SERVIO: UNIDADE
M
110,66%
PRODUO DA EQUIPE (C ) 1
8.5.2.5 AUX.1 KG 9,1000000 4,17 37,95
8.5.2.5 AUX.2 KG 4,2688193 7,24 30,91
8.5.2.5 AUX.3 M2 0,4408000 10,04 4,43
8.5.2.5 AUX.4 KG 1,9127000 4,74 9,07
8.5.2.5 AUX.5 KG 0,7469500 17,61 13,15
95,51
- Consumo cd. 8.5.1.5 aux.1 conforme tabela "Fesao", cantoneiras abas iguais 3" x 3" x 5/16"; (ver CPU 8.5.1.5)
- Consumo cd. 8.5.1.5 aux.2 = (74,695/100)*(2,54*(2,25)), conforme SINAPI;
- Consumo cd. 8.5.1.5 aux.3 = (0,0762+0,0762+0,058+0,01)*2. 95,51
- Consumo cd. 8.5.1.5 aux.4 = (0,617*0,155*2)*(1,00/0,10) BDI 24,35% 23,26
- Consumo cd. 8.5.1.5 aux.5 = (74,695/100)*1,00, conforme SINAPI; 118,77PREO UNITRIO TOTAL
(E) CUSTO DE MATERIAIS - TOTAL
CUSTO UNITRIO - TOTAL (D) + (E)
PERFIL METLICO "L" 3" x 3" x 5/16" 2 ALMA, AO ASTM A-36, MATERIAL, BENEFICIAMENTO, SOLDA DE CHUMBADORES 10mm AO DCE
MATERIAL, CORTE, DESEMPENO E SOLDAGEM CHAPA 58mm (2 1/4") X 10mm (3/8"), AO SAC-41
PROTEO ANTI-CORROSIVA
CHUMBADORES 10mm MATERIAL, BENEFICIAMENTO, SOLDA
CHAPA METLICA 3/8" x 3/8" MATERIAL, BENEFICIAMENTO, SOLDA
CDIGO MATERIAIS/SERVIOS UND CONSUMOCUSTO UNITRIO
(R$)CUSTO TOTAL (R$)
(B) CUSTO HORRIO DE MO-DE-OBRA
ENCARGOS SOCIAIS
(B) CUSTO HORRIO DE MO-DE-OBRA - TOTAL
CUSTO HORRIO TOTAL
(D) CUSTO UNITRIO DE EXECUO (A) + (B) / C
CUSTO HORRIO (R$)
(A) CUSTO HORRIO DE EQUIPAMENTOS - TOTAL
CDIGO MO-DE-OBRA SUPLEMENTAR UND COEFICIENTE SALRIO BASE (R$)
CUSTO OPER (R$)
CUSTO IMPROD (R$) CUSTO HORRIO (R$)
COMPOSIO DE PREO UNITRIO
CDIGO FORNECIMENTO E COLOCAO DE NOVO PERFIL METLICO "L" 3"X3"X5/16" ASTM A-36 COM TRATAMENTO ANTI CORROSIVO, MATERIAL, CORTE, DESEMPENO E SOLDAGEM CHAPA 58mmX10mm, AO SAC-418.5.2.5
CDIGO EQUIPAMENTOS UND QUANTUTILIZAO OPERATIVA
UTILIZAO IMPRODUTIVA
Local: RIO DE JANEIRO/RJ Objeto: EXECUO DE OBRAS DE ENGENHARIA PARA ALARGAMENTO DO SISTEMA DE PISTA 10/28 E RECUPERAO DA PAVIMENTAO DO SISTEMA DE PTIOS E PISTAS DO AEROPORTO INTERNACIONAL DO RIO DE JANEIRO / GALEO - ANTNIO CARLOS JOBIM
Data base: Dezembro / 2010
-
SERVIO: UNIDADE
KG
13333 UN 0,0000015 1,0000000 49.782,09 0,07
14254 UN 0,0000015 1,0000000 39.000,00 0,06
0,13
242 H 0,0045000 3,80 0,02
6110 H 0,0400000 4,85 0,19
6115 H 0,0400000 3,60 0,14
6160 H 0,0135000 4,85 0,07
0,42
110,66% 0,46
0,88
1,01
PRODUO DA EQUIPE (C ) 1 1,01
