PROCESSO DE VENDA DE PROJETO DE REMEDIAÇÃO OBRIGAÇÕES/LIMITAÇÕES Ana Paula Queiroz Waterloo Brasil Ltda. [email protected]

Transcript of PROCESSO DE VENDA DE PROJETO DE REMEDIAÇÃO … · PROCESSO DE VENDA DE PROJETO DE REMEDIAÇÃO...

PROCESSO DE VENDA DE PROJETO DE REMEDIAÇÃO OBRIGAÇÕES/LIMITAÇÕES

Ana Paula QueirozWaterloo Brasil Ltda.

[email protected]

•• ConsultoriaConsultoria??

•• EngenhariaEngenharia??

•• Obra Obra Civil?Civil?

•• Montagem elMontagem eléétricatrica? ? MecânicaMecânica??

•• Venda Venda de de EquipamentoEquipamento??

•• TercerizaTercerizaçção ão de de Mão Mão de de ObraObra??

•• Pesquisa CientPesquisa Cientííficafica??

•• Ciência ExataCiência Exata? ? BiolBiolóógicagica? Humana?? Humana?

O QUE O QUE ÉÉ UM PROJETO DE REMEDIAUM PROJETO DE REMEDIAÇÇÃOÃO

•• Metas Metas de de RemediaRemediaççãoão

•• Estudo Estudo de de Alternativas Alternativas de de RemediaRemediaççãoão

•• Projeto ConceitualProjeto Conceitual

•• Projeto ExecutivoProjeto Executivo

•• ImplantaImplantaççãoão

•• OperaOperaççãoão

•• MonitoramentoMonitoramento

COMPONENTES DE UM PROJETO DE COMPONENTES DE UM PROJETO DE REMEDIAREMEDIAÇÇÃOÃO

•• Definida Definida a a partir da Avaliapartir da Avaliaçção ão de de Risco Risco àà SaSaúúde de Humana.Humana.

•• Depende Depende do do uso pretendido da uso pretendido da áárearea..

•• SerSeráá decisiva na tdecisiva na téécnica cnica de de remediaremediaçção ão a ser a ser utilizadautilizada..

META DE REMEDIAMETA DE REMEDIAÇÇÃOÃO

VINYL CHLORIDE 100 YEARSCONTOUR INTERVAL= 0.002

GOLF COURSEFORMER

COC0.0133

TARGET LEVELSVC

BOUNDARY CONDITIONS)

RT3D RESULTS 100 YEARRUN (WITH BIO-FUTURE

NORTHEAST OHIO

FORMER GOLF COURSE

= TARGET LEVEL (SEE TABLE)

= POTABLE WELL

= STREAM SAMPLE

= GEOPROBE BORING

= MONITORING WELL= BUILDING

LEGEND

= BOREHOLE

100'0 200'

BAR SCALE IN FEET

AVENUE

ROAD

DRIVE

0.0360.0560.076

0.002

0.0060.010.0140.02

0.0280.04

Future Boundaries w/Decay

•• Tem o Tem o objetivo objetivo de de selecionar selecionar a a melhor tmelhor téécnica cnica de de remediaremediaçção ão com base com base nos elementosnos elementos::

•• EfetividadeEfetividade

•• ImplementabilidadeImplementabilidade

•• CustoCusto

•• PrazoPrazo

ESTUDO DE ALTERNATIVA DE ESTUDO DE ALTERNATIVA DE REMEDIAREMEDIAÇÇÃOÃO

Expected to receive regulatory approvalEstimated to be acceptable to general public since it

eliminates risks to river and receptors

Expected to receive regulatory approvalEstimated to be acceptable to general public since

it eliminates risks to river and receptorsRegulatory and

Community Acceptance

Estimated capital cost is $274,000, and present worth of 20 years O&M (10 years active sparging, 10 years monitoring only) is $842,100

Total implementation cost estimate is $1,116,100

Estimated capital cost is $282,4000, and present worth of 30 years O&M (20 years active pumping, 10 years monitoring only) is $2,054,800

Total implementation cost estimate is $2,337,200Cost

Readily implementedMinimal O&M

Readily implementedO&M intensiveImplementability

Eliminates pathway and, therefore, risk to the river and potential receptors (environmental and human)

Proven technology capable of 100% benzene removal insitu

Provides for treatment and removal of dissolved benzene through insitu volatilization

Continuous or cyclic operation possibleSystem easily expandableLikely to achieve applicable drinking water standards within

10 yearsContinued use of free phase benzene recovery system is

necessary for source control

Eliminates pathway and, therefore, risk to the river and potential receptors (environmental and human)

Proven technology capable of 100% benzene removal from recovered groundwater, but reduction of benzene in aquifer to applicable drinking water standard may be difficult

Likely to approach, but may not achieve applicable drinking water standards even after operation for 20 years

Continued use of free phase benzene recovery system is necessary for source control

Protection of Human Health and the Environment,

Effectiveness, and Reduction of

Contamination

Alternative 2Air/Biosparging

Alternative 1Groundwater Pump and Treat

Screening Criteria

PROJETO PILOTOPROJETO PILOTO

•• AvaliarAvaliar::

•• Geologia Geologia locallocal

•• Comportamento Comportamento dos dos contaminantescontaminantes

•• Emissões atmosfEmissões atmosfééricas geradasricas geradas

•• ResResííduos sduos sóólidos lidos e e llííquidosquidos

•• Compostos secundCompostos secundááriosrios

•• HidroquHidroquíímicamica

TESTE PILOTO – PLUMA DE BENZENO

TESTE PILOTO – PLUMA DE BENZENO

PROJETO CONCEITUAL E EXECUTIVOPROJETO CONCEITUAL E EXECUTIVO

•• Desenhos conforme normasDesenhos conforme normas

•• ARTART

•• Lista Lista de de MateriaisMateriais

•• ““Bid PackageBid Package””

•• HAZOPHAZOP

MW-4

MW-7

MW-3

EQUIPMENTAREA

AIR SPARGEPOINT

HIG

HW

AY

MONITORINGWELL

BERM

TANKTANK

MW-6

Preparation of executive design: Air/Preparation of executive design: Air/BiospargingBiospargingAlternative Alternative –– typical Air/typical Air/BiospargingBiosparging well and wellheadwell and wellhead

IMPLANTAIMPLANTAÇÇÃOÃO

•• EquipeEquipe

•• MateriaisMateriais

•• Procedimentos Procedimentos de de SeguranSeguranççaa

•• EPIsEPIs

•• CronogramaCronograma

•• Seguro Seguro de de ResponsabilidadeResponsabilidade

OPERAOPERAÇÇÃOÃO

•• Pelo EmpreendedorPelo Empreendedor

•• Pelo ConsultorPelo Consultor

•• RemotaRemota

MONITORAMENTOMONITORAMENTO

•• PeriodicidadePeriodicidade

•• No de No de pontospontos

•• MetodologiaMetodologia

•• RelatRelatóóriorio

Não se deve pular etapas na contrataNão se deve pular etapas na contrataçção, cada ão, cada etapa tem sua importância.etapa tem sua importância.

FORMAS DE CONTRATAFORMAS DE CONTRATAÇÇÃOÃO

•• Contrato Contrato de de RiscoRisco

•• Empreitada Empreitada GlobalGlobal

•• Em FasesEm Fases

•• Por MediPor Mediçção ão de de ServiServiççosos

•• ““BônusBônus””