DUPLICAO DA ESTRADA DE FERROCARAJS - EFC
ESTUDO AMBIENTAL E PLANO BSICOAMBIENTAL EA/PBA
VOLUME 1
CAPTULOS 1 a 4
Belo Horizonte
Outubro de 2011
-
________________________________________________________________________________i
SUMRIO
1. INDENTIFICAO DO EMPREENDEDOR E EMPRESA CONSULTORA .........................................................14
1.1 IDENTIFICAO DO EMPREENDEDOR ...............................................................................................14
1.2 IDENTIFICAO DA EMPRESA CONSULTORA .....................................................................................14
1.3 DADOS DA EQUIPE TCNICA MULTIDISCIPLINAR ...............................................................................15
1.3.1 EQUIPE AMPLO - ELABORAO DO ESTUDO AMBIENTAL E PLANO BSICO AMBIENTAL - EA/PBA .15
1.3.2 EQUIPE VALE EMPREENDEDOR .................................................................................................22
1.3.3 EQUIPE MRS ESTUDOS AMBIENTAIS APOIO TCNICO VALE .....................................................23
2. DADOS DO EMPREENDIMENTO ..............................................................................................................25
2.1 CARACTERIZAO DO EMPREENDIMENTO .......................................................................................25
2.1.1 HISTRICO DA ESTRADA DE FERRO CARAJS - EFC .......................................................................25
2.1.2 SNTESE DESCRITIVA DA ESTRADA DE FERRO CARAJS - EFC .........................................................28
2.1.3 OBJETO DE LICENCIAMENTO ........................................................................................................32
2.1.4 OBJETIVOS E JUSTIFICATIVAS DO EMPREENDIMENTO ..................................................................36
2.1.5 LOCALIZAO GEOGRFICA .........................................................................................................38
2.1.5.1 Malha Rodoviria Existente e Prevista ............................................................................................... 41
2.1.5.1.1 Rodovias federais e estaduais no entorno das obras ...................................................................... 41
2.1.5.1.2 Acessos Secundrios Existentes ..................................................................................................... 41
2.1.5.1.3 Rodovias Existentes e Projetadas ................................................................................................... 42
2.1.5.2 Ncleos Urbanos e Rurais ................................................................................................................... 42
2.1.5.3 Tipologias Vegetacionais .................................................................................................................... 42
2.1.5.3.1 Formaes Vegetais com influncia Fluviomarinha (Manguezal) ..................................................... 43
2.1.5.3.2 Floresta Ombrfila Densa (Floresta Pluvial Tropical) ....................................................................... 43
2.1.5.3.3 Floresta Ombrfila Aberta ............................................................................................................. 43
2.1.5.4 Cursos de gua Transpostos pela Ferrovia .......................................................................................... 53
2.1.5.5 Unidades de Conservao - UC ........................................................................................................... 54
2.1.5.6 Terras Indgenas, Quilombolas e Outras Comunidades Tradicionais ..................................................... 66
2.1.5.7 reas de Disposio de Material Excedente e Canteiro de Obras ......................................................... 68
2.1.5.8 Obras de Arte Especiais Existentes - OAEs ........................................................................................... 68
2.1.5.9 Interferncias Relevantes ................................................................................................................... 79
2.1.5.9.1 Interferncias das obras com a ferrovia existente .......................................................................... 79
2.1.5.9.2 Interferncias da duplicao com passagens em nvel .................................................................... 80
2.1.5.9.3 Interferncias com rodovias que so cruzadas pela EFC.................................................................. 80
2.1.5.9.4 Interface com Concessionrias de Servios Pblicos ....................................................................... 80
2.1.6 INSERO REGIONAL E LEGISLAO AMBIENTAL .........................................................................81
2.1.6.1 Interfaces da EFC com Empreendimentos Afins .................................................................................. 81
2.1.6.2 Programas e Projetos Pblicos e Privados Colocalizados ..................................................................... 82
2.1.6.2.1 Zoneamento Ecolgico Econmico- ZEE e Plano Estadual Ambiental............................................... 82
2.1.6.2.1.1 Par ........................................................................................................................................... 83
2.1.6.2.1.2 Maranho .................................................................................................................................. 84
2.1.6.2.2 Plano Nacional de Recursos Hdricos - PNRH .................................................................................. 84
2.1.6.2.2.1 Regio Hidrogrfica Tocantins-Araguaia ...................................................................................... 84
-
________________________________________________________________________________ii
2.1.6.2.2.1 Regio Hidrogrfica Tocantins-Araguaia...........................................................................................852.1.6.2.2.2 Regio Hidrogrfica Atlntico Nordeste Ocidental ...........................................................................852.1.6.2.3 Programa de Acelerao do Crescimento (PAC) ..................................................................................862.1.6.2.3.1 PAC - Maranho................................................................................................................................862.1.6.2.3.2 PAC - Par .........................................................................................................................................862.1.6.2.4 Plano Plurianual 2008-2011 PPA.......................................................................................................872.1.6.2.4.1 PPA Par...........................................................................................................................................87
Caminhos da Parceria ....................................................................................................................................87Integrao Regional.......................................................................................................................................87
2.1.6.2.4.2 PPA Maranho ..................................................................................................................................87Maranho Trafegvel ....................................................................................................................................87
2.1.6.2.5 Programa de Capacitao de Mo de Obra .........................................................................................882.1.6.3 Legislao Ambiental ................................................................................................................................89
2.1.6.3.1 Legislao Ambiental Estadual e Federal .............................................................................................892.1.6.3.2 Ordenamento Territorial Municipal...................................................................................................107
2.1.7 RGO FINANCIADOR - VALOR DO EMPREENDIMENTO ............................................................... 1082.2 DESCRIO DO PROJETO .................................................................................................................... 108
2.2.1 SNTESE DAS CARACTERSTICAS DO PROJETO DE DUPLICAO DA EFC ......................................... 1082.2.1.1 Duplicao ..............................................................................................................................................1102.2.1.2 Remodelaes dos Ptios de Cruzamento..............................................................................................1142.2.1.3 Desvios Ferrovirios................................................................................................................................120
2.2.1.3.1 Posicionamento das instalaes ........................................................................................................1212.2.1.3.2 Lanamento de linha de servio (auxiliar) .........................................................................................122
2.2.1.4 Instalaes Fixas .....................................................................................................................................1222.2.1.4.1 Unidades Administrativas ..................................................................................................................1262.2.1.4.2 Escritrio Operacional Vale................................................................................................................1272.2.1.4.3 Galpo de contratadas.......................................................................................................................1272.2.1.4.4 Oficina de Manuteno de Mquinas de Via .....................................................................................1282.2.1.4.5 Plataforma de Manuteno ...............................................................................................................1332.2.1.4.6 Posto de Abastecimento....................................................................................................................1352.2.1.4.7 Abrigo para Auto de linha ..................................................................................................................1382.2.1.4.8 Armazm de Peas.............................................................................................................................1402.2.1.4.9 Armazm de Inflamveis ...................................................................................................................1432.2.1.4.10 Sede de Manuteno de VP e Eletroeletrnica ...............................................................................1432.2.1.4.11 Sede de Manuteno de Via Permanente (VP)................................................................................1472.2.1.4.12 Sede de Manuteno de VP/Eletroeletrnica e Administrao.......................................................1472.2.1.4.13 Sede de Manuteno de VP, Eletroeletrnica e MGP......................................................................1472.2.1.4.14 Depsito Intermedirio de Resduos ...............................................................................................1482.2.1.4.15 Controle de Ptios - Parauapebas....................................................................................................1512.2.1.4.16 Controle de Ptios Aailndia (Locao 33) ..................................................................................1512.2.1.4.17 Refeitrio Vitria do Mearim ........................................................................................................1532.2.1.4.18 Refeitrio Parauapebas.................................................................................................................1532.2.1.4.19 Diversas Estruturas da rea do Alojamento de Alto Alegre do Pindar: .........................................1542.2.1.4.20 Central de Materiais Descartveis (CMD) ........................................................................................156