4221 L 0,0300000 1,99 0,06
4227 L 0,0002400 11,00
4229 KG 0,0000900 13,17
INS.002 KG 1,0500000 2,89 3,03
10997 KG 0,0048000 13,90 0,07
3,16
Referncia: SINAPI REFERENCIAL 73970/2 (adaptada), com os insumos e as composies C6388 e C6390 da composio C 6391 abertos nesta composio; (ver CPU 8.1.15 aux.1)
- O insumo INS.002 substitui o cd. 4766, e o preo referente do cd. 10953; (ver CPU 8.5.1.5 aux.1) 4,17
- O insumo 10997 substitui o 10999 (conforme projeto GIG-PPT-253-043/RO); (ver CPU 8.1.15 aux.1) BDI 24,35% 1,02
- Acrescido o insumo 14254, com o mesmo consumo do cd.13333. (ver CPU 8.1.15 aux.1) 5,19PREO UNITRIO TOTAL
(E) CUSTO DE MATERIAIS - TOTAL
CUSTO UNITRIO - TOTAL (D) + (E)
OLEO DIESEL COMBUSTIVEL COMUM
LEO LUBRIFICANTE PARA MOTORES DE EQUIPAMENTOS PESADOS (CAMINHES, TRATORES, RETROS E ETC...)
GRAXA
PERFIL ESTRUTURAL "L" 3" x 3" x 5/16"
ELETRODO AWS E-7018 (OK 48.04; WI 718) D=4MM (SOLDA ELETRICA)
CDIGO MATERIAIS/SERVIOS UND CONSUMOCUSTO UNITRIO
(R$)CUSTO TOTAL (R$)
(B) CUSTO HORRIO DE MO-DE-OBRA
ENCARGOS SOCIAIS
(B) CUSTO HORRIO DE MO-DE-OBRA - TOTAL
CUSTO HORRIO TOTAL
(D) CUSTO UNITRIO DE EXECUO (A) + (B) / C
CUSTO HORRIO (R$)
AJUDANTE ESPECIALIZADO
SERRALHEIRO
AJUDANTE
SOLDADOR
(A) CUSTO HORRIO DE EQUIPAMENTOS - TOTAL
CDIGO MO-DE-OBRA SUPLEMENTAR UND COEFICIENTE SALRIO BASE (R$)
CUSTO OPER (R$)
CUSTO IMPROD (R$) CUSTO HORRIO (R$)
GRUPO DE SOLDAGEM C/ GERADOR A DIESEL 33HP P/ SOLDA ELETRICA, SOBRE 04 RODAS, BAMBOZZI, MOD.TN8, C/MOTOR 4 CILINDROS 600A, GRUPO GERADOR, 76/84 KVA, MOTOR DIESEL DE 85 HP, ACIONAMENTOMANUAL, ESTACIONRIO
COMPOSIO DE PREO UNITRIO
CDIGO PERFIL METLICO "L" 3" x 3" x 5/16" 2 ALMA, AO ASTM A-36, MATERIAL, BENEFICIAMENTO, SOLDA DE CHUMBADORES 10mm AO DCE8.5.2.5 AUX.1
CDIGO EQUIPAMENTOS UND QUANTUTILIZAO OPERATIVA
UTILIZAO IMPRODUTIVA
Local: RIO DE JANEIRO/RJ Objeto: EXECUO DE OBRAS DE ENGENHARIA PARA ALARGAMENTO DO SISTEMA DE PISTA 10/28 E RECUPERAO DA PAVIMENTAO DO SISTEMA DE PTIOS E PISTAS DO AEROPORTO INTERNACIONAL DO RIO DE JANEIRO / GALEO - ANTNIO CARLOS JOBIM
Data base: Dezembro / 2010
-
SERVIO: UNIDADE
KG
13333 UN 0,0000015 1,0000000 49.782,09 0,07
14254 UN 0,0000015 1,0000000 39.000,00 0,06
0,13
242 H 0,0045000 3,80 0,02
6110 H 0,0400000 4,85 0,19
6115 H 0,0400000 3,60 0,14
6160 H 0,0543549 4,85 0,26
