Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.
Transcript of Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.
![Page 1: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/1.jpg)
Fabrica integrada de R.S.U. / energia ,compostagem, biodiesel
2011
WTE-BRASIL WTE-BRASIL
![Page 2: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/2.jpg)
Integrated Waste Facility for Brazil 2
Agenda
• Background• Lixo Brasil• Definiçao do Projeto• Input Streams• Processo Compostagem• Processo de Geraçao de Energia• Experiencia ICC• Sumario
WTE-BRASIL
![Page 3: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/3.jpg)
Integrated Waste Facility for Brazil 3
Objetivo – Instalação de Fabrica que transforma RSU, em energia, compostagem, biodiesel.
• XXX Tons de lixo dia usando o seguinte tipo de lixo:
1. Lixo da construção civil ( tijolo, madeiras a parte organica)2. Lixo Verde ( poda de arvores etc) 3. Lixo Organico
• Fabrica produzirá YYYMW de Eletricidade
• Separação de lixo no local.
• Fabrica de Compostagem.
WTE-BRASIL
![Page 4: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/4.jpg)
Integrated Waste Facility for Brazil 4
Requirements • xxx m2 de area – Para :
a) local de armazenamento do RSU (JIT 3 days capacity)b) Fabrica de Compostagemc) Fabrica de Geraçaõ de Energia.d) Warehousing of By- Productse) Estradas internasf) Cinturao verdeg) Fabrica de tijolos do RSU resultante de Residuos de Construção e
Demoliçaõh) xxx litros/dia per de tratamento de esgotos /.
• xxx tons de RSU /dia (max 30% Inerte) .
• Contrato de 30 anos de fornecimento do RSU.
• Ajuda para todas aprovações governamentais.
WTE-BRASIL
![Page 5: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/5.jpg)
Integrated Waste Facility for Brazil 5
Aprovações necessarias• Contrato de concessao com a Prefeitura. • Cessao da area pela prefeitura.
• Autorizaçao dos orgaos competentes.
• Todas licensas ambientais
WTE-BRASIL
![Page 6: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/6.jpg)
Integrated Waste Facility for Brazil 6
Beneficios para a Prefeitura• Remoçao do RSU que vai para aterro sanitario / lixao.
• Nada vai para o aterro sanitario / lixao, todo RSU é tratado.
• 100% Tecnologia verde canadense. ICC controla 4 fabricas no Reino Unido & Canada.
• Pode processar 1,000,000 litros de esgoto / lama dia
• Projeto cria varias oportunidades de emprego.
• Nao Poluente, Tecnologia de escala ( apartir de municipios com 100.000 Habitantes)
WTE-BRASIL
![Page 7: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/7.jpg)
Integrated Waste Facility for Brazil 7
Waste Approach and Commitment
• A WTE juntamente com o Grupo ICC estão comprometidos em fornecer as melhores soluções disponíveis para o tratamento de resíduos.
• Transformamos resíduos em recursos
WTE-BRASIL
![Page 8: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/8.jpg)
Integrated Waste Facility for Brazil 8
Waste Approach and Commitment
Os resíduos são uma fonte de nutrientes e energia
WTE/ICC podem fornecer:
Compostagem;
Energia Elétrica e
Calor.Em breve biodiesel
e querosene de aviação
WTE-BRASIL
![Page 9: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/9.jpg)
Integrated Waste Facility for Brazil 9
Waste Approach and Commitment
ICC está trabalhando em:
Pesquisa & Desenvolvimento do projeto em transformar resíduos de diesel sintético e querosene de aviação
WTE-BRASIL
![Page 10: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/10.jpg)
Integrated Waste Facility for Brazil 10
Project Definition
• Cidades do Brasil necessitam de uma instalação de processamento de resíduos em condições de produzir agregados de construção, adubo e eletricidade a partir de resíduos.
