THE WAY TO THE INNOVATION OF SKANSKA UK PLC VIA KTP Junho Sung
08. Oct. 2012
The way to the innovation of SKANSKA UK Plc via KTP
2
CONTENTS >>
02 ABOUT SKANSKA UK PlcSTAGE
03 RESEARCH PROPOSAL FOR THE INNOVATIONSTAGE
01 INTRODUCTION STAGE (Personal Statement – Focus on Experiences)
STAGE 01 INTRODUCTION
The way to the innovation of SKANSKA UK Plc via KTP
4
01 INTRODUCTION (Personal Statement- Focus on Experiences)01 INTRODUCTION (Personal Statement- Focus on Experiences)A. Experience on site
*Hands on experience at Project MGMT in accordance with Triangle Theory (Time, Cost and Quality)
*High quality skill at Site Management and Supervision (control project schedule, design and documents)
*Experience at stakeholders management and supply chain partners management
*Accumulated knowledge at Project Life Cycle (from inception to legacy)
Army Construction Field: S. Korea, as construction Engineering Officer
The way to the innovation of SKANSKA UK Plc via KTP
5
01 INTRODUCTION (Personal Statement- Focus on Experiences)B. Experience at MSc studies Project Management & Construction Management: UK
01. Technology & InformationManagement
• Group project- Tagging technologies, Project extranets and BIM in Project Management
• Group Project- Quality Control by Webcam in Construction Management
02. Sustainable Management/ Assessment
• Group project- Measuring Sustainability at Tower Building, Avery hill campus, by BREEAM/ LEED
03. Risk Management • Case Study- Risk Analysis and Management in 2018 Russia World Cup Project
04. Project Management • Case Study- Road Project in Estonia as Public Private Partnership(PPP)
05. Stakeholders Management• Case Study- Oxford Castle Development, UK
The way to the innovation of SKANSKA UK Plc via KTP
6
01 INTRODUCTION (Personal Statement- Focus on Experiences)B. Experience at MSc studies Project Management & Construction Management: UK
06. Human Resource Management
• Case Study- Human Resource Management Strategies for SENTOSA ENG. (shipbuilding company)
07. Supply Chain Management
• Case Study- JCB Plant Construction in South Africa: understanding sub- contract package in D&B
08. Finance and Management Accounting
• Assignment- Measuring Goodwill, Understanding Cash flow, Accounting process at Acquisition, Measuring Depreciation for PPE
Achievements: Increased knowledge and skills to research/work within unsupervised condition: Self Planning, Scheduling, and Implementing
STAGE 02 ABOUT SKANSKA UK Plc
The way to the innovation of SKANSKA UK Plc via KTP
8
02 Understanding of SKANSKA UK Plc with current Issues for Innovation A. Business Span
* Services: Having A wide business span
* Business Model: Integrating all disciplines and working
- Financing project - Design and Construction - Facility management - Operation and Management
- Working together with clients, partners, and supply chain partners
- Accordance with Skanska’s Code of Conduct & Five Zeros
The way to the innovation of SKANSKA UK Plc via KTP
9
02 Understanding of SKANSKA UK Plc with current Issues for Innovation
Goal: To deliver project as Sustainable(Green, Health & Safety, Business Ethics) trough Innovation.01.
02. Way to Innovation: Integrating – Culture transformation, Social networking, Supply chain management/Logistic, Technologies, Knowledge Management, Lean Construction.
03. Need for: Development of “Innovative Management System(Tools, Network, Process) – Idea Capturing/implementing”
B. Current Issues for Innovation
STAGE 03 RESEARCH PROPOSAL FOR THE INNOVATION
The way to the innovation of SKANSKA UK Plc via KTP
11
03 Research Proposal for the Innovation A. Concept
Q: How to Approach to the capturing ideas for Innovation and how to implement it ?
A: Approach to the answer according to the method of practical research working
The way to the innovation of SKANSKA UK Plc via KTP
12
03 Research Proposal for the Innovation
AIM: To develop tools, Networks, and Process for Idea Capture and Implementation.
Objectives of the project
Project topic 1. Culture Transformation
a. To understand the policies of SKANSKA UK Plc through the research works at Code of Conduct and Sustainable Procurement Policy. (General principles; Five Zeros; Supplier Assessment; Key Requirement; Quality Plan; Integrating Policy into management process; etc.)
b. To examine suitability of implementing the Information Technology(e.g. Barcode, RFID, BIM, etc.), Knowledge Management, Lean Construction, Other Technologies in SKANSKA UK Plc.
c. To identify / develop most suitable methods to increase current Business and Supply chain management system in accordance with company policies.