2.2.1.5 Obras de Arte Especiais e Correntes.......................................................................................................156
-
________________________________________________________________________________iii
2.2.2 CRITRIOS TCNICOS PARA AS OBRAS DE ARTE E DRENAGENS ..................................................... 1582.2.2.1 Estudos Hidrolgicos...............................................................................................................................158
2.2.2.1.1 Levantamento e anlise das bacias hidrogrficas intervenientes......................................................1582.2.2.1.2 Levantamentos no local da travessia de cursos dgua .....................................................................1582.2.2.1.3 Anlise de dados climatolgicos, fluviomtricos e pluviomtricos....................................................1592.2.2.1.4 Definio do regime de chuvas intensas............................................................................................1592.2.2.1.5 Caracterizao do zoneamento (uso e ocupao do solo) das bacias de interesse ...........................1602.2.2.1.6 Tempos de Concentrao e de Recorrncia ......................................................................................1602.2.2.1.7 Definio de Trechos de Regimes Hdricos Homogneos ..................................................................161
2.2.2.2 Estudos Hidrulicos.................................................................................................................................1622.2.2.2.1 Obras de arte Correntes ....................................................................................................................1622.2.2.2.2 Obras de arte Especiais......................................................................................................................163
2.2.2.3 Critrios Tcnicos para o Projeto de Drenagem .....................................................................................1632.2.3 ATIVIDADES REFERENTES ETAPA DE IMPLANTAO .................................................................. 165
2.2.3.1 Atividades Preliminares ..........................................................................................................................1652.2.3.1.1 Definio das Caractersticas Geomtricas ........................................................................................1652.2.3.1.1.1 Diretrizes para a duplicao da via .................................................................................................1652.2.3.1.1.2 Caractersticas da Seo Transversal ..............................................................................................1652.2.3.1.2 Aquisies e indenizaes .................................................................................................................1702.2.3.1.3 Limpeza das reas das Obras.............................................................................................................1702.2.3.1.4 Desmobilizao de Estruturas Existentes na Faixa de Domnio .........................................................1712.2.3.1.5 Terraplenagem...................................................................................................................................1722.2.3.1.5.1 Volumes de corte e aterro ..............................................................................................................1732.2.3.1.5.2 Regularizao do Subleito...............................................................................................................1742.2.3.1.5.3 Sublastro.........................................................................................................................................174
2.2.3.2 Infraestrutura Ferroviria .......................................................................................................................1742.2.3.2.1 Obras de Arte Especiais .....................................................................................................................1752.2.3.2.1.1 Pontes Ferrovirias .........................................................................................................................1752.2.3.2.1.2 Viadutos Ferrovirios e Rodovirios ...............................................................................................1762.2.3.2.2 Obras de Arte Correntes ....................................................................................................................1782.2.3.2.2.1 Bueiros............................................................................................................................................1782.2.3.2.2.2 Passagens inferiores (para veculos, gado e pedestres)..................................................................1792.2.3.2.2.3 Tnel bala e minitnel ....................................................................................................................1822.2.3.2.3 Sistema de Drenagem........................................................................................................................1842.2.3.2.3.1 Drenagem da plataforma................................................................................................................1842.2.3.2.3.2 Drenagem de Taludes .....................................................................................................................1842.2.3.2.3.3 Drenagem subsuperficial ................................................................................................................1852.2.3.2.3.4 Sees Tpicas dos Dispositivos de Drenagem ................................................................................1852.2.3.2.3.5 Valeta tipo americana com revestimento vegetal ..........................................................................1852.2.3.2.3.6 Canaleta Retangular........................................................................................................................1862.2.3.2.3.7 Caixas Coletoras..............................................................................................................................1882.2.3.2.3.8 Drenos ............................................................................................................................................1882.2.3.2.4 Obras de conteno...........................................................................................................................1892.2.3.2.4.1 Cortina Atirantada ..........................................................................................................................1902.2.3.2.4.2 Muros em Gabio ...........................................................................................................................190
-
________________________________________________________________________________iv
2.2.3.2.5 Obras Complementares .....................................................................................................................1912.2.3.2.5.1 Vedao da Faixa de Domnio.........................................................................................................1912.2.3.2.5.2 Vedao nos Viadutos Rodovirios.................................................................................................192
2.2.3.3 Superestrutura Ferroviria .....................................................................................................................1922.2.3.3.1 Padro da duplicao.........................................................................................................................1932.2.3.3.2 Elementos Componentes da Superestrutura:....................................................................................1932.2.3.3.2.1 Lastro ..............................................................................................................................................1942.2.3.3.2.2 Dormentes ......................................................................................................................................1952.2.3.3.2.3 Trilhos .............................................................................................................................................1952.2.3.3.2.4 Contratrilhos ...................................................................................................................................1962.2.3.3.2.5 Acessrios Metlicos ......................................................................................................................1962.2.3.3.3 Montagem da Superestrutura ...........................................................................................................1972.2.3.3.3.1 Topografia.......................................................................................................................................1972.2.3.3.3.2 Lanamento da Grade Ferroviria ..................................................................................................1982.2.3.3.3.3 Instalao de Aparelho de Mudana de Via (AMV) ........................................................................2012.2.3.3.3.4 Aplicao e regularizao do Lastro................................................................................................2022.2.3.3.3.5 Instalao de Sistema de Sinalizao..............................................................................................2042.2.3.3.3.6 Fornecimento de Energia................................................................................................................204
2.2.3.4 Mtodos Construtivos ............................................................................................................................2072.2.3.4.1 Servios Topogrficos ........................................................................................................................2072.2.3.4.2 Limpeza do Terreno ...........................................................................................................................2082.2.3.4.3 Execuo de Cortes............................................................................................................................2082.2.3.4.3.1 Tipos de escavao .........................................................................................................................2082.2.3.4.4 Execuo de Aterros ..........................................................................................................................2132.2.3.4.4.1 Fundaes de Aterros em Solos de Baixa Capacidade de Suporte .................................................2132.2.3.4.4.2 Fundaes de Aterros em Solos de Boa Capacidade de Suporte....................................................2132.2.3.4.4.3 Tipos de Aterro Compactado ..........................................................................................................2142.2.3.4.5 Execuo de Obras de Arte Correntes ...............................................................................................2192.2.3.4.5.1 Bueiros Celulares ............................................................................................................................2192.2.3.4.5.2 Bueiros Tubulares ...........................................................................................................................2202.2.3.4.5.3 Bueiros Celulares com Regime Perene ...........................................................................................2232.2.3.4.6 Obras de Arte Especiais .....................................................................................................................2242.2.3.4.6.1 Pontes Ferrovirias .........................................................................................................................2242.2.3.4.7 Estruturas de Conteno de Taludes .................................................................................................2312.2.3.4.7.1 Cortinas Atirantadas .......................................................................................................................2312.2.3.4.7.2 Muros de Gabio ............................................................................................................................2322.2.3.4.8 Equipamentos e Mquinas ................................................................................................................233
