Sky Stage Ultra Boiler Platform(UM 36 100)

download Sky Stage Ultra Boiler Platform(UM 36 100)

of 14

Transcript of Sky Stage Ultra Boiler Platform(UM 36 100)

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    1/14

    1

    Sky Climber LLC1800 Pittsburgh DriveDelaware, OH 43015

    Tel +740 203 3900Fax +740 203 [email protected]

    N.V. Sky Climber Europe S.A.K.M.O. Zone ItterbeekNijverheids Straat 23,

    Duffel B 2570 BelgiumTel +32 (0)3 887 81 20Fax +32 (0)3 887 09 94

    [email protected]

    UM-36-BOILER.00AOctober,

    2007

    www.skyclimber.com

    Sky Stage Ultra Boiler PlatformUser Manual

    SKY STAGE ULTRABOILER PLATFORM

    USER MANUAL

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    2/14

    2

    FOREWORD

    Welcome to Sky Climber.

    Congratulations on your new Sky Climber product. All Sky Climber products aredesigned and certified to the highest worldwide industry standards. Our continuousquality control ensures this product is manufactured to the relevant codes.Nonetheless, all of this work and effort can be and is nullified by improper use.

    It is vitally important that you and each and every person who is to utilize the SkyClimber product, take the time to learn the proper and safe methods relating toutilization of the Sky Climber product. Safety begins with a familiarization with thefunctions and limitations of the Sky Climber equipment. It is your responsibility toREAD AND UNDERSTAND the contents of this manual. If you have any questionswhatsoever, contact your dealer or Sky Climber customer service. It is our desire andintention to provide answers to your question regarding the proper use of Sky

    Climber products. Sky Climber cannot and will not under any circumstances beresponsible in any way for injuries or damage sustained as a result of misuse ormisapplication of the product. Please consult your sales materials to determine otherapplicable limitations of liability.

    Sky Climber user manual will guide you through installation and operationprocedures.

    Sky Climber reserves the right to continually improve its products. Every effort hasbeen made to make this manual as accurate as possible at the time of publication;however, there may be product changes which are not detailed in the manual. Please

    contact your dealer or Sky Climber customer service on a regular basis to obtainfollow up information and materials.

    We remind you to always wear personal fall protection equipment and to make surethat all persons utilizing the product are fully familiar with its features, including safetyfeatures and limitations, such as weight limitations.

    Sky Climber, 2006All rights reserved. No part of this publication may be reproduced, stored in a retrievalsystem, or transmitted, in any form or by any means, electronic, mechanical,photocopying, recording, or otherwise, without the prior written permission of thepublisher.

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    3/14

    3

    CONTENTS SKY STAGE ULTRA BOILER PLATFORM

    FOREWORD 2

    CONTENTS 3

    SAFETY GUIDELINES............................................................................................................ 4

    OPERATOR SAFETY.. 4

    OPERATION SAFETY 5

    SAFETY GUIDELINES -SPECIAL CONDITIONS INSTRUCTIONS:

    WINDSPEEDS................................................................................................................ 7

    HIGH VOLTAGE............................................................................................................. 7

    WELDING........................................................................................................................ 8

    MARINE ENVIRONMENTS............................................................................................. 8

    ASSEMBLY INSTRUCTIONS......................................................................................... 8

    STANDARD PLATFORM COMPONENTS AND PART NUMBERS.............................. 8

    STANDARD CONFIGURATIONS & ASSEMBLY LOAD RATINGS.............................. 10 & 11

    INSPECTION CHECK LIST .. 13

    INSTRUCTIONS............................................................................................................ 14

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    4/14

    4

    Safety Guidelines

    Operator Safety

    All persons who service, install, dismantle or use suspended access equipment must fullycomprehend and act in accordance with this manual and all appropriate regulations. Acompetent person is a designated person, suitably trained, qualified by knowledge andpractical experience to carry out the required task safely.Training, manuals and other documentation are available at Sky Climber. Do not hesitateto contact us for more details.