0,61
110,66% 0,68
1,29
1,42
PRODUO DA EQUIPE (C ) 1 1,42
4221 L 0,0300000 1,99 0,06
4227 L 0,0002400 11,00
4229 KG 0,0000900 13,17
1332 KG 1,0500000 2,20 2,31
10997 KG 0,0193262 13,90 0,27
8.1.15 aux.2.1 M 0,7027704 4,53 3,18
5,82
Referncia: SINAPI REFERENCIAL 73970/2 (adaptada), com os insumos e as composies C6388 e C6390 da composio C 6391 abertos nesta composio; (ver CPU 8.1.15 aux.1)
- O insumo 1332 substitui o 4766, e o insumo 10997 substitui o 10999 (conf. projeto GIG-PPT-253-043/RO); (ver insumo 1332 na CPU 8.1.15 aux.2 e o 10997 na CPU 8.1.15 aux.1)
- Consumo dos cd. 10997 e 6160 adaptados para o projeto; (ver CPU 8.1.15 aux.2) 7,24
- Acrescido o insumo 14254, com o mesmo consumo do cd.13333. (ver CPU 8.1.15 aux.1) BDI 24,35% 1,76
- Consumo do cdigo 8.1.15 aux.2.1 ={1/[(74,695/100)*(2,54*(2,25))]}*3 9,00PREO UNITRIO TOTAL
(E) CUSTO DE MATERIAIS - TOTAL
CUSTO UNITRIO - TOTAL (D) + (E)
OLEO DIESEL COMBUSTIVEL COMUM
LEO LUBRIFICANTE PARA MOTORES DE EQUIPAMENTOS PESADOS (CAMINHES, TRATORES, RETROS E ETC...)
GRAXA
CHAPA ACO GROSSA PRETA 3/8"(9,53MM) 74,695KG/M2
ELETRODO AWS E-7018 (OK 48.04; WI 718) D=4MM (SOLDA ELETRICA)
CORTE EM CHAPA DE AO DE 3/8"
CDIGO MATERIAIS/SERVIOS UND CONSUMOCUSTO UNITRIO
(R$)CUSTO TOTAL (R$)
(B) CUSTO HORRIO DE MO-DE-OBRA
ENCARGOS SOCIAIS
(B) CUSTO HORRIO DE MO-DE-OBRA - TOTAL
CUSTO HORRIO TOTAL
(D) CUSTO UNITRIO DE EXECUO (A) + (B) / C
CUSTO HORRIO (R$)
AJUDANTE ESPECIALIZADO
SERRALHEIRO
AJUDANTE
SOLDADOR
(A) CUSTO HORRIO DE EQUIPAMENTOS - TOTAL
CDIGO MO-DE-OBRA SUPLEMENTAR UND COEFICIENTE SALRIO BASE (R$)
CUSTO OPER (R$)
CUSTO IMPROD (R$) CUSTO HORRIO (R$)
GRUPO DE SOLDAGEM C/ GERADOR A DIESEL 33HP P/ SOLDA ELETRICA, SOBRE 04 RODAS, BAMBOZZI, MOD.TN8, C/MOTOR 4 CILINDROS 600A, GRUPO GERADOR, 76/84 KVA, MOTOR DIESEL DE 85 HP, ACIONAMENTOMANUAL, ESTACIONRIO
COMPOSIO DE PREO UNITRIO
CDIGO MATERIAL, CORTE, DESEMPENO E SOLDAGEM CHAPA 58mm (2 1/4") X 10mm (3/8"), AO SAC-418.5.2.5 AUX.2
CDIGO EQUIPAMENTOS UND QUANTUTILIZAO OPERATIVA
UTILIZAO IMPRODUTIVA
Local: RIO DE JANEIRO/RJ Objeto: EXECUO DE OBRAS DE ENGENHARIA PARA ALARGAMENTO DO SISTEMA DE PISTA 10/28 E RECUPERAO DA PAVIMENTAO DO SISTEMA DE PTIOS E PISTAS DO AEROPORTO INTERNACIONAL DO RIO DE JANEIRO / GALEO - ANTNIO CARLOS JOBIM
Data base: Dezembro / 2010