2.2.3.5 Materiais e Insumos................................................................................................................................2352.2.3.6 Estruturas de Apoio ................................................................................................................................235
2.2.3.6.1 Canteiros de Obras ............................................................................................................................2352.2.3.6.2 reas de Emprstimo (AEs)................................................................................................................2382.2.3.6.3 reas para Disposio de Materiais Excedente -ADMEs....................................................................2382.2.3.6.4 reas para Disposio de Materiais Provisrios - ADMP ...................................................................2392.2.3.6.5 Estradas de Servio e Acessos............................................................................................................2412.2.3.6.5.1 Acessos Transversais.......................................................................................................................241
-
________________________________________________________________________________v
2.2.3.6.5.2 Estradas de Servio .........................................................................................................................2412.2.3.6.6 Sistema de Fornecimento de Energia ................................................................................................2432.2.3.6.6.1 Proteo Contra Descarga Eltrica e Atmosfrica ..........................................................................2442.2.3.6.7 Sistema de Abastecimento de gua ..................................................................................................2442.2.3.6.8 Sistema de Abastecimento de Combustvel.......................................................................................244
2.2.3.7 Fontes de Gerao e Sistemas de Controle Ambiental na Implantao .................................................2452.2.3.7.1 Resduos Slidos ................................................................................................................................2452.2.3.7.1.1 Fontes e Estimativa de Volume de Gerao ...................................................................................2452.2.3.7.1.2 Sistema de controle (acondicionamento, estocagem temporria e disposio final) ....................2522.2.3.7.1.3 Resduos Classe I .............................................................................................................................2562.2.3.7.1.4 Resduos Classe IIA..........................................................................................................................2562.2.3.7.1.5 Resduos Classe IIB..........................................................................................................................2572.2.3.7.2 Efluentes Lquidos..............................................................................................................................2572.2.3.7.3 Sistemas de Drenagem nas Frentes de Obras....................................................................................2582.2.3.7.4 Sistema de Drenagem nos Canteiros de Obras..................................................................................2592.2.3.7.5 Qualidade do Ar .................................................................................................................................2602.2.3.7.5.1 Emisso de Material Particulado (MP)............................................................................................2602.2.3.7.5.2 Emisso de Gases de Combusto ...................................................................................................2612.2.3.7.6 Rudos e Vibraes.............................................................................................................................262
2.2.4 ATIVIDADES REFERENTES ETAPA DE OPERAO......................................................................... 2622.2.4.1 Operao Ferroviria ..............................................................................................................................262
2.2.4.1.1 Transporte de Minrios e Cargas Diversas.........................................................................................2622.2.4.1.2 Transporte de Passageiros .................................................................................................................2662.2.4.1.3 Funcionamento das Instalaes Fixas ................................................................................................2662.2.4.1.3.1 Postos de Abastecimento de Combustveis ....................................................................................2662.2.4.1.3.2 Controle de Ptio ............................................................................................................................2672.2.4.1.3.3 Sede de Manuteno de Via Permanente e de Eletroeletrnica ....................................................2672.2.4.1.3.4 Armazns de Peas .........................................................................................................................2682.2.4.1.3.5 Armazm de Inflamveis ................................................................................................................2682.2.4.1.3.6 Restaurantes...................................................................................................................................2712.2.4.1.3.7 Plataformas de Manuteno ..........................................................................................................2712.2.4.1.3.8 Alojamento .....................................................................................................................................2722.2.4.1.3.9 Abrigos de auto de linha .................................................................................................................2722.2.4.1.4 Gerenciamento e Segurana Operacional da Ferrovia ......................................................................2722.2.4.1.4.1 Formao de Prefixos .....................................................................................................................2732.2.4.1.4.2 Sistema de Licenciamento de Trens ...............................................................................................2742.2.4.1.4.3 Sistema de Comunicao ................................................................................................................2742.2.4.1.4.4 Sistemas Complementares .............................................................................................................2762.2.4.1.5 Atividades de Manuteno ................................................................................................................2792.2.4.1.5.1 Manuteno da Superestrutura......................................................................................................279
Modelo de Renovao de Linha ..................................................................................................................282Verificao do Lastro ...................................................................................................................................283Substituio de Trilhos ................................................................................................................................283Substituio de Dormentes .........................................................................................................................283
2.2.4.1.5.2 Manuteno da Infraestrutura .......................................................................................................284
-
________________________________________________________________________________vi
Controle de Plantas Invasoras .....................................................................................................................285Monitoramento e Recuperao de Taludes ................................................................................................285Manuteno dos Sistemas de Drenagem e das Obras de Arte Correntes ...................................................286
Limpeza manual: .....................................................................................................................................287Limpeza mecanizada:..............................................................................................................................287
2.2.4.1.5.3 Manuteno de Obras de Arte Especiais ........................................................................................2872.2.4.1.6 Estruturas de Apoio Operao ........................................................................................................2872.2.4.1.6.1 Sistema de Fornecimento de Energia Eltrica ................................................................................2872.2.4.1.6.2 Sistema de Abastecimento de gua ...............................................................................................2882.2.4.1.6.3 Estradas de Servio .........................................................................................................................2882.2.4.1.7 Fontes de Gerao e Sistemas de Controle Ambiental na Operao.................................................2892.2.4.1.7.1 Resduos Slidos .............................................................................................................................289
Fontes e estimativa de volume de gerao .................................................................................................289Acondicionamento, estocagem temporria e disposio final....................................................................289
2.2.4.1.7.2 Efluentes Lquidos Sanitrios ..........................................................................................................294Estimativa da gerao e sistemas de controle e tratamento de efluentes sanitrios .................................294
Ptio da Locao 04 ................................................................................................................................294Ptio da Locao 10 ................................................................................................................................295Ptio da Locao 14 ................................................................................................................................297Ptio da Locao 17 ................................................................................................................................298Ptio da Locao 24 ................................................................................................................................299Ptio da Locao 33 ................................................................................................................................299Ptio da Locao 43 ................................................................................................................................301Ptio da Locao 48 ................................................................................................................................302Ptio da Locao 56 ................................................................................................................................303