    Operators must be emotionally and physically able to withstand the stress of working atelevations. Do not work at elevations if subject to seizures or loss of physical control.Operators must be safety conscious, responsible and not under the influence of alcohol,drugs or other substances.

    All persons using suspended access systems must at all times wear safety harnessesattached by lanyards and rope grabs to independent lifelines. Use short lanyards andattach the rope grabs as high on the lifeline as practically possible. Lifelines shall befastened to a fixed anchorage other than the rigging systems. Do not disconnect or removeharnesses or lanyards until safely on the ground or until completely disembarked fromsuspension system to a safe location.

    Safety helmets should be worn at all times when servicing, disassembling or using theequipment.

    Provide protection for operators from collision with overhead obstacles and falling objects.

    Provide adequate protection below the suspended system to prevent injury to personsfrom falling objects. Keep all persons from beneath suspended platforms.

    Maintain contact with your supervisor at all times.

    Make a copy of this manual available to every person using, erecting and assembling thisequipment.

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    5/14

    5

    Safety Guidelines (continued)

    Operation Safety

    All suspended access equipment must be handled with care: during handling of equipment,installation and use (place loads gently on platform).

    Inspect and test the equipment before use, rigging, re-rigging, after de-rigging and atregular intervals to make sure that it is maintained in a safe workable condition. Thesupervisor should assign a competent person for inspection purposes. In case of equipmentfailures or difficulties noticed during testing and inspection prior to use, contact your nearestSky Climber representative and do not use the equipment until it is repaired or replaced.Only use Sky Climber spare parts. Do not alter any equipment. Maintenance may only be

    carried out by Sky Climber representatives.

    Verify if all decals and nameplates are properly affixed and legible. If they are obscured ormissing, replacements are available from Sky Climber.

    Always verify if a platform is properly counterweighted: check the rigging systems prior toeach shift.

    Never load the platform above the indicated safe working load.

    In case of an emergency during operation press the red emergency stop button on the hoistor control unit. The platform will halt immediately (power is cut off, brakes are activated).Solve the problem first, prior to further use.

    Do not use hoists in conjunction with cableless control systems.

    Never use suspended access systems for transportation of passengers from one level toanother.

    Keep the vertical travel zone of the platform free of obstructions. When running into anobstruction immediately stop the platform. Inspect the platform and the obstruction for

    possible damage and/or hang-up. Proceed in a safe direction. Take care not to overload thesystem or get in slack rope situations when running into an obstacle.

    Beware of obstacles when there is too small of a clearance between platform and faade.Use long-handled tools when working at large distances between platform and faade.

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    6/14

    6

    Safety Guidelines

    Operation Safety (continued)

    Do not handle suspended loads in conjunction with suspended platforms.

    When leaving a suspended platform (in mid-air) first secure the platform to the face ofthe structure in order to keep it from moving away. Do not forget to disconnect theplatform from the structure before lifting or raising, otherwise serious injuries and/ordamage can occur.

    Hazardous situations occur when it is not possible to lower platform to a safe position,over water and public roads.

    Never alter equipment once the platform is suspended. Keep all equipment out ofreach of unauthorized persons.

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    7/14

    7

    InspectionApplicationTempConditionCategoryGroup

    Prior to each work shift.

    Every hour.

    All0C/32FFreezing-3

    Prior to each work shift.

    Service Every 3 months

    Service Every 3 months

    Abrasive materials; sand grit,dust, welding.

    Caustic materials; corrosivechemicals

    Adhesive materials; cement,plaster, paint, caulking,compound

    >0C/32F

    >0C/32F

    >0C/32F

    Contaminated

    Contaminated

    Contaminated

    A

    B

    C

    2

    Prior to each work shift.Inspections, light

    maintenance, windowwashing.

    >0C/32FNormal-1

    Do not use suspended access equipment in severe conditions: extreme environmentalconditions, corrosive environment, strong magnetic fields, explosive atmospheres.

    Do not use suspended access equipment when handling loads could lead to dangeroussituations: molten metal, acids/bases, radioactive materials, brittle loads.

    Wind Speeds

    Use adequate restraints when lifting height exceeds 40m (131) with wind speeds above50km/h = 14m/s (31mph).