• Para efeitos de gestão, propomos um contrato em três fases:• Fase 1 - Definição Facilidade• Fase 2 - Construção e da Comissão• Fase 3 - As operações em andamento e Expansão
WTE-BRASIL
![Page 11: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/11.jpg)
11
Project DefinitionFase 1 - Definição do Projeto
Nesta fase iremos:Definir os materiais que entram em termos de quantidade e qualidade;
Visita ao local para avaliação do projeto da planta;Construção / engenharia de relatórios de Arquitetura:
Hydro, GeológicaProjeto de Construção;Empreiteiros seguro;
Estudo de Massa para a Fabrica;
Integrated Waste Facility for Brazil WTE-BRASIL
![Page 12: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/12.jpg)
Integrated Waste Facility for Brazil 12
Project Definition
Fase 1 - Definição do Projeto
Desenvolver sub-contratos e obter fornecedores no Brasil tanto quanto possível;
Sub-contrato com a Companhia de Engenharia de Gestão local e
Estabelecer a base operacional para o ICC em São Paulo Brazil.
WTE-BRASIL
![Page 13: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/13.jpg)
Integrated Waste Facility for Brazil 13
Project Definition
Fase 2 - Construção
Com o Plano da Fase 1, entregar a construção de edifícios
equipamentos de Sub-contrato:
Construção
Inspeção
Aprovação
Entrega
Instalação
WTE-BRASIL
![Page 14: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/14.jpg)
Integrated Waste Facility for Brazil 14
Project Definition
Fase 2 - Construção
ICC Equipamentos
Construção
Inspeção
Aprovação
Entrega
Instalação
Testes e comissionamento
Trabalhar com Prefeitura para estabelecer a quantidade de entrada e de qualidade
WTE-BRASIL
![Page 15: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/15.jpg)
Integrated Waste Facility for Brazil 15
Processing Streams
WTE-BRASIL
![Page 16: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/16.jpg)
Integrated Waste Facility for Brazil 16
Compost Processing Stream
Entradas de três fontes
Madeira de C & D (construçao e demoliçao)
separadas por tela de dedo e passou por moinho de baixa
velocidade à mesa de mixagem.
WTE-BRASIL
![Page 17: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/17.jpg)
Integrated Waste Facility for Brazil 17
Compost Processing Stream
Entradas de três fontes
Orgânicos separados na fonte
Direto para mixer
WTE-BRASIL
![Page 18: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/18.jpg)
Integrated Waste Facility for Brazil 18
Compost Processing Stream
Entradas de três fontes
Organicos separada da linha de RSU
separados por trommel e adicionados ao mixer.
WTE-BRASIL
![Page 19: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/19.jpg)
Integrated Waste Facility for Brazil 19
Compost Processing Stream
ICC Proprietary Digesters
WTE-BRASIL
![Page 20: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/20.jpg)
Integrated Waste Facility for Brazil 20
Compost Processing Stream
Tunnel Compost Turners
WTE-BRASIL
![Page 21: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/21.jpg)
Integrated Waste Facility for Brazil 21
Compost Processing Stream
Trommel Screening
WTE-BRASIL
![Page 22: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/22.jpg)
Integrated Waste Facility for Brazil 22
Compost Processing Stream
Shaking Bed Screeners
WTE-BRASIL
![Page 23: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/23.jpg)
Integrated Waste Facility for Brazil 23
Compost Products
2 ou 3 tipos de produtos
Composto - fine
Composto - Clare
Fertilizante
WTE-BRASIL
![Page 24: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/24.jpg)
Integrated Waste Facility for Brazil 24
Power Process Stream
Entradas:
Resíduos de madeira de C & D separados
Grinder (baixa velocidade)
Combustíveis - borracha
moinho triturador /
Misto de RSU
Separados material orgânico maior que 3 / 8 ", que passou por trommel nos RSU fluxo de processo
WTE-BRASIL
![Page 25: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/25.jpg)