2.2.4.1.7.3 Efluentes Lquidos Oleosos .............................................................................................................311Estimativa de Gerao, Sistemas de Controle e Tratamento ......................................................................311
2.2.4.1.7.4 Qualidade do Ar ..............................................................................................................................313Emisso de Material Particulado (MP) ........................................................................................................313Emisso de Gases de Combusto ................................................................................................................314Sistema de Controle de Material Particulado..............................................................................................314
2.2.4.1.7.5 Rudos e Vibraes..........................................................................................................................3142.2.5 MO DE OBRA ................................................................................................................................ 3152.2.6 CRONOGRAMA FSICO DAS ATIVIDADES ........................................................................................ 317
3. ALTERNATIVAS TECNOLGICAS E LOCACIONAIS ...................................................................................3183.1 HISTRICO LOCACIONAL..................................................................................................................... 3183.2 ALTERNATIVAS LOCACIONAIS ............................................................................................................. 318
3.2.1 Definio dos Critrios de Avaliao............................................................................................... 3203.2.2 Anlise dos Critrios Relevantes ..................................................................................................... 322
3.2.2.1 Meio Bitico............................................................................................................................................3223.2.2.1.1 Supresso de Vegetao ....................................................................................................................3223.2.2.1.2 Interferncia em rea de Preservao Permanente - APP ................................................................323
3.2.2.2 Meio Fsico..............................................................................................................................................3243.2.2.2.1 Volume de Material Movimentado....................................................................................................324
3.2.2.3 Meio Socioeconmico ............................................................................................................................324
-
________________________________________________________________________________vii
3.2.2.3.1 Desapropriao..................................................................................................................................3243.2.2.3.2 Interferncia em Infraestrutura Existente .........................................................................................3253.2.2.3.2.1 Realocao......................................................................................................................................3253.2.2.3.2.2 Aproveitamento..............................................................................................................................3253.2.2.3.3 Custo Financeiro ................................................................................................................................325
3.2.2.4 Concluso para Alternativas Gerais ........................................................................................................3263.2.3 ALTERNATIVAS ESPECFICAS LADO DIREITO ................................................................................ 328
3.2.3.1 Locao 1 (trecho entre km 3+80 ao 8+75) ............................................................................................3283.2.3.1.1 Concluso...........................................................................................................................................328
3.2.3.2 Locao 9 (km 133+030 a 137+000) .......................................................................................................3303.2.3.2.1 Concluso...........................................................................................................................................330
3.2.3.3 Locao 14 (entre km 218+905 a 219+925)............................................................................................3313.2.3.3.1 Concluso...........................................................................................................................................332
3.2.3.4 Locao 33 (km 513+300 a 514+100) .....................................................................................................3333.2.3.4.1 Concluso...........................................................................................................................................333
3.2.3.5 Locaes 43 (km 651+950 a 666+539 a), 44 (km 670+880 a 681+989) e 46 (km 709+342 a 717+879)..3343.2.3.5.1 Concluso...........................................................................................................................................335
3.2.3.6 Locao 47 (km 717+879 a 735+177) .....................................................................................................3423.2.3.6.1 Concluso...........................................................................................................................................342
3.2.4 CONCLUSO GERAL DAS ALTERNATIVAS LOCACIONAIS ................................................................. 3433.2.5 NO REALIZAO DO EMPREENDIMENTO..................................................................................... 344
3.3 ALTERNATIVAS TECNOLGICAS .......................................................................................................... 3453.3.1 Quanto s Edificaes..................................................................................................................... 345
3.3.1.1 Sistemas de Controle Ambiental.............................................................................................................3453.3.2 Comparao Entre Os Modais De Transporte Rodovirio E Ferrovirio ......................................... 345
3.3.2.1 Transporte Rodovirio ............................................................................................................................3453.3.2.2 Transporte Ferrovirio ............................................................................................................................3463.3.2.3 Anlise Ambiental das Alternativas do Sistema de Transporte ..............................................................3473.3.2.4 Concluso Quanto ao Sistema de Transporte.........................................................................................347
3.3.3 QUANTO S TECNOLOGIAS DE CONSTRUO................................................................................ 3473.3.3.1 Dormentes de Madeira...........................................................................................................................3483.3.3.2 Dormentes de Ao ..................................................................................................................................3483.3.3.3 Dormentes de Concreto..........................................................................................................................349
3.3.3.3.1 Dormente de Concreto Monobloco Protendido ................................................................................3493.3.3.3.2 Dormente Misto ou Bi-bloco (RS) ......................................................................................................350
3.3.3.4 Anlise Ambiental das Alternativas de Construo ................................................................................3503.3.3.4.1 Dormentes de Madeira:.....................................................................................................................3503.3.3.4.2 Dormentes de Ao: ............................................................................................................................3513.3.3.4.3 Dormente de Concreto: .....................................................................................................................351
3.3.3.5 Concluso quanto a Tecnologia de Construo ......................................................................................3513.3.4 QUANTO AOS MTODOS DE CONTENO DE TALUDES NOS LOCAIS DE SENSIBILIDADE AMBIENTAL
3514. DELIMITAO DAS REAS DE INFLUNCIA DO EMPREENDIMENTO ......................................................353
4.1 REA DIRETAMENTE AFETADA ADA ......................................................................................................... 3534.2 REA DE INFLUNCIA DIRETA AID ............................................................................................................ 353
-
________________________________________________________________________________viii
4.3 REA DE INFLUNCIA INDIRETA AII ........................................................................................................... 363
-
________________________________________________________________________________ix
LISTA DE FIGURASFIGURA 2-1: LOCALIZAO E ACESSOS ESCOPO DA DUPLICAO DA ESTRADA DE FERRO CARAJS .......................................... 41FIGURA 2-2 NCLEOSURBANOS E AGLOMERADOS RURAIS LOCALIZADOS NA REA DE INSERO DA ESTRADA DE FERRO CARAJS -
EFC (FOLHAS 1 A 8)........................................................................................................................................... 45FIGURA 2-3 - TIPOLOGIAS VEGETACIONAIS NA REA DE INSERO DA EFC............................................................................. 53FIGURA 2-4 PRINCIPAIS CURSOS DGUA TRANSPOSTOS PELA EFC E LOCALIZAO DAS PONTES A SEREM DUPLICADAS (FOLHAS 1 A
10) ................................................................................................................................................................. 56FIGURA 2-5: UNIDADES DE CONSERVAO EXISTENTES NA REGIO DE INSERO DA EFC......................................................... 66FIGURA 2-6: TERRAS INDGENAS E OUTRAS COMUNIDADES TRADICIONAIS LOCALIZADAS NA REA DE INSERO DA EFC ................. 68FIGURA 2-7: LOCALIZAO GEOGRFICA DAS REAS DE APOIO S OBRAS DA EFC (FOLHAS 1 A 10)............................................ 70FIGURA 2-8: CROQUIS DOS COMPONENTES DE CADA LOCAO......................................................................................... 111FIGURA 2-9: PTIO DE CRUZAMENTO TPICO VISTO EM PLANTA ........................................................................................ 115FIGURA 2-10: DIAGRAMAUNIFILAR LOCALIZAO DOS PTIOS E INSTALAES FIXAS ........................................................ 118FIGURA 2-11: INTERLIGAO DOS PTIOS DE CRUZAMENTO COM AS DUPLICAES ............................................................... 119FIGURA 2-12: ARRANJO BSICO DOS DESVIOS FERROVIRIOS ........................................................................................... 122FIGURA 2-13: ESQUEMTICO DA LINHA DE SERVIO ....................................................................................................... 122FIGURA 2-14: PERSPECTIVA DA NOVAOFICINA DEMANUTENO DEMQUINAS DE VIA DE AAILNDIA ................................. 128FIGURA 2-15: SEO TRANSVERSAL DA OFICINA DE MQUINAS DE VIAS DE AAILNDIA (PARA ATENDER QUATRO LINHAS