    Do not use suspended access equipment when hazards could arise from wind pressureacting onloads having a surface area in excess of 2m (21.5 SQFT).

    With the occurrence of high winds the platform should either be lowered to the ground orraised to the roof top and secured.

    Do not use suspended access equipment when wind speed exceeds 50km/hour

    High Voltage Power-lines

    Refer to regulations, federal, state and local codes when working in the vicinity ofelectrical overhead power-lines. Consult the local power company for safe operatingprocedures.

    The minimum separation between live power lines and platform is 3m (10).

    Touching live power-lines may result in death or serious injury.

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    8/14

    8

    Welding

    During welding, the electrocution hazard and the risk of the welding current passing throughthe steel wire ropes shall be eliminated by taking the following precautions:

    Use insulated thimbles at each suspension point. Insulate surplus steel wire rope storedon roof to prevent grounding or, terminate steel wire rope at insulated thimble.

    Cover steel wire rope above hoist and Sky Lock for a distance of 1.2m (4) withinsulating material: rubber hose taped in place. Insulate tail line below hoist: extenddownward sufficiently to prevent contact with platform. The portion of tail line hanging freebelow platform must be guided and/or retained so that it does not become grounded.

    Cover each hoist, Sky Lock and wire winder with protective covers made out of insulatingmaterial.

    Connect a ground conductor from platform to work piece. The size of this conductor shallbe equal to or greater than the size of the stinger lead. It must be a secondary conductorand shall not be in series with the primary conductor between welder and work piece.

    Marine Environment Salty environments may deteriorate aluminum & steel components. Frequently inspectequipment.

    Excess material accumulation Make sure that excess material does not clutter up the

    hoist, Sky Lock or platform.

    Assembly Instructions

    Sky Stage Ultra Boiler Platform

    Sky Stage Ultra Boiler Platform is a modular work platform. All components arewelded out of high quality aluminum. The platform length can vary between 1 and 9meters configurations. A section consists of 2 side panels, a floor panel and 2 top

    rails. A rigid structure is formed by attaching sections to connecting frames withconnecting pins. Top rails are telescopic on both sides of the stage. Wall rollers andcasters are optional.

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    9/14

    9

    Assembly Instructions (continued)

    Step 1. .Assemble platform by placing 2-side panels vertically facing each other; secure ina connecting frame/post with locking pin to each side panel. Repeat this step for one to

    three sections, placing connecting frames, pins and posts in between each section.

    Step 2. Place the standard end stirrup at opposite ends of the platform. Use theconnecting frame to attached the stirrup to the platform with pins.

    Step 3. Place the folding floor between the two side panels.

    Step 4. Place the wall roller on the side panel, one each toward opposite ends.

    Step 5. Place the top rails in the posts with pins.

    Step 6. Reverse the assembly instructions for disassemble of the platform.

    See specific Hoist Operators Manual for instructions on mounting hoist and sky lock tothe platform stirrups.

    Repositioning platform1. Remove all load from the platform.2. De-reeve hoists.3. Reposition platform underneath new position of rigging

    361019 3m side panel boiler 361010 3m top rail boiler361023 2m side panel boiler 361022 2m top rail boiler361027 1m side panel boiler 361026 1m top rail boiler

    361021 3m folding floor boiler361025 2m folding floor boiler 360111 wall roller assembly361026 1m folding floor boiler 360019 safety pin assembly

    361911 end stirrup assembly boiler 361014 telescoping post boiler

    361051 end gate boiler 361030 low profile walk bystirrup

    361054 low profile 2nd leg361015 connecting frame boiler (required for work cage)

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    10/14

    10

    361019 3m side panel boiler 361010 3m top rail boiler361023 2m side panel boiler 361022 2m top rail boiler361027 1m side panel boiler 361026 1m top rail boiler

    361021 3m folding floor boiler 361014 telescoping post361025 2m folding floor boiler (not pictured)361026 1m folding floor boiler 361015 connecting frame

    361911 end stirrup assembly boiler 361051 end gate boiler361030 low profile moveable stirrup361054 low profile moveable stirrup - 2nd leg (required on all SSU work cages)

    Floor

    Connecting Frame

    Side Panel

    End Stirrup

    Top RailEnd Gate

    Low Profile Moveable StirrupStandardConfigurations

    & AssemblyLoad Ratings

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    11/14

    11

    2

    2

    2

    2

    2

    2

    2

    2

    2

    450 kg

    1000 lbs

    0*64644844229m

    293

    450 kg

    1000 lbs

    0*2 61 226

    44844228m

    263

    450 kg1000 lbs.