B. Detail of proposal (Aim, Objectives, and Methodology)
a. To examine current culture transformation system in SKANSKA UK Plc.
b. To recognise their limitations of implementation for high efficiency or Innovation.
c. To re-examine into Knowledge Management, Socio-technology System(STS), and Actor Network Theory(ANT) for culture transformation and applicability in SKANSKA UK Plc.
Project topic 2. Business and Supply chain
MGMT
The way to the innovation of SKANSKA UK Plc via KTP
13
03 Research Proposal for the Innovation
Methodology of Project topic 1 & 2
1. Secondary Data Collection:
B. Detail of proposal (Aim, Objectives, and Methodology)
II. Case StudyII. Case StudyI. Secondary Data CollectionI. Secondary Data Collection III. Primary Data CollectionIII. Primary Data Collection ⅣⅣ. Contents Analysis. Contents Analysis ⅤⅤ. Development. Development
Research on Culture Transformation / Social Networking, STS, ANT, CIOB or RICS guidelines for Supply Chain Management; Journals; Conference Data; Etc.
The way to the innovation of SKANSKA UK Plc via KTP
14
03 Research Proposal for the Innovation
Methodology of Project topic 1 & 2B. Detail of proposal (Aim, Objectives, and Methodology)
II. Case StudyII. Case StudyI. Secondary Data CollectionI. Secondary Data Collection III. Primary Data CollectionIII. Primary Data Collection ⅣⅣ. Contents Analysis. Contents Analysis ⅤⅤ. Development. Development
2. Case Study:
a. Internal: IT team in SKANSKA US(Innovation method/Lean Construction); M25 Widening Project UK(Cost Saving – Supply Chain Management/Logistic);
b. External: ARUP’s Knowledge Management System; other case studies.
The way to the innovation of SKANSKA UK Plc via KTP
15
03 Research Proposal for the Innovation
Data collection from Interviews, Questionnaires, and Group meeting of Key members / Linkages (sub-contractors and supply chain partners).
3. Primary data collection:
Methodology of Project topic 1 & 2B. Detail of proposal (Aim, Objectives, and Methodology)
II. Case StudyII. Case StudyI. Secondary Data CollectionI. Secondary Data Collection III. Primary Data CollectionIII. Primary Data Collection ⅣⅣ. Contents Analysis. Contents Analysis ⅤⅤ. Development. Development
The way to the innovation of SKANSKA UK Plc via KTP
16
03 Research Proposal for the Innovation
4. Contents Analysis:
Collect overlap data for innovation from each research working and consider the suitability to adopt in SKANSKA UK plc in accordance with company policies.
Methodology of Project topic 1 & 2B. Detail of proposal (Aim, Objectives, and Methodology)
II. Case StudyII. Case StudyI. Secondary Data CollectionI. Secondary Data Collection III. Primary Data CollectionIII. Primary Data Collection ⅣⅣ. Contents Analysis. Contents Analysis ⅤⅤ. Development. Development
The way to the innovation of SKANSKA UK Plc via KTP
17
03 Research Proposal for the Innovation
Test a prototype system with key supply chain partners and collect their feedback; Update the system through monitoring.
5. Development tools, network, process:
Methodology of Project topic 1 & 2B. Detail of proposal (Aim, Objectives, and Methodology)
II. Case StudyII. Case StudyI. Secondary Data CollectionI. Secondary Data Collection III. Primary Data CollectionIII. Primary Data Collection ⅣⅣ. Contents Analysis. Contents Analysis ⅤⅤ. Development. Development
The way to the innovation of SKANSKA UK Plc via KTP
18
03 Research Proposal for the Innovation B. Detail of proposal (Development Process)
Company Policies-Code of Conducts
-Sustainable Procurement
Business Model / Culture Transformation System
Project type, Procurement,Scale of project, Area, so on
Researching & Benchmarking Test Options
Secondary Data Collection(Internal / External data)
Case Study(Internal / External data)
Primary Data Collection(From Partners)
Option 1
Define Opportunities: Filtering Process Set Design Options
Option 2
Option 3
Selection & ImplementationMonitoringFeedback
Participating / Collaborating-Sub Contractors-Supply Chain Partners-Clients-Senior Managers-Etc.
The way to the innovation of SKANSKA UK Plc via KTP
19
03 Research Proposal for the Innovation C. Challenges
01. Gap between different parties’ expectations and ways of developing process
02.
03.
Limited data volume at primary data collection (limited response / opportunities to get correct data based on key supply chain partners’ idea)
Difficulties to develop Multi-Applicable System (considering various business span / project types)