SIMULTANEAMENTE)......................................................................................................................................... 130FIGURA 2-16: PLANTA BAIXA DA OFICINA DE MQUINAS DE VIAS DE AAILNDIA.................................................................. 131FIGURA 2-17: PLANTAS BAIXAS DAS OFICINAS DE MQUINAS DE VIAS DE PARAUAPEBAS E SANTA INS (PARA ATENDER DUAS LINHAS
SIMULTANEAMENTE)......................................................................................................................................... 132FIGURA 2-18: MODELO DAS NOVAS PLATAFORMAS DE MANUTENO................................................................................ 133FIGURA 2-19: DETALHES ARQUITETNICOS DA PLATAFORMA DE MANUTENO DE EQUIPAMENTOS DE FISCALIZAO E MANUTENO
DE VIA............................................................................................................................................................ 134FIGURA 2-20: MODELO DE POSTO DE ABASTECIMENTO A SER IMPLANTADO NO ESCOPO DAS INSTALAES FIXAS ....................... 135FIGURA 2-21: VISTA DO POSTO DEABASTECIMENTO PADRO........................................................................................... 136FIGURA 2-22: CORTE NO PROJETO DO POSTO DE ABASTECIMENTO .................................................................................... 137FIGURA 2-23: PERSPECTIVA DO ABRIGO DE AUTO DE LINHA .............................................................................................. 138FIGURA 2-24: PLANTA BAIXA DO PROJETO DO ABRIGO DE AUTO DE LINHA ........................................................................... 139FIGURA 2-25: PLANTA BAIXA DO ARMAZM DE PEAS DE AAILNDIA................................................................................ 141FIGURA 2-26: PLANTA BAIXA DO ARMAZM DE PEAS DEMARAB.................................................................................... 142FIGURA 2-27: PLANTA BAIXA DO ARMAZM DE INFLAMVEIS............................................................................................ 143FIGURA 2-28: PERSPECTIVA ARQUITETNICA DA SEDE DE MANUTENO DE VP E ELETROELETRNICA DE ROSRIO E CARAJS....... 144FIGURA 2-29: CORTES NO PROJETO DAS SEDES DE MANUTENO DE VP E ELETROELETRNICA................................................ 145FIGURA 2-30: PLANTA BAIXA DA SEDE DE MANUTENO DE VP (LAYOUT REDUZIDO) ............................................................ 146FIGURA 2-31: PERSPECTIVA ARQUITETNICA DA SEDE DE MANUTENO DE VP E ELETROELETRNICA ...................................... 148FIGURA 2-32: PERSPECTIVA DODEPSITO INTERMEDIRIO DE RESDUOS/DIR .................................................................... 148FIGURA 2-33: PLANTA BAIXA TIPO DODEPSITO INTERMEDIRIO DE RESDUOS ................................................................... 149FIGURA 2-34: CORTES NO PROJETO DODEPSITO INTERMEDIRIO DE RESDUOS (ESTRUTURA-TIPO)........................................ 150FIGURA 2-35: PLANTA BAIXA DO PROJETO PADRO DA SEDE DE MAQUINISTAS E OPERAO DE PTIOS E DO CONTROLE DE PTIOS,
EM AAILNDIA E PARAUAPEBAS ........................................................................................................................ 152FIGURA 2-36: PLANTA BAIXA DO NOVO ALOJAMENTO DE ALTO ALEGRE .............................................................................. 155FIGURA 2-37: SEO TPICA DE TERRAPLENAGEM, EM CORTE, DA LINHADUPLICADA. .......................................................... 167
-
________________________________________________________________________________x
FIGURA 2-38: SEO TPICA DE TERRAPLENAGEM, EM ATERRO, DA LINHA DUPLICADA.......................................................... 168FIGURA 2-39: SEO TPICA DA FERROVIA DUPLICADA, LADEADA PELA ESTRADA DE SERVIO ................................................. 169FIGURA 2-40: INFRAESTRUTURA FERROVIRIA ............................................................................................................... 175FIGURA 2-41: VISTA FRONTAL DE UMA PASSAGEM INFERIOR TIPO .................................................................................... 179FIGURA 2-42: VISTA DO EMBOQUE DEMINITNEL ......................................................................................................... 183FIGURA 2-43: VISTA DO EMBOQUE DE TNEL BALA ........................................................................................................ 183FIGURA 2-44: SEO TRANSVERSAL TPICA DE VALETA AMERICANA ................................................................................... 185FIGURA 2-45: POSICIONAMENTO TPICO DE VALETA AMERICANA ....................................................................................... 186FIGURA 2-46: SEO TPICA DE UMA CANALETA RETANGULAR CR SARJETA E VALETA TRAPEZOIDAL EM CONCRETO ................. 186FIGURA 2-47: CORTE DA VALETA TRAPEZOIDAL ............................................................................................................. 187FIGURA 2-48: POSICIONAMENTO TPICO DA VALETA TRAPEZOIDAL..................................................................................... 187FIGURA 2-49: CORTE DA DESCIDA EM DEGRAUS ............................................................................................................. 187FIGURA 2-50: DETALHE TPICO DE CAIXA COLETORA ........................................................................................................ 188FIGURA 2-51: DRENOS SUBTERRNEOS ........................................................................................................................ 188FIGURA 2-52: DRENO CEGO ....................................................................................................................................... 188FIGURA 2-53: ALGUNSMATERIAIS EMPREGADOS NA SUPERESTRUTURA............................................................................. 194FIGURA 2-54: ASSENTAMENTO DE CONTRATRILHOS EM PONTES E VIADUTOS. ..................................................................... 196FIGURA 2-55: EIXO E TOPO DA LINHA FRREA. .............................................................................................................. 197FIGURA 2-56: LOCALIZAO DAS SUBESTAES PREVISTAS AO LONGO DA EFC................................................................... 206FIGURA 2-57: CROQUIS DA PREVISO DE IMPLANTAO DE HOUSES E CASES ENTRE AS SUBESTAES. .................................... 206FIGURA 2-58: DESENHO ESQUEMTICO DE EXECUO DE CORTES TIPO I............................................................................. 209FIGURA 2-59: DESENHO ESQUEMTICO DE EXECUO DE CORTES TIPO II ............................................................................ 210FIGURA 2-60: DESENHO ESQUEMTICO DE EXECUO DE CORTES TIPO III 1 E 2 ETAPAS................................................... 211FIGURA 2-61: DESENHO ESQUEMTICO DE EXECUO DE CORTES TIPO IV - 1 E 2 ETAPAS................................................... 212FIGURA 2-62: DESENHO ESQUEMTICO DE CORTES TIPO V - 1 E 2 ETAPAS........................................................................ 213FIGURA 2-63: DESENHO ESQUEMTICO DE EXECUO DE ATERRO TIPO I............................................................................. 215FIGURA 2-64: DESENHO ESQUEMTICO DE EXECUO DE ATERROS TIPO II .......................................................................... 216FIGURA 2-65: DESENHO ESQUEMTICO DE EXECUO DE ATERRO TIPO III........................................................................... 217FIGURA 2-66: CROQUIS DA SEO TRANSVERSAL TPICA DOS ATERROS DAS ADMES ............................................................. 218FIGURA 2-67: RECUPERAO AMBIENTAL DOS ATERROS DE ADMES ................................................................................. 218FIGURA 2-68: ETAPAS EXECUTIVAS DE BUEIROS CELULARES ............................................................................................. 220FIGURA 2-69: DESENHO ESQUEMTICO DE BUEIRO TUBULAR............................................................................................ 221FIGURA 2-70: ETAPAS DE EXECUO DA ESTACA ESCAVADA.............................................................................................. 225FIGURA 2-71: ETAPAS DE EXECUO DA ESTACA-RAIZ. .................................................................................................... 225FIGURA 2-72: BATE ESTACAS TIPO QUEDA LIVRE. ........................................................................................................... 226FIGURA 2-73 IAMENTO E CRAVAO DE ESTACA .......................................................................................................... 226FIGURA 2-74: ETAPAS DO PROCESSO DE CRAVAO DE ESTACAS EM RIOS E IGARAPS: POSICIONAMENTO E CRAVAO DA ESTACA,
POSICIONAMENTO E CRAVAO DA CAMISA E PREENCHIMENTO DA CAMISA METLICA. .................................................. 228FIGURA 2-75: BATE ESTACA SOBRE PLATAFORMA AMPARADA EM ATERRO DE CONQUISTA ...................................................... 229FIGURA 2-76: RETIRADA DO ATERRO DE CONQUISTA....................................................................................................... 229FIGURA 2-77: LOCAO TOPOGRFICA DOS BORDOS DO BLOCO E COTAS DE ARRASAMENTO DE ESTACAS................................... 230FIGURA 2-78: MONTAGEM DE ARMADURA DE BLOCOS DE COROAMENTO DE FUNDAES EM ESTACAS..................................... 230FIGURA 2-79: FASE I DE CONSTRUO DE CORTINAS ATIRANTADAS .................................................................................... 231FIGURA 2-80: FASE II DE CONSTRUO DE CORTINAS ATIRANTADAS ................................................................................... 232FIGURA 2-81: FASE III DE CONSTRUO DE CORTINAS ATIRANTADAS .................................................................................. 232
-
________________________________________________________________________________xi
FIGURA 2-82: CROQUI DE SITUAO DOS CANTEIROS AVANADOS..................................................................................... 236FIGURA 2-83: LOCALIZAO DAS ADMES FORA DA FAIXA DE DOMNIO .............................................................................. 240FIGURA 2-84: FLUXO DE RESDUOS NA IMPLANTAO ..................................................................................................... 255FIGURA 2-85: FROTA PARAMANUTENOMECANIZADA DA VIA ...................................................................................... 281FIGURA 2-86: LAYOUT DOS DIRS A SEREM INSTALADOS PARA OTIMIZAR AS ESTRUTURAS DE GESTO DE RESDUOS NA EFC........... 291FIGURA 2-87: LAYOUT DASMINI CENTRAIS DEMATERIAIS DESCARTADOS (MINI-CMD) COM 40M2. ..................................... 292FIGURA 2-88: LAYOUT DA CENTRAL DEMATERIAIS DESCARTADOS (CMD) COM 600M2, DEMARAB E AAILNDIA ................. 293FIGURA 2-89: PERFIL DE ELEVAO DO TERRENO NO PTIO DA LOCAO 10. ...................................................................... 296FIGURA 2-90: REA DA ETE COMPACTA EM CONCRETO ARMADO (MODELO CONVENCIONAL) DE AAILNDIA. .......................... 300FIGURA 2-91: ETE DE AAILNDIA REATORES BIOLGICOS, LEITOS DE SECAGEM, CASA DE QUMICA E ADMINISTRAO............. 301FIGURA 2-92: PROJETO TIPO DA ETE COMPACTA A SER INSTALADA.................................................................................... 306FIGURA 2-93: FLUXOGRAMA DO PROCESSO DE TRATAMENTO DE ESGOTOS NA ETE.............................................................. 308FIGURA 2-94: FLUXO BSICO DE TRATAMENTO DE EFLUENTES NOS TANQUES SPTICOS .......................................................... 309FIGURA 2-95: PROJETO TIPO DO SISTEMA SPTICO E FILTRO ANAERBICO A SER UTILIZADO..................................................... 310FIGURA 2-96: HISTOGRAMA DEMO DEOBRA DA IMPLANTAO .................................................................................... 316FIGURA 3-1: DEMONSTRAO DE ALTERNATIVA DE DUPLICAO DA EFC DIREITA OU ESQUERDA DA LINHA TRONCO. ................ 319FIGURA 3-2 LINHA DE TRANSMISSO E COMUNIDADE LINDEIRA ESQUERDA DA EFC ......................................................... 329FIGURA 3-3 DETALHES DA PONTE DA LOCAO 14....................................................................................................... 332FIGURA 3-4 SENSIBILIDADE MORFODINMICA DA LOCAO 43. A REA EM DESTAQUE REPRESENTA A PLANCIE DE INUNDAO. 336FIGURA 3-5 SENSIBILIDADE MORFODINMICA DA LOCAO 44 . A REA EM DESTAQUE REPRESENTA A PLANCIE DE INUNDAO. 337FIGURA 3-6 SENSIBILIDADE MORFODINMICA DA LOCAO 46. AS REA REPRESENTA A REA DE INUNDAO DO RIO TOCANTINS