Integrated Waste Facility for Brazil 25
Power Process Stream
O material é misturado na batedeira e enviado para qualquer Biodryer ou direto para o gaseificador, dependendo do teor de umidade
WTE-BRASIL
![Page 26: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/26.jpg)
Integrated Waste Facility for Brazil 26
Power Process Stream
Biodryer
Usado se a umidade for superior a 40%
ICC Proprietary dryer
WTE-BRASIL
![Page 27: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/27.jpg)
Integrated Waste Facility for Brazil 27
Power Process Stream
Gaseificador
Cada um gaseificador será capaz de lidar com cerca de 180 toneladas por dia
WTE-BRASIL
![Page 28: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/28.jpg)
Integrated Waste Facility for Brazil 28
Power Process Stream
Boiler
WTE-BRASIL
![Page 29: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/29.jpg)
Integrated Waste Facility for Brazil 29
Power Process Stream
Turbina de vapor / Geradores
WTE-BRASIL
![Page 30: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/30.jpg)
Integrated Waste Facility for Brazil 30
Instalações existentes que estão em operação
• Nanaimo / Canada
• Levenseat / Reino Unido
• Pitt Meadows / Canada
• Water Ford / Irlanda
WTE-BRASIL
![Page 31: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/31.jpg)
Integrated Waste Facility for Brazil 31
Nanaimo Composting Facility (Canada)
• Fonte orgânica separada de resíduos de fertilizantes e adubo orgânico
• 23.400 toneladas por ano de capacidade
• Operacional desde 2004
• 100% de propriedade e operado pela ICC
WTE-BRASIL
![Page 32: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/32.jpg)
Integrated Waste Facility for Brazil 32
Levenseat Composting Facility (Scotland)
• Fonte orgânica separada de resíduos para compostagem.
• 14.400 toneladas por ano de capacidade
• Operacional desde 2009
• 25% propriedade ICC
• Operado por Organics Levenseat Ltd.
WTE-BRASIL
![Page 33: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/33.jpg)
Integrated Waste Facility for Brazil 33
Pitt Meadows Gasification Facility (Canada)
• resíduos de madeira para aquecer
• 20MMBTU/hr
• Operacional desde 2006
• Possuído e operado por Fable Farm Greenhouse.
WTE-BRASIL
![Page 34: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/34.jpg)
Integrated Waste Facility for Brazil 34
Waterford Gasification Facility (Ireland)
• resíduos de madeira para aquecer
• 20MMBTU/hr
• Operacional desde 2008
• Possuído e operado por D-Pellet Ltd.
WTE-BRASIL
![Page 35: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/35.jpg)
Integrated Waste Facility for Brazil 35
Sumario
Grupo ICC fornece sistemas de gestão de resíduos, desde 2002;
Grupo ICC tem patenteado a tecnologia líder mundial para o tratamento de resíduos orgânicos para compostagem e adubação com sites na América do Norte, América Central e Europa;
WTE-BRASIL
![Page 36: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/36.jpg)
Integrated Waste Facility for Brazil 36
Sumario
Com os nossos parceiros técnicos o Grupo ICC tem tecnologia de gaseificação patenteado para processar os resíduos orgânicos para produzir de forma eficiente energia , calor, compostagem e em breve biodiesel e querosene de aviação.
Grupo ICC tem condiçoes entregar projetos no tempo e no orçamento;
Temos mais de 100 anos de experiência em fabricação de equipamento pesado .
WTE-BRASIL
![Page 37: Fabrica integrada de R.S.U. / energia,compostagem, biodiesel 2011 WTE-BRASIL.](https://reader038.fdocumentos.com/reader038/viewer/2022102923/552fc122497959413d8cbe8b/html5/thumbnails/37.jpg)
Obrigado
ICC AUTHORIZED AND EXCLUSIVE REPRESENTATIVE IN BRASIL
WTE BRASIL
ARNALDO CERDEIRA CHEBL CAIO PEREIRA DE ALMEIDA Diretor Comercial Diretor ExecutivoSao Paulo– BRASIL55-11-30459933 55-11-9191291655-11-91776877 [email protected] [email protected] Rua Dr. Alceu de Campos Rodrigues 46, cjto 91
Integrated Waste Facility for Brazil 37WTE-BRASIL