    0*4 22 142

    44844227m233

    560 kg

    1250 lbs.

    0*424

    30634226m

    196

    560 kg

    1250 lbs.

    0*2 211

    22

    30634225m

    166

    560 kg

    1250 lbs.

    0*42430634224m

    136

    560 kg

    1250 lbs.

    0*2122424223m

    99

    560 kg

    1250 lbs.

    0*21216424222m

    69

    560 kg

    1250 lbs.

    0*21216424221m

    39

    PlatformL

    ength

    EndStirrup

    Rod(partofendstirrup)

    LockingClip(partofend

    stirrup)

    ConnectingFrame

    SidePanel

    ConnectingPinAssem

    bly

    TelescopicPost

    1m 2m 3m

    FloorPanel

    1m 2m 3m 1m 2m 3m

    TopRail

    CasterAssembly

    WallRollerAssembly

    LoadRating

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    12/14

    12

    Safe Working Load

    1. Determine working load limit (WLL) of hoist.

    2. Add WLLs of hoists used.

    3. Compare total WLL of hoists less the self weight of platform with load rating (LR) ofplatform.

    4. Use lowest value as the Safe Working Load (SWL).

    Do not concentrate all loads but equally distribute over total length of platform.

    If loads are concentrated on one half of a platform then the SWL equals the WLL of 1

    hoist less half the self-weight of the platform (never exceed floor rating).

    The load on the floor panels must not exceed the floor rating: maximum 180kg permeter platform or 120lbs per foot platform.

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    13/14

    13

    Check ListsInspect prior to installation

    Operating instructions are kept with stage at all times

    Reject & replace parts when the following failures are noticed:

    Cracked or torn welds.

    Cracked or torn material.

    Deformations that could endanger the structural strength.

    Deformations that would not allow normal installation.

    Deformed or cracked connecting holes.

    Damaged, missing or illegible decals indicating load ratings, configurations etc.

    Check components prior to shipment

    Use table Standard configurations & Assembly Parts in this user manual to verify the correctamount of parts prior to shipment. Ensure all decals and/or nameplates are in place and legible.

    Inspection after installation

    Inspect the platform assembly after installation and prior to each work shift:

    Verify load rating per this manual or decals and verify this load will not be exceeded

    Verify if all connections have a Connecting Pin assembly:Side Panel: 4 Connecting Pin assys

    Top Rail: 2 Connecting Pin assysTelescopic Post: 1 Connecting Pin assys

    Verify if each Connecting Pin is secured with a Locking Clip.

    Side Panel: 4 Connecting Pin assysTop Rail: 2 Connecting Pin assys

    Telescopic Post: 1 Connecting Pin assys

    Verify if each End Stirrup has 2 secured Locking Clips or connecting Rod.

    Verify if Wall Roller assemblies are tightened.

    Verify if all warning decals and rating labels are in place and legible

    Verify if provisions are made to protect workers from falling objects above and below equipment.

    Verify if stirrups are in line with the roof supports.

  • 8/3/2019 Sky Stage Ultra Boiler Platform(UM 36 100)

    14/14

    14

    Logbook

    Instruction to the owner

    Owner must keep a logbook which contains the following:

    Name of the competent person in charge.

    Date and name of operator (s).

    Serial number of hoist (s) and secondary device (s).

    Number of hours equipment in service.

    Specification of wire rope.

    Number of hours wire rope in use.

    Record of any incident and action taken.

    Dates of periodic inspection and record of outcome.

    Maintenance and repair records shall be kept in logbook.