 0.03 0.01 0.01
T60 0.03 0.01 0.01
T61 0.03 0.01 0.01
T62 0.03 0.01 0.01
T63 0.03 0.01 0.01
T64 0.03 0.01 0.01
T65 0.03 0.01 0.01
T66 0.03 0.01 0.01
T67 0.03 0.01 0.01
T68 0.94 0.21 0.98
T69 1.04 0.53 8.47
T70 0.89 0.45 6.32
1 1.04 0.00 -48.56
2 0.89 0.00 -160.38
3 0.14 0.03 3.78
4 0.03 0.01 4.03
5 0.06 0.01 4.03
6 0.47 0.11 2.91
7 0.22 0.05 4.51
Resultado nos Nós às 24:00 Horas
106
Nó (ID) Consumo (L/s) Carga Hidráulica (m) Pressão (M.C.A)
1 0.03 238.44 114.44
2 0.03 238.44 132.44
3 0.03 238.43 157.43
4 0.03 238.50 103.50
5 0.03 238.44 110.44
6 0.03 243.11 64.11
7 0.03 243.10 63.10
8 0.03 243.36 98.36
9 0.03 243.36 103.36
10 0.03 243.07 50.07
11 0.03 243.07 50.07
12 0.03 243.04 55.04
13 0.03 238.45 122.45
14 0.03 238.45 106.45
15 0.03 238.45 125.45
16 0.03 242.96 77.96
17 0.03 242.96 52.96
18 0.03 246.99 36.99
19 0.03 246.99 31.99
20 0.03 246.78 30.78
21 0.03 246.73 43.73
22 0.03 243.61 85.61
23 0.03 243.68 87.68
24 0.03 246.70 53.70
25 0.03 246.89 19.89
26 0.03 247.06 12.06
27 0.03 247.00 25.00
28 0.03 246.99 23.99
29 0.03 243.19 49.19
30 0.03 243.19 54.19
31 0.03 243.19 75.19
32 0.03 243.19 78.19
33 0.03 239.16 103.16
34 0.03 246.79 27.79
U1 0.00 238.43 157.43
U2 0.00 238.44 132.44
U3 0.00 238.44 116.44
U4 0.00 238.44 110.44
U5 0.00 238.45 122.45
U6 0.00 238.45 125.45
U7 0.00 238.45 105.45
U8 0.00 238.50 101.50
U9 0.00 243.04 54.04
U10 0.00 243.07 49.07
U11 0.00 243.07 50.07
U12 0.00 243.10 62.10
U13 0.00 243.11 65.11
U14 0.00 243.36 98.36
107
U15 0.00 243.36 102.36
U16 0.00 243.61 86.61
U17 0.00 243.68 88.68
U18 0.00 246.70 52.70
U19 0.00 246.73 43.73
U20 0.00 246.78 31.78
U21 0.00 246.79 27.79
U22 0.00 246.89 19.89
U23 0.00 247.06 12.06
U24 0.00 247.00 24.00
U25 0.00 246.99 22.99
U26 0.00 243.19 48.19
U27 0.00 243.19 53.19
U28 0.00 243.19 76.19
U29 0.00 243.19 78.19
U30 0.00 239.16 104.16
U31 0.00 246.99 32.99
U32 0.00 246.99 35.99
U33 0.00 242.96 52.96
U34 0.00 242.96 78.96
PV2 0.00 238.45 121.45
PV6 0.00 247.01 25.01
A1 0.00 250.97 48.97
A2 0.00 262.75 160.75
A3 0.00 246.97 51.97
A4 0.00 243.19 108.19
A5 0.00 246.98 56.98
A6 0.00 246.59 91.59
A7 0.00 243.01 106.01
P1 -1.03 202.00 0.00
P2 -0.89 102.00 0.00
R1 0.97 247.09 11.09
Resultado nos Trechos às 24:00 Horas
108
Trecho (ID) Vazão (L/s) Velocidade (m/s) Perda de Carga (m/km)
T1 0.03 0.01 0.01
T2 0.03 0.01 0.00
T3 0.06 0.01 0.01
T4 0.08 0.02 0.01
T5A 0.11 0.03 0.02
T5B 0.08 0.02 0.01
T6 0.06 0.01 0.01
T7 0.03 0.01 0.00
T8 0.19 0.04 0.05
T9 0.22 0.05 0.07
T10 0.25 0.06 0.08
T11 0.28 0.06 0.10
T12 0.31 0.07 0.12
T13 0.33 0.08 0.14
T14 0.36 0.08 0.16
T15 0.39 0.09 0.19
T16 0.42 0.09 0.21
T17 0.44 0.10 0.24
T18 0.47 0.11 0.27
T19 0.50 0.11 0.30
T20 0.53 0.12 0.33
T21 0.56 0.13 0.37
T22 0.58 0.13 0.40
T23 0.61 0.14 0.44
T24 0.31 0.07 0.12
T25 0.19 0.04 0.05
T25B 0.17 0.04 0.04
T26 0.14 0.03 0.03
T27 0.11 0.03 0.02
T28 0.08 0.02 0.01
T29 0.06 0.01 0.01
T30 0.03 0.01 0.00
T31 0.11 0.03 0.02
T32 0.08 0.02 0.01
T33 0.06 0.01 0.01
T34 0.03 0.01 0.00
T35 0.03 0.01 0.01
T36 0.03 0.01 0.01
T37 0.03 0.01 0.01
T38 0.03 0.01 0.01
T39 0.03 0.01 0.01
T40 0.03 0.01 0.01
T41 0.03 0.01 0.01
T42 0.03 0.01 0.01
T43 0.03 0.01 0.01
T44 0.03 0.01 0.01
T45 0.03 0.01 0.01
T46 0.03 0.01 0.01
109
T47 0.03 0.01 0.01
T48 0.03 0.01 0.01
T49 0.03 0.01 0.01
T50 0.03 0.01 0.01
T51 0.03 0.01 0.01
T52 0.03 0.01 0.01
T53 0.03 0.01 0.01
T54 0.03 0.01 0.01
T55 0.03 0.01 0.01
T56 0.03 0.01 0.01
T57 0.03 0.01 0.01
T58 0.03 0.01 0.01
T59 0.03 0.01 0.01
T60 0.03 0.01 0.01
T61 0.03 0.01 0.01
T62 0.03 0.01 0.01
T63 0.03 0.01 0.01
T64 0.03 0.01 0.01
T65 0.03 0.01 0.01
T66 0.03 0.01 0.01
T67 0.03 0.01 0.01
T68 0.94 0.21 0.98
T69 1.03 0.52 8.29
T70 0.89 0.45 6.27
1 1.03 0.00 -48.97
2 0.89 0.00 -160.75
3 0.14 0.03 3.78
4 0.03 0.01 4.03
5 0.06 0.01 4.03
6 0.47 0.11 2.91
7 0.22 0.05 4.51
__________________________________________________
BRAZ CAMPOS
Engº Civil – CREA 7044/D-GO
RESPONSÁVEL TÉCNICO