-
SERVIO: UNIDADE
M2
242 H 0,3000000 3,80 1,14
4783 H 0,4000000 4,85 1,94
3,08
110,66% 3,41
6,49
6,49
PRODUO DA EQUIPE (C ) 1 6,49
7307 L 0,2400000 14,78 3,55
3,55
Referncia: SINAPI REFERENCIAL 74064/1. (ver CPU 8.1.15 aux.4)
10,04
BDI 24,35% 2,44
12,48PREO UNITRIO TOTAL
(E) CUSTO DE MATERIAIS - TOTAL
CUSTO UNITRIO - TOTAL (D) + (E)
FUNDO ANTICORROSIVO TIPO ZARCAO OU EQUIV
CDIGO MATERIAIS/SERVIOS UND CONSUMOCUSTO UNITRIO
(R$)CUSTO TOTAL (R$)
(B) CUSTO HORRIO DE MO-DE-OBRA
ENCARGOS SOCIAIS
(B) CUSTO HORRIO DE MO-DE-OBRA - TOTAL
CUSTO HORRIO TOTAL
(D) CUSTO UNITRIO DE EXECUO (A) + (B) / C
CUSTO HORRIO (R$)
AJUDANTE ESPECIALIZADO
PINTOR
(A) CUSTO HORRIO DE EQUIPAMENTOS - TOTAL
CDIGO MO-DE-OBRA SUPLEMENTAR UND COEFICIENTE SALRIO BASE (R$)
CUSTO OPER (R$)
CUSTO IMPROD (R$) CUSTO HORRIO (R$)
COMPOSIO DE PREO UNITRIO
CDIGO
PROTEO ANTI-CORROSIVA8.5.2.5 AUX.3
CDIGO EQUIPAMENTOS UND QUANTUTILIZAO OPERATIVA
UTILIZAO IMPRODUTIVA
Local: RIO DE JANEIRO/RJ Objeto: EXECUO DE OBRAS DE ENGENHARIA PARA ALARGAMENTO DO SISTEMA DE PISTA 10/28 E RECUPERAO DA PAVIMENTAO DO SISTEMA DE PTIOS E PISTAS DO AEROPORTO INTERNACIONAL DO RIO DE JANEIRO / GALEO - ANTNIO CARLOS JOBIM
Data base: Dezembro / 2010
-
SERVIO: UNIDADE
KG
13333 UN 0,0000015 1,0000000 49.782,09 0,07
14254 UN 0,0000015 1,0000000 39.000,00 0,06
0,13
242 H 0,0045000 3,80 0,02
6110 H 0,0400000 4,85 0,19
6115 H 0,0400000 3,60 0,14
6160 H 0,0135000 4,85 0,07
0,42
110,66% 0,46
0,88
1,01
PRODUO DA EQUIPE (C ) 1 1,01
4221 L 0,0300000 1,99 0,06
4227 L 0,0002400 11,00
4229 KG 0,0000900 13,17
26 KG 1,0500000 3,43 3,60
10997 KG 0,0048000 13,90 0,07
3,73
Referncia: SINAPI REFERENCIAL 73970/2 (adaptada), com os insumos e as composies C6388 e C6390 da composio C 6391 abertos nesta composio; (ver CPU 8.1.15 aux.1)
- O insumo 26 substitui o 4766, e o insumo 10997 substitui o 10999 (conf. projeto GIG-PPT-253-043/RO); (ver insumo 26 na 4,74
CPU 8.1.15 aux.5 e insumo 10997na CPU 8.1.15 aux.1) BDI 24,35% 1,15
- Acrescido o insumo 14254, com o mesmo consumo do cd.13333. (ver CPU 8.1.15 aux.1) 5,89PREO UNITRIO TOTAL
(E) CUSTO DE MATERIAIS - TOTAL
CUSTO UNITRIO - TOTAL (D) + (E)
OLEO DIESEL COMBUSTIVEL COMUM
LEO LUBRIFICANTE PARA MOTORES DE EQUIPAMENTOS PESADOS (CAMINHES, TRATORES, RETROS E ETC...)
