DO THE RIGHT THING.Central de Relacionamento: 0800 031 2303Ouvidoria: 0800 721 0717
Acesse:
www.samarco.com/historias
An Overview of the Actions Performed by Samarco in the Last 120 Days
NOV 15 Ì Accident at Fundão dam
Ì Emergency actions
Ì Psycosocial assistance to affected people
Ì Accommodation of the displaced families
Ì Samarco’s employees take paid leave
Ì Immediate implementation of an emergency plan
Ì Beginning of the piezometers daily monitoring as well as monitoring at the structures
Ì Beginning of animal rescue
5
6
Installation of radars in Santarém, Selinha and Sela
7
Ì Collection of water samples along Rio Doce
Ì Implementation of a radar control room
Ì Beginning of the cleaning process on the roads
8
Ì Employees start paid leave
Ì Installation of a radar in Germano9
First meeting with representatives of Samarco and the community10
Beginning of intervantion at the dams structures11
Beginning of water supply to affected communities12
Displaced people are accommodated in houses rented by Samarco14
Ì Completion of the pipelines project for the water treatment plant in Rio Guandu
Ì Beginning of cleaning operations in Candonga
15
Ì Signing of the Preliminary Term for Environmental Liability
Ì Submission of Environmental Plans to SEMAD and IBAMA
Ì More than 600 students return to school
16
Delivery of school kits17
Implementation of a weekly dialogue and negotiation table between Samarco and the Housing Company of Minas Gerais (Cohab MG)
18
Ì Opening of assistance stations in Espírito Santo
Ì Dialogue meeting with the community
Ì Implementation of the integrated monitoring center
19
Delivery of the alternative water collection system and pipelines in Governador Valadares
21
Meeting with the National Mayors Front (FNP)23
Gradual re-establishment of water supply in Colatina24
Lecture about Professional Training in Mariana and Barra Longa27
Installation of electrical piezometers in Selinha28
End of paid leave for employees29
Ì Visit from ALMG dams committee to Samarco’s dams
Ì Financial support cards start being delivered
Ì Beginning of company-wide vacation at Samarco
30
Technical report from SES Geosol lab certifying that the water is appropriate for human consumption after treated
26
![Page 2: Balanço 120 dias - Veja as ações da Samarco - versão em inglês](https://reader037.fdocumentos.com/reader037/viewer/2022100421/579076301a28ab6874b81527/html5/thumbnails/2.jpg)
DO THE RIGHT THING.An Overview of the Actions Performed by Samarco in the Last 120 Days
Central de Relacionamento: 0800 031 2303Ouvidoria: 0800 721 0717
Acesse:
www.samarco.com/historias
DEC 15Houses started being delivered in Mariana1
Beginning of sonar mapping of Rio Doce water3
Samarco signs TAC with the Ministry of Labor in Minas Gerais and Espírito Santo
4
Delivery of bridge between Águas Claras and Monsenhor Horta (Mariana)
5
Ì Delivery of the financial business card to fishermen and river side communities
Ì Samarco gets officially liable for the center of rescued animals
Ì Re-vegetation of the areas along the margins of rivers Gualaxo and Doce
10
99,7% of the families spend Christmas in houses rented by Samarco
30
Opening of an assistance station in Galileia
31
Ì Opening of an assistance station in Barra Longa
Ì CPRM (Brazil Geological Service) and ANA certify the water quality in Rio Doce
15
Graduation of about 60 students in Bento Rodrigues16
Ì Graduation of students in Paracatu de Baixo
Ì Signing of a Preliminary Term of Liability (TCP) to formalize the actions regarding animal care
18
Ì Delivery of bridge between Campinas and Barreto (Mariana)
Ì Delivery of 6 artesian wells in Colatina
20
Beginning of dredging operations in the reservoir of Risoleta Neves hydropower plant in Candonga
22
99,7% of the families spend Christmas in houses rented by Samarco25
Delivery of the bridge which connects Pedras and Borba to Águas Claras and Campinas (Mariana)
11
JAN 16End of the company-wide vacation at Samarco4
Delivery of bridge over the River Onça in Barra Longa6
Sonar mapping confirms the existence of fish in Rio Doce9
Employees return to the operations unit11
Samarco registers the Recovery Plan within IBAMA
18
Ì Delivery of the bridge over the river Gama in Mariana
Ì 220 residents impacted were re-employed
22
Samarco’s staff start layoff25
Results of analysis prove that the plume did not reach Abrolhos
27
Samarcos employees in Minas Gerais and Espírito Santo, approve during meeting, an agreement for the temporary interruption of their work contract (layoff)
15
![Page 3: Balanço 120 dias - Veja as ações da Samarco - versão em inglês](https://reader037.fdocumentos.com/reader037/viewer/2022100421/579076301a28ab6874b81527/html5/thumbnails/3.jpg)
DO THE RIGHT THING.An Overview of the Actions Performed by Samarco in the Last 120 Days
Central de Relacionamento: 0800 031 2303Ouvidoria: 0800 721 0717
Acesse:
www.samarco.com/historias
FEB 16 Ì Back to School after holidays in Mariana
and Barra Longa Ì Delivery of the bridge in Curvina
15
Ì Samarco, SESI and City Hall offer free training courses in em Mariana
16
Ì Conclusion of the project to reinforce the dam of Santarém
Ì Conclusion of the tailings retaining dike S3
Ì 3,500 financial support cards delivered to the communities and riparians
19
21
29
Construction of a containment barrier below Santarém dam
28
MAR 16 Ì Signing of the agreement between
Samarco, Vale and BHP Billiton and the Federal governments of de MG and ES
Ì All families who lost their homes have already been accommodated in houses or in other lodging chosen by them
Ì Over 4 million m² of area re-vegetated along the margins of rivers Gualaxo, Carmo and Doce
Ì Over 4 thousand subsidiary cards have been provided to the affected people, including the Riverside communities
2
13
15