.................................................................................................................................................................... 338FIGURA 3-7 ENROCAMENTO PROPOSTO PARA GARANTIR MAIOR SEGURANA AO ATERRO E MENOR CARREAMENTO DE SEDIMENTOS
PARA O RIO. A LINHA VERMELHA REPRESENTA A METODOLOGIA TRADICIONAL, OU SEJA LANAMENTOS DE ATERRO SOMENTECOM SOLO ...................................................................................................................................................... 352
FIGURA 4-1: REAS DE INFLUNCIA DO MEIO FSICO E BITICO.......................................................................................... 355FIGURA 4-2: REAS DE INFLUNCIA DO MEIO SOCIOECONMICO....................................................................................... 356FIGURA 4-3: REAS DE INFLUNCIADIRETA DO MEIO SOCIOECONMICO FAIXA DE 500METROS .......................................... 357FIGURA 4-4: REAS DE INFLUNCIADIRETA DO MEIO SOCIOECONMICO BAIRROS INTERCEPTADOS, PEQUI/AAILNDIA-MA..358FIGURA 4-5: REAS DE INFLUNCIADIRETA DO MEIO SOCIOECONMICO - BAIRROS INTERCEPTADOS, MARAB-PA .................... 359FIGURA 4-6: REAS DE INFLUNCIADIRETA DO MEIO SOCIOECONMICO MUNICPIO DE PEQUENO PORTE, IGARAP DOMEIO-MA
.................................................................................................................................................................... 360FIGURA 4-7: REAS DE INFLUNCIADIRETA DO MEIO SOCIOECONMICO RODOVIA COMO BARREIRA FSICA, SANTA RITA-MA.... 361FIGURA 4-8: REAS DE INFLUNCIADIRETA DO MEIO SOCIOECONMICO COMUNIDADEQUILOMBOLA, PEDRINHAS/ANAJATUBA-
MA............................................................................................................................................................... 362
-
________________________________________________________________________________xii
LISTA DE TABELASTABELA 2-1: PRODUTOS TRANSPORTADOS PELA ESTRADA DE FERRO CARAJS ....................................................................... 27TABELA 2-2: PTIOS DE CRUZAMENTO EXISTENTES LICENCIADOS......................................................................................... 28TABELA 2-3:MUNICPIOS INTERCEPTADOS PELA EFC NOS ESTADOS DOMARANHO E DO PAR ............................................... 32TABELA 2-4: RAMAIS FERROVIRIOS INTERLIGADOS EFC ................................................................................................. 32TABELA 2-5:MASSA SALARIAL GERADA .......................................................................................................................... 38TABELA 2-6: GERAO DE IMPOSTOS ESTIMADA PARA A DUPLICAO DA FERROVIA ................................................................ 39TABELA 2-7: PRINCIPAIS CURSOS DGUA TRANSPOSTOS E LOCALIZAO DAS PONTES A SEREM DUPLICADAS ................................ 54TABELA 2-8: LEGISLAO APLICVEL AO EMPREENDIMENTO ............................................................................................... 91TABELA 2-9: SITUAO DOSMUNICPIOS DA REA DE INFLUNCIA FRENTE AO ESTATUTO DAS CIDADES.................................... 107TABELA 2-10: TRECHOS DE LINHA A SEREM DUPLICADOS E PTIOS A SEREM REMODELADOS .................................................... 111TABELA 2-11: DESVIOS FERROVIRIOS PREVISTOS.......................................................................................................... 120TABELA 2-12: LOCALIZAO E ESTRUTURAS QUE INTEGRAM AS INSTALAES FIXAS.............................................................. 123TABELA 2-13: TEMPOS DE CONCENTRAO E DE RECORRNCIA DE REFERNCIA PARA O PROJETO DE DUPLICAO. ...................... 160TABELA 2-14: RESUMO DOS VOLUMES DE TERRAPLENAGEM ............................................................................................ 173TABELA 2-15: VIADUTOS FERROVIRIOS A SEREM DUPLICADOS ......................................................................................... 176TABELA 2-16: VIADUTOS RODOVIRIOS A SEREM IMPLANTADOS EM SUBSTITUIO A PNS. .................................................... 176TABELA 2-17: PASSAGENS INFERIORES A SEREM AMPLIADAS/IMPLANTADAS PARA AS DUPLICAES........................................ 179TABELA 2-18: PASSAGENS INFERIORES A SEREM AMPLIADAS PARA AS REMODELAES.......................................................... 182TABELA 2-19: PASSAGENS INFERIORES A SEREM AMPLIADAS PARA OSDESVIOS FERROVIRIOS................................................ 182TABELA 2-20: QUANTITATIVO DE TNEIS BALA EMINITNEIS A SEREM IMPLANTADOS PARA A DUPLICAO ............................. 184TABELA 2-21: OBRAS DE CONTENO PREVISTAS PARA A DUPLICAO .............................................................................. 189TABELA 2-22: MUROS DE VEDAO EM BLOCOS DE CONCRETO........................................................................................ 192TABELA 2-23: DIMENSES E PESO DO TRILHO DO TIPO TR-68 ......................................................................................... 196TABELA 2-24: RELAO DE EQUIPAMENTOS A SEREMUTILIZADOS NA IMPLANTAO DO EMPREENDIMENTO ............................ 233TABELA 2-25: ESTRADAS DE SERVIO EXISTENTES E PROJETADAS AO LONGO DA EFC ............................................................ 242TABELA 2-26: IDENTIFICAO DO TIPO DE RESDUO GERADO E RESPECTIVAS FONTES DE GERAO............................................ 245TABELA 2-27: QUANTITATIVO DE RESDUOS SLIDOS (KG/MS) DIR CANTEIROS AVANADOS............................................. 246TABELA 2-28: QUANTITATIVO DE RESDUOS DE DEMOLIO ............................................................................................ 250TABELA 2-29: MOVIMENTAO DE COMPOSIES POR DIA PERODO 2012 A 2016.......................................................... 263TABELA 2-30: LOCALIZAO DAS CENTRAIS DE ARMAZENAMENTO DE RESDUOS NA EFC....................................................... 290TABELA 2-31: LOCALIZAO DO PONTO DE DISPERSO DE EFLUENTES NO SOLO E POOS DE MONITORAMENTO. DATUMWGS 84
F23 ............................................................................................................................................................. 297TABELA 2-32: ETES COMPACTAS A SEREM INSTALADAS, PONTOS DE LANAMENTOS E INCREMENTO DE EFETIVO ........................ 304TABELA 2-33: SEPARADORES DE GUA ELEO NASUNIDADESOPERACIONAIS DA EFC ......................................................... 311TABELA 3-1: ANLISE DE SENSIBILIDADE MORFODINMICA DO LADO ESQUERDO OU DIREITO DA EFC........................................ 321TABELA 3-2: TABELA DE CRITRIOS PARA AVALIAO DE ALTERNATIVAS LOCACIONAIS E AVALIAO DE SUA RELEVNCIA PARA A
ALTERNATIVA LOCACIONAL ................................................................................................................................. 322TABELA 3-3 - REA, EM HECTARES, DA VEGETAO PRESENTE NA REA DO EMPREENDIMENTO, CONFORME LOCALIZAO E ESTADO DE
CONSERVAO E AVALIAO CONFORME PESO ....................................................................................................... 323TABELA 3-4 NMERO E REA DE APPS NA REA DO EMPREENDIMENTO CONFORME LOCALIZAO ND: N DE APP DIREITA; NE:
N APP ESQUERDA; AE: REA DE APPS, EM HECTARE, ESQUERDA; AD: REA DE APPS, EM HECTARE, DIREITA ....... 324TABELA 3-5-MATRIZ COMPARATIVA DAS INTERFERNCIAS AMBIENTAIS POR ALTERNATIVA LOCACIONAL E DEFINIO DE LADO MAIS
FAVORVEL POR CRITRIO .................................................................................................................................. 327
-
________________________________________________________________________________xiii
TABELA 3-6 - MATRIZ COMPARATIVA DAS INTERFERNCIAS AMBIENTAIS NA LOCAO 1 E DEFINIO DE LADO MAIS FAVORVEL PORCRITRIO ........................................................................................................................................................ 329
TABELA 3-7 - MATRIZ COMPARATIVA DAS INTERFERNCIAS AMBIENTAIS NA LOCAO 9 E DEFINIO DE LADO MAIS FAVORVEL PORCRITRIO ........................................................................................................................................................ 330
TABELA 3-8 - MATRIZ COMPARATIVA DAS INTERFERNCIAS AMBIENTAIS NA LOCAO 14 E DEFINIO DE LADO MAIS FAVORVEL PORCRITRIO ........................................................................................................................................................ 333
TABELA 3-9 - MATRIZ COMPARATIVA DAS INTERFERNCIAS AMBIENTAIS NA LOCAO 33 E DEFINIO DE LADO MAIS FAVORVEL PORCRITRIO ........................................................................................................................................................ 333
TABELA 3-10 -MATRIZ COMPARATIVA DAS INTERFERNCIAS AMBIENTAIS NA LOCAES43 (KM 651+950 A 666+539 A)........... 339TABELA 3-11 -MATRIZ COMPARATIVA DAS INTERFERNCIAS AMBIENTAIS NAS LOCAES 44 (KM 670+880 A 681+989) .......... 340TABELA 3-12 -MATRIZ COMPARATIVA DAS INTERFERNCIAS AMBIENTAIS NAS LOCAES 46 (KM 709+342 A 717+879) ........... 341TABELA 3-13 -MATRIZ COMPARATIVA DAS INTERFERNCIAS AMBIENTAIS NAS LOCAES 47 (KM 717+ 879 A 735+177 ).......... 342TABELA 3-14 ALTERNATIVA LOCACIONAL MAIS ADEQUADA ............................................................................................ 344
-
________________________________________________________________________________xiv
LISTA DE ANEXOSAnexo 2-1 Certides Municipais de uso do soloAnexo 2-2 reas AdquiridasAnexo 2-3 Estruturas existentes a serem desmobilizadas na faixa de domnio FDAnexo 2-4 Volumes de cortes e aterrosAnexo 2-5 Bueiros a serem implantados ou prolongadosAnexo 2-6 Dispositivos de drenagem previstosAnexo 2-7 Materiais e quantitativosAnexo 2-8 Canteiros principais e avanadosAnexo 2-9 Empresas homologadas para destinao de resduos classe IAnexo 2-10 Empresas homologadas para destinao de resduos classe IIAnexo 2-11 Cronograma fsico das atividades de implantao
LISTA DE APNDICESApndice I Documentao da Equipe Tcnica (CTF e ART)Apndice II Planta do Projeto Geomtrico sobre Imagem de SatliteApndice III Sees Transversais do Projeto GeomtricoApndice IV Plantas e Perfis Longitudinais do Projeto Geomtrico
-
________________________________________________________________________________15
1. INDENTIFICAO DO EMPREENDEDOR E EMPRESACONSULTORA
1.1 IDENTIFICAO DO EMPREENDEDOR
DADOS DO EMPREENDEDORNome da empresa: VALE S.A.CNPJ: 33.592.510/0426-63Endereo: Ptio de Cruzamento de Marab, Km 738, Estrada de Ferro Carajs,S/NRepresentante legal: Srgio Francisco Aranha de LimaCPF: 198.531.223-91Endereo: Av. dos Holandeses, Lote 01, Qd 05, Ed. Venetto, N 01, Ponta doFarol, So Lus Maranho, CEP: 65.075-650Funo: Diretor de Departamento Projetos Logstica ALPAContato: [email protected]: (98) 3194-3897CTF: O CTF do responsvel pela empresa contratante encontra-se noApndice I deste documento.
