SASP SD BOM

download SASP SD BOM

of 13

Transcript of SASP SD BOM

  • 7/30/2019 SASP SD BOM

    1/13

    Variant Configuration for a BOM

    By Bageerath Cheryala

    A material CYCLE is created as a configurable material with Gen. Item category group as 0004 andItem category group as ERLA. Also material CYCLE is a BOM material, which has sub items.

    Go to Transaction code: MM01. Do the following:

    1. Basic Data 2 Screen: Set Material is Configurable Indicator2. To determine item category TAC in sales order, maintain a suitable item category group such

    as 0002

    3. MRP 2 View: Procurement type E: In house Production4. MRP 3 View: Strategy Group. 25: Make-to-order for configurable used for demo5. MRP3 View: Availability Check 02: Individual Requirement6. Classification view: Attach the variant class

    Go to tab classification and select the class type Variants-300 as shown below.

  • 7/30/2019 SASP SD BOM

    2/13

    Assign the class CYCLECLASS in the assignments area.

    The class CYCLECLASS is created with the class type 300 (Variants) for the material cycle.

    Transaction Code: CL01.

  • 7/30/2019 SASP SD BOM

    3/13

    Now maintain the characteristics as shown below in the screen shot.

    1) CYCLETYRES 2) SYSTEM

    3) CYCLEMODEL 4) CYCLEPRIZE

    Now the characteristic CYCLETYRES was created with character format.

    Transaction Code: CT04.

  • 7/30/2019 SASP SD BOM

    4/13

    Go to the values tab and maintain the characteristic values and description as per the requirement.

    Now the characteristic SYSTEM was created with character format.

    Now Go to Transaction Code: CT04.

  • 7/30/2019 SASP SD BOM

    5/13

    Go to the values tab and maintain the characteristic values and description as per the requirement.

    Now the characteristic CYCLEMODEL was created with character format.

    Transaction Code: CT04.

  • 7/30/2019 SASP SD BOM

    6/13

    Go to the values tab and maintain the characteristic values and description as per the requirement.

    Now the characteristic CYCLEPRICE was created with character format. This characteristic is allowed

    for multiple values.

    Transaction Code: CT04.

  • 7/30/2019 SASP SD BOM

    7/13

    Go to the additional data tab and maintain the table name as SDCOM (which links Sales andDistribution with Variant configuration) and field name as VKOND.

    Now we have to maintain the dependencies for the class CYCLECLASS. The dependencyCYCLEPRICE is created for the class. Go to dependency editor as shown below.

    Transaction Code: CU01.

  • 7/30/2019 SASP SD BOM

    8/13

  • 7/30/2019 SASP SD BOM

    9/13

    The necessary settings need to be maintained for the configurable material CYCLE to explore in asales order.

    We have to create the variant conditions for the characteristics maintained in the classCYCLECLASS. Then go to configuration or press F8 as shown below.

    Transaction code: CU50.

  • 7/30/2019 SASP SD BOM

    10/13

    Select one of the characteristics and go for its value and press the icon assign variant condition. Likewise we can maintain the variants for all the char. Values of the characteristics.

    This is the variant as specified as medium range which should have the condition records maintainedfor VA00 and VA01.

  • 7/30/2019 SASP SD BOM

    11/13

    Finally maintain the condition records for the condition VA00 by using the transaction code: VK11.

    The below specified conditions are active for the material CYCLE.

    Now let us create a sales order. As the material is a BOM material it should explore with the sub-itemsand also should give us the screen to select the required material.

  • 7/30/2019 SASP SD BOM

    12/13

    Press enter for the various characteristics of the material.

    As the material CYCLE is a configurable material, we can choose various options for the material asshown below.

    The material CYCLE is exploded with the sub-items and the net value is directly calculated based onthe variants maintained for condition type VA00.

  • 7/30/2019 SASP SD BOM

    13/13

    The BOM components for material CYCLE are:

    Transaction Code: CS02.

    RIM, PEDDLE, TYRES are the sub-items for material CYCLE.

    This is the complete overview of the variant configuration for a BOM material.