GRAXA
ACO CA-25 3/8" (9,52 MM)
ELETRODO AWS E-7018 (OK 48.04; WI 718) D=4MM (SOLDA ELETRICA)
CDIGO MATERIAIS/SERVIOS UND CONSUMOCUSTO UNITRIO
(R$)CUSTO TOTAL (R$)
(B) CUSTO HORRIO DE MO-DE-OBRA
ENCARGOS SOCIAIS
(B) CUSTO HORRIO DE MO-DE-OBRA - TOTAL
CUSTO HORRIO TOTAL
(D) CUSTO UNITRIO DE EXECUO (A) + (B) / C
CUSTO HORRIO (R$)
AJUDANTE ESPECIALIZADO
SERRALHEIRO
AJUDANTE
SOLDADOR
(A) CUSTO HORRIO DE EQUIPAMENTOS - TOTAL
CDIGO MO-DE-OBRA SUPLEMENTAR UND COEFICIENTE SALRIO BASE (R$)
CUSTO IMPROD (R$) CUSTO HORRIO (R$)
GRUPO DE SOLDAGEM C/ GERADOR A DIESEL 33HP P/ SOLDA ELETRICA, SOBRE 04 RODAS, BAMBOZZI, MOD.TN8, C/MOTOR 4 CILINDROS 600A, GRUPO GERADOR, 76/84 KVA, MOTOR DIESEL DE 85 HP, ACIONAMENTOMANUAL, ESTACIONRIO
COMPOSIO DE PREO UNITRIO
CDIGO
8.5.2.5 AUX.4
CDIGO EQUIPAMENTOS UND QUANTUTILIZAO OPERATIVA
UTILIZAO IMPRODUTIVA
CUSTO OPER (R$)
Local: RIO DE JANEIRO/RJ Objeto: EXECUO DE OBRAS DE ENGENHARIA PARA ALARGAMENTO DO SISTEMA DE PISTA 10/28 E RECUPERAO DA PAVIMENTAO DO SISTEMA DE PTIOS E PISTAS DO AEROPORTO INTERNACIONAL DO RIO DE JANEIRO / GALEO - ANTNIO CARLOS JOBIM
Data base: Dezembro / 2010
CHUMBADORES 10mm MATERIAL, BENEFICIAMENTO, SOLDA
-
SERVIO: UNIDADE
KG
13333 UN 0,0000015 1,0000000 49.782,09 0,07
14254 UN 0,0000015 1,0000000 39.000,00 0,06
0,13
242 H 0,0045000 3,80 0,02
6110 H 0,0400000 4,85 0,19
6115 H 0,0400000 3,60 0,14
6160 H 0,5493291 4,85 2,66
3,01
110,66% 3,33
6,34
6,47
PRODUO DA EQUIPE (C ) 1 6,47
4221 L 0,0300000 1,99 0,06
4227 L 0,0002400 11,00
4229 KG 0,0000900 13,17
1332 KG 1,0500000 2,20 2,31
10997 KG 0,1953170 13,90 2,71
8.1.15 aux.2.1 M 1,3387777 4,53 6,06
11,14
Referncia: SINAPI REFERENCIAL 73970/2 (adaptada), com os insumos e as composies C6388 e C6390 da composio C 6391 abertos nesta composio; (ver CPU 8.1.15 aux.1)