1.2 IDENTIFICAO DA EMPRESA CONSULTORA
DADOS DA EMPRESA CONSULTORANome da empresa: AMPLO ENGENHARIA E GESTO DE PROJETOS LTDArea de atuao: Consultoria especializada em engenharia e cincias da terra e do meio-ambiente.Endereo: Av. Professor Slvio de Vasconcelos, n105, Bairro So Bento, BeloHorizonte, MG.Telefone: (31) 2526-4186Contatos: Luiz Cludio Ribeiro Rodrigues Coordenador Geral do RA([email protected])CNPJ: 04.590.934/0001-81Inscrio Municipal: 167.675/001-8 (Prefeitura Municipal de Belo Horizonte)Inscrio Estadual: IsentoRegistro no IBAMA: 1.444.133CTF O CTF da AMPLO ENGENHARIA E GESTO DE PROJETOS encontra-se no Apndice I deste documento.RepresentanteLegal/Pessoa deContato:
Luiz Cludio Ribeiro Rodrigues
CPF: 550.500.006-10Registro no IBAMA: 2.318.262
-
________________________________________________________________________________16
1.3 DADOS DA EQUIPE TCNICA MULTIDISCIPLINAR
1.3.1 EQUIPE AMPLO - ELABORAO DO ESTUDO AMBIENTAL E PLANO BSICO AMBIENTAL - EA/PBA
Profissional rea profissional Funo Conselho de Classe CTF IBAMA
COORDENAO GERAL
Luiz Cludio Ribeiro Rodrigues
Engenheiro Gelogo e de Minas
Coordenador Geral CREA MG 50059/D 2318262
COORDENAO TEMTICA
Doroto merson Storck de Oliveira
Gegrafo Meio Socioeconmico CREA DF 10748/D 4351022
Luiz Cludio Ribeiro Rodrigues
Engenheiro Gelogo e de Minas
Meio Fsico CREA MG 50059/D 2318262
Rubem Augusto da Paixo Dornas
Bilogo Meio Bitico CRBio 70304/04 - D 2922966
CARACTERIZAO DO EMPREENDIMENTO
Allaoua Saadi Gegrafo Caracterizao do Empreendimento
_ 2814237
Jackson Cleiton Ferreira Campos
Gegrafo CE/Anlise Integrada CREA MG 56633/D 248955
Regina Clia Vallejo Mendes
Engenheiro Civil
Coordenadora/Reviso e Adequao da Caracterizao do Empreendimento e Passivos Ambientais
CREA RJ 29600/D 238649
MEIO FSICO
Luiz Cludio Ribeiro Rodrigues
Engenheiro Gelogo e de Minas
Geologia/Hidrogeologia/Cavidades/Process
os erosivos CREA MG 50059/D 2318262
Alessandra Rabelo Porto
Engenheira Civil Hidrologia CREA MG 107498/LP
5371110
Alysson Alvim de Lima
Gegrafo Clima/Reviso de
relatrios CREA MG 91015/D 4868092
Daniel Romeiro Silva Geografo Geoprocessamento _ 4897911
Fernando Alves Lima Engenheiro Civil Hidrologia CREA MG 86129/D 5373102
Joo Alves da Silva Filho
Gegrafo Geoprocessamento CREA MG
0000133103LP 1932888
Marcio Figueiredo de Resende
Engenheiro Civil Hidrologia CREA MG 59443/D 1631315
Marco Antnio de Mendona Vecci
Engenheiro Mecnico Rudo e Vibrao _ 2637990
Mario Cicareli Pinheiro
Engenheiro Civil Hidrologia CREA RJ 38958/D 349086
-
________________________________________________________________________________17
Profissional rea profissional Funo Conselho de Classe CTF IBAMA
Paulo Guerino Garcia Rossi
Gegrafo Geomorfologia/Proces
sos Erosivos /Cavidades
CREA MG 122856/D
4899935
Rafaela Ferraz Marchi
Arquiteta Rudo e Vibrao CREA MG 97257/D 3632433
Rafael Resende de Oliveira
Engenheiro Agrnomo Geoprocessamento CREA MG 136686/D
5250532
Renata Fraga Nogueira
Tcnica Geoprocessamento _ 5372890
Roberto Franco Jnior
Tcnico Processos
Erosivos/solos _ 3617915
Rodrigo Kasbergen Silva
Engenheiro Mecnico Qualidade do ar CREA MG 80559/D 1615653
Stella Silva da Fonseca
Engenheira Ambiental Qualidade do ar, Rudo e Vibrao
CREA MG 100949 4897575
Thiago Vieira da Silva Matos
Gegrafo Geoprocessamento _ 5375881
MEIO BITICO
Tiago Teixera Dornas Bilogo Reviso de Relatrio CRBio 37581/04 - D 1537547
Laura Romano Fabrini
Biloga Logstica de
campo/Relatrio CRBio 49634/04 - D 3542089
Rafaela Cordeiro Biloga Logstica de
campo/Tabulao de dados
CRBio 62968-04/D 4339627
EQUIPE MASTOFAUNA - Pequenos mamferos - P
Ana Cristina Mendes de Oliveira
Biloga Coordenadora /Elaborao de
relatrio CRBio 13695/04 - D 1226034
Airton Jos de Moura Junior
Bilogo Levantamento de
campo - P CRBio 44708/04 - D 2134869
Braz Lino A. Alves da Silva
Bilogo Levantamento de
campo - P CRBio 67868/05 - D 4330579
Eduardo de Rodrigues Coelho
Bilogo Levantamento de
campo - P CRBio 49521/04 - D 1565495
Helbert Antnio Botelho
Bilogo Levantamento de
campo - P CRBio 57747/04 - D 2242017
Juliana Macaron Longo Biloga
Levantamento de campo -P CRBio 70722/04 - D 4871520
Raphael Hiplito dos Santos Bilogo
Levantamento de campo - P CRBio 70120/04 - D 2917602
Tamara Almeida Flores
Biloga Levantamento de
campo - P CRBio 73090/06 - D 1838684
Weslei Lopes Bilogo Levantamento de
campo - P CRBio 44091/04 - D 2140760
-
________________________________________________________________________________18
Profissional rea profissional Funo Conselho de Classe CTF IBAMA
EQUIPE MASTOFAUNA - Mdios e grandes mamferos - M/G
Maria Ceclia C.Silva Ferreira
Biloga Coordenadora/Elaborao de relatrio
CRBio 62193/04 - D 4203870
Adrian Paul Ashton Barnett
Tcnico Levantamento de campo - M/G
_ 5240227
Bernardo de Faria Leopoldo
Bilogo Levantamento de campo - M/G
CRBio 76667/04 - P 2067977
Eduardo de Rodrigues Coelho Bilogo
Levantamento de campo - M/G CRBio 49521/04 - D 1565495
Joo Marcos Silla Bilogo Levantamento de campo - M/G CRBio 66361/07 - D 3904318
Joo Paulo Gravina Bilogo Levantamento de campo - M/G
CRBio 70965/04 - D
3901822
Maria Beatriz A. Carvalho
Biloga Levantamento de campo - M/G
CRBio 62530/04 - D 3765173
Rafael Brando Crepaldi
Tcnico Levantamento de campo - M/G
- 5223609
Victor Sbato Rocha Bilogo Levantamento de campo - M/G
CRBio 70029/04 - D 4264894
EQUIPE AVIFAUNA
Gustavo Henrique P.Pedersoli
Bilogo Coordenador/Elaborao de relatrio
CRBio 57253/04 - D 2033091
Albano Schultz Neto Bilogo Levantamentos de
Campo CRBio 11504/05 - D 324551
Elinete Batista Rodrigues
Biloga Levantamentos de
Campo CRBio 27997/05 - D 290158
Estevo Luis Pereira Lima
Bilogo Levantamentos de
Campo CRBio 44710/04 - D 975510
Gabriel Augusto Leite Bilogo Levantamentos de
Campo CRBio 61034/04 - D 1498520
Kurazo Mateus Okada Aguiar
Bilogo Levantamentos de
Campo CRBio 52781/06 - D 2099780
Leonardo Gabriel Campos de Oliveira Torres
Bilogo Levantamentos de Campo/Elaborao
de relatrio CRBio 37422/04 - D 1671710
Marcelo Henrique Mello Barreiros
Bilogo Levantamentos de
Campo CRBio 68456/01 - D 3764432
Thiago Moura dos Santos
Bilogo Levantamentos de
Campo CRBio 82262/01 - D 2255918
HERPETOFAUNA
Adriano Lima Silveira Bilogo Coordenador/Elaborao de relatrio
CRBio 44894/04 - D 1034566
Barnagleison Silva Lisboa
Bilogo Levantamentos de
Campo CRBio 77891/05 - P 2598710
-
________________________________________________________________________________19
Profissional rea profissional Funo Conselho de Classe CTF IBAMA
Caio Antnio Figueiredo de Andrade
Bilogo Levantamentos de
Campo CRBio 78442/02 - D 3729337
Emanuelle de Oliveira Lack
Biloga Levantamentos de
Campo CRBio 78639/02 - D 2962494
Leandra de Paula C. Pinheiro
Biloga Levantamentos de
Campo CRBio 52825/06 - D 1226430
Marcelo Gomes dos Santos
Bilogo Levantamentos de
Campo CRBio 65835/02 - D 4004953
Marcus Thadeu T. Santos
Bilogo Levantamentos de
Campo CRBio 76659/04 - P 2694800
Pablo Suares Tcnico Levantamentos de
Campo - 1036382
Pedro Santos Abe Bilogo Levantamentos de
Campo CRBio 52841/06 - D 1226126
Raphael Jonas Correa de Oliveira
Bilogo Levantamentos de
Campo CRBio 78970/02 - P 5284124
Thamires Bancio Alves dos Santos
Biloga Levantamentos de
Campo CRBio 84022/02 - P 5139500
Youszef Oliveira da C.Bitar
Bilogo Levantamentos de
Campo CRBio 52817/06 - D 1226388
EQUIPE BIOTA AQUTICA
Mara Oliveira Campos
Biloga Coordenadora/Elabor
ao de relatrio/Perifiton
CRBio 57927/04 - D 4996897
Akemi Aoki Biloga Levantamentos de Campo/Zooplncton
CRBio 76650/04 - D 5229844
Alice de Souza Guimares
Biloga Levantamentos de Campo/Zooplncton
CRBio 70384/04 - D 4966418
Aline Dias Paz Biloga Levantamentos de Campo/Zoobentos
CRBio 76193/04 - D 5238559
Diego Martins Serelli Bilogo Levantamentos de Campo/Zoobentos
CRBio 80370/04 - D 5240173
Gabriela Lage Melo Biloga Levantamentos de Campo/Fitoplncton
CRBio 80304/04 - D 5238500
Guilherme H.S.P. C. Barbosa
Bilogo Levantamentos de Campo/Zoobentos
CRBio 49472/04 - D 3507289
Luciana Pena Mello Brando
Biloga Levantamentos de Campo/Zooplncton
CRBio 70229/04 - D 5132374
Marianne Antunes Rodrigues
Biloga Levantamentos de Campo/Zoobentos
CRBio 57786/04 - D 4198494
Rose Lilian de Miranda
Biloga Levantamentos de Campo/Perifiton - Fitoplncton
CRBio 37733/04 - D 5238671
ICTIOFAUNA
Valria de Albuquerque Oliveira
Biloga Coordenadora/Elaborao de relatrio
CRBio 52966/06 - D 1936100
-
________________________________________________________________________________20
Profissional rea profissional Funo Conselho de Classe CTF IBAMA
Adna Almeida de Albuquerque
Engenheira Agrnoma Levantamentos de
Campo CREA PA
1509774238 1916070
Anderson Ferreira Bilogo Levantamentos de
Campo CRBio 64655/01 - D 3688642
Barbara Heck Schallenberger
Oceangrafa Levantamentos de
Campo Aoceano 1960 3191637
Cristophe Henrique Azevedo da Costa
Bilogo Levantamentos de
Campo CRBio 73496/06 - D 5238888
Guilherme Moreira Dutra
Bilogo Laboratrio CRBio 73198/06 - D 4917086
Leiliane Souza da Silva
Biloga Levantamentos de
Campo CRBio 73403/06 - D 4984601
Luciano Fogaa de Assis Montag
Bilogo Elaborao de relatrio
CRBio 52339/06 - D 1036741
Thiago Agusto Pedroso Barbosa
Bilogo Levantamentos de
Campo CRBio 73399/06 - D 2418094
Tiago Magalhes Freitas
Bilogo Levantamentos de
Campo CRBio 52940/06 - D 2078579
Vitor Hudson da Consolao Almeida
Bilogo Levantamentos de
Campo CRBio 73347/06 - D 2868317
EQUIPE FAUNA ATROPELADA
Rubem Augusto da Paixo Dornas
Bilogo Coordenador/Elaborao de relatrio
CRBio 70304/04 - D 2922966
Adna Albuquerque Engenheira Agrnoma Levantamentos de
Campo CREA PA
1509774238 1916070
Cristina Azevedo Gomes
Biloga Levantamentos de
Campo CRBio 62717/04 - D 5083321
Emanuelle Lack Biloga Levantamentos de
Campo CRBio 78639/02 - D 2962494
Glauco Furtado Dias Bilogo Levantamentos de
Campo CRBio 70524/04 - D 5240679
Juliana Aragon Pinto Biloga Levantamentos de
Campo CRBio 42337/02 - D 5223851
Marcus Thadeu T. Santos
Bilogo Levantamentos de
Campo CRBio 76659/04 - P 2694800
Priscila Reis Kahwage
Mdica Veterinria Levantamentos de
Campo CRMV 1740/PA 5209662
Rafael Brando Crepaldi
Tcnico Levantamentos de
Campo _ 5223609
Roberta Christiane O. Andrade
Biloga Levantamentos de
Campo CRBio 70946/04 - D 3278023
Roberta Elise Silva Biloga Levantamentos de
Campo CRBio 73499/06-D 1905352
Vitor Hudson da Consolao Almeida
Bilogo Levantamentos de
Campo CRBio 73347/06 - D 2868317
Wanderlei Rodrigo D.Maciel
Bilogo Levantamentos de
Campo CRBio 037282/04 -
D 617616
-
________________________________________________________________________________21
Profissional rea profissional Funo Conselho de Classe CTF IBAMA
FLORA
Samir Gonalves Rolim
Engenheiro Agrnomo Coordenador/Elaborao de relatrio
CREA SP 501180/D 1513442
Felipe Maerschner A. Peixoto
Bilogo Coordenador de
campo/Elaborao de relatrio
CRBio 64125/01 - D 2279762
Izabela Fonseca Braga
Biloga Levantamentos de
Campo CRBio 51457/04 - D 5223903
Jos Ataliba Mantelli Aboin Gomes
Bilogo Levantamentos de
Campo CRBio 72507/01 - D 4981917
Rafaela Silva de Oliveira
Engenheira Florestal Levantamentos de
Campo CREA 2008144792 3994855
Renato da Silva Nunes
Engenheiro Florestal Levantamentos de
Campo CREA 2010130913 4028782
MEIO SOCIOECONMICO
Doroto merson Storck de Oliveira
Gegrafo Coordenador/Elaborao de relatrio
CREA DF 10748/D 4351022
Leoneci Ermelinda Silva Storck de Oliveira
Gegrafa Coordenao de
Campo _
4930350
Alfredo Costa Gegrafo Levantamento de
Dados _ 4899879
Bruno Oliveira Rocha Gegrafo Levantamento de
Dados/Elaborao de Relatrio
CREA MG 128691/D
5341347
Cladio Marcio Letro de Castro
Cientista Social Elaborao de Relatrio
_ 5364404
Clverson Storck Gonalves
Bilogo Levantamento de
dados CRBio 076369/04-
D 5168296
Daniela de Ftima Ferraro Nunes
Antroploga Elaborao de Relatrio
_ 2655551
Elisete Cristina de Souza Ribeiro Rodrigues
Tcnica Levantamento de
dados _
5369856
Erika Storck Cezrio Odontloga Elaborao de Relatrio
_ 5365153
Fabiana Lusa Muniz Silveira
Historiadora Elaborao de Relatrio
_ 5365066
Francisco Frade Barcelos Neto
Gegrafo
Levantamento de Dados - localidades rurais/Tcnico Especializado
Geoprocessamento
CREA MG 133287/D
4922236
Glauco Jos de Matos Umbelino
Gegrafo Elaborao de Relatrio
_ 1965615
Jos Henrique Porto Silveira
Psicologia Elaborao de Relatrios
MEC 0629/AFP-2 617691
-
________________________________________________________________________________22
Profissional rea profissional Funo Conselho de Classe CTF IBAMA
Kely Cristina Moreira Gegrafa Levantamento de
Dados/Elaborao de Relatrio
_ 5335356
Lus Felipe Ferreira Faguntes dos Santos
Bilogo Levantamento de
Dados CRBio 076231/04 -
D 5152865
Manuela Muzzi de Abreu
Turismologa Levantamento de
Dados
_ 5169394
Maria da Consolao Fernandes
Psicloga Levantamento de
Dados/Elaborao de Relatrio
CRP - 04/27548 3071118
Maria de Lourdes Figueiredo
Gegrafa Levantamento de
Dados _ 5370103
Maria Stella de Castro Nunes
Engenheira Ambiental Levantamento de
Dados _ 263550
Matheus de Oliveira Nativo
Engenheiro Agrnomo Levantamento de
Dados CREA MG 137264LP 5369702
Matheus Henrique Fernandes Valle
Tcnico Elaborao de Relatrios
_ 5334629
Moacir Mello Salles Gegrafo
Levantamento de Dados/Tcnico Especializado
Geoprocessamento
CREA MG 110290/D
2877338
Morgan Csar de Almeida
Gegrafo Levantamento de
Dados/Elaborao de Relatrio
_ 5222356
Nikolas Abreu Borges Trevizani
Geografo Levantamento de Dados /Elaborao
de Relatrio _ 5213141
Plnio Storck Gonalves
Engenheiro Sanitarista e Ambiental
Levantamento de Dados
CREA MG 115119/D
4930931
Rejane Balmant Letro
Gegrafa Elaborao de Relatrio
_ 5364460
Roberth Rodrigues e Silva
Engenheiro Sanitarista e Ambiental
Levantamentos de Dados
CREA MG 113832 5168211
Thiago Antnio Fernandes Camilo
Gegrafo
Levantamento de Dados/Tcnico Especializado
Geoprocessamento
CREA MG 142699/D
5334667
Jos Marconi Barros da Nbrega Administrador Reviso do relatrio CRA MA 1437 5287454
Jos Marinho Mendes da Silva Jnior
Engenheiro Ambiental Reviso do relatrio CREA PA 14912/D 4449589
APOIO ADMINISTRATIVO/LOGSTICA
Christiane Marques Caldeira
Arquiteta Formatao e Editorao
CREA MG 94015/D 4898101
-
________________________________________________________________________________23
Profissional rea profissional Funo Conselho de Classe CTF IBAMA
Izabella Moretto Nvel Tcnico Apoio Administrativo _ _
Jorge Neto Nvel Tcnico Geoprocessamento _ _
Jussara Sampaio Rodrigues
Nvel Tcnico Formatao e E