- O insumo 1332 substitui o 4766, e o insumo 10997 substitui o 10999 (conf. projeto GIG-PPT-253-043/RO); (ver insumo 1332 na CPU 8.1.15 aux.2 e o 10997 na CPU 8.1.15 aux.1)
- Consumo dos cd. 10997 e 6160 adaptados para o projeto; (ver CPU 8.1.15 aux.2) 17,61
- Acrescido o insumo 14254, com o mesmo consumo do cd.13333. (ver CPU 8.1.15 aux.1) BDI 24,35% 4,29
- Consumo do cdigo 8.1.15 aux.2.1 = {1/[(74,695/100)*1,00]}*1 21,90PREO UNITRIO TOTAL
(E) CUSTO DE MATERIAIS - TOTAL
CUSTO UNITRIO - TOTAL (D) + (E)
OLEO DIESEL COMBUSTIVEL COMUM
LEO LUBRIFICANTE PARA MOTORES DE EQUIPAMENTOS PESADOS (CAMINHES, TRATORES, RETROS E ETC...)
GRAXA
CHAPA ACO GROSSA PRETA 3/8"(9,53MM) 74,695KG/M2
ELETRODO AWS E-7018 (OK 48.04; WI 718) D=4MM (SOLDA ELETRICA)
CORTE EM CHAPA DE AO DE 3/8"
CDIGO MATERIAIS/SERVIOS UND CONSUMOCUSTO UNITRIO
(R$)CUSTO TOTAL (R$)
(B) CUSTO HORRIO DE MO-DE-OBRA
ENCARGOS SOCIAIS
(B) CUSTO HORRIO DE MO-DE-OBRA - TOTAL
CUSTO HORRIO TOTAL
(D) CUSTO UNITRIO DE EXECUO (A) + (B) / C
CUSTO HORRIO (R$)
AJUDANTE ESPECIALIZADO
SERRALHEIRO
AJUDANTE
SOLDADOR
(A) CUSTO HORRIO DE EQUIPAMENTOS - TOTAL
CDIGO MO-DE-OBRA SUPLEMENTAR UND COEFICIENTE SALRIO BASE (R$)
CUSTO IMPROD (R$) CUSTO HORRIO (R$)
GRUPO DE SOLDAGEM C/ GERADOR A DIESEL 33HP P/ SOLDA ELETRICA, SOBRE 04 RODAS, BAMBOZZI, MOD.TN8, C/MOTOR 4 CILINDROS 600A, GRUPO GERADOR, 76/84 KVA, MOTOR DIESEL DE 85 HP, ACIONAMENTOMANUAL, ESTACIONRIO
COMPOSIO DE PREO UNITRIO
CDIGO
8.5.2.5 AUX.5
CDIGO EQUIPAMENTOS UND QUANTUTILIZAO OPERATIVA
UTILIZAO IMPRODUTIVA
CUSTO OPER (R$)
Local: RIO DE JANEIRO/RJ Objeto: EXECUO DE OBRAS DE ENGENHARIA PARA ALARGAMENTO DO SISTEMA DE PISTA 10/28 E RECUPERAO DA PAVIMENTAO DO SISTEMA DE PTIOS E PISTAS DO AEROPORTO INTERNACIONAL DO RIO DE JANEIRO / GALEO - ANTNIO CARLOS JOBIM
Data base: Dezembro / 2010
CHAPA METLICA 3/8" x 3/8" MATERIAL, BENEFICIAMENTO, SOLDA